SlideShare une entreprise Scribd logo
1  sur  4
PROJECT
ENGINEER/MANAGER
DAVID SMITH
101 Sillars Meadow, Irvine, KA12 0LD
07966864911
david.smi@hotmail.co.uk
PROFILE
Looking for freelance work from 28.3.16, I am set up Ltd company and have my
own van for transport.
I am currently working for McLaughlin and Harvey at Ayrshires New Kilmarnock
Campus as Project Engineer. My previous employer was Graham Construction
working on the Stirling University Residences framework. I have also worked on
the high profile Velodrome and National Sports Arena for the Commonwealth
Games 2014.
I have gained significant experience and qualifications during the last 12 years
on a varying range of projects. I came into construction as a draughtsman but
soon sought out site experience and have not looked back since.
At work I would say one of my greatest attributes is being able to handle
pressure and utilize my experience to make decisions in calm and collected
manner.
I am driven to ensure that any project I am on finishes on program and with
quality assurance of upmost importance.
EMPLOYMENT
Summary of capabilities
 Ensuring that Health and Safety is number one priority and all RAMS and
permits are relevant and in place.
 Managing sub-contractors work and making sure the quality assurance
files are kept meticulously.
 Programming works to ensure the completion date of the project is not
compromised.
 As a temporary works coordinator I am well versed in maintaining the
register and supervising temporary works on site. I am comfortable with
heavy duty propping of steelwork, back propping and complex design
scaffolds.
 Management of direct hire crane lifts as an appointed person.
 Experience in the construction of retaining walls, concrete
formwork/tables, steelwork foundations, in-situ and pre-cast stairs/walls,
drainage, setting out of slip forms/jump forms for concrete cores.
 Excellent understanding of construction drawings.
 Able to liaise with engineers/architects on design and builds to find the
best solution to any problems encountered within the design and optimize
constructability.
 Setting out, leveling and surveying of all civil engineering aspects of the
project to a high accuracy as taught on setting out courses and by keeping
myself up to date with technological advances.
 Producing topographical surveys and quantifying cut and fills.
 Able to operate various models of total stations including 1 man robotic
stations.
 Proficient in the use of auto cad for as built drawings etc.
 I am very comfortable with setting up and maintaining site control stations
by means of traversing and coordinate corrections.
 Particularly interested in geotechnical design and application, this was my
favorite subject at university.
Employment history
Aug 2014 - Present
Working for McLaughlin and Harvey at the new Ayrshire College Kilmarnock Campus
(£40 mil) as Project Engineer.
I am responsible for managing sub-contractors on site to ensure program dates are
achieved.
Chairing meetings with the design team and sub-contractors to discuss
constructability concerns and resolve outstanding issues.
Checking setting out and making sure QA forms are completed.
Coordinating all temporary works and crane lifts on site.
May 2012 – Aug 2014
Employed by Graham Construction working on the Stirling University residences
framework.
My role as Site Engineer has many duties which differ through the progress of the
job, mainly ensuring that work is carried out correctly and supervising sub-contractors
with safety being the upmost priority.
Jan 2012 – May 2012 (Freelance)
Working through Contract Scotland on a Robertsons site for Maccalan Whiskey
building 2 new whiskey warehouses near Aberlour.
Dec 2010 – Jan 2012 (Freelance)
Working for Decomo at the Velodrome setting out for the installation of precast
cladding panels around the envelope of the project. Supervising the progress of site
works and marking up drawings.
April 2010 – Dec 2010 (Freelance)
Setting out engineer at the Velodrome and National sports arena in Glasgow for PC
Harrington. Concrete framed main structure with major structural steel at either side,
setting out of curved ret walls at the velodrome track.
April 2009 – April 2010
Finishing my Degree full time in Environmental Civil Engineering at Glasgow
Caledonian University.
Dec 2008 – April 2009 (from this point down l was employed by Barr Construction)
Edinburgh trams depot, site set up.
Oct 2008 – Dec 2008
Quality engineer, overseeing sub-contractors work at 3 midlothian primary schools at
Bonnyrigg, penicuik, dalkeith.
August 2007 – Oct 2008
Glasgow University Hub, major redevelopment/extension of existing concrete frame
using ret walls with cast in bolts for steel frame at either end of original concrete
structure. I was responsible for surveying of existing structure and all setting out.
Jan 2007 – August 2007
Largs academy IT building, engineer on a steel portal frame with brick work cladding.
August 2005 – Jan 2007
Neighbourhood centre Kilmarnock, this is where l gained site experience of setting
out through guidance of senior engineers and finished the last 6 months as the only
site engineer.
Sept 2003 – Aug 2005
Apprentice Draughtsman for Barr Steel / Solway Precast using auto cad and various
steelwork packages to prepare detailed drawings
PROFESSIONAL QUALIFICATIONS
 February 2015 Ipaf Harness Training (1 day)
 Oct 2014 CITB Temporary Works Coordinator course (2 day)
 May 2014 Temporary Works Coordinator course (1 day)
 Feb 2014 Appointed Person Cranes grade: credit (3 day)
 June 2013 QA level 3 First Aid at Work (4 day)
 October 2012 4 day CSR Gold Card for Supervisors course
 November 2008 CITB Advanced Surveying and Setting Out (1 week)
 December 2007 Chubb Fire Warden Course (1 day)
 November 2007 CITB Intermediate Surveying and Setting Out (1 week)
 May 2007 CITB Foundation Surveying and Setting Out (1 week)
 November 2006 Planning and Programming (1 day)
 June 2006 Scaffolding Safety inspection (2 days)
 August 2004 Auto-cad (2 days)
 August 2004 Manual Handling (1 day)
EDUCATION
Glasgow Caledonian University. 2007- 2010
BSC Degree with distinction (>70%) in Environmental Civil Engineering
Stow College, Glasgow 2003 – 2007
4 year day release
HNC Civil Engineering level 7
Greenwood Academy, Irvine 1999 - 2003
8No Standard Grades
INTERESTS
 Play football.
 Snowboarding in the winter.
ADDITIONAL INFORMATION
 Hold a Full Driving License.
 Have an excellent knowledge of computers.
 Basic Disclosure form completed
REFERENCES
Gareth Brown 07919 593951
Site Manager
Graham Construction
Andrew Doherty 07598 772906
Project Manager
McLaughlin and Harvey

Contenu connexe

Tendances

Tendances (20)

Kirk_Welsh_6-1-2016_Short
Kirk_Welsh_6-1-2016_ShortKirk_Welsh_6-1-2016_Short
Kirk_Welsh_6-1-2016_Short
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1
 
Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23
 
CV
CVCV
CV
 
Farman Ali Rao
Farman Ali RaoFarman Ali Rao
Farman Ali Rao
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Engr salman cv
Engr salman cvEngr salman cv
Engr salman cv
 
Paul Battersby CV 2016
Paul Battersby CV 2016Paul Battersby CV 2016
Paul Battersby CV 2016
 
RAMESH KUMAR TIWARI CV jssl 1
RAMESH KUMAR TIWARI CV jssl 1RAMESH KUMAR TIWARI CV jssl 1
RAMESH KUMAR TIWARI CV jssl 1
 
CV - Mechanical Engineer
CV - Mechanical EngineerCV - Mechanical Engineer
CV - Mechanical Engineer
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
aminCV 2016
aminCV 2016aminCV 2016
aminCV 2016
 
Engineer salman
Engineer salmanEngineer salman
Engineer salman
 
Faruk Ulas SULHAN CV
Faruk Ulas SULHAN CVFaruk Ulas SULHAN CV
Faruk Ulas SULHAN CV
 
Jason Lee McGraw Resume (1)
Jason Lee McGraw Resume (1)Jason Lee McGraw Resume (1)
Jason Lee McGraw Resume (1)
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
al dabney resume
al dabney resumeal dabney resume
al dabney resume
 
JEFFIN K JOSE CV
JEFFIN K JOSE CVJEFFIN K JOSE CV
JEFFIN K JOSE CV
 

En vedette

nForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm User Experience
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Constructionturbi
 
Fau Innovation 6 2010 Progress
Fau Innovation  6 2010 ProgressFau Innovation  6 2010 Progress
Fau Innovation 6 2010 Progressfzollo
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen
 
Designing Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsDesigning Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsnForm User Experience
 
PRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIAPRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIADevender Kumar
 
Ush company case study
Ush company case studyUsh company case study
Ush company case studystartguru
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructionsengineeringwatch
 
IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machineTeow Beng Hur
 
Construction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingConstruction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingDragon Sourcing
 
Construction Management Case Study on Burj Khalifa
Construction Management Case Study on  Burj KhalifaConstruction Management Case Study on  Burj Khalifa
Construction Management Case Study on Burj KhalifaVaibhav Shrivastava
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREShivangi Saini
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storeyBroad Homes Intl.
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibsUTHM
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of constructionJoji Mathew
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Actionable Customer Development
Actionable Customer DevelopmentActionable Customer Development
Actionable Customer DevelopmentAndreas Klinger
 

En vedette (20)

nForm better intranets | PCL construction case study
nForm better intranets | PCL construction case studynForm better intranets | PCL construction case study
nForm better intranets | PCL construction case study
 
Partially Industrialized Construction
Partially Industrialized ConstructionPartially Industrialized Construction
Partially Industrialized Construction
 
Fau Innovation 6 2010 Progress
Fau Innovation  6 2010 ProgressFau Innovation  6 2010 Progress
Fau Innovation 6 2010 Progress
 
Silvapen Industrialized Cons.
Silvapen Industrialized Cons.Silvapen Industrialized Cons.
Silvapen Industrialized Cons.
 
Designing Better Applications, Websites and Intranets
Designing Better Applications, Websites and IntranetsDesigning Better Applications, Websites and Intranets
Designing Better Applications, Websites and Intranets
 
PRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIAPRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIA
 
Ush company case study
Ush company case studyUsh company case study
Ush company case study
 
green building
green buildinggreen building
green building
 
Indonesia - adaptation in South East Asia
Indonesia - adaptation in South East AsiaIndonesia - adaptation in South East Asia
Indonesia - adaptation in South East Asia
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machine
 
Construction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingConstruction Company Case Study by Dragonsourcing
Construction Company Case Study by Dragonsourcing
 
Construction Management Case Study on Burj Khalifa
Construction Management Case Study on  Burj KhalifaConstruction Management Case Study on  Burj Khalifa
Construction Management Case Study on Burj Khalifa
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storey
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Actionable Customer Development
Actionable Customer DevelopmentActionable Customer Development
Actionable Customer Development
 

Similaire à David Smith 2016 CV

Bj Byrnes Graduate
Bj Byrnes GraduateBj Byrnes Graduate
Bj Byrnes Graduatebj byrnes
 
2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - Estimator2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - EstimatorAndrei Kogan
 
2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - Estimator2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - EstimatorAndrei Kogan
 
ARUNKUMAR.R_ CV
ARUNKUMAR.R_ CVARUNKUMAR.R_ CV
ARUNKUMAR.R_ CVArun Kumar
 
Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)Fawad Raja
 
Resume Chen Li
Resume Chen LiResume Chen Li
Resume Chen LiChenLi174
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)Amit Singh
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)Amit Singh
 
Seif Elshorbagy's C.V. (1)
Seif Elshorbagy's C.V. (1)Seif Elshorbagy's C.V. (1)
Seif Elshorbagy's C.V. (1)Seif Elshorbagy
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017Steven Miller
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Kerry Polkinghorne
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron Pistorius
 

Similaire à David Smith 2016 CV (20)

Bj Byrnes Graduate
Bj Byrnes GraduateBj Byrnes Graduate
Bj Byrnes Graduate
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
Shannon Volk CV
Shannon Volk CVShannon Volk CV
Shannon Volk CV
 
2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - Estimator2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - Estimator
 
2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - Estimator2016 Resume Andrei Kogan - Estimator
2016 Resume Andrei Kogan - Estimator
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
ARUNKUMAR.R_ CV
ARUNKUMAR.R_ CVARUNKUMAR.R_ CV
ARUNKUMAR.R_ CV
 
Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)
 
Resume Chen Li
Resume Chen LiResume Chen Li
Resume Chen Li
 
Resume Chen Li
Resume Chen LiResume Chen Li
Resume Chen Li
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
 
shirish_pallepati_Resume
shirish_pallepati_Resumeshirish_pallepati_Resume
shirish_pallepati_Resume
 
Seif Elshorbagy's C.V. (1)
Seif Elshorbagy's C.V. (1)Seif Elshorbagy's C.V. (1)
Seif Elshorbagy's C.V. (1)
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
 
Akomolafe C.V
Akomolafe C.VAkomolafe C.V
Akomolafe C.V
 
Masoud rahimzadeh cv
Masoud rahimzadeh cvMasoud rahimzadeh cv
Masoud rahimzadeh cv
 
---Ajinkya-- Resume
---Ajinkya-- Resume---Ajinkya-- Resume
---Ajinkya-- Resume
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitae
 

David Smith 2016 CV

  • 1. PROJECT ENGINEER/MANAGER DAVID SMITH 101 Sillars Meadow, Irvine, KA12 0LD 07966864911 david.smi@hotmail.co.uk PROFILE Looking for freelance work from 28.3.16, I am set up Ltd company and have my own van for transport. I am currently working for McLaughlin and Harvey at Ayrshires New Kilmarnock Campus as Project Engineer. My previous employer was Graham Construction working on the Stirling University Residences framework. I have also worked on the high profile Velodrome and National Sports Arena for the Commonwealth Games 2014. I have gained significant experience and qualifications during the last 12 years on a varying range of projects. I came into construction as a draughtsman but soon sought out site experience and have not looked back since. At work I would say one of my greatest attributes is being able to handle pressure and utilize my experience to make decisions in calm and collected manner. I am driven to ensure that any project I am on finishes on program and with quality assurance of upmost importance. EMPLOYMENT Summary of capabilities  Ensuring that Health and Safety is number one priority and all RAMS and permits are relevant and in place.  Managing sub-contractors work and making sure the quality assurance files are kept meticulously.  Programming works to ensure the completion date of the project is not compromised.  As a temporary works coordinator I am well versed in maintaining the register and supervising temporary works on site. I am comfortable with heavy duty propping of steelwork, back propping and complex design scaffolds.  Management of direct hire crane lifts as an appointed person.  Experience in the construction of retaining walls, concrete formwork/tables, steelwork foundations, in-situ and pre-cast stairs/walls, drainage, setting out of slip forms/jump forms for concrete cores.  Excellent understanding of construction drawings.
  • 2.  Able to liaise with engineers/architects on design and builds to find the best solution to any problems encountered within the design and optimize constructability.  Setting out, leveling and surveying of all civil engineering aspects of the project to a high accuracy as taught on setting out courses and by keeping myself up to date with technological advances.  Producing topographical surveys and quantifying cut and fills.  Able to operate various models of total stations including 1 man robotic stations.  Proficient in the use of auto cad for as built drawings etc.  I am very comfortable with setting up and maintaining site control stations by means of traversing and coordinate corrections.  Particularly interested in geotechnical design and application, this was my favorite subject at university. Employment history Aug 2014 - Present Working for McLaughlin and Harvey at the new Ayrshire College Kilmarnock Campus (£40 mil) as Project Engineer. I am responsible for managing sub-contractors on site to ensure program dates are achieved. Chairing meetings with the design team and sub-contractors to discuss constructability concerns and resolve outstanding issues. Checking setting out and making sure QA forms are completed. Coordinating all temporary works and crane lifts on site. May 2012 – Aug 2014 Employed by Graham Construction working on the Stirling University residences framework. My role as Site Engineer has many duties which differ through the progress of the job, mainly ensuring that work is carried out correctly and supervising sub-contractors with safety being the upmost priority. Jan 2012 – May 2012 (Freelance) Working through Contract Scotland on a Robertsons site for Maccalan Whiskey building 2 new whiskey warehouses near Aberlour. Dec 2010 – Jan 2012 (Freelance) Working for Decomo at the Velodrome setting out for the installation of precast cladding panels around the envelope of the project. Supervising the progress of site works and marking up drawings. April 2010 – Dec 2010 (Freelance) Setting out engineer at the Velodrome and National sports arena in Glasgow for PC Harrington. Concrete framed main structure with major structural steel at either side, setting out of curved ret walls at the velodrome track. April 2009 – April 2010 Finishing my Degree full time in Environmental Civil Engineering at Glasgow Caledonian University.
  • 3. Dec 2008 – April 2009 (from this point down l was employed by Barr Construction) Edinburgh trams depot, site set up. Oct 2008 – Dec 2008 Quality engineer, overseeing sub-contractors work at 3 midlothian primary schools at Bonnyrigg, penicuik, dalkeith. August 2007 – Oct 2008 Glasgow University Hub, major redevelopment/extension of existing concrete frame using ret walls with cast in bolts for steel frame at either end of original concrete structure. I was responsible for surveying of existing structure and all setting out. Jan 2007 – August 2007 Largs academy IT building, engineer on a steel portal frame with brick work cladding. August 2005 – Jan 2007 Neighbourhood centre Kilmarnock, this is where l gained site experience of setting out through guidance of senior engineers and finished the last 6 months as the only site engineer. Sept 2003 – Aug 2005 Apprentice Draughtsman for Barr Steel / Solway Precast using auto cad and various steelwork packages to prepare detailed drawings PROFESSIONAL QUALIFICATIONS  February 2015 Ipaf Harness Training (1 day)  Oct 2014 CITB Temporary Works Coordinator course (2 day)  May 2014 Temporary Works Coordinator course (1 day)  Feb 2014 Appointed Person Cranes grade: credit (3 day)  June 2013 QA level 3 First Aid at Work (4 day)  October 2012 4 day CSR Gold Card for Supervisors course  November 2008 CITB Advanced Surveying and Setting Out (1 week)  December 2007 Chubb Fire Warden Course (1 day)  November 2007 CITB Intermediate Surveying and Setting Out (1 week)  May 2007 CITB Foundation Surveying and Setting Out (1 week)  November 2006 Planning and Programming (1 day)  June 2006 Scaffolding Safety inspection (2 days)  August 2004 Auto-cad (2 days)  August 2004 Manual Handling (1 day) EDUCATION Glasgow Caledonian University. 2007- 2010 BSC Degree with distinction (>70%) in Environmental Civil Engineering Stow College, Glasgow 2003 – 2007 4 year day release HNC Civil Engineering level 7 Greenwood Academy, Irvine 1999 - 2003
  • 4. 8No Standard Grades INTERESTS  Play football.  Snowboarding in the winter. ADDITIONAL INFORMATION  Hold a Full Driving License.  Have an excellent knowledge of computers.  Basic Disclosure form completed REFERENCES Gareth Brown 07919 593951 Site Manager Graham Construction Andrew Doherty 07598 772906 Project Manager McLaughlin and Harvey