Value Engineering-Constructability
 VALUE ENGINEERING
 Value Engineering (VE) has been defined as:
 the systematic effort directed at analyzing the
functional requirements of:
 systems
 equipment
 facilities
 procedures
 and supplies for the purpose of achieving the
essential function at the lowest total (life-cycle)
cost.
Value Engineering-Constructability
 Also, all the efforts are focused on meeting needed
issues such as:
 Performance;
 Reliability;
 quality, maintainability;
 aesthetics,
 Safety;
 fire resistance;
 while, at the same time, achieving lowest life-cycle
cost.
Value Engineering-Constructability
 Constructability implementation can
act as a predecessor to value
engineering.
 Providing information through
constructor input and lessons
learned from past projects such
that value engineering may be
more effective.
Value Engineering
Implementation of value engineering involves
several steps:
1. Information;
2. functional analysis;
3. creative mind;
4. Evaluation;
5. planning & proposal;
6. Implementation;
7. follow-up.
Value Engineering
 The creative step involves a brainstorming
session where life-cycle cost alternatives, for
design components are considered.
Value engineering may be performed in two
ways:
 (1) Proactively
 (2) Reactively
Value Engineering(Value Analysis)
 What Is Value Engineering?
 Value Engineering (V.E.), also known as Value Analysis,
 is a systematic and function-based approach to
improving the value of products, projects, or processes.
 VE involves a group of people following a structured
process.
 The process helps team members communicate better
across boundaries.
 understand different perspectives,
 innovate, and analyze.
Value Engineering
 What does Value Engineering do?
 Value Engineering improves value.
 On a major road development, improvements
to value might include:
 reducing the life cycle cost of an interchange,
enhancing safety in a design;
 or reducing impacts to the public by
shortening the duration of a construction
project.
Value Engineering
 Value Engineering uses a combination of
creative and analytical techniques to identify
alternative ways to achieve objectives.
 The use of Function Analysis differentiates
Value Engineering from other problem solving
approaches.
 VE focuses on delivering the product or service
at the best price.
 This is achieved by incorporating those value
characteristics deemed most important by the
customer.
Value Engineering
How does V.E. work?
 V.E. follows a structured thought process
to evaluate options.
 Every V.E. session goes through a
number of steps:
 Gather information -What is being done
now?
 Measure Performance -How will the
alternatives be measured?
Value Engineering
 Analyse Functions -What must be done?
What does it Cost?
 Generate Ideas (Brainstorming) -What else
will do the job?
 Evaluate and Rank Ideas -Which Ideas are
the best?
 Develop and Expand Ideas -What are the
impacts? What is the cost? What is the
performance?
 Present Ideas Sell Alternatives
122 value engineering
122 value engineering
122 value engineering
Value Engineering
People involved in VE should be able of
establishing the following:
 effective challenge to design criteria and
accepted standards;
 access and evaluation of operational and
maintenance cost;
 focus on high cost areas and replace with
lower;
 selection of effective alternatives.
Value Engineering
There are four important steps most be taken in
modified VE job plan. They are as follow:
 1. Information Phase
 -Briefing by the Client
 -Feasibility study with client presence,
 -Outline proposals
 -Scheme design
Value Engineering
2-VE Steps
Validation or preparation of cost estimate
 Familiarisation and breakdown of data into
elements-cost models
 Functional evaluation of areas to isolate high
cost, poor value areas,
3-Speculative Phase
 Team review of project-idea listing
 Development of final idea listing.
Value Engineering
4-Analytical Phase
 Evaluation of ideas listing
 Selection of high cost areas for in-depth study,
 Team brainstorming for generation of possible
alternatives suitable for in-depth analysis
 Investigate alternatives
 Team review of analysis
 Preparation of proposal drafts.
Value Engineering
Proposal Phase
 Review of results from analytical phase with
client to gain additional information and enhance
implementation.
 Review and revision of proposal
 Preparation of final proposals
 Report, including cost estimate review
Value Engineering
 What are the benefits of V.E.?
 Value Engineering is a tool that will improve
Mangers ability to manage projects;
 solve problems;
 Innovate;
 communicate.
 A VE program in an organization will give the
organisation a definitive tool to improve value in
any product, project or process.
Value Engineering
 The advantages of carrying out a VE are:
 Cost savings;
 risk reduction;
 schedule improvements;
 improved designs and better collaboration
have been the outcomes of investment in
VE studies.
 The return from the investment in VE
normally exceeds 10:1.
Value Engineering
CASE STUDY
 A commercial office development was to be
constructed using JCT 2007 following the
completion of the design.
 The client was reluctant to accept the financial
feasibility study.
 Therefore, it was decided to VE the design down
to an acceptable cost.
Value Engineering
Solution
 The value engineering team decided
during the initial information stage to
target 3 main areas, such as;
 primary criteria: ratio of net let table area
to gross building area
Value Engineering
 architectural review: attempting to
relax specifications without affecting
the overall quality of the building.
 The basement, plant rooms, service
cores and the cladding system were
all identified as possible targets.
Value Engineering
 engineering review- targets included:
 superstructure
 public health requirement
 smoke extraction systems
 environmental services installations.
 A brain storming approach was adopted for
the creation of alternative ideas.
 The scope of value improvement was listed
as:
Value Engineering
 the basic shape of the original design
was critical as being wasteful in terms
of the resultant net let table floor area.
 Alternatively proposals were made for
improving floor layouts, leading to 80%
net let able floor area, compared to the
75%.
Value Engineering
 potential savings were identified by
concentrating the major plant items in
the basement areas and reducing the
extend of the basement ductwork by
relocating the air shafts.
 Rationalisations were also suggested
for the layout and number of lift cores.
Value Engineering
 a significant simplification was perceived
to be possible if the dimensions of the
central atrium and the width of the
entrance were adjusted to coincide with
the structural grid.
 build ability principles were applied to the
external cladding resulting in the
suggested use of composite steel framed
panels to fit the storey heights and column
centres.
Value Engineering
 The proposed toilets were also reviewed and
a considerable saving was recognised as
being possible by the incorporation of pre-
fabricated toilet pods.
 Form the cost figures it can be seen that the
alternative design proposals represented a
construction saving of 2.1 million.
 The cost of VE WAS £43,000.
122 value engineering
Value Engineering
Value Engineering
1 sur 32

Recommandé

Value engineering par
Value engineeringValue engineering
Value engineeringArushi Chadha
4.4K vues20 diapositives
Value engineering and Analysis par
Value engineering and AnalysisValue engineering and Analysis
Value engineering and AnalysisChaitanya Chenna
3.4K vues22 diapositives
Value engineering seminar presentation par
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentationamrutrajbk
4.2K vues19 diapositives
Value Engineering for Roads & Highways Project par
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Projectajmal4
12.7K vues37 diapositives
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY par
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYVALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYSJMIT,now NMAMIT NITTE
4.6K vues15 diapositives
Construction Cost Control par
Construction Cost ControlConstruction Cost Control
Construction Cost ControlSunayana Miglani
5.8K vues31 diapositives

Contenu connexe

Tendances

Construction Planing & Schedule par
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
4.1K vues47 diapositives
Value engineering Short Over view ppt par
Value engineering Short Over view pptValue engineering Short Over view ppt
Value engineering Short Over view pptMashfiq Albartross
10.7K vues28 diapositives
Procurement in construction par
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
1.6K vues23 diapositives
Construction Project Management par
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
14.7K vues51 diapositives
Value Management Group Assignment par
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
5.8K vues44 diapositives
Construction Documents par
Construction DocumentsConstruction Documents
Construction DocumentsAllan Berry
7.3K vues126 diapositives

Tendances(20)

Procurement in construction par MahSobeh
Procurement in constructionProcurement in construction
Procurement in construction
MahSobeh1.6K vues
Construction Project Management par Rajat Nainwal
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal14.7K vues
Value Management Group Assignment par Arissa Loh
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
Arissa Loh 5.8K vues
Construction Documents par Allan Berry
Construction DocumentsConstruction Documents
Construction Documents
Allan Berry7.3K vues
Value Engineering Part 1 par Pankaj Nalwa
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1
Pankaj Nalwa2.1K vues
PPT on Construction Costing par Manish Kandpal
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
Manish Kandpal12.9K vues
Value engineering in residential house construction par IAEME Publication
Value engineering in residential house constructionValue engineering in residential house construction
Value engineering in residential house construction
Value engineering case study ppt par AnuragTewari2
Value engineering case study pptValue engineering case study ppt
Value engineering case study ppt
AnuragTewari215.1K vues
Cp 2 selection of contractor - pq and post q par umes manandhar
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
umes manandhar5K vues
Concept of Value Management par msmayamin128
 Concept of Value Management Concept of Value Management
Concept of Value Management
msmayamin128908 vues
Fundamentals of value engineering par Karim Ragab
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering
Karim Ragab5.6K vues
Value analysis and Value Engineering par Tushar Lohani
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value Engineering
Tushar Lohani1.2K vues

En vedette

Value Engineering And Value Analysis par
Value Engineering And Value AnalysisValue Engineering And Value Analysis
Value Engineering And Value Analysisthombremahesh
130.8K vues63 diapositives
Value Engineering par
Value EngineeringValue Engineering
Value EngineeringBruce Sauter
26K vues12 diapositives
Value analysis and value engineering par
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineeringAyush dixit
26.2K vues30 diapositives
Value Engineering par
Value EngineeringValue Engineering
Value EngineeringFarzad Vasheghani Farahani
64.5K vues36 diapositives
Value engineering par
Value engineeringValue engineering
Value engineeringDr. Chandan Vichoray
7.7K vues26 diapositives
What is VAVE par
What is VAVE What is VAVE
What is VAVE Reff Ren
280.2K vues38 diapositives

En vedette(20)

Value Engineering And Value Analysis par thombremahesh
Value Engineering And Value AnalysisValue Engineering And Value Analysis
Value Engineering And Value Analysis
thombremahesh130.8K vues
Value analysis and value engineering par Ayush dixit
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
Ayush dixit 26.2K vues
What is VAVE par Reff Ren
What is VAVE What is VAVE
What is VAVE
Reff Ren280.2K vues
Value Engineering, What's not to love? par Nick Grant
Value Engineering, What's not to love?Value Engineering, What's not to love?
Value Engineering, What's not to love?
Nick Grant2.8K vues
Value Analysis & Value Engineering par Himangi Thattey
Value Analysis & Value EngineeringValue Analysis & Value Engineering
Value Analysis & Value Engineering
Himangi Thattey8.7K vues
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G par Mohan Kumar G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Mohan Kumar G4.2K vues
Value engineering practical par Abada Saad
Value engineering practicalValue engineering practical
Value engineering practical
Abada Saad21.3K vues
Cost Reduction of a product through Value Analysis & Value Engineering par QuEST Global
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value Engineering
QuEST Global25.4K vues
Value Engineering Introduction - K K B par Kumar Bhatt
Value Engineering Introduction - K K BValue Engineering Introduction - K K B
Value Engineering Introduction - K K B
Kumar Bhatt1.7K vues
Value Analysis Value Engineering & Business Process Reengineering par T HARI KUMAR
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
T HARI KUMAR6.3K vues
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob) par JiWoon Yi
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
JiWoon Yi822 vues

Similaire à 122 value engineering

Value engineering significance par
Value engineering significanceValue engineering significance
Value engineering significanceYash Patel
109 vues23 diapositives
Application of Value Engineering in Commercial Building Projects par
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projectsnitinrane33
16 vues6 diapositives
Application of Value Engineering in Construction Projects par
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projectsnitinrane33
42 vues5 diapositives
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION par
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONIAEME Publication
284 vues7 diapositives
Value engineering _2_ par
Value engineering _2_Value engineering _2_
Value engineering _2_Swetlina .
3.8K vues16 diapositives
041 integrating lean construction (2) par
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)drdej19
35 vues35 diapositives

Similaire à 122 value engineering(20)

Value engineering significance par Yash Patel
Value engineering significanceValue engineering significance
Value engineering significance
Yash Patel109 vues
Application of Value Engineering in Commercial Building Projects par nitinrane33
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
nitinrane3316 vues
Application of Value Engineering in Construction Projects par nitinrane33
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
nitinrane3342 vues
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION par IAEME Publication
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
Value engineering _2_ par Swetlina .
Value engineering _2_Value engineering _2_
Value engineering _2_
Swetlina .3.8K vues
041 integrating lean construction (2) par drdej19
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)
drdej1935 vues
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry par IRJET Journal
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET Journal33 vues
Application of-value-engineering-in-residential-building-ijertv9 is050725 par Minn Lwin
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
Minn Lwin14 vues
Value Engineering - PMPD Presentation_0.pptx par PareshSwami2
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptx
PareshSwami23 vues
VA-VE Presentation.pptx par DevenJally1
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
DevenJally1127 vues
Introduction to value engineering and value analysis par Prathamesh Kadam
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysis
Prathamesh Kadam5.2K vues
IRJET- The Application of Value Engineering to Highway Projects and Programs par IRJET Journal
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET Journal39 vues
Practical Application of Value Engineering in Capital Projects par PMA Consultants
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital Projects
PMA Consultants193 vues
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine... par IRJET Journal
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET Journal29 vues

Plus de Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020 par
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
504 vues19 diapositives
28 dej my news punch rev 28-12-2019 par
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019Dr Fereidoun Dejahang
216 vues13 diapositives
16 fd my news punch rev 16-12-2019 par
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019Dr Fereidoun Dejahang
690 vues13 diapositives
029 fast-tracking projects par
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projectsDr Fereidoun Dejahang
290 vues21 diapositives
028 fast-tracking projects & cost overrun par
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
122 vues57 diapositives
027 fast-tracked projects-materials par
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materialsDr Fereidoun Dejahang
83 vues32 diapositives

Plus de Dr Fereidoun Dejahang(20)

Dernier

Activated sludge process .pdf par
Activated sludge process .pdfActivated sludge process .pdf
Activated sludge process .pdf8832RafiyaAltaf
8 vues32 diapositives
_MAKRIADI-FOTEINI_diploma thesis.pptx par
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptxfotinimakriadi
7 vues32 diapositives
Wire Rope par
Wire RopeWire Rope
Wire RopeIwiss Tools Co.,Ltd
9 vues5 diapositives
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... par
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...Anowar Hossain
12 vues34 diapositives
Effect of deep chemical mixing columns on properties of surrounding soft clay... par
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...AltinKaradagli
6 vues10 diapositives
IWISS Catalog 2022 par
IWISS Catalog 2022IWISS Catalog 2022
IWISS Catalog 2022Iwiss Tools Co.,Ltd
26 vues66 diapositives

Dernier(20)

DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... par Anowar Hossain
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
Anowar Hossain12 vues
Effect of deep chemical mixing columns on properties of surrounding soft clay... par AltinKaradagli
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...
Informed search algorithms.pptx par Dr.Shweta
Informed search algorithms.pptxInformed search algorithms.pptx
Informed search algorithms.pptx
Dr.Shweta16 vues
MSA Website Slideshow (16).pdf par msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla58 vues
Design and analysis of a new undergraduate Computer Engineering degree – a me... par WaelBadawy6
Design and analysis of a new undergraduate Computer Engineering degree – a me...Design and analysis of a new undergraduate Computer Engineering degree – a me...
Design and analysis of a new undergraduate Computer Engineering degree – a me...
WaelBadawy656 vues
fakenews_DBDA_Mar23.pptx par deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra812 vues
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx par AnnieRachelJohn
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptxSTUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx
AnnieRachelJohn33 vues

122 value engineering

  • 2. Value Engineering-Constructability  VALUE ENGINEERING  Value Engineering (VE) has been defined as:  the systematic effort directed at analyzing the functional requirements of:  systems  equipment  facilities  procedures  and supplies for the purpose of achieving the essential function at the lowest total (life-cycle) cost.
  • 3. Value Engineering-Constructability  Also, all the efforts are focused on meeting needed issues such as:  Performance;  Reliability;  quality, maintainability;  aesthetics,  Safety;  fire resistance;  while, at the same time, achieving lowest life-cycle cost.
  • 4. Value Engineering-Constructability  Constructability implementation can act as a predecessor to value engineering.  Providing information through constructor input and lessons learned from past projects such that value engineering may be more effective.
  • 5. Value Engineering Implementation of value engineering involves several steps: 1. Information; 2. functional analysis; 3. creative mind; 4. Evaluation; 5. planning & proposal; 6. Implementation; 7. follow-up.
  • 6. Value Engineering  The creative step involves a brainstorming session where life-cycle cost alternatives, for design components are considered. Value engineering may be performed in two ways:  (1) Proactively  (2) Reactively
  • 7. Value Engineering(Value Analysis)  What Is Value Engineering?  Value Engineering (V.E.), also known as Value Analysis,  is a systematic and function-based approach to improving the value of products, projects, or processes.  VE involves a group of people following a structured process.  The process helps team members communicate better across boundaries.  understand different perspectives,  innovate, and analyze.
  • 8. Value Engineering  What does Value Engineering do?  Value Engineering improves value.  On a major road development, improvements to value might include:  reducing the life cycle cost of an interchange, enhancing safety in a design;  or reducing impacts to the public by shortening the duration of a construction project.
  • 9. Value Engineering  Value Engineering uses a combination of creative and analytical techniques to identify alternative ways to achieve objectives.  The use of Function Analysis differentiates Value Engineering from other problem solving approaches.  VE focuses on delivering the product or service at the best price.  This is achieved by incorporating those value characteristics deemed most important by the customer.
  • 10. Value Engineering How does V.E. work?  V.E. follows a structured thought process to evaluate options.  Every V.E. session goes through a number of steps:  Gather information -What is being done now?  Measure Performance -How will the alternatives be measured?
  • 11. Value Engineering  Analyse Functions -What must be done? What does it Cost?  Generate Ideas (Brainstorming) -What else will do the job?  Evaluate and Rank Ideas -Which Ideas are the best?  Develop and Expand Ideas -What are the impacts? What is the cost? What is the performance?  Present Ideas Sell Alternatives
  • 15. Value Engineering People involved in VE should be able of establishing the following:  effective challenge to design criteria and accepted standards;  access and evaluation of operational and maintenance cost;  focus on high cost areas and replace with lower;  selection of effective alternatives.
  • 16. Value Engineering There are four important steps most be taken in modified VE job plan. They are as follow:  1. Information Phase  -Briefing by the Client  -Feasibility study with client presence,  -Outline proposals  -Scheme design
  • 17. Value Engineering 2-VE Steps Validation or preparation of cost estimate  Familiarisation and breakdown of data into elements-cost models  Functional evaluation of areas to isolate high cost, poor value areas, 3-Speculative Phase  Team review of project-idea listing  Development of final idea listing.
  • 18. Value Engineering 4-Analytical Phase  Evaluation of ideas listing  Selection of high cost areas for in-depth study,  Team brainstorming for generation of possible alternatives suitable for in-depth analysis  Investigate alternatives  Team review of analysis  Preparation of proposal drafts.
  • 19. Value Engineering Proposal Phase  Review of results from analytical phase with client to gain additional information and enhance implementation.  Review and revision of proposal  Preparation of final proposals  Report, including cost estimate review
  • 20. Value Engineering  What are the benefits of V.E.?  Value Engineering is a tool that will improve Mangers ability to manage projects;  solve problems;  Innovate;  communicate.  A VE program in an organization will give the organisation a definitive tool to improve value in any product, project or process.
  • 21. Value Engineering  The advantages of carrying out a VE are:  Cost savings;  risk reduction;  schedule improvements;  improved designs and better collaboration have been the outcomes of investment in VE studies.  The return from the investment in VE normally exceeds 10:1.
  • 22. Value Engineering CASE STUDY  A commercial office development was to be constructed using JCT 2007 following the completion of the design.  The client was reluctant to accept the financial feasibility study.  Therefore, it was decided to VE the design down to an acceptable cost.
  • 23. Value Engineering Solution  The value engineering team decided during the initial information stage to target 3 main areas, such as;  primary criteria: ratio of net let table area to gross building area
  • 24. Value Engineering  architectural review: attempting to relax specifications without affecting the overall quality of the building.  The basement, plant rooms, service cores and the cladding system were all identified as possible targets.
  • 25. Value Engineering  engineering review- targets included:  superstructure  public health requirement  smoke extraction systems  environmental services installations.  A brain storming approach was adopted for the creation of alternative ideas.  The scope of value improvement was listed as:
  • 26. Value Engineering  the basic shape of the original design was critical as being wasteful in terms of the resultant net let table floor area.  Alternatively proposals were made for improving floor layouts, leading to 80% net let able floor area, compared to the 75%.
  • 27. Value Engineering  potential savings were identified by concentrating the major plant items in the basement areas and reducing the extend of the basement ductwork by relocating the air shafts.  Rationalisations were also suggested for the layout and number of lift cores.
  • 28. Value Engineering  a significant simplification was perceived to be possible if the dimensions of the central atrium and the width of the entrance were adjusted to coincide with the structural grid.  build ability principles were applied to the external cladding resulting in the suggested use of composite steel framed panels to fit the storey heights and column centres.
  • 29. Value Engineering  The proposed toilets were also reviewed and a considerable saving was recognised as being possible by the incorporation of pre- fabricated toilet pods.  Form the cost figures it can be seen that the alternative design proposals represented a construction saving of 2.1 million.  The cost of VE WAS £43,000.