ERIA Research Project
“Natural Gas Master Plan
for Myanmar”
11 December 2018
Thingaha Hotel, Nay Pyi Taw
Yoshikazu Kobayashi
The Institute of Energy Economics, Japan (IEEJ)
IEEJ © 2018
2
IEEJ©2018
 ERIA Research Project “Natural Gas Master
Plan for Myanmar
- Supply and demand outlook
- Natural gas import
- Required investments
- Roadmap
- Conclusions
 Outline of LNG Producer Consumer
Conference
- Overview
- Major discussion issues
Contents of presentation
3
IEEJ©2018
Natural Gas Master Plan for
Myanmar
4
IEEJ©2018
1. Introduction
- Background, Objectives, and
Assumptions
2. Trends in the global LNG
market
- Natural gas and LNG demand
and supply in the world
- Natural gas and LNG prices
3. Myanmar gas policies and
strategies
- National energy policies
- Policies related to oil and gas
4. Natural gas supply outlook
- Current production
- Production outlook
Table of content
5. Natural gas demand
outlook
- Natural gas demand by sector
and by region
- City gas development in
Yangon and Mandalay
6. Natural gas infrastructures
- Existing natural gas
infrastructure
- Required investments to
restore north-south pipeline
connection
- LNG import
7. Roadmap until 2040
- Required actions in upstream
and downstream
8. Conclusions
5
IEEJ©2018
 Domestic natural gas production is forecasted to decline.
- While several fields are being developed, the growth will only partially
offset the decline in production from existing fields.
 Natural gas shortage will need to be met by LNG, reduction of
export, or both.
Natural gas supply outlook
IEEJ estimate of domestic
production outlook
Natural gas export outlook
Sources: IEEJ. MoEE
6
IEEJ©2018
 Natural gas demand in Myanmar has grown rapidly in recent years.
- Major growth driver is power generation sector.
 Yangon is by far the largest gas consuming region.
- Power and transportation are the major demand segments in Yangon.
- Most of the gas in Yangon is supplied from offshore fields while the gas
supply to northern regions are supplied from onshore fields.
Natural gas demand in Myanmar
Natural gas consumption in
Myanmar*
*Because of the difference of sources, the figures of the graphs may be different. Sources: IEA; IEEJ estimate
Natural gas consumption by
sector as of FY 2017*
7
IEEJ©2018
 Demand is forecasted to grow by 2.5
times until 2040.
- Demand will increase from 454 mmcfd
in 2017 to 1,142 mmcfd in 2040.
- Demand from the power sector will
continue to lead the demand growth.
- Demand from the industrial sector is
also expected to grow significantly.
- Consumption for energy industry is
likely to decrease in the upstream
sector, but the demand for
downstream (refinery) will grow as
the new refinery will be in operation.
- Demand for transportation sector will
also grow at moderate rate as CNG
bus will continue to be used in
Yangon.
- Growth of in residential / commercial
sector depends on policy initiative.
Natural gas demand outlook
Natural gas demand outlook
in Myanmar
Sources: IEEJ estimate
8
IEEJ©2018
 The largest potential demand is in industrial sector.
- Thilawah SEZ has a big potential of industrial demand.
 Demand for a new refinery is forecasted emerge from the mid-2020s.
 Transportation sector will see a moderate growth.
 Required investment for additional infrastructure (mainly for
industrial demand development) is USD 4.2 million.
City gas demand in Yangon
City gas (non-power) demand
outlook in Yangon
Sources: IEEJ estimate
City gas demand locations in
Yangon
9
IEEJ©2018
 While currently gas is not used in Mandalay, the demand is expected
to emerge from the mid-2020s.
- Most of expected demand is in Industrial sector; residential commercial
demand will emerge from the 2030s.
 Required investments for additional infrastructure is USD27.0 million.
 Strong policy initiative is needed to realize city gas use in Mandalay.
City gas demand in Mandalay
City gas (non-power) demand
outlook in Mandalay
Sources: IEEJ estimate
City gas demand locations in Mandalay
10
IEEJ©2018
 Myanmar has an extensive natural gas
pipeline network.
 However, pipeline networks in the north
and the south is divided because the
connecting pipeline is out of operation.
- Leakage problem by corrosion
 The restoration of the north-south
linkage will bring great economic and
supply security benefits
- Demand creation along the restored line.
- Flexible supply operation in case of
emergency
 Renovation of the interrupted parts will
cost USD 77.4 milllion
Pipeline connection
Pipeline network in Myanmar
Sources: MoEE
11
IEEJ©2018
 Because of the lack of international import pipeline, Myanmar will
have to rely on LNG as an import source.
 The study assumes Myanmar will need to import LNG from 2023.
- Preparatory should be accelerated.
 Three LNG import projects are being planned in the south.
- All of them are Gas-to-Power projecbts
Natural gas (LNG) import
Expected LNG imports*
*Import requirement is estimated at different rate of realization of onshore developments; Sources: IEEJ. MoEE
Planned LNG receiving projects
Project
Import
capacity
(mtpa)
Installed
Generation
Capacity
(MW)
Region
Alone LNG to
Power
Project
0.4 356 Yangon
MeeLongGyaing
LNG to Power
Project
1.6 1,390 Ayeyarwady
Kanbauk
LNG to Power
Project
1.0 1,230 Tanyintharyi
12
IEEJ©2018
Roadmap
2018 2020 2025 2030 2035 2040
Upstream development Development of M-3 Start production of M-3
Development of A-6 Start production of A-6
Development of new onshore fields Start production of onshore fields
Exploration Discovery
Appraisal
Development Start production of newly discovered fields
Pipeline network Comprehensive pipeline
Development Plan
Renovation .development of pipeline based on the Plan
FS for North-South pipeline
Connection
Construction of North-South Pipeline
Pipeline network expansion
in southern states
LNG Gas to Power Negotiation of the three
proposed project
Installation FSRU-1
Installation FSRU-2
Installation FSRU-3
Installation FSRU
Kyaukpyu
City gas network Accumulation of Demand
in Thilawah
Construction
Gas power plant
in Thilawah
Development
network in Thilawah
Demand development
in Northwestern Yangon
Planning of New Yangon City
Build pipeline network
for New Yangon City
Industrial demand development
in MIZ and Myotha Industrial Park
Build Pipeline network
to downtown Mandalay
Abbreviation: LNG = Liquefied Natural Gas, FS = Fesibility Study, MIZ = Mandalay Industrial Zone, FRSU = Floating Storage and Regasification Unit
Table: Roadmap for the Development of Myanmar’s Natural Gas Market
Sources: IEEJ
13
IEEJ©2018
 Enhance the role and capacity of government.
- The government should lead the effort to create demand by initiating and
coordinating the infrastructure development projects.
 Encourage and accelerate domestic upstream development.
- Domestic production is the most reliable supply source.
- All projects at the development stage should be developed in a timely
manner and exploration efforts should be continued.
 Improve the resilience of the pipeline network.
- Myanmar’s pipeline network is in a vulnerable condition.
- A comprehensive review of the domestic pipeline network and renovation
of critical parts of the existing network should be undertaken.
 Reform the energy pricing system.
- Gradual but steady reform of the pricing system will be required to ensure
investments.
 Grow human capital to utilize LNG.
- Training the country’s experts will facilitate the future LNG imports.
Conclusions
14
IEEJ©2018
Overview of LNG producer
Consumer Conference
15
IEEJ©2018
 The 7th LNG Producer – Consumer Conference was held in Nagoya
(central part of Japan) on 22 October 2018.
 More than 1,000 participants from 28 countries
 Ministerial session, CEO session, and four topical sessions
- For the detail, see conference web-site (https://www.lng-conference.org/)
Overview
16
IEEJ©2018
 “1st LNG revolution”
- Expansion in liquefaction capacity in the
U.S., Australia, and Qatar
- Demand surge in emerging markets;
demand recovery in traditional markets
- The recent surge of LNG supply capacity
brings revolutionary effect to the market.
 LNG trade expands much faster than
natural gas trade.
- LNG evolves from a minor means of
natural gas trade to a major one.
 Air pollution control as another
springboard for LNG demand
- China’s Blue-sky policy has caused a
significant LNG demand growth.
- Other countries such as India will follow.
“The First LNG Revolution”
LNG supply in the world
Source: IEA
17
IEEJ©2018
 Challenges in Asia LNG market
- Huge upfront capital investments
- Price competitiveness
- Inflexible supply contract
 Importance of Prod-Cons dialogue
- Engagement with emerging buyers
- Knowledge creation through dialogue
 Japan’s initiative
- Financial support for LNG facilities
- Encouraging more flexible LNG trade by
removing destination restriction
 US efforts in Asian LNG market
- Energy infrastructure development under
Liberal and Open Indo-Pacific initiative
- Declaration of no risk of export revocation
How to develop LNG demand in Asia?
LNG demand outlook in Asia
Source: IEEJ
18
IEEJ©2018
 Need for a price benchmark to
rationalize prices
- Persistent linkage to crude oil price
- Activated spot market is needed
through removal of destination
restriction
 Review of the existing LNG trading
custom by anti-monopoly authority to
remove destination restriction
 Standardization of LNG contract
- Facilitating active cargo transactions
 Growing roles of portfolio players
- Provision of flexible supply by holding
various supply and demand outlets
- Arbitrage inter-regional price
differentials
More flexible and transparent market
Natural gas prices in the world
Source: METI, EIA
19
IEEJ©2018
 Diverging interests between sellers and buyers
- Sellers want long-term contracts to secure revenue certainty and
financing.
- Buyers prefer shorter-term and more flexible contracts to adapt demand
uncertainty.
 Imperatives of continuous Producer – Consumer dialogue
- Overcoming the gap of interests between sellers and buyers
- Optimal risk allocation among parties involved in the LNG project
 Providing a model project template for a downstream project
- Typical pattern of risk allocation
- Standard templates for required contracts / documents for LNG receiving
project may facilitate investments
 Several good news for supply capacity expansions
- Qatari plan to expand its capacity to 110 mtpa; FID of LNG Canada
How to promote investments?
20
The IEEJ was ranked second in the field
of energy research in the 2017 Global
Think Tank Ranking conducted by the
University of Pennsylvania.
(ranked third in 2016 and first in 2015)

Contenu connexe

Similaire à ERIA Research Project: Natural Gas Master Plan for Myanmar

Security of Gas supply to Power markets in Nigeria
Security of Gas supply to Power markets in NigeriaSecurity of Gas supply to Power markets in Nigeria
Security of Gas supply to Power markets in NigeriaTade Oyewunmi
 
Siew 2015 launch
Siew 2015 launchSiew 2015 launch
Siew 2015 launchSIEW2015
 
Siew 2015 launch
Siew 2015 launchSiew 2015 launch
Siew 2015 launchLin Long
 
Indonesia lng to support development of power and industry domestic sampe ...
Indonesia lng to support development of power and industry  domestic   sampe ...Indonesia lng to support development of power and industry  domestic   sampe ...
Indonesia lng to support development of power and industry domestic sampe ...Sampe Purba
 
Fact pack series report
Fact pack series reportFact pack series report
Fact pack series reportAngel Dass
 
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...Dr. Oliver Massmann
 
Sagging the Elephant Reserves
Sagging the Elephant ReservesSagging the Elephant Reserves
Sagging the Elephant ReservesAnurak Atthasit
 
APAC LNG PDF
APAC LNG PDFAPAC LNG PDF
APAC LNG PDFPaul Lim
 
02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...
02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...
02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...The Business Council of Mongolia
 
20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed
20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed
20.02.2014 Global coal markets and implications for Mongolia, Arshad SayedThe Business Council of Mongolia
 
Le 05 Liquefied Natural Gas (LNG) Business
Le 05 Liquefied Natural Gas (LNG) BusinessLe 05 Liquefied Natural Gas (LNG) Business
Le 05 Liquefied Natural Gas (LNG) BusinessNsulangi Paul
 
Iran pak gas p ipeline final (1)
Iran pak gas p ipeline final (1)Iran pak gas p ipeline final (1)
Iran pak gas p ipeline final (1)anwaar azad
 
Woodside - MCRB Community Consultation Workshop - Rakhine, October 2019
Woodside - MCRB Community Consultation Workshop - Rakhine,  October 2019Woodside - MCRB Community Consultation Workshop - Rakhine,  October 2019
Woodside - MCRB Community Consultation Workshop - Rakhine, October 2019Ethical Sector
 
Value through partnerships: LNG market in Asia
Value through partnerships: LNG market in AsiaValue through partnerships: LNG market in Asia
Value through partnerships: LNG market in AsiaGAIL Social
 
Gas infrastructure development in archipelagic country sampe l. purba
Gas infrastructure development in archipelagic country   sampe l. purbaGas infrastructure development in archipelagic country   sampe l. purba
Gas infrastructure development in archipelagic country sampe l. purbaSampe Purba
 

Similaire à ERIA Research Project: Natural Gas Master Plan for Myanmar (20)

Security of Gas supply to Power markets in Nigeria
Security of Gas supply to Power markets in NigeriaSecurity of Gas supply to Power markets in Nigeria
Security of Gas supply to Power markets in Nigeria
 
Siew 2015 launch
Siew 2015 launchSiew 2015 launch
Siew 2015 launch
 
Siew 2015 launch
Siew 2015 launchSiew 2015 launch
Siew 2015 launch
 
Indonesia lng to support development of power and industry domestic sampe ...
Indonesia lng to support development of power and industry  domestic   sampe ...Indonesia lng to support development of power and industry  domestic   sampe ...
Indonesia lng to support development of power and industry domestic sampe ...
 
Fact pack series report
Fact pack series reportFact pack series report
Fact pack series report
 
Managment ppt
Managment pptManagment ppt
Managment ppt
 
Naice 2010 SPE powerpoint
Naice 2010 SPE powerpointNaice 2010 SPE powerpoint
Naice 2010 SPE powerpoint
 
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
Lawyer in Vietnam VIETNAM – THE DRAFT NATIONAL ELECTRICITY DEVELOPMENT PLANNI...
 
Myanmar Country Presentation at ACEF 2014
Myanmar Country Presentation at ACEF 2014Myanmar Country Presentation at ACEF 2014
Myanmar Country Presentation at ACEF 2014
 
Sagging the Elephant Reserves
Sagging the Elephant ReservesSagging the Elephant Reserves
Sagging the Elephant Reserves
 
APAC LNG PDF
APAC LNG PDFAPAC LNG PDF
APAC LNG PDF
 
SKKmigas
SKKmigasSKKmigas
SKKmigas
 
02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...
02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...
02.20-21.2014, PRESENTATION, Global Coal Markets and Implications for Mongoli...
 
20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed
20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed
20.02.2014 Global coal markets and implications for Mongolia, Arshad Sayed
 
Le 05 Liquefied Natural Gas (LNG) Business
Le 05 Liquefied Natural Gas (LNG) BusinessLe 05 Liquefied Natural Gas (LNG) Business
Le 05 Liquefied Natural Gas (LNG) Business
 
Natural gas 2018
Natural gas 2018Natural gas 2018
Natural gas 2018
 
Iran pak gas p ipeline final (1)
Iran pak gas p ipeline final (1)Iran pak gas p ipeline final (1)
Iran pak gas p ipeline final (1)
 
Woodside - MCRB Community Consultation Workshop - Rakhine, October 2019
Woodside - MCRB Community Consultation Workshop - Rakhine,  October 2019Woodside - MCRB Community Consultation Workshop - Rakhine,  October 2019
Woodside - MCRB Community Consultation Workshop - Rakhine, October 2019
 
Value through partnerships: LNG market in Asia
Value through partnerships: LNG market in AsiaValue through partnerships: LNG market in Asia
Value through partnerships: LNG market in Asia
 
Gas infrastructure development in archipelagic country sampe l. purba
Gas infrastructure development in archipelagic country   sampe l. purbaGas infrastructure development in archipelagic country   sampe l. purba
Gas infrastructure development in archipelagic country sampe l. purba
 

Plus de Economic Research Institute for ASEAN and East Asia

Plus de Economic Research Institute for ASEAN and East Asia (20)

First Asia CCUS Network Forum
First Asia CCUS Network ForumFirst Asia CCUS Network Forum
First Asia CCUS Network Forum
 
Entrepreneurship, Startups, and Innovation (E-S-I) in ASEAN and East Asia: Sh...
Entrepreneurship, Startups, and Innovation (E-S-I) in ASEAN and East Asia: Sh...Entrepreneurship, Startups, and Innovation (E-S-I) in ASEAN and East Asia: Sh...
Entrepreneurship, Startups, and Innovation (E-S-I) in ASEAN and East Asia: Sh...
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
 
Event Report: ASEAN MSMEs in a COVID-19 World (revised)
Event Report: ASEAN MSMEs in a COVID-19 World (revised)Event Report: ASEAN MSMEs in a COVID-19 World (revised)
Event Report: ASEAN MSMEs in a COVID-19 World (revised)
 
ASEAN on Point: Ensuring the Resilience and Sustainability of the Agriculture...
ASEAN on Point: Ensuring the Resilience and Sustainability of the Agriculture...ASEAN on Point: Ensuring the Resilience and Sustainability of the Agriculture...
ASEAN on Point: Ensuring the Resilience and Sustainability of the Agriculture...
 
Energy Security and Resilience in the ASEAN Region - Prof Jun Arima | ERIA
Energy Security and Resilience in the ASEAN Region - Prof Jun Arima | ERIAEnergy Security and Resilience in the ASEAN Region - Prof Jun Arima | ERIA
Energy Security and Resilience in the ASEAN Region - Prof Jun Arima | ERIA
 
Promotion of Intra-Trade and Investment for a Cohesive and Responsive ASEAN C...
Promotion of Intra-Trade and Investment for a Cohesive and Responsive ASEAN C...Promotion of Intra-Trade and Investment for a Cohesive and Responsive ASEAN C...
Promotion of Intra-Trade and Investment for a Cohesive and Responsive ASEAN C...
 
Disaster Mitigation Social Resilience: From Humans to Infrastructure
Disaster Mitigation Social Resilience: From Humans to InfrastructureDisaster Mitigation Social Resilience: From Humans to Infrastructure
Disaster Mitigation Social Resilience: From Humans to Infrastructure
 
AHWIN Forum - Achieving Healthy Aging in Asia: Envisioning Better Care for Ol...
AHWIN Forum - Achieving Healthy Aging in Asia: Envisioning Better Care for Ol...AHWIN Forum - Achieving Healthy Aging in Asia: Envisioning Better Care for Ol...
AHWIN Forum - Achieving Healthy Aging in Asia: Envisioning Better Care for Ol...
 
Expanding the Opportunities through I4.0 for Integration, Transformation, and...
Expanding the Opportunities through I4.0 for Integration, Transformation, and...Expanding the Opportunities through I4.0 for Integration, Transformation, and...
Expanding the Opportunities through I4.0 for Integration, Transformation, and...
 
Trade and Development Amidst Disruption: Implications for ASEAN - Prof Mari E...
Trade and Development Amidst Disruption: Implications for ASEAN - Prof Mari E...Trade and Development Amidst Disruption: Implications for ASEAN - Prof Mari E...
Trade and Development Amidst Disruption: Implications for ASEAN - Prof Mari E...
 
How to Take Advantage of New Technologies for Economic Development in ASEAN? ...
How to Take Advantage of New Technologies for Economic Development in ASEAN? ...How to Take Advantage of New Technologies for Economic Development in ASEAN? ...
How to Take Advantage of New Technologies for Economic Development in ASEAN? ...
 
Growth and Key Structural Policy Challenges in Emerging Asia
Growth and Key Structural Policy Challenges in Emerging AsiaGrowth and Key Structural Policy Challenges in Emerging Asia
Growth and Key Structural Policy Challenges in Emerging Asia
 
How Should the Region Respond to an Unending Trade War?
How Should the Region Respond to an Unending Trade War? How Should the Region Respond to an Unending Trade War?
How Should the Region Respond to an Unending Trade War?
 
Trends and Attitudes towards International Migration
Trends and Attitudes towards International MigrationTrends and Attitudes towards International Migration
Trends and Attitudes towards International Migration
 
Functional Recovery Care
Functional Recovery CareFunctional Recovery Care
Functional Recovery Care
 
Analysis of Energy Demand Supply Situation in Myanmar
Analysis of Energy Demand Supply Situation in MyanmarAnalysis of Energy Demand Supply Situation in Myanmar
Analysis of Energy Demand Supply Situation in Myanmar
 
Human Resource Development in Indonesia in a Response to Digital Revolution
Human Resource Development in Indonesia in a Response to Digital RevolutionHuman Resource Development in Indonesia in a Response to Digital Revolution
Human Resource Development in Indonesia in a Response to Digital Revolution
 
The Use of Digital Technology to Improve Quality of Life
The Use of Digital Technology to Improve Quality of LifeThe Use of Digital Technology to Improve Quality of Life
The Use of Digital Technology to Improve Quality of Life
 
H.E. Mr Rudiantara's Keynote Speech at the High Level Seminar Project 2045
H.E. Mr Rudiantara's Keynote Speech at the High Level Seminar Project 2045H.E. Mr Rudiantara's Keynote Speech at the High Level Seminar Project 2045
H.E. Mr Rudiantara's Keynote Speech at the High Level Seminar Project 2045
 

Dernier

↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...ranjana rawat
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 

Dernier (20)

↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 

ERIA Research Project: Natural Gas Master Plan for Myanmar

  • 1. 1 ERIA Research Project “Natural Gas Master Plan for Myanmar” 11 December 2018 Thingaha Hotel, Nay Pyi Taw Yoshikazu Kobayashi The Institute of Energy Economics, Japan (IEEJ) IEEJ © 2018
  • 2. 2 IEEJ©2018  ERIA Research Project “Natural Gas Master Plan for Myanmar - Supply and demand outlook - Natural gas import - Required investments - Roadmap - Conclusions  Outline of LNG Producer Consumer Conference - Overview - Major discussion issues Contents of presentation
  • 4. 4 IEEJ©2018 1. Introduction - Background, Objectives, and Assumptions 2. Trends in the global LNG market - Natural gas and LNG demand and supply in the world - Natural gas and LNG prices 3. Myanmar gas policies and strategies - National energy policies - Policies related to oil and gas 4. Natural gas supply outlook - Current production - Production outlook Table of content 5. Natural gas demand outlook - Natural gas demand by sector and by region - City gas development in Yangon and Mandalay 6. Natural gas infrastructures - Existing natural gas infrastructure - Required investments to restore north-south pipeline connection - LNG import 7. Roadmap until 2040 - Required actions in upstream and downstream 8. Conclusions
  • 5. 5 IEEJ©2018  Domestic natural gas production is forecasted to decline. - While several fields are being developed, the growth will only partially offset the decline in production from existing fields.  Natural gas shortage will need to be met by LNG, reduction of export, or both. Natural gas supply outlook IEEJ estimate of domestic production outlook Natural gas export outlook Sources: IEEJ. MoEE
  • 6. 6 IEEJ©2018  Natural gas demand in Myanmar has grown rapidly in recent years. - Major growth driver is power generation sector.  Yangon is by far the largest gas consuming region. - Power and transportation are the major demand segments in Yangon. - Most of the gas in Yangon is supplied from offshore fields while the gas supply to northern regions are supplied from onshore fields. Natural gas demand in Myanmar Natural gas consumption in Myanmar* *Because of the difference of sources, the figures of the graphs may be different. Sources: IEA; IEEJ estimate Natural gas consumption by sector as of FY 2017*
  • 7. 7 IEEJ©2018  Demand is forecasted to grow by 2.5 times until 2040. - Demand will increase from 454 mmcfd in 2017 to 1,142 mmcfd in 2040. - Demand from the power sector will continue to lead the demand growth. - Demand from the industrial sector is also expected to grow significantly. - Consumption for energy industry is likely to decrease in the upstream sector, but the demand for downstream (refinery) will grow as the new refinery will be in operation. - Demand for transportation sector will also grow at moderate rate as CNG bus will continue to be used in Yangon. - Growth of in residential / commercial sector depends on policy initiative. Natural gas demand outlook Natural gas demand outlook in Myanmar Sources: IEEJ estimate
  • 8. 8 IEEJ©2018  The largest potential demand is in industrial sector. - Thilawah SEZ has a big potential of industrial demand.  Demand for a new refinery is forecasted emerge from the mid-2020s.  Transportation sector will see a moderate growth.  Required investment for additional infrastructure (mainly for industrial demand development) is USD 4.2 million. City gas demand in Yangon City gas (non-power) demand outlook in Yangon Sources: IEEJ estimate City gas demand locations in Yangon
  • 9. 9 IEEJ©2018  While currently gas is not used in Mandalay, the demand is expected to emerge from the mid-2020s. - Most of expected demand is in Industrial sector; residential commercial demand will emerge from the 2030s.  Required investments for additional infrastructure is USD27.0 million.  Strong policy initiative is needed to realize city gas use in Mandalay. City gas demand in Mandalay City gas (non-power) demand outlook in Mandalay Sources: IEEJ estimate City gas demand locations in Mandalay
  • 10. 10 IEEJ©2018  Myanmar has an extensive natural gas pipeline network.  However, pipeline networks in the north and the south is divided because the connecting pipeline is out of operation. - Leakage problem by corrosion  The restoration of the north-south linkage will bring great economic and supply security benefits - Demand creation along the restored line. - Flexible supply operation in case of emergency  Renovation of the interrupted parts will cost USD 77.4 milllion Pipeline connection Pipeline network in Myanmar Sources: MoEE
  • 11. 11 IEEJ©2018  Because of the lack of international import pipeline, Myanmar will have to rely on LNG as an import source.  The study assumes Myanmar will need to import LNG from 2023. - Preparatory should be accelerated.  Three LNG import projects are being planned in the south. - All of them are Gas-to-Power projecbts Natural gas (LNG) import Expected LNG imports* *Import requirement is estimated at different rate of realization of onshore developments; Sources: IEEJ. MoEE Planned LNG receiving projects Project Import capacity (mtpa) Installed Generation Capacity (MW) Region Alone LNG to Power Project 0.4 356 Yangon MeeLongGyaing LNG to Power Project 1.6 1,390 Ayeyarwady Kanbauk LNG to Power Project 1.0 1,230 Tanyintharyi
  • 12. 12 IEEJ©2018 Roadmap 2018 2020 2025 2030 2035 2040 Upstream development Development of M-3 Start production of M-3 Development of A-6 Start production of A-6 Development of new onshore fields Start production of onshore fields Exploration Discovery Appraisal Development Start production of newly discovered fields Pipeline network Comprehensive pipeline Development Plan Renovation .development of pipeline based on the Plan FS for North-South pipeline Connection Construction of North-South Pipeline Pipeline network expansion in southern states LNG Gas to Power Negotiation of the three proposed project Installation FSRU-1 Installation FSRU-2 Installation FSRU-3 Installation FSRU Kyaukpyu City gas network Accumulation of Demand in Thilawah Construction Gas power plant in Thilawah Development network in Thilawah Demand development in Northwestern Yangon Planning of New Yangon City Build pipeline network for New Yangon City Industrial demand development in MIZ and Myotha Industrial Park Build Pipeline network to downtown Mandalay Abbreviation: LNG = Liquefied Natural Gas, FS = Fesibility Study, MIZ = Mandalay Industrial Zone, FRSU = Floating Storage and Regasification Unit Table: Roadmap for the Development of Myanmar’s Natural Gas Market Sources: IEEJ
  • 13. 13 IEEJ©2018  Enhance the role and capacity of government. - The government should lead the effort to create demand by initiating and coordinating the infrastructure development projects.  Encourage and accelerate domestic upstream development. - Domestic production is the most reliable supply source. - All projects at the development stage should be developed in a timely manner and exploration efforts should be continued.  Improve the resilience of the pipeline network. - Myanmar’s pipeline network is in a vulnerable condition. - A comprehensive review of the domestic pipeline network and renovation of critical parts of the existing network should be undertaken.  Reform the energy pricing system. - Gradual but steady reform of the pricing system will be required to ensure investments.  Grow human capital to utilize LNG. - Training the country’s experts will facilitate the future LNG imports. Conclusions
  • 14. 14 IEEJ©2018 Overview of LNG producer Consumer Conference
  • 15. 15 IEEJ©2018  The 7th LNG Producer – Consumer Conference was held in Nagoya (central part of Japan) on 22 October 2018.  More than 1,000 participants from 28 countries  Ministerial session, CEO session, and four topical sessions - For the detail, see conference web-site (https://www.lng-conference.org/) Overview
  • 16. 16 IEEJ©2018  “1st LNG revolution” - Expansion in liquefaction capacity in the U.S., Australia, and Qatar - Demand surge in emerging markets; demand recovery in traditional markets - The recent surge of LNG supply capacity brings revolutionary effect to the market.  LNG trade expands much faster than natural gas trade. - LNG evolves from a minor means of natural gas trade to a major one.  Air pollution control as another springboard for LNG demand - China’s Blue-sky policy has caused a significant LNG demand growth. - Other countries such as India will follow. “The First LNG Revolution” LNG supply in the world Source: IEA
  • 17. 17 IEEJ©2018  Challenges in Asia LNG market - Huge upfront capital investments - Price competitiveness - Inflexible supply contract  Importance of Prod-Cons dialogue - Engagement with emerging buyers - Knowledge creation through dialogue  Japan’s initiative - Financial support for LNG facilities - Encouraging more flexible LNG trade by removing destination restriction  US efforts in Asian LNG market - Energy infrastructure development under Liberal and Open Indo-Pacific initiative - Declaration of no risk of export revocation How to develop LNG demand in Asia? LNG demand outlook in Asia Source: IEEJ
  • 18. 18 IEEJ©2018  Need for a price benchmark to rationalize prices - Persistent linkage to crude oil price - Activated spot market is needed through removal of destination restriction  Review of the existing LNG trading custom by anti-monopoly authority to remove destination restriction  Standardization of LNG contract - Facilitating active cargo transactions  Growing roles of portfolio players - Provision of flexible supply by holding various supply and demand outlets - Arbitrage inter-regional price differentials More flexible and transparent market Natural gas prices in the world Source: METI, EIA
  • 19. 19 IEEJ©2018  Diverging interests between sellers and buyers - Sellers want long-term contracts to secure revenue certainty and financing. - Buyers prefer shorter-term and more flexible contracts to adapt demand uncertainty.  Imperatives of continuous Producer – Consumer dialogue - Overcoming the gap of interests between sellers and buyers - Optimal risk allocation among parties involved in the LNG project  Providing a model project template for a downstream project - Typical pattern of risk allocation - Standard templates for required contracts / documents for LNG receiving project may facilitate investments  Several good news for supply capacity expansions - Qatari plan to expand its capacity to 110 mtpa; FID of LNG Canada How to promote investments?
  • 20. 20 The IEEJ was ranked second in the field of energy research in the 2017 Global Think Tank Ranking conducted by the University of Pennsylvania. (ranked third in 2016 and first in 2015)