01/ The chief task of the roving frame is the attenuation
of the sliver.
02/Impart protective twist in order to increase the
strength of roving.
03/ The third task can not be directly attributed to
spinning. It is used in winding of roving into a package.
So that it can be transported stored handled and used in
the ring spinning m/c.
01.Shift the cone belt corresponding to increase in the
bobbin dia.
02. Reverse the direction of the bobbin rail at the lower
& upper end of the lift stroke.
03. To form a tappered end so that the package can be
transferred handle & fed in the spinning machine.
01/ The bobbin speed is higher than the flyer speed at all
point of winding.
O2/ The winding on speed is constant through out the
process.
03/ With the increase of bobbin dia ,the bobbin speed
must be decreased.
04/ Less tenssion on roving or yarn.
05/ The variation of bobbin speed with the increase of
bobbin dia must be constant.
06/ Used in cotton spinning.
01/ Higher flyer speed: Up to 16oo-1800.
02/ Plastic Flyer: Light weight low power consumtion.
03/ greading in the oil bath.
04/ automatic tenssion controller.
05/ Can changing automatically.
06/ Modification of flyer top.
07/ Invertor motor.
08/centrally lubrication.
01/ Irreguar Roving.
02/ Roving breakage .
03/ Sliver breakage.
04/ Roller lapping.
05/ Unequal tappering .
06/ Hard roving bobbin.
07/ Ridgy bobbin .
08/Thicks thin place.
Conventional Drafting System Modern Drafting System
01:It is Roller Drafting method. 01: It is apron method.
02:Short fibre control is not good. 02:Better control of short fibre.
03:Drafe range is 06-10. 03: Drafe range is 10-15.
04:It is Irregular draft distribution. 04:It is regular draft distribution.
05: Roller weight by dead weight & hook
arrangement.
05:Roller weighting by spring loaded or
pneumatic.
06:More time requried For changing of
roller setting.
06: Less time requried.
07:More tendency of roller lopping & end
breakage.
07:Less tendency of roller lopping & end
breakage.
 Sliver trumpet’s are mounted on bar behind the rear
cylinder of the drafting arrangement design to lead
the sliver into the drafting arrangement.A second
sliver condenser is provided in the breake draf field &
a third is the main drafting field.
 Object:
 01. To bring the fibre strand bauk together again since
during drafting it continually tend’s to move apart.
 02.To keep the processing clean and proper.
 Apron: It is eudless sheed made of either synthetic rubber
or leather.they have thinkness of loom & are held taut by
tenssioning devi
 Advantages:
 01. To reduce the loss of short fibre.
 02. Help to impart hight draft.
 03: Make the roller setting flexible for changing the staple
length.
 04:It act’s like a guide to control the fibre to a possible
extent.
 Spindle: The spindle is a simply support and drive
element for the flyer,without any axuilary function.It
is a long steel shaft,mounted at it’s lower end in a
bearing.
 Types of spindle:
 01.mounted mounted.
 02.closed mounted.
 03.top mounted.
 01.To attenuate the roving to from yarn of the requried
count by drafting.
 02.To impact strength to the fibre strand by twisting.
 03.To wind up the yarn on the bobbin is form of the
resulting yarn on to bobbin.
 04.To build up the yarn on to bobbin is form of a suitable
package for storage transportation & processing.
 01:Best quality raw materials.
 02:Good but too high surface smoothness.
 03:An even surface.
 04:Good running condition.
 05:Good even surface hardness,higher than
traveller.
 O6:suitability between ring & bobbin dia.
 01:Excessive yarn tenssion.
 02:excessive irregularity of yarn.
 03:excess twist of roving.
 04:excess spindle speed.
 05:Incorrect roller setting.
 06:Incorrect roller draft.
 07:Faulty drafting system.
 08:Strutched roving.
 09:traveller fyying out.
 Combing: Combing may be defined as the remobal of
short fibre neps & impurities of card sliver by using comb
with the help of knives,brushes&teeths.
 OBJECTS:
*01: To removal short fibre blow a preclecd length.so that
spinners are able to produce fibre/better yarn.
02:To remove neps & foregin matters from the cotton &
sliver.
03:With the help of drawing and dubling combed sliver is
uniform&the fibre are straight & parallel.
 01: For finer count high draft is requried but draft
irregularity for presence of short fibre.
 02:Long fibre are finer than short fibre after
combing higher count is possible.
 03: Long fibre has less hairness but more lustre.
 04: Comber is necessary for better yarn
appearance& regularity.
 01: Lap feed by feed roller.
 02: Lap nipping by nipper.
 03:Combing by cylinder.
 04:Nipper opening & forwarding.
 05: Dataching roller backward movement.
 06: Combing by top comb.
 07: Dataching roller forward movement.
 08:Waste extraction by the brush.

Contenu connexe

Tendances

Important parts on ring frame
Important parts on ring frameImportant parts on ring frame
Important parts on ring frameMdibrahimkhalil31
 
Ring spinning machine
Ring spinning machineRing spinning machine
Ring spinning machineRedwan Islam
 
Ring and traveller of ring frame
Ring and traveller of ring frameRing and traveller of ring frame
Ring and traveller of ring frameArman sarker
 
Optimisation of drawframe autoleveller
Optimisation of drawframe autolevellerOptimisation of drawframe autoleveller
Optimisation of drawframe autolevellerHitesh Choudhary
 
A study on different opening roller wire configuration
A study on different opening roller wire configurationA study on different opening roller wire configuration
A study on different opening roller wire configurationSagnik Ghosh
 
Rotor spinning working principle
Rotor spinning working principleRotor spinning working principle
Rotor spinning working principlehammama syed
 
Autoleveller and stop motion in drawframe
Autoleveller and stop motion in drawframeAutoleveller and stop motion in drawframe
Autoleveller and stop motion in drawframeVaibhavSingh573
 
Study on drawing and doubling
Study on drawing and doublingStudy on drawing and doubling
Study on drawing and doublingMd Fahimuzzaman
 
Buhler Fiber To Yarn
Buhler Fiber To YarnBuhler Fiber To Yarn
Buhler Fiber To YarnDavid Sasso
 
Presentation ,broken stitch by mehadi hasan
Presentation ,broken stitch by  mehadi hasanPresentation ,broken stitch by  mehadi hasan
Presentation ,broken stitch by mehadi hasanMehadi Hasan
 
Types of Yarn and Spinning
Types of Yarn and SpinningTypes of Yarn and Spinning
Types of Yarn and SpinningRaNa ALi HaiDer
 
How to Calculate Weight of TMT Bars?
How to Calculate Weight of TMT Bars?How to Calculate Weight of TMT Bars?
How to Calculate Weight of TMT Bars?Shyam Steel TMT Bar
 

Tendances (19)

Important parts on ring frame
Important parts on ring frameImportant parts on ring frame
Important parts on ring frame
 
Ringspinningframe
RingspinningframeRingspinningframe
Ringspinningframe
 
Ring spinning machine
Ring spinning machineRing spinning machine
Ring spinning machine
 
Auto cone winding
Auto cone windingAuto cone winding
Auto cone winding
 
Ring and traveller of ring frame
Ring and traveller of ring frameRing and traveller of ring frame
Ring and traveller of ring frame
 
V belt and rope drives
V belt and rope drivesV belt and rope drives
V belt and rope drives
 
Optimisation of drawframe autoleveller
Optimisation of drawframe autolevellerOptimisation of drawframe autoleveller
Optimisation of drawframe autoleveller
 
A study on different opening roller wire configuration
A study on different opening roller wire configurationA study on different opening roller wire configuration
A study on different opening roller wire configuration
 
Winding machine
Winding machineWinding machine
Winding machine
 
Spinning [compatibility mode],Yarn types classification
Spinning [compatibility mode],Yarn types classificationSpinning [compatibility mode],Yarn types classification
Spinning [compatibility mode],Yarn types classification
 
Rotor spinning working principle
Rotor spinning working principleRotor spinning working principle
Rotor spinning working principle
 
Autoleveller and stop motion in drawframe
Autoleveller and stop motion in drawframeAutoleveller and stop motion in drawframe
Autoleveller and stop motion in drawframe
 
Study on drawing and doubling
Study on drawing and doublingStudy on drawing and doubling
Study on drawing and doubling
 
Buhler Fiber To Yarn
Buhler Fiber To YarnBuhler Fiber To Yarn
Buhler Fiber To Yarn
 
Presentation ,broken stitch by mehadi hasan
Presentation ,broken stitch by  mehadi hasanPresentation ,broken stitch by  mehadi hasan
Presentation ,broken stitch by mehadi hasan
 
New conveyor
New conveyorNew conveyor
New conveyor
 
Types of Yarn and Spinning
Types of Yarn and SpinningTypes of Yarn and Spinning
Types of Yarn and Spinning
 
MODERN WINDING MACHINE
MODERN WINDING MACHINEMODERN WINDING MACHINE
MODERN WINDING MACHINE
 
How to Calculate Weight of TMT Bars?
How to Calculate Weight of TMT Bars?How to Calculate Weight of TMT Bars?
How to Calculate Weight of TMT Bars?
 

En vedette

Formation professionnelle
Formation professionnelleFormation professionnelle
Formation professionnelleChris RHAND
 
es300-2015-whatpowerspowerfulwomen
es300-2015-whatpowerspowerfulwomenes300-2015-whatpowerspowerfulwomen
es300-2015-whatpowerspowerfulwomenRebecca Chen
 
Personal blog kernel for pst split
Personal blog   kernel for pst splitPersonal blog   kernel for pst split
Personal blog kernel for pst splitPUNEET MISHRA
 
Plan de actuación miniempresas-ceip sagrado corazón-t.alháquime
Plan de actuación miniempresas-ceip sagrado corazón-t.alháquimePlan de actuación miniempresas-ceip sagrado corazón-t.alháquime
Plan de actuación miniempresas-ceip sagrado corazón-t.alháquimeConsejería de Educación
 
Recuperación de la Informacion
Recuperación de la InformacionRecuperación de la Informacion
Recuperación de la InformacionAntonia Molina
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality AssuranceLYNN GAGNON
 
Verbi irregolari nel passato remoto
Verbi irregolari nel passato remotoVerbi irregolari nel passato remoto
Verbi irregolari nel passato remotoIvann Nikolov
 
Transformation process of a Photolab
Transformation process of a PhotolabTransformation process of a Photolab
Transformation process of a PhotolabAbhishek Kushwaha
 
MS Project 2010 intermediate Course Cert
MS Project 2010 intermediate Course CertMS Project 2010 intermediate Course Cert
MS Project 2010 intermediate Course CertJoshua Wilson
 
Properties of fal g masonry blocks
Properties of fal g masonry blocksProperties of fal g masonry blocks
Properties of fal g masonry blockseSAT Journals
 
1ro.a trueno la escuela
1ro.a trueno la escuela1ro.a trueno la escuela
1ro.a trueno la escuelaJose Caldera
 
Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...
Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...
Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...Probodh Mallick
 

En vedette (14)

Formation professionnelle
Formation professionnelleFormation professionnelle
Formation professionnelle
 
1378 1
1378 11378 1
1378 1
 
es300-2015-whatpowerspowerfulwomen
es300-2015-whatpowerspowerfulwomenes300-2015-whatpowerspowerfulwomen
es300-2015-whatpowerspowerfulwomen
 
Personal blog kernel for pst split
Personal blog   kernel for pst splitPersonal blog   kernel for pst split
Personal blog kernel for pst split
 
Plan de actuación miniempresas-ceip sagrado corazón-t.alháquime
Plan de actuación miniempresas-ceip sagrado corazón-t.alháquimePlan de actuación miniempresas-ceip sagrado corazón-t.alháquime
Plan de actuación miniempresas-ceip sagrado corazón-t.alháquime
 
Recuperación de la Informacion
Recuperación de la InformacionRecuperación de la Informacion
Recuperación de la Informacion
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
Verbi irregolari nel passato remoto
Verbi irregolari nel passato remotoVerbi irregolari nel passato remoto
Verbi irregolari nel passato remoto
 
Transformation process of a Photolab
Transformation process of a PhotolabTransformation process of a Photolab
Transformation process of a Photolab
 
MS Project 2010 intermediate Course Cert
MS Project 2010 intermediate Course CertMS Project 2010 intermediate Course Cert
MS Project 2010 intermediate Course Cert
 
Properties of fal g masonry blocks
Properties of fal g masonry blocksProperties of fal g masonry blocks
Properties of fal g masonry blocks
 
1ro.a trueno la escuela
1ro.a trueno la escuela1ro.a trueno la escuela
1ro.a trueno la escuela
 
4to.d fosiles
4to.d fosiles4to.d fosiles
4to.d fosiles
 
Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...
Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...
Latest 74 draft_guidelinesasonphosphogypsumgeneratedfromphosphoricacidplants1...
 

Similaire à Y.M.T-2 (20)

Combing action
Combing actionCombing action
Combing action
 
Jute spinning assingnment_MD. SALIM RANA_DUET
Jute spinning assingnment_MD. SALIM RANA_DUETJute spinning assingnment_MD. SALIM RANA_DUET
Jute spinning assingnment_MD. SALIM RANA_DUET
 
Warping phpapp3648
Warping phpapp3648Warping phpapp3648
Warping phpapp3648
 
Draw frame (1)
Draw frame (1)Draw frame (1)
Draw frame (1)
 
RING FRAME Machine
RING FRAME MachineRING FRAME Machine
RING FRAME Machine
 
Warping
WarpingWarping
Warping
 
Direct warping power point presentation
Direct warping power point presentationDirect warping power point presentation
Direct warping power point presentation
 
Direct warping
Direct warping Direct warping
Direct warping
 
Carding note
Carding noteCarding note
Carding note
 
Simplex machine. Roving, sliver
Simplex machine. Roving, sliverSimplex machine. Roving, sliver
Simplex machine. Roving, sliver
 
ROTOR SPINNING PROCESS
ROTOR SPINNING PROCESSROTOR SPINNING PROCESS
ROTOR SPINNING PROCESS
 
Auto cone winding machine
Auto cone winding machineAuto cone winding machine
Auto cone winding machine
 
3572
35723572
3572
 
Simplex comber ringframe
Simplex comber ringframe Simplex comber ringframe
Simplex comber ringframe
 
Tpm 1
Tpm   1Tpm   1
Tpm 1
 
Machine parameter of speed frame
Machine parameter of speed frameMachine parameter of speed frame
Machine parameter of speed frame
 
"Warping method in a Textile Weaving Technology"
 "Warping method in a Textile Weaving Technology" "Warping method in a Textile Weaving Technology"
"Warping method in a Textile Weaving Technology"
 
Carding,card clothing,grinding, autoleveller.pdf
Carding,card clothing,grinding, autoleveller.pdfCarding,card clothing,grinding, autoleveller.pdf
Carding,card clothing,grinding, autoleveller.pdf
 
WARPING PRESENTATION
WARPING PRESENTATION WARPING PRESENTATION
WARPING PRESENTATION
 
Bdft ii, tmt, unit-i, loom & itz types
Bdft ii, tmt, unit-i, loom & itz typesBdft ii, tmt, unit-i, loom & itz types
Bdft ii, tmt, unit-i, loom & itz types
 

Y.M.T-2

  • 1. Wellcome to my Presentation class Assignment on: Y.M.T-2 Md. Nazmul Haque Batch: day-17th I.D: 113-0053-002
  • 2. 01/ The chief task of the roving frame is the attenuation of the sliver. 02/Impart protective twist in order to increase the strength of roving. 03/ The third task can not be directly attributed to spinning. It is used in winding of roving into a package. So that it can be transported stored handled and used in the ring spinning m/c.
  • 3. 01.Shift the cone belt corresponding to increase in the bobbin dia. 02. Reverse the direction of the bobbin rail at the lower & upper end of the lift stroke. 03. To form a tappered end so that the package can be transferred handle & fed in the spinning machine.
  • 4. 01/ The bobbin speed is higher than the flyer speed at all point of winding. O2/ The winding on speed is constant through out the process. 03/ With the increase of bobbin dia ,the bobbin speed must be decreased. 04/ Less tenssion on roving or yarn. 05/ The variation of bobbin speed with the increase of bobbin dia must be constant. 06/ Used in cotton spinning.
  • 5. 01/ Higher flyer speed: Up to 16oo-1800. 02/ Plastic Flyer: Light weight low power consumtion. 03/ greading in the oil bath. 04/ automatic tenssion controller. 05/ Can changing automatically. 06/ Modification of flyer top. 07/ Invertor motor. 08/centrally lubrication.
  • 6. 01/ Irreguar Roving. 02/ Roving breakage . 03/ Sliver breakage. 04/ Roller lapping. 05/ Unequal tappering . 06/ Hard roving bobbin. 07/ Ridgy bobbin . 08/Thicks thin place.
  • 7. Conventional Drafting System Modern Drafting System 01:It is Roller Drafting method. 01: It is apron method. 02:Short fibre control is not good. 02:Better control of short fibre. 03:Drafe range is 06-10. 03: Drafe range is 10-15. 04:It is Irregular draft distribution. 04:It is regular draft distribution. 05: Roller weight by dead weight & hook arrangement. 05:Roller weighting by spring loaded or pneumatic. 06:More time requried For changing of roller setting. 06: Less time requried. 07:More tendency of roller lopping & end breakage. 07:Less tendency of roller lopping & end breakage.
  • 8.  Sliver trumpet’s are mounted on bar behind the rear cylinder of the drafting arrangement design to lead the sliver into the drafting arrangement.A second sliver condenser is provided in the breake draf field & a third is the main drafting field.  Object:  01. To bring the fibre strand bauk together again since during drafting it continually tend’s to move apart.  02.To keep the processing clean and proper.
  • 9.  Apron: It is eudless sheed made of either synthetic rubber or leather.they have thinkness of loom & are held taut by tenssioning devi  Advantages:  01. To reduce the loss of short fibre.  02. Help to impart hight draft.  03: Make the roller setting flexible for changing the staple length.  04:It act’s like a guide to control the fibre to a possible extent.
  • 10.  Spindle: The spindle is a simply support and drive element for the flyer,without any axuilary function.It is a long steel shaft,mounted at it’s lower end in a bearing.  Types of spindle:  01.mounted mounted.  02.closed mounted.  03.top mounted.
  • 11.  01.To attenuate the roving to from yarn of the requried count by drafting.  02.To impact strength to the fibre strand by twisting.  03.To wind up the yarn on the bobbin is form of the resulting yarn on to bobbin.  04.To build up the yarn on to bobbin is form of a suitable package for storage transportation & processing.
  • 12.  01:Best quality raw materials.  02:Good but too high surface smoothness.  03:An even surface.  04:Good running condition.  05:Good even surface hardness,higher than traveller.  O6:suitability between ring & bobbin dia.
  • 13.  01:Excessive yarn tenssion.  02:excessive irregularity of yarn.  03:excess twist of roving.  04:excess spindle speed.  05:Incorrect roller setting.  06:Incorrect roller draft.  07:Faulty drafting system.  08:Strutched roving.  09:traveller fyying out.
  • 14.  Combing: Combing may be defined as the remobal of short fibre neps & impurities of card sliver by using comb with the help of knives,brushes&teeths.  OBJECTS: *01: To removal short fibre blow a preclecd length.so that spinners are able to produce fibre/better yarn. 02:To remove neps & foregin matters from the cotton & sliver. 03:With the help of drawing and dubling combed sliver is uniform&the fibre are straight & parallel.
  • 15.  01: For finer count high draft is requried but draft irregularity for presence of short fibre.  02:Long fibre are finer than short fibre after combing higher count is possible.  03: Long fibre has less hairness but more lustre.  04: Comber is necessary for better yarn appearance& regularity.
  • 16.  01: Lap feed by feed roller.  02: Lap nipping by nipper.  03:Combing by cylinder.  04:Nipper opening & forwarding.  05: Dataching roller backward movement.  06: Combing by top comb.  07: Dataching roller forward movement.  08:Waste extraction by the brush.