SlideShare une entreprise Scribd logo
1  sur  12
Production Planning
 and Control, MPS




MASTER PRODUCTION SCHEDULE (MPS)
WORKFLOW SCENARIO
MASTER PRODUCTION SCHEDULE
    (MPS) WORKFLOW SCENARIO




            Release 2.8




2           © 2010 eresource Infotech Private Limited. All rights reserved
Copyright
© Copyright 2010 ERESOURCE. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose
without the express permission of eresource Infotech P. Ltd. The information contained herein may be
changed without prior notice.

Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered
trademarks of Microsoft Corporation.

HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide
Web Consortium,

eresource, eresource Logo. Eresourceerp.com are trademarks or registered trademarks of eresource
Infotech in India and several other countries all over the world. All other products mentioned are
trademarks or registered trademarks of their respective companies




      3                                   © 2010 eresource Infotech Private Limited. All rights reserved
Table of Contents

Master Production Schedule ........................................................................................................................ 5
The Production Process definition in eresource. .......................................................................................... 6
Product and Material Definition in eresource .............................................................................................. 7
Forecasts Consumed by orders ..................................................................................................................... 8
Linkage to other Company Activities .......................................................................................................... 10
Master Production Scheduling in MPC system ........................................................................................... 10
Capacity Planning and Daily Route Availability ........................................................................................... 11




         4                                                  © 2010 eresource Infotech Private Limited. All rights reserved
Master Production Schedule


Interaction between demand management and master production scheduling (MPS) are frequent and
detailed. As customer orders are received and entered into MPS, the detailed order information should
be provided to the master production scheduler as the orders occur. An effective master production
schedule in eresource ERP provides the basis for making good use of manufacturing resources, making
customer delivery promises, resolving trade-off between sales and manufacturing, and attaining the
firm’s strategic objectives as reflected in the sales and operations plan. Similarly, in eresource ERP
demand management needs information on the status of orders, capacity consumed, and capacity
available so customer can be kept information. Details vary significantly between make-to-order,
assemble-to-order, and make make-to-stock. In all conditions, the underlying concept is that forecasts
are consumed over time by actual customer orders.

Eresource ERP Master Production Scheduling system is used in conjunction with Material Requirements
Planning (MRP) to schedule finished goods production and raw materials requirements when and where
they are required.




                                                             Make-to-order
                                         Assemble-
                                          to-order
                Make-to-stock                                                                 Capacity
                                                                       Forecast
                                                 Customer               order
                                                   orders


                                    Time in future

 Current date




      5                                  © 2010 eresource Infotech Private Limited. All rights reserved
The Production Process definition in eresource.


In eresource, the Production process starts from setting up the Production process parameters.
Eresource ERP is scalable enabling users to configure the production process for any Item as required.
The lead time of an production operation for a product is defined;

The executing time is the linear sum of the following segment times;

    •   Start Time

    •   End Time

    •   Process Time




On the basis of the parameters defined here, the system computes the duration of individual operation
of the product.




        6                                 © 2010 eresource Infotech Private Limited. All rights reserved
Product and Material Definition in eresource
Product Defination is an integral part of the ERP Production process and Material Requirement
management, and thus requires a detailed explanation in the setup process, not only from the master
data point of view but also for transactional processes.

We will therefore describe how eresource handles finished product Management

The product Defination in eresource can be extended and described in the following manner

   •   Basic Product Information : Basic product information includes search key values, Description,
       Product Categorizaion, Unit of measurement, EAN

   •   Production Process : This refers to the process that takes to manufacture the product and time
       taken in each of the processes




   •   Product BOM (Bill of Material) : More advanced products would include BOM kits that are made
       up of other products (referred to as BOM components)

   •   IPQC and FGQC process : IPQC refers to In-process-Quality-Check and FGQC to Finished Quality
       Check. Here the parameters of IPQC and FGQC is defined with the acceptable tolerance.



       7                                 © 2010 eresource Infotech Private Limited. All rights reserved
•   Product Business Partner: This describes additional information used when product Is
      manufactured and purchased.

  •   Product Replenishment: This describes the rules of how a product would be replenished. This
      would, for instance, include minimum and maximum quantities to hold in stock.


Forecasts Consumed by orders


      Observe in above figure that the lines for three different environments are quite different in
      eresource ERP.

   • For the Make-to-order environment, there are very few actual customer orders, thus demand is
      generally satisfied from inventory. This reflects the need to manage the finished goods
      inventory.
   • For the assemble-to-order environment, there are customer orders already booked for several
      periods into the future. This reflects the need to provide accurate delivery promise dates the
      customers.
   • Still different demand management problems confront the firm with a make-to-order
      environment, even though there’s a larger backlog of customer orders. Communication
      between the firm and the customer first involves engineering, as orders become completely
      specified, and then project management status and delivery date promising.




      8                                  © 2010 eresource Infotech Private Limited. All rights reserved
eresource ERP provides you the provision to create Master Production scheduling on the bases of Sales
order, Forecast or Both. For a particular time period you are allow to do Production Scheduling. All finish
material requirement get filtered out on the click of Consolidated Requirement Item Name Wise.

A Mfg Order No. which is system generated gets populated which is customer specific and its sales order
no. In eresource ERP you have provision to schedule a plan Qty and system will auto generate the
pending Qty. System will tell the start and end date of each and every particular Mfg Order No.




       9                                   © 2010 eresource Infotech Private Limited. All rights reserved
Linkage to other Company Activities


   Resource Planning                          Sales and                            Demand
                                         operations planning                      Management




                                                                                                           Enterprise Resource Planning ( ERP )
  Rough-cut capacity                     Master Production
      planning                           Scheduling ( MPS )

                                                                               Front end

                                                                                 Engine
                                          Detailed Material
                                          planning ( MRP )




Master Production Scheduling in MPC system

The above figure presents a partial schematic for the complete manufacturing planning and control
system which is showing the linkages to master production scheduling. The detailed schedule produced
by the MPS which drives the entire engine and back-end system, as well as the rough-cut capacity
planning activity.

The linkage to the eresource ERP system of the firms is shown as indirect, but they are important. The
role of MPS in eresource ERP system is the same as we have described here: disaggregating the sales
and operations plan, creating a statement of the output from the factory, and providing the information
for coordinating sales and manufacturing.

The demand management block in above figure represents a company’s forecasting, order entry, order
promising and physical distribution activities. Demand management collects data on all sources of
demand for manufacturing capacity: customer orders, forecasts of future customer orders, warehouse
replenishments, interplant transfer, spare parts requirements and so forth. These forecasts in eresource
ERP are summarized and provided to sales and operations planning.




     10                                   © 2010 eresource Infotech Private Limited. All rights reserved
In eresource ERP sales and operations planning the forecasts from demand management will be
consolidated and incorporated into sales and operations plan.


Capacity Planning and Daily Route Availability

Capacity planning involves an analysis of the master production schedule to discover the existence of
any manufacturing resources that represent potential bottlenecks in the production flow. This is a
eresource Linkage that provides a rough evaluation of potential capacity problems with a particular
MPS. The disaggregation of the operations plan into production plans for specific product defines the
product minx that will be produced. These plans in eresource ERP also provide the basic demand
forecast for each MPS production unit. The eresource MPS, in turn, provides the input data to the
material requirements planning system. The MPS, then, is the driver of all the detailed manufacturing
activities needed to meet the output objectives of the firm.




Eresource ERP Master Production Scheduling system quickly and accurately schedules all item
requirements for each manufacturing facility.




    11                                   © 2010 eresource Infotech Private Limited. All rights reserved
Some of the benefits of using Master Production Schedule module are it helps last minute scheduling,
shortage avoidance, efficient allocations of resources and cost control. It gives the customer timely
information on what they need and when they need. Eresource ERP's MPS module organizes what the
customer need to do and when efficiently. The schedule can be re-calculated easily when a process fails,
for example, the situations like a material shortage or manpower absence.




     12                                   © 2010 eresource Infotech Private Limited. All rights reserved

Contenu connexe

Tendances

Tendances (8)

Pharmaceutical erp-ebroucher
Pharmaceutical erp-ebroucherPharmaceutical erp-ebroucher
Pharmaceutical erp-ebroucher
 
Chapter 9 layout strategies
Chapter 9 layout strategiesChapter 9 layout strategies
Chapter 9 layout strategies
 
Pswfl
PswflPswfl
Pswfl
 
Erp formanufacturingindustry
Erp formanufacturingindustryErp formanufacturingindustry
Erp formanufacturingindustry
 
Supply Relationship Management Srm 7.0
Supply Relationship Management Srm 7.0Supply Relationship Management Srm 7.0
Supply Relationship Management Srm 7.0
 
Information-2-Intelligence
Information-2-IntelligenceInformation-2-Intelligence
Information-2-Intelligence
 
Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers
 
Rotkäppchen-Mumm Sektkellereien
Rotkäppchen-Mumm SektkellereienRotkäppchen-Mumm Sektkellereien
Rotkäppchen-Mumm Sektkellereien
 

En vedette (12)

Jasa hipnoterapi
Jasa hipnoterapiJasa hipnoterapi
Jasa hipnoterapi
 
Hypno aura
Hypno auraHypno aura
Hypno aura
 
Packaging Industry in Sweden
Packaging Industry in SwedenPackaging Industry in Sweden
Packaging Industry in Sweden
 
Tobacco in Algeria
Tobacco in AlgeriaTobacco in Algeria
Tobacco in Algeria
 
Boletim esperança 27
Boletim esperança 27Boletim esperança 27
Boletim esperança 27
 
Masalah hipnoterapi yg ditangani
Masalah hipnoterapi yg ditanganiMasalah hipnoterapi yg ditangani
Masalah hipnoterapi yg ditangani
 
Impressionen der FH Salzburg
Impressionen der FH SalzburgImpressionen der FH Salzburg
Impressionen der FH Salzburg
 
Innovative Beta-2 Microglobulin Testing Technologies and Emerging Markets
Innovative Beta-2 Microglobulin Testing Technologies and Emerging MarketsInnovative Beta-2 Microglobulin Testing Technologies and Emerging Markets
Innovative Beta-2 Microglobulin Testing Technologies and Emerging Markets
 
Biomecanica fractura huesos_largos
Biomecanica fractura huesos_largosBiomecanica fractura huesos_largos
Biomecanica fractura huesos_largos
 
Life Insurance in Peru, Key Trends and Opportunities to 2016
Life Insurance in Peru, Key Trends and Opportunities to 2016Life Insurance in Peru, Key Trends and Opportunities to 2016
Life Insurance in Peru, Key Trends and Opportunities to 2016
 
Apoplejia 1229957996821572-1
Apoplejia 1229957996821572-1Apoplejia 1229957996821572-1
Apoplejia 1229957996821572-1
 
TECHBells
TECHBellsTECHBells
TECHBells
 

Similaire à Production planning mps mrp eresource

Erp by surya shankar 12mt07ind020
Erp by surya shankar 12mt07ind020Erp by surya shankar 12mt07ind020
Erp by surya shankar 12mt07ind020
Akash Maurya
 
ERP( enterprise resource planning)
ERP( enterprise resource planning)ERP( enterprise resource planning)
ERP( enterprise resource planning)
Omer Maroof
 
sappresentation- By Prithwijit
sappresentation- By Prithwijit sappresentation- By Prithwijit
sappresentation- By Prithwijit
PRITHWIJIT PAL
 
Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8
Pratik Van
 
MBALN-670 Operations Management Title of the topic 6 .docx
MBALN-670 Operations Management  Title of the topic 6 .docxMBALN-670 Operations Management  Title of the topic 6 .docx
MBALN-670 Operations Management Title of the topic 6 .docx
ARIV4
 

Similaire à Production planning mps mrp eresource (20)

Erp by surya shankar 12mt07ind020
Erp by surya shankar 12mt07ind020Erp by surya shankar 12mt07ind020
Erp by surya shankar 12mt07ind020
 
The Complete Guide to ERP
The Complete Guide to ERPThe Complete Guide to ERP
The Complete Guide to ERP
 
ERP Software
ERP SoftwareERP Software
ERP Software
 
Chapter 2 erp
Chapter 2 erpChapter 2 erp
Chapter 2 erp
 
Free Accounting Software UK
Free Accounting Software UKFree Accounting Software UK
Free Accounting Software UK
 
ERP( enterprise resource planning)
ERP( enterprise resource planning)ERP( enterprise resource planning)
ERP( enterprise resource planning)
 
ERP
ERPERP
ERP
 
sappresentation- By Prithwijit
sappresentation- By Prithwijit sappresentation- By Prithwijit
sappresentation- By Prithwijit
 
MIS Applications: Enterprise Resource Planning (ERP), MIS and ERP, Business P...
MIS Applications: Enterprise Resource Planning (ERP), MIS and ERP, Business P...MIS Applications: Enterprise Resource Planning (ERP), MIS and ERP, Business P...
MIS Applications: Enterprise Resource Planning (ERP), MIS and ERP, Business P...
 
Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8
 
An ERP Solution Provider's Guide for Manufacturers
An ERP Solution Provider's Guide for ManufacturersAn ERP Solution Provider's Guide for Manufacturers
An ERP Solution Provider's Guide for Manufacturers
 
Vitthal Day 1
Vitthal Day 1Vitthal Day 1
Vitthal Day 1
 
Rolls royce
Rolls royceRolls royce
Rolls royce
 
MBALN-670 Operations Management Title of the topic 6 .docx
MBALN-670 Operations Management  Title of the topic 6 .docxMBALN-670 Operations Management  Title of the topic 6 .docx
MBALN-670 Operations Management Title of the topic 6 .docx
 
Overview of ERP System
Overview of ERP SystemOverview of ERP System
Overview of ERP System
 
ERP
ERPERP
ERP
 
Erp presentation
Erp presentationErp presentation
Erp presentation
 
Mps in eresource erp
Mps in eresource erpMps in eresource erp
Mps in eresource erp
 
Sap in delhi metro
Sap in delhi metroSap in delhi metro
Sap in delhi metro
 
SYSPRO ERP for Manufacturing
SYSPRO ERP for Manufacturing SYSPRO ERP for Manufacturing
SYSPRO ERP for Manufacturing
 

Dernier

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Dernier (20)

Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 

Production planning mps mrp eresource

  • 1. Production Planning and Control, MPS MASTER PRODUCTION SCHEDULE (MPS) WORKFLOW SCENARIO
  • 2. MASTER PRODUCTION SCHEDULE (MPS) WORKFLOW SCENARIO Release 2.8 2 © 2010 eresource Infotech Private Limited. All rights reserved
  • 3. Copyright © Copyright 2010 ERESOURCE. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of eresource Infotech P. Ltd. The information contained herein may be changed without prior notice. Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, eresource, eresource Logo. Eresourceerp.com are trademarks or registered trademarks of eresource Infotech in India and several other countries all over the world. All other products mentioned are trademarks or registered trademarks of their respective companies 3 © 2010 eresource Infotech Private Limited. All rights reserved
  • 4. Table of Contents Master Production Schedule ........................................................................................................................ 5 The Production Process definition in eresource. .......................................................................................... 6 Product and Material Definition in eresource .............................................................................................. 7 Forecasts Consumed by orders ..................................................................................................................... 8 Linkage to other Company Activities .......................................................................................................... 10 Master Production Scheduling in MPC system ........................................................................................... 10 Capacity Planning and Daily Route Availability ........................................................................................... 11 4 © 2010 eresource Infotech Private Limited. All rights reserved
  • 5. Master Production Schedule Interaction between demand management and master production scheduling (MPS) are frequent and detailed. As customer orders are received and entered into MPS, the detailed order information should be provided to the master production scheduler as the orders occur. An effective master production schedule in eresource ERP provides the basis for making good use of manufacturing resources, making customer delivery promises, resolving trade-off between sales and manufacturing, and attaining the firm’s strategic objectives as reflected in the sales and operations plan. Similarly, in eresource ERP demand management needs information on the status of orders, capacity consumed, and capacity available so customer can be kept information. Details vary significantly between make-to-order, assemble-to-order, and make make-to-stock. In all conditions, the underlying concept is that forecasts are consumed over time by actual customer orders. Eresource ERP Master Production Scheduling system is used in conjunction with Material Requirements Planning (MRP) to schedule finished goods production and raw materials requirements when and where they are required. Make-to-order Assemble- to-order Make-to-stock Capacity Forecast Customer order orders Time in future Current date 5 © 2010 eresource Infotech Private Limited. All rights reserved
  • 6. The Production Process definition in eresource. In eresource, the Production process starts from setting up the Production process parameters. Eresource ERP is scalable enabling users to configure the production process for any Item as required. The lead time of an production operation for a product is defined; The executing time is the linear sum of the following segment times; • Start Time • End Time • Process Time On the basis of the parameters defined here, the system computes the duration of individual operation of the product. 6 © 2010 eresource Infotech Private Limited. All rights reserved
  • 7. Product and Material Definition in eresource Product Defination is an integral part of the ERP Production process and Material Requirement management, and thus requires a detailed explanation in the setup process, not only from the master data point of view but also for transactional processes. We will therefore describe how eresource handles finished product Management The product Defination in eresource can be extended and described in the following manner • Basic Product Information : Basic product information includes search key values, Description, Product Categorizaion, Unit of measurement, EAN • Production Process : This refers to the process that takes to manufacture the product and time taken in each of the processes • Product BOM (Bill of Material) : More advanced products would include BOM kits that are made up of other products (referred to as BOM components) • IPQC and FGQC process : IPQC refers to In-process-Quality-Check and FGQC to Finished Quality Check. Here the parameters of IPQC and FGQC is defined with the acceptable tolerance. 7 © 2010 eresource Infotech Private Limited. All rights reserved
  • 8. Product Business Partner: This describes additional information used when product Is manufactured and purchased. • Product Replenishment: This describes the rules of how a product would be replenished. This would, for instance, include minimum and maximum quantities to hold in stock. Forecasts Consumed by orders Observe in above figure that the lines for three different environments are quite different in eresource ERP. • For the Make-to-order environment, there are very few actual customer orders, thus demand is generally satisfied from inventory. This reflects the need to manage the finished goods inventory. • For the assemble-to-order environment, there are customer orders already booked for several periods into the future. This reflects the need to provide accurate delivery promise dates the customers. • Still different demand management problems confront the firm with a make-to-order environment, even though there’s a larger backlog of customer orders. Communication between the firm and the customer first involves engineering, as orders become completely specified, and then project management status and delivery date promising. 8 © 2010 eresource Infotech Private Limited. All rights reserved
  • 9. eresource ERP provides you the provision to create Master Production scheduling on the bases of Sales order, Forecast or Both. For a particular time period you are allow to do Production Scheduling. All finish material requirement get filtered out on the click of Consolidated Requirement Item Name Wise. A Mfg Order No. which is system generated gets populated which is customer specific and its sales order no. In eresource ERP you have provision to schedule a plan Qty and system will auto generate the pending Qty. System will tell the start and end date of each and every particular Mfg Order No. 9 © 2010 eresource Infotech Private Limited. All rights reserved
  • 10. Linkage to other Company Activities Resource Planning Sales and Demand operations planning Management Enterprise Resource Planning ( ERP ) Rough-cut capacity Master Production planning Scheduling ( MPS ) Front end Engine Detailed Material planning ( MRP ) Master Production Scheduling in MPC system The above figure presents a partial schematic for the complete manufacturing planning and control system which is showing the linkages to master production scheduling. The detailed schedule produced by the MPS which drives the entire engine and back-end system, as well as the rough-cut capacity planning activity. The linkage to the eresource ERP system of the firms is shown as indirect, but they are important. The role of MPS in eresource ERP system is the same as we have described here: disaggregating the sales and operations plan, creating a statement of the output from the factory, and providing the information for coordinating sales and manufacturing. The demand management block in above figure represents a company’s forecasting, order entry, order promising and physical distribution activities. Demand management collects data on all sources of demand for manufacturing capacity: customer orders, forecasts of future customer orders, warehouse replenishments, interplant transfer, spare parts requirements and so forth. These forecasts in eresource ERP are summarized and provided to sales and operations planning. 10 © 2010 eresource Infotech Private Limited. All rights reserved
  • 11. In eresource ERP sales and operations planning the forecasts from demand management will be consolidated and incorporated into sales and operations plan. Capacity Planning and Daily Route Availability Capacity planning involves an analysis of the master production schedule to discover the existence of any manufacturing resources that represent potential bottlenecks in the production flow. This is a eresource Linkage that provides a rough evaluation of potential capacity problems with a particular MPS. The disaggregation of the operations plan into production plans for specific product defines the product minx that will be produced. These plans in eresource ERP also provide the basic demand forecast for each MPS production unit. The eresource MPS, in turn, provides the input data to the material requirements planning system. The MPS, then, is the driver of all the detailed manufacturing activities needed to meet the output objectives of the firm. Eresource ERP Master Production Scheduling system quickly and accurately schedules all item requirements for each manufacturing facility. 11 © 2010 eresource Infotech Private Limited. All rights reserved
  • 12. Some of the benefits of using Master Production Schedule module are it helps last minute scheduling, shortage avoidance, efficient allocations of resources and cost control. It gives the customer timely information on what they need and when they need. Eresource ERP's MPS module organizes what the customer need to do and when efficiently. The schedule can be re-calculated easily when a process fails, for example, the situations like a material shortage or manpower absence. 12 © 2010 eresource Infotech Private Limited. All rights reserved