SlideShare une entreprise Scribd logo
1  sur  22
THERMAL SAND
RECLAMATION PLANT
INTRODUCTION
What is Sand Reclamation ?
 The Sand Reclamation is process of cleaning previously
used sand so it can be reused
Why Sand Reclamation ?
 Due to environmental regulations, the disposal of waste
foundry sand has become one of the most pressing problems for
the foundry.
 In recent years because of the high disposal costs encountered
and difficulty in finding disposal sites.
 Scarcity of New sand due to local authorities are imposing
restrictions in mining. In future, there will be chances of stopping
supplies to save the natural resources.
 Thermal Reclamation is the process in which the sand is
heated to a temperature of about 600 to 800 deg. C, in a
specially designed fluidized bed Combustor which is the
main equipment of the thermal reclamation system.
 In the Thermal Reclaimer, the sand grains obtained from
the lump breaker is generally preheated
 And feed into the combustor where it is fluidized by
precisely controlled air flow at desired pressure.
 The fluidized bed also receives LPG gas at controlled
rate which burns in the fluidized bed with oxygen available
in the fluidizing air in the bed. The binder in the sand is
totally burnt and hot reclaimed sand is obtained at the outlet
of the Combustor.
THERMAL RECLMATION BY PROCESS
Why Thermal Process…?!
 Thermally Reclaimed sand undergoes lower
thermal expansion causing better mould
stability.
 Thermally reclaimed sand is better than fresh
sand because it is more rounded in shape
causing lesser binder demand as well as can
be used with any chemical binder system in
subsequent cycle.
 Thermally reclaimed sand is better than
mechanically reclaimed sand.
Sand Pro-Claimer Plant Drawing
(Only for Green Sand)
Thermal Reclamation plant Drawing
PROCESS FLOW CHART
LIST OF EQUIPMENTS
S.No Equipment Descrepition
1 LUM CRUSHER
2 BELT CONVEYOR WITH MAGNETIC PULLEY
3 OBMS WITH MAGNETIC PULLEY
4 PROCLAIMAER WITH BLOWER
5
PULSE JET DUST BAG FILTER WITH SUPPORTING EQUIPMENT (40 Bags, 7.5Hp Blower)
(FOR PROCLAIMER)
6 BUCKET ELEVATOR - I
7 OVER HEAD VIBRATING SIEVER
8 SAND STORAGE HOPPER (20 MT capacity)
9 SAND FEEDER BELT WITH RAV & MAGNETIC PULLEY
10 BUCKET ELEVATOR - II
11 COMBUSTION FURNACE 2TPH WITH PLC & MCC CONTROL PANEL
12 DIRECT SAND COOLER WITH FLUDIZED BLOWER
13 SAND SIEVER FOR RECLAIM SAND
14 BUCKET ELEVATOR - III
15 RECLAIMED SAND STORAGE HOPPER (20 MT capacity)
16 DUST & FLUE GAS EXHAUST SYSTEM
17
WET SCRUBBER UNIT WITH SUCTION ID FAN WITH CHIMNEY 13 MTS FROM FLOOR
LEVEL WITH PUMP
18 PULSE JET BAG FILTER WITH SUPPORTING EQUIPMENT (60 Bags, 10 Hp Blower)
CONTROAL PANEL
REQUIREMENTS
 Space Requirement (Shed) - Minimum 25m x10m x 10m
 Outside space - 10m x 10m (For scrubber & Cooling tower)
 Electricity Requirement for Total Plant - 75.00 KW
(Thermal Plant – 61.00 KW + Pro-Claimer – 15.00 KW)
 Labour – 4 Persons/ Shift ( Thermal -2 & Pro-Claimer – 2 )
 Conserves Natural Environment and Cost by eliminating Dumping of used
toxic sand .
 Reclaimed sand replaces fresh sand.( Less purchase )
 Drying not required for reclaimed sand and thus cost can be eliminated.
 Uniform Properties & Characteristics.
 Supply will be Consistent & Adequate.
 No Freight charges and Delay.
 No need to have bulk inventory.
 LOI is Max 0.3 % as per your sand
 OEE -85 - 90%,
 Thermal Efficiency- 90 - 95%
 Gas Consumption : 10 to 15 Kgs (This will vary according to the sand)
7 to 10 Kgs ( For Green Sand Thermal running)
 Finally Sand cost would be Cheaper.
Advantages…..
Returns…..!!!
ROI - LESS THAN ONE YEAR
Budget Cost of the (2 TPH) Reclamation Plant
( As per our Drawing)
12000000
1 INVESTMENT COST (PER KG) UOM
Out Put per Day of 2 TPH ( 2 ton * 24 hrs) 48 MT
Our put per Month (48 x 25 Days) 1200 MT
Our Put for 2 Years ( 1200 * 24 months) 28800 MT
Investment cost (12000000 / 24000) / 1000 0.42 INR
Interest on Investment cost (@ 15%) 0.15 INR
TOTAL INVESTMENT COST / KG 0.57
2 RUNNING COST (PER KG)
Electricity Cost per KG (@ Rs.7 per Unit) ( 38 KWH per TON) 0.30 INR
LPG cost per KG (@ Rs.50 per KG) (Consumption - 10-12 KG PER TON) 0.55 INR
Labour (4 labour per Shift @ Rs.400 per Head) 0.1 INR
Plant Maintenance cost 0.05 INR
TOTAL RUNNING COST / KG 1.00
A TOTAL COST ( INVESTMENT & RUNNING) PER KG 1.57 INR
B PRESENT FRESH SILICA SAND COST PER KG 2.75 INR
Less DIFFRENCE COST PER KG (A-B) 1.18 INR
Yearly Tonnage as per above (1200 MT X 12 MONTHS) 14400 MT
SO, COST PER YEAR ( 14400000 KGS X RS.1.18) 17040000 INR
COST PER MONTH 1420000 INR
ROI PERIOD ( 12000000/1420000) 8 Months
Q> What type of Sands can be re-claimed in the Machine?
A> Green Sand / Shell Mould Sand / Alpha Set / Furon (No-bake) / Cold Box Sands
Can be reclaimed.
(*Green Sand needed PRO-CLAIMER PLANT Additionally)
Q> How many times the sand can be re-claimed?
A> Sand Can be reclaimed 10 times (Max)
Q> What types / Ranges of Plants are available ?
A> Thermal Process – with a capacity of 0.5 to 5.0 MT / Hr Plants are available.
Q> What type of Combustion?
A> Fluidized Bed Combustion
Q> What are the Fuel can be used in the Thermal sand reclamation Plant?
A> LPG and CNG can be used.
Q> What is the fuel consumption levels?
A> Consumptions are based on the input sand that to be reclaimed*
Level 1 : If the input sand LOI is 2 to 3% - The Consumption per TON would be
LPG – 10 to 13 KG and CNG -14-18 NM3
Level 2 : If the input sand LOI is Belo 2 - The Consumption per TON would be LPG
– 13 to 15 KG and CNG -18-21 NM3
FAQ…..??
Q> What is the Cycle time for Sand reclamation?
A> 7 to 10 Minutes (During Continuous Fluidization Process)
Q> What is the Electricity consumption during production?
A>The Electricity Consumption would be 23 KWH (Units) per TON. (46 KWH for 2 TONS)
Q> What will the Loss of Ignition ( LOI) on the sand after reclamation?
A>It would be <0.2%
Q> What ratios we should mix the fresh sand during next production?
A>The Fresh sand need to be added / Mixed in 1:9 ratio (10%)
Q> How many tons reclaimed per hour?
A> Approximately 1.80 MT used sand can be re-Claimed per hour – (In 2 TPH Plant)
Q> How many years ROI will happen and Explain?
A> Maximum Within a Year....(If Plant runs to this 90% efficiency) It is again based on your
sand volumes.
Q> Is the Equipment is Approved by Pollution Control Board?
A> The Process is Approved. The PCB Approval to be obtained for the Plant after Installation
at your end. We can assist in this Area.
FAQ…..??
THANK YOU…
M/s.Thiruvapathi Engineering Works,
S.F.No.625/2, Eachanari Chettipalayam Road,
Eachanari (PO),
Coimbatore – 641 021.
TAMIL NADU – INDIA.
Contact Us:
Mr.Kanagaraj - 0091 – 9842234578
Mr.Vijaya Kumar – 0091-9894833344
E-mail: thiruvapathikanakaraj@gmail.com
indosourcing@live.in

Contenu connexe

Tendances

Presentation on lubricants
Presentation on lubricantsPresentation on lubricants
Presentation on lubricantsMd.Arman Hossain
 
Metallurgical Thermodynamics & Kinetics Lecture Notes
Metallurgical Thermodynamics & Kinetics Lecture NotesMetallurgical Thermodynamics & Kinetics Lecture Notes
Metallurgical Thermodynamics & Kinetics Lecture NotesFellowBuddy.com
 
Treatment of crude oils
Treatment of crude oilsTreatment of crude oils
Treatment of crude oilsKarnav Rana
 
Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.VikasKumar1998
 
Sulfuric acid manufacturing and process flow diagram
Sulfuric acid manufacturing and process flow diagramSulfuric acid manufacturing and process flow diagram
Sulfuric acid manufacturing and process flow diagramUsama Pervaiz
 
Catalytic reforming process
Catalytic reforming processCatalytic reforming process
Catalytic reforming processIhsan Wassan
 
Re refining of lubricated oil222
Re refining of lubricated oil222Re refining of lubricated oil222
Re refining of lubricated oil222Gaurav Bhardwaj
 
Corex Process - iron Manufacturing Technology
Corex Process - iron Manufacturing TechnologyCorex Process - iron Manufacturing Technology
Corex Process - iron Manufacturing TechnologyAsad Jamil
 
Presentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, ThyssenkruppPresentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, ThyssenkruppVoces Mineras
 
PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...
PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...
PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...SAJJAD KHUDHUR ABBAS
 

Tendances (20)

Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Fluidization
FluidizationFluidization
Fluidization
 
Presentation on lubricants
Presentation on lubricantsPresentation on lubricants
Presentation on lubricants
 
Carbonisation of coal
Carbonisation of coalCarbonisation of coal
Carbonisation of coal
 
Metallurgical Thermodynamics & Kinetics Lecture Notes
Metallurgical Thermodynamics & Kinetics Lecture NotesMetallurgical Thermodynamics & Kinetics Lecture Notes
Metallurgical Thermodynamics & Kinetics Lecture Notes
 
Treatment of crude oils
Treatment of crude oilsTreatment of crude oils
Treatment of crude oils
 
Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.
 
Lubricants
LubricantsLubricants
Lubricants
 
Reverberatory furnace
Reverberatory furnaceReverberatory furnace
Reverberatory furnace
 
Metallurgy of Copper
Metallurgy of CopperMetallurgy of Copper
Metallurgy of Copper
 
cement-mill
 cement-mill cement-mill
cement-mill
 
Reid vapor Pressure
Reid vapor PressureReid vapor Pressure
Reid vapor Pressure
 
Sulfuric acid manufacturing and process flow diagram
Sulfuric acid manufacturing and process flow diagramSulfuric acid manufacturing and process flow diagram
Sulfuric acid manufacturing and process flow diagram
 
Catalytic reforming process
Catalytic reforming processCatalytic reforming process
Catalytic reforming process
 
Re refining of lubricated oil222
Re refining of lubricated oil222Re refining of lubricated oil222
Re refining of lubricated oil222
 
Corex Process - iron Manufacturing Technology
Corex Process - iron Manufacturing TechnologyCorex Process - iron Manufacturing Technology
Corex Process - iron Manufacturing Technology
 
Presentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, ThyssenkruppPresentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, Thyssenkrupp
 
Presentation on
Presentation onPresentation on
Presentation on
 
PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...
PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...
PRODUCTION OF 60, 000 MTPA OF OLEOCHEMICAL METHYL ESTER FROM RBD PALM KERNEL ...
 
Carburizing
CarburizingCarburizing
Carburizing
 

Similaire à Thermal Sand Reclamation Plant

Briquettes (TEJAS PATEL)
Briquettes  (TEJAS PATEL)Briquettes  (TEJAS PATEL)
Briquettes (TEJAS PATEL)Tejas Patel
 
Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...
Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...
Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...IRJET Journal
 
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...Meherunnesha (Nishat)
 
Business plan on fly ash (final)
Business plan on fly ash (final)Business plan on fly ash (final)
Business plan on fly ash (final)Vinayak Selvarajan
 
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLYPRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLYiQHub
 
IRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash Bricks
IRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash BricksIRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash Bricks
IRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash BricksIRJET Journal
 
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand ReclamationIRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand ReclamationIRJET Journal
 
Recovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn productionRecovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn productionKAUSHIK SHUBHANK
 
Rice Straw co-firing - Final - Copy.pptx
Rice Straw  co-firing - Final - Copy.pptxRice Straw  co-firing - Final - Copy.pptx
Rice Straw co-firing - Final - Copy.pptxAbhinav Saurav
 
Umang sanadhya presentation
Umang sanadhya presentationUmang sanadhya presentation
Umang sanadhya presentationUmang Sanadhya
 
fdocuments.us_business-plan-on-fly-ash-final.pdf
fdocuments.us_business-plan-on-fly-ash-final.pdffdocuments.us_business-plan-on-fly-ash-final.pdf
fdocuments.us_business-plan-on-fly-ash-final.pdfManiKandan853147
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 
Accpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & Services
Accpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & ServicesAccpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & Services
Accpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & ServicesIndiaMART InterMESH Limited
 
Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...
Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...
Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...IRJET Journal
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Noteswilliampatricklaw
 

Similaire à Thermal Sand Reclamation Plant (20)

Briquettes (TEJAS PATEL)
Briquettes  (TEJAS PATEL)Briquettes  (TEJAS PATEL)
Briquettes (TEJAS PATEL)
 
Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...
Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...
Evaluation of Strength Characteristics of Clayey Soil Using Shredded Rubber T...
 
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
 
Business plan on fly ash (final)
Business plan on fly ash (final)Business plan on fly ash (final)
Business plan on fly ash (final)
 
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLYPRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
 
IRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash Bricks
IRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash BricksIRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash Bricks
IRJET-Review on Bagasse Ash an Effective Replacement in Fly Ash Bricks
 
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand ReclamationIRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
 
Recovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn productionRecovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn production
 
Rice Straw co-firing - Final - Copy.pptx
Rice Straw  co-firing - Final - Copy.pptxRice Straw  co-firing - Final - Copy.pptx
Rice Straw co-firing - Final - Copy.pptx
 
Umang sanadhya presentation
Umang sanadhya presentationUmang sanadhya presentation
Umang sanadhya presentation
 
fdocuments.us_business-plan-on-fly-ash-final.pdf
fdocuments.us_business-plan-on-fly-ash-final.pdffdocuments.us_business-plan-on-fly-ash-final.pdf
fdocuments.us_business-plan-on-fly-ash-final.pdf
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 
Accpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & Services
Accpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & ServicesAccpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & Services
Accpre Engineering Pvt. Ltd., Hyderabad, Industrial Plants & Services
 
Construction of an ash pond with wrp,
Construction of an ash pond with wrp,Construction of an ash pond with wrp,
Construction of an ash pond with wrp,
 
ppt on business.pptx
ppt on business.pptxppt on business.pptx
ppt on business.pptx
 
Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...
Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...
Experimental Studies on Concrete for the Partial Replacement of Cement by Egg...
 
HSY process EN
HSY process ENHSY process EN
HSY process EN
 
ppt project
ppt projectppt project
ppt project
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Notes
 

Thermal Sand Reclamation Plant

  • 2. INTRODUCTION What is Sand Reclamation ?  The Sand Reclamation is process of cleaning previously used sand so it can be reused Why Sand Reclamation ?  Due to environmental regulations, the disposal of waste foundry sand has become one of the most pressing problems for the foundry.  In recent years because of the high disposal costs encountered and difficulty in finding disposal sites.  Scarcity of New sand due to local authorities are imposing restrictions in mining. In future, there will be chances of stopping supplies to save the natural resources.
  • 3.  Thermal Reclamation is the process in which the sand is heated to a temperature of about 600 to 800 deg. C, in a specially designed fluidized bed Combustor which is the main equipment of the thermal reclamation system.  In the Thermal Reclaimer, the sand grains obtained from the lump breaker is generally preheated  And feed into the combustor where it is fluidized by precisely controlled air flow at desired pressure.  The fluidized bed also receives LPG gas at controlled rate which burns in the fluidized bed with oxygen available in the fluidizing air in the bed. The binder in the sand is totally burnt and hot reclaimed sand is obtained at the outlet of the Combustor. THERMAL RECLMATION BY PROCESS
  • 4. Why Thermal Process…?!  Thermally Reclaimed sand undergoes lower thermal expansion causing better mould stability.  Thermally reclaimed sand is better than fresh sand because it is more rounded in shape causing lesser binder demand as well as can be used with any chemical binder system in subsequent cycle.  Thermally reclaimed sand is better than mechanically reclaimed sand.
  • 5. Sand Pro-Claimer Plant Drawing (Only for Green Sand)
  • 8.
  • 9. LIST OF EQUIPMENTS S.No Equipment Descrepition 1 LUM CRUSHER 2 BELT CONVEYOR WITH MAGNETIC PULLEY 3 OBMS WITH MAGNETIC PULLEY 4 PROCLAIMAER WITH BLOWER 5 PULSE JET DUST BAG FILTER WITH SUPPORTING EQUIPMENT (40 Bags, 7.5Hp Blower) (FOR PROCLAIMER) 6 BUCKET ELEVATOR - I 7 OVER HEAD VIBRATING SIEVER 8 SAND STORAGE HOPPER (20 MT capacity) 9 SAND FEEDER BELT WITH RAV & MAGNETIC PULLEY 10 BUCKET ELEVATOR - II 11 COMBUSTION FURNACE 2TPH WITH PLC & MCC CONTROL PANEL 12 DIRECT SAND COOLER WITH FLUDIZED BLOWER 13 SAND SIEVER FOR RECLAIM SAND 14 BUCKET ELEVATOR - III 15 RECLAIMED SAND STORAGE HOPPER (20 MT capacity) 16 DUST & FLUE GAS EXHAUST SYSTEM 17 WET SCRUBBER UNIT WITH SUCTION ID FAN WITH CHIMNEY 13 MTS FROM FLOOR LEVEL WITH PUMP 18 PULSE JET BAG FILTER WITH SUPPORTING EQUIPMENT (60 Bags, 10 Hp Blower)
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 17. REQUIREMENTS  Space Requirement (Shed) - Minimum 25m x10m x 10m  Outside space - 10m x 10m (For scrubber & Cooling tower)  Electricity Requirement for Total Plant - 75.00 KW (Thermal Plant – 61.00 KW + Pro-Claimer – 15.00 KW)  Labour – 4 Persons/ Shift ( Thermal -2 & Pro-Claimer – 2 )
  • 18.  Conserves Natural Environment and Cost by eliminating Dumping of used toxic sand .  Reclaimed sand replaces fresh sand.( Less purchase )  Drying not required for reclaimed sand and thus cost can be eliminated.  Uniform Properties & Characteristics.  Supply will be Consistent & Adequate.  No Freight charges and Delay.  No need to have bulk inventory.  LOI is Max 0.3 % as per your sand  OEE -85 - 90%,  Thermal Efficiency- 90 - 95%  Gas Consumption : 10 to 15 Kgs (This will vary according to the sand) 7 to 10 Kgs ( For Green Sand Thermal running)  Finally Sand cost would be Cheaper. Advantages…..
  • 19. Returns…..!!! ROI - LESS THAN ONE YEAR Budget Cost of the (2 TPH) Reclamation Plant ( As per our Drawing) 12000000 1 INVESTMENT COST (PER KG) UOM Out Put per Day of 2 TPH ( 2 ton * 24 hrs) 48 MT Our put per Month (48 x 25 Days) 1200 MT Our Put for 2 Years ( 1200 * 24 months) 28800 MT Investment cost (12000000 / 24000) / 1000 0.42 INR Interest on Investment cost (@ 15%) 0.15 INR TOTAL INVESTMENT COST / KG 0.57 2 RUNNING COST (PER KG) Electricity Cost per KG (@ Rs.7 per Unit) ( 38 KWH per TON) 0.30 INR LPG cost per KG (@ Rs.50 per KG) (Consumption - 10-12 KG PER TON) 0.55 INR Labour (4 labour per Shift @ Rs.400 per Head) 0.1 INR Plant Maintenance cost 0.05 INR TOTAL RUNNING COST / KG 1.00 A TOTAL COST ( INVESTMENT & RUNNING) PER KG 1.57 INR B PRESENT FRESH SILICA SAND COST PER KG 2.75 INR Less DIFFRENCE COST PER KG (A-B) 1.18 INR Yearly Tonnage as per above (1200 MT X 12 MONTHS) 14400 MT SO, COST PER YEAR ( 14400000 KGS X RS.1.18) 17040000 INR COST PER MONTH 1420000 INR ROI PERIOD ( 12000000/1420000) 8 Months
  • 20. Q> What type of Sands can be re-claimed in the Machine? A> Green Sand / Shell Mould Sand / Alpha Set / Furon (No-bake) / Cold Box Sands Can be reclaimed. (*Green Sand needed PRO-CLAIMER PLANT Additionally) Q> How many times the sand can be re-claimed? A> Sand Can be reclaimed 10 times (Max) Q> What types / Ranges of Plants are available ? A> Thermal Process – with a capacity of 0.5 to 5.0 MT / Hr Plants are available. Q> What type of Combustion? A> Fluidized Bed Combustion Q> What are the Fuel can be used in the Thermal sand reclamation Plant? A> LPG and CNG can be used. Q> What is the fuel consumption levels? A> Consumptions are based on the input sand that to be reclaimed* Level 1 : If the input sand LOI is 2 to 3% - The Consumption per TON would be LPG – 10 to 13 KG and CNG -14-18 NM3 Level 2 : If the input sand LOI is Belo 2 - The Consumption per TON would be LPG – 13 to 15 KG and CNG -18-21 NM3 FAQ…..??
  • 21. Q> What is the Cycle time for Sand reclamation? A> 7 to 10 Minutes (During Continuous Fluidization Process) Q> What is the Electricity consumption during production? A>The Electricity Consumption would be 23 KWH (Units) per TON. (46 KWH for 2 TONS) Q> What will the Loss of Ignition ( LOI) on the sand after reclamation? A>It would be <0.2% Q> What ratios we should mix the fresh sand during next production? A>The Fresh sand need to be added / Mixed in 1:9 ratio (10%) Q> How many tons reclaimed per hour? A> Approximately 1.80 MT used sand can be re-Claimed per hour – (In 2 TPH Plant) Q> How many years ROI will happen and Explain? A> Maximum Within a Year....(If Plant runs to this 90% efficiency) It is again based on your sand volumes. Q> Is the Equipment is Approved by Pollution Control Board? A> The Process is Approved. The PCB Approval to be obtained for the Plant after Installation at your end. We can assist in this Area. FAQ…..??
  • 22. THANK YOU… M/s.Thiruvapathi Engineering Works, S.F.No.625/2, Eachanari Chettipalayam Road, Eachanari (PO), Coimbatore – 641 021. TAMIL NADU – INDIA. Contact Us: Mr.Kanagaraj - 0091 – 9842234578 Mr.Vijaya Kumar – 0091-9894833344 E-mail: thiruvapathikanakaraj@gmail.com indosourcing@live.in