Practical legal aspects
of implementation of biogas
projects under “green” tariff

danevychlaw.com
CONTENT


      Legislative incentives for development of biogas in Ukraine

      Rates of “green” tariff for electricity from biomass and
     biogas

       Rates change/decrease in the future

       Ukrainian component for “green” tariff projects

      Procedure and main requirements/conditions for getting
     “green” tariff

       Main legislative barriers

danevychlaw.com
DANEVYCH law firm



      Strong international focus

      Actively involved into green energy legal environment for
     last 4 years

       IFC expert on “green” tariff mapping in Ukraine

     Legal expert and partner of Ukrainian Bioenergy
     Association

     We are proud to provide Clients with services which make
     the environment better and the economy of Ukraine stronger

danevychlaw.com
Incentives for development
                        of biogas projects

      Tax incentives under the Tax Code
           exemption from import VAT and customs duties
           decrease of land tax for renewable energy power plants by 75%
           limits for rental payments for lands lease from state and municipal
           authorities by 3% of appraisal value
           exemption from CPT of
                profit from main activity of companies in the energy sphere
                which produces electricity only from renewable till 2021
                profit from simultaneous production of electricity and heat
                and/or heat from biofuels till 2020

     Possibility to use JI under Kyoto Protocol for
     biomass/biogas energy projects

       Feed-in tariff scheme or “green” tariff (GT)
danevychlaw.com
Minimal fixed GT rates
                     (current law)
    Type of energy    Power station capacity and other factors Rate of the
                              influencing the rate of GT       tariff (€ / kW)
                      less 600 kW                                  0,0646
          Wind        600-2000 kW                                  0,0754
                      more 2000 kW                                 0,1131
                      Power plants on ground surface               0,4653
                      Power plants on the roofs of buildings
      Solar energy    with power capacity exceeding 100 kW         0,4459

                      Power plants on the roofs of buildings         0,4265
                      with power capacity of up to 100 kW and
                      facades of buildings regardless power
                      capacity
                      Should be at least partially of plant origin   0,1239
        Biomass
                      to be eligible
  Small hydropower
danevychlaw.com
                      not more than 10000 kW                         0,0775
        plants
Change/Decrease of GT
                   in the future (current law)

      GT is established until 2030 (grounds for termination are
     also established by a Decree of NERC)


      Decrease of the current GT rates for BPPs commissioned
     (significantly upgraded) after:
         2014 – by 10%
         2019 – by 20%
         2024 – by 30%




danevychlaw.com
Current statistics


      In the middle of 2009 the core legislation on the current
     feed-in tariff scheme (GT) was enacted


       As of November2012 GT is
          established for 2 companies operating biomass power
         plants out of 69 licensees awarded with fixed
         (guaranteed) GT
          1-2 biogas power plants (BPPs) with non-fixed GT




danevychlaw.com
Current coverage of minimal
                            fixed GT rate for biomass
Types of biomass (biogas)          Process of        electricity Eligibility to minimal
                                   generation                    fixed GT rate for
                                                                 biomass
Biomass of plant or at
least partially of plant             Steam turbine process                 Yes
origin
                                       Gasification or other
                                    processes where biomass
                                                                          No*
                                     is not used directly as a
                                                fuel
Biomass of animal origin
                                          Any processes                   No*
BIOGAS,       INCLUDING
LANDFILL GAS, WASTE                       Any processes                   No*
GAS, SIMILAR BIOGASES
  danevychlaw.com   *National Energy Regulation Commission (NERC) will establish GT
                    for them at commercially substantiated level (most likely very low)
Coverage of minimal
                   fixed GT rate for biomass

      NERC approves minimal fixed GT rates only for BPPs using
     solely biogas!!!
         Combined use of biogas and traditional energy sources
         make BPPs ineligible to minimal fixed GT rate for biogas
         regardless of biogas share




danevychlaw.com
Expected change in minimal
                    fixed GT rate for biogas
Draft Law of Ukraine No. 10183 adopted on 20.11.2012 and sent
to the President on 21.11.2012. Expected to take effect on
01.04.2012
                    Coefficient of GT for power plants commissioned, Rate
    Categories
                                     of the tariff (€ / kW)
 eligible to GT

                                               from         from        from
                       till       from
                                           01.01.201    01.01.202   01.01.202
                    31.03.20 01.04.2013
                                              5 till       0 till      5 till
                      13          till
                                           31.12.201    31.12.202   31.12.202
                  inclusively 31.12.2014
                                                9            4           9
   Electricity
     from         0,12386      0,12386      0,11147      0,09908     0,0867
   biomass

   Electricity
                       -       0,12386      0,11147      0,09908     0,0867
 from biogas
Expected definitions of
                   biomass and biogas

      Biomass is determined as non-fossil biologically renewable
     substances of organic origin in the form of agricultural
     waste (livestock and crop sectors), forestry waste and
     technologically related industries which are subject to
     biodegrading as well as organic and industrial fraction of
     industrial and municipal waste.
         No restriction on source of animal or plant origin!!!
         Energy crops are not covered!


      Biogas is gas formed from biomass.



danevychlaw.com
Guarantee of GT application
                    in the future

     Its rates are not tied to retail rates or average rates for
     producers of electricity

     They are fixed as of January 1, 2009 in EUR and linked to
     EUR/UAH exchange rate (if more than 10.86 )

     The State guarantees GT application to commissioned BPPs
     and purchase of all electricity produced by them




danevychlaw.com
Purchase of electricity
                   at GT rates

     Wholesale Electricity Market of Ukraine (WEM) represented
     by State Enterprise “Energorynok”
         State guarantee of purchase of all electricity produced
         by BPPs under GT

      Direct sales of electricity to consumers
          Legislative limitations
          Absence of economic and administrative incentives




danevychlaw.com
Purchase of electricity
                    at GT rates

  Draft Law No. 10571 adopted in the first hearing by the
  parliament on 20.11.2012- transition to bilateral contracts and
  balancing market

     All sales of “green” electricity at bilateral contracts, “day
     ahead” or balancing markets at market prices

      Only “day ahead” market shall purchase electricity at GT by
     its operator




danevychlaw.com
Purchase of electricity
                    at GT rates

  Draft Law No. 10571

      Special requirements for coverage non-balance

     Special fund will secure the purchase of all GT electricity
     and reimburse expenses related to non-balance

      Terms of payments will be determined by special rules

      Transition period may last up to 5 years (deadline 1.01.2016)




danevychlaw.com
Ukrainian component
                      requirement (currently)

      The share of the Ukrainian component (fixed assets,
     materials, works, services) in the total value of BPP
     construction depending on the year of its commissioning
     shall be at least
           since 2012 – 15 %

           since 2013 – 30%

           since 2014 – 50 %




danevychlaw.com
Ukrainian component
                  requirement (currently)

      Cabinet of ministers approved on 24.09.2012 «procedure»
     on issuance of certificates of origin
         Procedure entered into force on 28.09.2012



      Procedure on calculation adopted by NERC on15.06.2012
         Procedure entered into force on 19.10.2012




danevychlaw.com
Ukrainian component
                   requirement (currently)

  «Procedure» on issuance of certificate of origin

      Chamber of commerce of Ukraine or regional chambers
     issue the certificates (procedure is not adopted!)


     Calculation is carried out by expert organizations published
     Ministry of Regional Development, Construction and Utilities
     of Ukraine (not really correct wording)




danevychlaw.com
Ukrainian component
                   requirement (currently)

  Procedure on component calculation (content)
    Formula for calculation

     Documents confirming value of materials, services, works
     and fixed assets

      Calculation after commissioning and respective application

     Conclusion of the expert organization and list of considered
     documents– confirmation of Ukrainian component




danevychlaw.com
Ukrainian component
                       requirement (expected)

      The share of the Ukrainian component (fixed assets,
     materials, works, services) in the total value of BPP
     construction depending on the year of its commissioning
     shall be at least
           since April 1,2013 till July 1, 2013 – 15% (old calculation
           approach)
           since 2014 – 30%
           since 2015 – 50 %


     NERC will itself determine Ukrainian component since
     2014!!!



danevychlaw.com
Ukrainian component
                       requirement (expected)

       The fixed shares since 2014


      Elements of local content   Operations should     Fixed share, %
                                  be taken in Ukraine


      Bioreactor for hydrolysis   manufacturing              35

      Cogenerator                 manufacturing              35

      Construction works          performance                30

      Total                                                  100




danevychlaw.com
Ukrainian component
                      requirement (expected)

  The fixed shares- possible interpretations
     fixed shares (maximal shares) within respective 30% or 50% of the
     component which may be allocated for different types of elements of
     Ukrainian origin, for instance, value of BPP is EUR 1 000 000, 30% LCR
     – EUR 300 000, and the maximal value of elements of Ukrainian origin
     which could attributed for compliance with the requirement
          bioreactor – EUR 105 000
          cogenerator – EUR 105 000
          construction – EUR 90 000

     fixed shares (maximal shares) total value of the project and its any share
     may satisfy the requirement , in the foregoing requirement may satisfy
     30% of the requirement

     any other possible interpretation of NERC
danevychlaw.com
Approval of GT


     Rates of GT shall be approved by NERC for each producer
     after filling the application and the required package of
     documents regarding the constructed and commissioned BPP

      Term for passing a decision by NERC:
         Consideration of documents package– 30 calendar days
          Approval by NERC’s meeting– 15 calendar days

    GT documentation (stipulated by the respective
   NERC’s Resolution)

      GOOD NEWS! Approval fee is absent



danevychlaw.com
Conditions for GT Projects
                    Implementation

     Set up of a company
     Electricity producer (CHP producer)
     license
      Connection to the grid (compensation
     of expenses related to grid
     connection)
     Participation in WEM and signing
     WEM Agreement
     Conclusion of agreement for sales of
     electricity with State Enterprise
     “Energorynok”
     Execution of documentation for power
     plants construction (documents on
     the use of land plots, project
     documentation, commissioning etc.)
danevychlaw.com
Conditions for GT Projects
                                            Implementation
                                                                                           Development of          Registration of              Receipt of                Registration of
Change of designated      Registration of                  Examination of PD,
                                                                                              project               declaration re            permission r e              declaration on
     purpose                ownership                         if necessary
                                                                                           documentation             preparatory            construction works              readiness
                                                                                                                  works, if necessary
                       Registration of leases

                                                                                              Receipt of            Registration of          Issue of Certificate
                          Registration of                      Receipt of initial                                   declaration re                                        Registration of
                                                                                               technical                                       on readiness for
                          easements and                             data                                             beginning of                                           ownership
                                                                                              conditions                                         exploitation
                            superficies                                                                              construction


                                 Acquisition of                                                                                                                      Connection to
                                 rights in land                                                        Construction
                                                                                                                                                                       the grid

      Set up of a                 License for                                                                              Conclusion of
                                                                        Joining WEM and Signing                                                             Connection of other
       company                    electricity                                                                             agreement with
                                                                            WEM Agreement                                                                      power plants
    (charter shall                production                                                                               Energorynok
   provide that the                                                                                                                                          Connection of wind
                                                                                                                                                                  farms
       company           Receipt of
                                                Receipt of a
                         electricity                                                        GT approval by NERC                                               Connection of
       produces                                  license for
                         producer’s                                                                                                                         combined heat and
                                                     CHP
     electricity)          license                                                                                                                            power plants

                                                                           Exemption from import VAT and          Maximal annual lease payments – 3% of
                                                                                  customs duties                             appraisal value
                              Tax and customs
                               duties breaks                           Exemption from corporate profit tax till
                                                                                                                         25% of required land tax
                                                                                       2011




 danevychlaw.com
Legislative barriers


  Main legislative barriers for development of biomass power
  projects under the GT

      state guarantee

      Ukrainian component requirement

      connection to the grid

      coverage of minimal fixed GT rates of biomass and biogas?!




danevychlaw.com
CONTACTS
t +38 044 596 46 36
f +38 044 596 46 35
e maksym.sysoiev@danevychlaw.com                      MAKSYM SYSOIEV, LL.M.,
a 10 B, Vozdvyzhenska Street, Office 8, Kyiv, 04071   Attorney-at-law, Senior Associate
Ukraine                                               of DANEVYCH law firm
www.danevychlaw.com

Contenu connexe

Tendances

Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...Ilkka Hannula
 
session 4 NEEAP Bahrain
session 4 NEEAP  Bahrainsession 4 NEEAP  Bahrain
session 4 NEEAP BahrainRCREEE
 
A Sustainable Future
A Sustainable FutureA Sustainable Future
A Sustainable FutureAtul Raturi
 
Optimizing PHEVs on the Grid
Optimizing PHEVs on the GridOptimizing PHEVs on the Grid
Optimizing PHEVs on the GridAaron Sobel
 
Government action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulationGovernment action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulationCeramics 2011
 
Anre president
Anre   presidentAnre   president
Anre presidentA
 
German Energy Transition Workshop-Arne Jungjohann from HBF
German Energy Transition Workshop-Arne Jungjohann from HBF German Energy Transition Workshop-Arne Jungjohann from HBF
German Energy Transition Workshop-Arne Jungjohann from HBF EDAMA
 
Ucraina green tariff
Ucraina  green tariffUcraina  green tariff
Ucraina green tariffCarlo Scarpa
 
2010 12-16 kurnitski-synergia
2010 12-16 kurnitski-synergia2010 12-16 kurnitski-synergia
2010 12-16 kurnitski-synergiaSitra Energia
 
Design needs of a solar pv system for winton – queensland, australia
Design needs of a solar pv system for winton – queensland, australiaDesign needs of a solar pv system for winton – queensland, australia
Design needs of a solar pv system for winton – queensland, australiaAlexander Decker
 
Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...
Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...
Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...Pomcert
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
Wind Force Newsletter Nov, Edition, 2011
Wind Force Newsletter   Nov, Edition, 2011Wind Force Newsletter   Nov, Edition, 2011
Wind Force Newsletter Nov, Edition, 2011rupeshsingh_1
 
No to BNPP Revival Power Issues
No to BNPP Revival Power IssuesNo to BNPP Revival Power Issues
No to BNPP Revival Power Issuesgtapang
 
Renewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of EnglandRenewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of Englandcrifcambs
 

Tendances (20)

Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
 
Loi DEEE - Allemagne
Loi DEEE - AllemagneLoi DEEE - Allemagne
Loi DEEE - Allemagne
 
session 4 NEEAP Bahrain
session 4 NEEAP  Bahrainsession 4 NEEAP  Bahrain
session 4 NEEAP Bahrain
 
A Sustainable Future
A Sustainable FutureA Sustainable Future
A Sustainable Future
 
Biomass economy
Biomass economyBiomass economy
Biomass economy
 
Optimizing PHEVs on the Grid
Optimizing PHEVs on the GridOptimizing PHEVs on the Grid
Optimizing PHEVs on the Grid
 
E&T Honorable Mention: Watt IS pitch
E&T Honorable Mention: Watt IS pitchE&T Honorable Mention: Watt IS pitch
E&T Honorable Mention: Watt IS pitch
 
Government action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulationGovernment action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulation
 
Anre president
Anre   presidentAnre   president
Anre president
 
German Energy Transition Workshop-Arne Jungjohann from HBF
German Energy Transition Workshop-Arne Jungjohann from HBF German Energy Transition Workshop-Arne Jungjohann from HBF
German Energy Transition Workshop-Arne Jungjohann from HBF
 
Ucraina green tariff
Ucraina  green tariffUcraina  green tariff
Ucraina green tariff
 
2010 12-16 kurnitski-synergia
2010 12-16 kurnitski-synergia2010 12-16 kurnitski-synergia
2010 12-16 kurnitski-synergia
 
Design needs of a solar pv system for winton – queensland, australia
Design needs of a solar pv system for winton – queensland, australiaDesign needs of a solar pv system for winton – queensland, australia
Design needs of a solar pv system for winton – queensland, australia
 
Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...
Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...
Dariusz Kardaś - Barriers to biogas/bioenergy development on national and reg...
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Wind Force Newsletter Nov, Edition, 2011
Wind Force Newsletter   Nov, Edition, 2011Wind Force Newsletter   Nov, Edition, 2011
Wind Force Newsletter Nov, Edition, 2011
 
No to BNPP Revival Power Issues
No to BNPP Revival Power IssuesNo to BNPP Revival Power Issues
No to BNPP Revival Power Issues
 
Syria
SyriaSyria
Syria
 
Sudan
SudanSudan
Sudan
 
Renewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of EnglandRenewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of England
 

Similaire à Presentation Maksym Sysoiev_Biogas

Paritet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccParitet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccPARITET
 
Presentation by Maksym Sysoiev_for Biomass Conference_September 2013
Presentation by Maksym Sysoiev_for Biomass Conference_September 2013Presentation by Maksym Sysoiev_for Biomass Conference_September 2013
Presentation by Maksym Sysoiev_for Biomass Conference_September 2013Irina Koroleva
 
Presentation Maksym Sysoiev Renewables_September 2013_ENG
Presentation Maksym Sysoiev Renewables_September 2013_ENGPresentation Maksym Sysoiev Renewables_September 2013_ENG
Presentation Maksym Sysoiev Renewables_September 2013_ENGIrina Koroleva
 
Presentation by Maksym Sysoiev for Biogas conference_September 2013_english
Presentation by Maksym Sysoiev for Biogas conference_September 2013_englishPresentation by Maksym Sysoiev for Biogas conference_September 2013_english
Presentation by Maksym Sysoiev for Biogas conference_September 2013_englishIrina Koroleva
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012rupeshsingh_1
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...electricitygovernance
 
Doe 2013 Eere Congressional Budget Request
Doe 2013 Eere Congressional Budget RequestDoe 2013 Eere Congressional Budget Request
Doe 2013 Eere Congressional Budget RequestLarry Stapleton
 
Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarIrinaParitet
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012rupeshsingh_1
 
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...OECD Environment
 
The Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus WheatlyThe Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus Wheatlycatherinewall
 
Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Sarod Paichayonrittha
 
Newletter green tariff for solar panels of households
Newletter green tariff for solar panels of households Newletter green tariff for solar panels of households
Newletter green tariff for solar panels of households Maksym Sysoiev
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTRenato Borra
 
Energy in Australia: Past, present and future
Energy in Australia: Past, present and futureEnergy in Australia: Past, present and future
Energy in Australia: Past, present and futureIEA-ETSAP
 
Session 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupSession 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupOECD Environment
 
Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy Sampe Purba
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Atanas Georgiev
 
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...OECD Environment
 

Similaire à Presentation Maksym Sysoiev_Biogas (20)

Paritet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nuccParitet presentation gt_ renewable energy projects_nucc
Paritet presentation gt_ renewable energy projects_nucc
 
Presentation by Maksym Sysoiev_for Biomass Conference_September 2013
Presentation by Maksym Sysoiev_for Biomass Conference_September 2013Presentation by Maksym Sysoiev_for Biomass Conference_September 2013
Presentation by Maksym Sysoiev_for Biomass Conference_September 2013
 
Presentation Maksym Sysoiev Renewables_September 2013_ENG
Presentation Maksym Sysoiev Renewables_September 2013_ENGPresentation Maksym Sysoiev Renewables_September 2013_ENG
Presentation Maksym Sysoiev Renewables_September 2013_ENG
 
Presentation by Maksym Sysoiev for Biogas conference_September 2013_english
Presentation by Maksym Sysoiev for Biogas conference_September 2013_englishPresentation by Maksym Sysoiev for Biogas conference_September 2013_english
Presentation by Maksym Sysoiev for Biogas conference_September 2013_english
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
 
Doe 2013 Eere Congressional Budget Request
Doe 2013 Eere Congressional Budget RequestDoe 2013 Eere Congressional Budget Request
Doe 2013 Eere Congressional Budget Request
 
Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_Cissolar
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012
 
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
 
The Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus WheatlyThe Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus Wheatly
 
Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012
 
Newletter green tariff for solar panels of households
Newletter green tariff for solar panels of households Newletter green tariff for solar panels of households
Newletter green tariff for solar panels of households
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 
Energy in Australia: Past, present and future
Energy in Australia: Past, present and futureEnergy in Australia: Past, present and future
Energy in Australia: Past, present and future
 
Session 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupSession 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial Group
 
Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy
 
Agham Feed-in Tariff system Briefer
Agham Feed-in Tariff system BrieferAgham Feed-in Tariff system Briefer
Agham Feed-in Tariff system Briefer
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
 
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
 

Plus de Irina Koroleva

Presentation employment
Presentation employmentPresentation employment
Presentation employmentIrina Koroleva
 
Presentation by Borys Danevych
Presentation by Borys DanevychPresentation by Borys Danevych
Presentation by Borys DanevychIrina Koroleva
 
Presentation Agriculture
Presentation AgriculturePresentation Agriculture
Presentation AgricultureIrina Koroleva
 
Presentation_Maksym Sysoiev_bioenergy
Presentation_Maksym Sysoiev_bioenergyPresentation_Maksym Sysoiev_bioenergy
Presentation_Maksym Sysoiev_bioenergyIrina Koroleva
 
Presentation_seminar 13 _02_2013 Danevych law firm
Presentation_seminar 13 _02_2013 Danevych law firmPresentation_seminar 13 _02_2013 Danevych law firm
Presentation_seminar 13 _02_2013 Danevych law firmIrina Koroleva
 
Borys Danevych Clinical_08.02.2013
Borys Danevych Clinical_08.02.2013Borys Danevych Clinical_08.02.2013
Borys Danevych Clinical_08.02.2013Irina Koroleva
 
PDP changes_Danevych law firm
PDP changes_Danevych law firmPDP changes_Danevych law firm
PDP changes_Danevych law firmIrina Koroleva
 
HR Breakfast, January_2013
HR Breakfast, January_2013HR Breakfast, January_2013
HR Breakfast, January_2013Irina Koroleva
 
Incentives for IT _ Danevych law firm
Incentives for IT _ Danevych law firmIncentives for IT _ Danevych law firm
Incentives for IT _ Danevych law firmIrina Koroleva
 
Запрошення на прес-конференцію
Запрошення на прес-конференціюЗапрошення на прес-конференцію
Запрошення на прес-конференціюIrina Koroleva
 
приглашение для сми
приглашение для смиприглашение для сми
приглашение для смиIrina Koroleva
 
Прес-конференція
Прес-конференціяПрес-конференція
Прес-конференціяIrina Koroleva
 
Human Capital Forum. Presentation on new Law on Employment
Human Capital Forum. Presentation on new Law on EmploymentHuman Capital Forum. Presentation on new Law on Employment
Human Capital Forum. Presentation on new Law on EmploymentIrina Koroleva
 
HR breakfast 10_10_2012
HR breakfast 10_10_2012HR breakfast 10_10_2012
HR breakfast 10_10_2012Irina Koroleva
 

Plus de Irina Koroleva (14)

Presentation employment
Presentation employmentPresentation employment
Presentation employment
 
Presentation by Borys Danevych
Presentation by Borys DanevychPresentation by Borys Danevych
Presentation by Borys Danevych
 
Presentation Agriculture
Presentation AgriculturePresentation Agriculture
Presentation Agriculture
 
Presentation_Maksym Sysoiev_bioenergy
Presentation_Maksym Sysoiev_bioenergyPresentation_Maksym Sysoiev_bioenergy
Presentation_Maksym Sysoiev_bioenergy
 
Presentation_seminar 13 _02_2013 Danevych law firm
Presentation_seminar 13 _02_2013 Danevych law firmPresentation_seminar 13 _02_2013 Danevych law firm
Presentation_seminar 13 _02_2013 Danevych law firm
 
Borys Danevych Clinical_08.02.2013
Borys Danevych Clinical_08.02.2013Borys Danevych Clinical_08.02.2013
Borys Danevych Clinical_08.02.2013
 
PDP changes_Danevych law firm
PDP changes_Danevych law firmPDP changes_Danevych law firm
PDP changes_Danevych law firm
 
HR Breakfast, January_2013
HR Breakfast, January_2013HR Breakfast, January_2013
HR Breakfast, January_2013
 
Incentives for IT _ Danevych law firm
Incentives for IT _ Danevych law firmIncentives for IT _ Danevych law firm
Incentives for IT _ Danevych law firm
 
Запрошення на прес-конференцію
Запрошення на прес-конференціюЗапрошення на прес-конференцію
Запрошення на прес-конференцію
 
приглашение для сми
приглашение для смиприглашение для сми
приглашение для сми
 
Прес-конференція
Прес-конференціяПрес-конференція
Прес-конференція
 
Human Capital Forum. Presentation on new Law on Employment
Human Capital Forum. Presentation on new Law on EmploymentHuman Capital Forum. Presentation on new Law on Employment
Human Capital Forum. Presentation on new Law on Employment
 
HR breakfast 10_10_2012
HR breakfast 10_10_2012HR breakfast 10_10_2012
HR breakfast 10_10_2012
 

Presentation Maksym Sysoiev_Biogas

  • 1. Conference on “Biogas is a chance for Ukraine’s energy independence and its European integration” 22 November 2012 Kyiv, Ukraine Practical legal aspects of implementation of biogas projects under “green” tariff danevychlaw.com
  • 2. CONTENT Legislative incentives for development of biogas in Ukraine Rates of “green” tariff for electricity from biomass and biogas Rates change/decrease in the future Ukrainian component for “green” tariff projects Procedure and main requirements/conditions for getting “green” tariff Main legislative barriers danevychlaw.com
  • 3. DANEVYCH law firm Strong international focus Actively involved into green energy legal environment for last 4 years IFC expert on “green” tariff mapping in Ukraine Legal expert and partner of Ukrainian Bioenergy Association We are proud to provide Clients with services which make the environment better and the economy of Ukraine stronger danevychlaw.com
  • 4. Incentives for development of biogas projects Tax incentives under the Tax Code exemption from import VAT and customs duties decrease of land tax for renewable energy power plants by 75% limits for rental payments for lands lease from state and municipal authorities by 3% of appraisal value exemption from CPT of profit from main activity of companies in the energy sphere which produces electricity only from renewable till 2021 profit from simultaneous production of electricity and heat and/or heat from biofuels till 2020 Possibility to use JI under Kyoto Protocol for biomass/biogas energy projects Feed-in tariff scheme or “green” tariff (GT) danevychlaw.com
  • 5. Minimal fixed GT rates (current law) Type of energy Power station capacity and other factors Rate of the influencing the rate of GT tariff (€ / kW) less 600 kW 0,0646 Wind 600-2000 kW 0,0754 more 2000 kW 0,1131 Power plants on ground surface 0,4653 Power plants on the roofs of buildings Solar energy with power capacity exceeding 100 kW 0,4459 Power plants on the roofs of buildings 0,4265 with power capacity of up to 100 kW and facades of buildings regardless power capacity Should be at least partially of plant origin 0,1239 Biomass to be eligible Small hydropower danevychlaw.com not more than 10000 kW 0,0775 plants
  • 6. Change/Decrease of GT in the future (current law) GT is established until 2030 (grounds for termination are also established by a Decree of NERC) Decrease of the current GT rates for BPPs commissioned (significantly upgraded) after: 2014 – by 10% 2019 – by 20% 2024 – by 30% danevychlaw.com
  • 7. Current statistics In the middle of 2009 the core legislation on the current feed-in tariff scheme (GT) was enacted As of November2012 GT is established for 2 companies operating biomass power plants out of 69 licensees awarded with fixed (guaranteed) GT 1-2 biogas power plants (BPPs) with non-fixed GT danevychlaw.com
  • 8. Current coverage of minimal fixed GT rate for biomass Types of biomass (biogas) Process of electricity Eligibility to minimal generation fixed GT rate for biomass Biomass of plant or at least partially of plant Steam turbine process Yes origin Gasification or other processes where biomass No* is not used directly as a fuel Biomass of animal origin Any processes No* BIOGAS, INCLUDING LANDFILL GAS, WASTE Any processes No* GAS, SIMILAR BIOGASES danevychlaw.com *National Energy Regulation Commission (NERC) will establish GT for them at commercially substantiated level (most likely very low)
  • 9. Coverage of minimal fixed GT rate for biomass NERC approves minimal fixed GT rates only for BPPs using solely biogas!!! Combined use of biogas and traditional energy sources make BPPs ineligible to minimal fixed GT rate for biogas regardless of biogas share danevychlaw.com
  • 10. Expected change in minimal fixed GT rate for biogas Draft Law of Ukraine No. 10183 adopted on 20.11.2012 and sent to the President on 21.11.2012. Expected to take effect on 01.04.2012 Coefficient of GT for power plants commissioned, Rate Categories of the tariff (€ / kW) eligible to GT from from from till from 01.01.201 01.01.202 01.01.202 31.03.20 01.04.2013 5 till 0 till 5 till 13 till 31.12.201 31.12.202 31.12.202 inclusively 31.12.2014 9 4 9 Electricity from 0,12386 0,12386 0,11147 0,09908 0,0867 biomass Electricity - 0,12386 0,11147 0,09908 0,0867 from biogas
  • 11. Expected definitions of biomass and biogas Biomass is determined as non-fossil biologically renewable substances of organic origin in the form of agricultural waste (livestock and crop sectors), forestry waste and technologically related industries which are subject to biodegrading as well as organic and industrial fraction of industrial and municipal waste. No restriction on source of animal or plant origin!!! Energy crops are not covered! Biogas is gas formed from biomass. danevychlaw.com
  • 12. Guarantee of GT application in the future Its rates are not tied to retail rates or average rates for producers of electricity They are fixed as of January 1, 2009 in EUR and linked to EUR/UAH exchange rate (if more than 10.86 ) The State guarantees GT application to commissioned BPPs and purchase of all electricity produced by them danevychlaw.com
  • 13. Purchase of electricity at GT rates Wholesale Electricity Market of Ukraine (WEM) represented by State Enterprise “Energorynok” State guarantee of purchase of all electricity produced by BPPs under GT Direct sales of electricity to consumers Legislative limitations Absence of economic and administrative incentives danevychlaw.com
  • 14. Purchase of electricity at GT rates Draft Law No. 10571 adopted in the first hearing by the parliament on 20.11.2012- transition to bilateral contracts and balancing market All sales of “green” electricity at bilateral contracts, “day ahead” or balancing markets at market prices Only “day ahead” market shall purchase electricity at GT by its operator danevychlaw.com
  • 15. Purchase of electricity at GT rates Draft Law No. 10571 Special requirements for coverage non-balance Special fund will secure the purchase of all GT electricity and reimburse expenses related to non-balance Terms of payments will be determined by special rules Transition period may last up to 5 years (deadline 1.01.2016) danevychlaw.com
  • 16. Ukrainian component requirement (currently) The share of the Ukrainian component (fixed assets, materials, works, services) in the total value of BPP construction depending on the year of its commissioning shall be at least since 2012 – 15 % since 2013 – 30% since 2014 – 50 % danevychlaw.com
  • 17. Ukrainian component requirement (currently) Cabinet of ministers approved on 24.09.2012 «procedure» on issuance of certificates of origin Procedure entered into force on 28.09.2012 Procedure on calculation adopted by NERC on15.06.2012 Procedure entered into force on 19.10.2012 danevychlaw.com
  • 18. Ukrainian component requirement (currently) «Procedure» on issuance of certificate of origin Chamber of commerce of Ukraine or regional chambers issue the certificates (procedure is not adopted!) Calculation is carried out by expert organizations published Ministry of Regional Development, Construction and Utilities of Ukraine (not really correct wording) danevychlaw.com
  • 19. Ukrainian component requirement (currently) Procedure on component calculation (content) Formula for calculation Documents confirming value of materials, services, works and fixed assets Calculation after commissioning and respective application Conclusion of the expert organization and list of considered documents– confirmation of Ukrainian component danevychlaw.com
  • 20. Ukrainian component requirement (expected) The share of the Ukrainian component (fixed assets, materials, works, services) in the total value of BPP construction depending on the year of its commissioning shall be at least since April 1,2013 till July 1, 2013 – 15% (old calculation approach) since 2014 – 30% since 2015 – 50 % NERC will itself determine Ukrainian component since 2014!!! danevychlaw.com
  • 21. Ukrainian component requirement (expected) The fixed shares since 2014 Elements of local content Operations should Fixed share, % be taken in Ukraine Bioreactor for hydrolysis manufacturing 35 Cogenerator manufacturing 35 Construction works performance 30 Total 100 danevychlaw.com
  • 22. Ukrainian component requirement (expected) The fixed shares- possible interpretations fixed shares (maximal shares) within respective 30% or 50% of the component which may be allocated for different types of elements of Ukrainian origin, for instance, value of BPP is EUR 1 000 000, 30% LCR – EUR 300 000, and the maximal value of elements of Ukrainian origin which could attributed for compliance with the requirement bioreactor – EUR 105 000 cogenerator – EUR 105 000 construction – EUR 90 000 fixed shares (maximal shares) total value of the project and its any share may satisfy the requirement , in the foregoing requirement may satisfy 30% of the requirement any other possible interpretation of NERC danevychlaw.com
  • 23. Approval of GT Rates of GT shall be approved by NERC for each producer after filling the application and the required package of documents regarding the constructed and commissioned BPP Term for passing a decision by NERC: Consideration of documents package– 30 calendar days Approval by NERC’s meeting– 15 calendar days GT documentation (stipulated by the respective NERC’s Resolution) GOOD NEWS! Approval fee is absent danevychlaw.com
  • 24. Conditions for GT Projects Implementation Set up of a company Electricity producer (CHP producer) license Connection to the grid (compensation of expenses related to grid connection) Participation in WEM and signing WEM Agreement Conclusion of agreement for sales of electricity with State Enterprise “Energorynok” Execution of documentation for power plants construction (documents on the use of land plots, project documentation, commissioning etc.) danevychlaw.com
  • 25. Conditions for GT Projects Implementation Development of Registration of Receipt of Registration of Change of designated Registration of Examination of PD, project declaration re permission r e declaration on purpose ownership if necessary documentation preparatory construction works readiness works, if necessary Registration of leases Receipt of Registration of Issue of Certificate Registration of Receipt of initial declaration re Registration of technical on readiness for easements and data beginning of ownership conditions exploitation superficies construction Acquisition of Connection to rights in land Construction the grid Set up of a License for Conclusion of Joining WEM and Signing Connection of other company electricity agreement with WEM Agreement power plants (charter shall production Energorynok provide that the Connection of wind farms company Receipt of Receipt of a electricity GT approval by NERC Connection of produces license for producer’s combined heat and CHP electricity) license power plants Exemption from import VAT and Maximal annual lease payments – 3% of customs duties appraisal value Tax and customs duties breaks Exemption from corporate profit tax till 25% of required land tax 2011 danevychlaw.com
  • 26. Legislative barriers Main legislative barriers for development of biomass power projects under the GT state guarantee Ukrainian component requirement connection to the grid coverage of minimal fixed GT rates of biomass and biogas?! danevychlaw.com
  • 27. CONTACTS t +38 044 596 46 36 f +38 044 596 46 35 e maksym.sysoiev@danevychlaw.com MAKSYM SYSOIEV, LL.M., a 10 B, Vozdvyzhenska Street, Office 8, Kyiv, 04071 Attorney-at-law, Senior Associate Ukraine of DANEVYCH law firm www.danevychlaw.com