Dulhasti Power Plant Project

Abstract

Begun in 1985, the Dulhasti power
project set in the northern Indian
provinces of Jammu and Kashmir, is
a renowned example of a disaster
in project cost estimation and
delivery.
During the inception stage, the
project’s cost was estimated to be
1.6 Billion Rupees (about $50
Million). By the time the contract
was let, the cost estimates had
risen to 4.5 Billion Rupees and later
it rose to 8, 11, 16 and 24 Billion
Rupees (nearly $750 Million). Till
2004, the project was not
completed, although well over $1
Billion was spent, just pursuing it.
This study and analysis highlights
those areas which experienced the
big hits in the cost estimation
procedures and what steps did the
Indian Govt. take in order to
sustain the budgetary perspective
and complete the project.

Karthik Murali | EMGT 709
Western New England University
March 2nd, 2013
karthik.murali@wne.edu
Case Study – Dulhasti Power Plant Project

Contents
Contents ......................................................................... 1
Summary......................................................................... 1
The Challenges................................................................ 2
Initial Challenge .............................................................. 3
Political Issues................................................................. 3
Geographical Issue ......................................................... 5
Project’s Frontier ............................................................ 6
Conclusion ...................................................................... 8
Appendix – Figures & Images ......................................... 8
Bibliography.................................................................... 9

Summary
The idea of the project was a very straightforward concept.
Dulhasti was designed as a 390MW hydroelectric power plant
to be built on Chandra River, which is a swift-flowing tributary
of the Chenab River in the Doda region, a rugged, mountainous section of the Himalayas, and
several hundred kilometers form larger cities.
The project dealt with,
1. Building a dam
2. Erect a hydroelectric generating station
3. String hundreds of miles of transmission lines
The transmission lines were to be built in a way that they start near the headwaters of a system
of rivers flowing onto the plain south of the mountain region. The contract of the project was
finalized initially for $50 Million which led the contracting organizations anticipate that the
project could be completed in a reasonable time frame.
Adv. Engr. Cost Estimation | March 5th, 2013

1
Case Study – Dulhasti Power Plant Project

The Challenges
The driving factor that led to the decision of the
construction of a hydro electrical power plant was the
geographical plus points and the natural factors that acted
as an added advantage.
Mountains, rivers that were large enough to provide the
water capacity to run a hydroelectric plant for Dulhasti
dimensions were some of the naturally available support
instruments.
The following were the challenges observed during the progress of the project,
Figure 1

Positives

Challenges

Although there were two strong positives i.e. anchoring points that led to the initiation of the
project, the challenges ousted the advantageous factors of the overall proposition. The
geographical plus points were not complementary to the problems the logistics would face and
there were political issues with the neighboring country which indirectly led to additional costs.
These problems eventually led to a huge time delay in the completion and delivery of the Dulhasti
Power Plant.

Adv. Engr. Cost Estimation | March 5th, 2013

2
Case Study – Dulhasti Power Plant Project

Initial Challenge
The contract for the power generation project was
first awarded to a French Consortium. They
immediately reverted and asked for an upward
price revision. The Indian Govt. refused, having a
doubt on the French Consortium that it had known
all along that their initial bid was too low and were
hoping to simply “buy” the project prior to
renegotiating.
Given that the Indian Govt. had refused the initial price quote revision, this resulted into a second
bidding process. There was a wide competition from other European countries then in the field.
However, the second bid offer by the French was surprisingly much lower than the first one.
Although this process initially appeared to save the Indian Govt. a lot of money, it was not a good
and smooth beginning to the partnership between the Govt. and the French Consortium.

Political Issues
The site selected for the project, unfortunately, came with
some serious drawbacks. Jammu & Kashmir shares the
border with Pakistan. As history being a strong and true
witness, India and its neighboring country have had lot of
problems. It is persistent from 1947, the year India got
independence and experienced a partition with Pakistan.
Jammu & Kashmir has been the epicenter of numerous and serious clashes between separatist
forces supported by the Pakistan Govt. and the Indian Army units stationed in the region to keep
the peace.
The construction of a power plant in such a disputed area would certainly provoke some sort of
a reaction by the nationalist groups, using terrorism as their chief means of opposition.
Adv. Engr. Cost Estimation | March 5th, 2013

3
Case Study – Dulhasti Power Plant Project
Figure 2

The power plant was to be constructed at the Kishtwar district in Jammu which is just a few miles
away from the Indo-Pak border. The Kishtwar region is prone to external attacks and influences
across the border. The construction of the dam would become an obvious target to the terrorists
and it could end up endangering the nearby inhabited villages and the national roadways of India
which is one of the prime sources for material transportation for the Indian Army.

This led to the inclusion of additional charges of security for the site and the surrounding areas,
and it undoubtedly became prohibitively expensive. The initial estimation would have certainly
not made any provision for security – around the site and the neighboring areas, this uncounted
area must have gone rising till the final completion of the project.

Adv. Engr. Cost Estimation | March 5th, 2013

4
Case Study – Dulhasti Power Plant Project

The security has to be given right from the time the project work starts on the construction site
and it has to be stabilized and continued even after the completion of the power plant in order
to ensure that the massive effort put in does not go in vain.

Geographical Issue
As mentioned earlier, the construction site was situated in
the mountainous region of Jammu & Kashmir provinces, the
site was intended to capitalize on the proximity of the large
river systems capable of providing the water capacity that
was needed to run a hydroelectric plant of Dulhasti’s
dimensions.

The geographical challenge – creation of a large plant in a region that almost totally devoid of
supporting infrastructure. This also included an adequate logistics network (roadways and
railways). The ideology of building the power plant in the foothills of the Himalayas may sound
flabbergasting and look very scenic when done, but it was absolutely not cost effective,
particularly as almost all the supplies had to be brought in with air transportation metering up
the cost bar exorbitantly.

All the raw materials viz. cement, wood, stone and steel had to be hauled by helicopters for miles
over snowbound areas. Not to forget, the climate conditions. It snows for more than half a year
in Jammu and Kashmir and convincing labor (highest authority engineers to skilled laborers who
do the hardcore jobs) to work in those conditions was impossible without paying them a fat
packet of money each month. This also surpassed the initial estimation.

Adv. Engr. Cost Estimation | March 5th, 2013

5
Case Study – Dulhasti Power Plant Project

Project’s Frontier
The following graph explains the project’s timeline in general. The
power plant initiation to completion is spread over a span of 22 long
years. The big impact on the project’s progress was due to the Kargil
War (fought between India & Pakistan over seizing the territory of
Kargil which lies in the Indian occupied Kashmir) that went on for more
than 90 long days i.e. from May to August 1999.
The impact was worsened since it was the same year the project underwent its second major
revision with regards to structure, logistics and other important dynamics that were the active
catalysts in the project.
Figure 3
1985

1990

1995

2000

2005

2010

Project's Overall Span

French Cosortium 1st Bid

1st Major Revision

2nd Major Revision

Kargil War Effects

French Consortium Backs Off

New Contract Norwegian Co.

There was more to come. After the Kargil War subsided; although the after effects were bad, the
project had no time to recoil and gain a stable resumption.

Adv. Engr. Cost Estimation | March 5th, 2013

6
Case Study – Dulhasti Power Plant Project

The reason being the French Consortium which was in-charge of the whole program backed off.
They had pulled out due to some major differences with the Indian Govt. over the cost and the
work policy.
This forced the Indian Govt. to reissue the bid and this time the project was awarded to a
Norwegian Co. that led the project work with complete charge from the year 2002 till the
completion of the completion i.e. the year 2007.
The following graph shows the cost graph for the Dulhasti Power Plant. It started with an
estimation of 50 Million $ in its year of inception and shows an exponential raise to 1.5 Billion $
till completion. This jump is enormous and disastrous at the same time as it becomes a vivid study
for cost estimation failure and project delivery.
Figure 4

Dulhasti Power Plant's Cost
1600
1400

in Million $

1200
1000
800
600
400
200
0
1985

1987

1990

1995

2000

2002

2005

2007

Year

The work on the plant continued in fits and starts for over 20 years. By the turn of the century,
over $1 Billion had been spent on the Dulhasti project and the plant was still not operational.
Further, in order to offset the expense of the project, the cost of power to be generated by the
plant has risen by over 500%, making the plant an inefficient producer of electrical power for the
countryside.

Adv. Engr. Cost Estimation | March 5th, 2013

7
Case Study – Dulhasti Power Plant Project

Conclusion
The Dulhasti Hydroelectric Power Plant finally became operational on the 7 th of
April, 2007. It has been generating 1907 Million units of electricity in a 90%
dependable year.
It is one of the major accomplishments for NHPC (National Hydroelectric Power Corporation)
thereby building one of the most important HPPs in India, thus allowing for an integrated and
efficient power development.
The Dulhasti Power Plant serves eight states and the capital of India – Delhi, Jammu & Kashmir,
Himachal Pradesh, Punjab, Haryana, Uttar Pradesh, Rajasthan, Chandigarh and Uttaranchal.

Appendix – Figures & Images
Exhibit

Title

Figure 1

SmartArt Diagram – Beam Balance

Figure 2

Northern Provinces of India

Figure 3

Project’s Timeline

Figure 4

Dulhasti Power Plant Cost Graph

Image Courtesy

www.google.com/images

Adv. Engr. Cost Estimation | March 5th, 2013

8
Case Study – Dulhasti Power Plant Project

Bibliography
1. Blog, H. (2010, October 29th). Issues and Problems in Hydro Power Development in
India. Retrieved from HydroPowerStation.Com:
http://hydropowerstation.com/?tag=dulhasti-hydroelectric-project
2. Engineering, T. (2007, Apri 10). Dulhasti Dam & Hydro Electric Power Project. Retrieved
from Tractabel-Engineering: http://www.tractebel-engineeringgdfsuez.com/reference/dul-hasti-dam-and-hydroelectric-power-project/
3. Govt. of India. (2007). Project Implementation Status Report of Central Sector Projects.
Infrastructure and Project Management Division. New Delhi: Ministry of Statistics and
Programme Implementation.
4. Knowledge, M. H. (2012, November 7th). Working Challenges in Adverse Geological
Conditions. Retrieved from Blogspot.Com:
http://mmmhydropower.blogspot.com/2012/11/working-challenges-inadverse_8814.html
5. NHPC. (2008). Dulhasti Power Plant Project. Kishtwar, Jammu & Kashmir, India.
Retrieved from http://www.youtube.com/watch?v=q9A6kbDdQKk
6. Parihar, P. (2010, February 10th). Kishtwar - Ek Jannat. Retrieved from Blogspot.Com:
http://mykishtwar.blogspot.com/2010/02/dul-hasti-project.html
7. PM News Bureau. (2005, December 5th). Dulhasti Project by March 2006. Retrieved
from Project Monitor.Com:
http://www.projectsmonitor.com/detailnews.asp?newsid=10119
8. Rocky, R. (2007, April 7th). Dulhasti - A Ray of Hope for the Dark J&K. Retrieved from
Indian Express.Com: http://www.indianexpress.com/news/dulhasti-a-ray-of-hope-for-dark--jk/28049/0

Adv. Engr. Cost Estimation | March 5th, 2013

9

Contenu connexe

Tendances

Medical oxygen generator plant for hospital
Medical oxygen generator plant for hospitalMedical oxygen generator plant for hospital
Medical oxygen generator plant for hospitalRajinder Singh
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training ReportShivendra Bhushan
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...Rahul Akinapelli
 
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyThermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyJayant Suthar
 
classification of substation & busbar arrangement
classification of substation & busbar arrangementclassification of substation & busbar arrangement
classification of substation & busbar arrangementRahul Ghayal
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSManohar Tatwawadi
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT Amit Gupta
 
Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)Prem Baboo
 
Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)subhadip manna
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Mahi hydro power plant summer industrial training presentaion
Mahi hydro power plant summer industrial training presentaion Mahi hydro power plant summer industrial training presentaion
Mahi hydro power plant summer industrial training presentaion mechanical Singh
 
A complete presentation on Boiler.
A complete presentation on Boiler.A complete presentation on Boiler.
A complete presentation on Boiler.Anuj Maurya
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt Prabhat Kumar
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheaterdishti7
 

Tendances (20)

Medical oxygen generator plant for hospital
Medical oxygen generator plant for hospitalMedical oxygen generator plant for hospital
Medical oxygen generator plant for hospital
 
Stator water system chemistry
Stator water system chemistryStator water system chemistry
Stator water system chemistry
 
NHPC Training Report
NHPC Training ReportNHPC Training Report
NHPC Training Report
 
REPORT-NHPC
REPORT-NHPCREPORT-NHPC
REPORT-NHPC
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training Report
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
 
Thermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of EnergyThermal power plant | Electrical Engineering | Notes | Source of Energy
Thermal power plant | Electrical Engineering | Notes | Source of Energy
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
classification of substation & busbar arrangement
classification of substation & busbar arrangementclassification of substation & busbar arrangement
classification of substation & busbar arrangement
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)Steam turbine over speed trip systems (6)
Steam turbine over speed trip systems (6)
 
Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Mahi hydro power plant summer industrial training presentaion
Mahi hydro power plant summer industrial training presentaion Mahi hydro power plant summer industrial training presentaion
Mahi hydro power plant summer industrial training presentaion
 
A complete presentation on Boiler.
A complete presentation on Boiler.A complete presentation on Boiler.
A complete presentation on Boiler.
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
HT and LT SWITCHGEAR
HT and LT SWITCHGEARHT and LT SWITCHGEAR
HT and LT SWITCHGEAR
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheater
 

En vedette

Positioning RIN case study pakistan
Positioning   RIN case study pakistanPositioning   RIN case study pakistan
Positioning RIN case study pakistanArmanYousaf
 
a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification
 a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification
a Case study on A V Birla Group - Legacy of Free Enterprise and DiversificationMARAM SRAVAN KUMAR
 
Rin detergent case analysis group 10
Rin detergent case analysis group 10Rin detergent case analysis group 10
Rin detergent case analysis group 10Vinamra Sangal
 
Freemium publishing - OECD case study. SSP 2013
Freemium publishing - OECD case study. SSP 2013Freemium publishing - OECD case study. SSP 2013
Freemium publishing - OECD case study. SSP 2013tobygreen
 
OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...
OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...
OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...EUROsociAL II
 
United-kingdom-unleashing-productivity-oecd-main-findings-presentation
United-kingdom-unleashing-productivity-oecd-main-findings-presentationUnited-kingdom-unleashing-productivity-oecd-main-findings-presentation
United-kingdom-unleashing-productivity-oecd-main-findings-presentationOECD, Economics Department
 
1 introduction and oecd
1   introduction and oecd1   introduction and oecd
1 introduction and oecdBatuhan
 
Economic consequences of brexit OECD April 2016
Economic consequences of brexit OECD April 2016Economic consequences of brexit OECD April 2016
Economic consequences of brexit OECD April 2016OECD, Economics Department
 

En vedette (9)

Positioning RIN case study pakistan
Positioning   RIN case study pakistanPositioning   RIN case study pakistan
Positioning RIN case study pakistan
 
a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification
 a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification
a Case study on A V Birla Group - Legacy of Free Enterprise and Diversification
 
Rin detergent case analysis group 10
Rin detergent case analysis group 10Rin detergent case analysis group 10
Rin detergent case analysis group 10
 
Freemium publishing - OECD case study. SSP 2013
Freemium publishing - OECD case study. SSP 2013Freemium publishing - OECD case study. SSP 2013
Freemium publishing - OECD case study. SSP 2013
 
OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...
OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...
OECD Study on Regional Development in Brazil / Claire Charbit Deputy Head of ...
 
United-kingdom-unleashing-productivity-oecd-main-findings-presentation
United-kingdom-unleashing-productivity-oecd-main-findings-presentationUnited-kingdom-unleashing-productivity-oecd-main-findings-presentation
United-kingdom-unleashing-productivity-oecd-main-findings-presentation
 
United kingdom-compared-to-oecd-economies
United kingdom-compared-to-oecd-economiesUnited kingdom-compared-to-oecd-economies
United kingdom-compared-to-oecd-economies
 
1 introduction and oecd
1   introduction and oecd1   introduction and oecd
1 introduction and oecd
 
Economic consequences of brexit OECD April 2016
Economic consequences of brexit OECD April 2016Economic consequences of brexit OECD April 2016
Economic consequences of brexit OECD April 2016
 

Similaire à Dulhasti Power Plant Case Study

The Untold Story of Konkan Railway
The Untold Story of Konkan RailwayThe Untold Story of Konkan Railway
The Untold Story of Konkan RailwayRohit Dhoundiyal
 
Capacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel IndustryCapacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel IndustryDr. Amarjeet Singh
 
Dabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxDabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxNIHALTYAGI5
 
Project Management
Project ManagementProject Management
Project ManagementAnton Orlov
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYShabaz Khan
 
Time overruns welcome to power line
Time overruns   welcome to power lineTime overruns   welcome to power line
Time overruns welcome to power lineProbodh Mallick
 
5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdf5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdfAthimoolam M
 
J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...
J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...
J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...AdrianSyaifullah2
 
0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant
0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant
0647 Project Development of the Wayang Windu Unit 2 Geothermal Power PlantZerry Antro
 
Djibouti geothermal project study
Djibouti geothermal project studyDjibouti geothermal project study
Djibouti geothermal project studyParti Djibouti
 
Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010zubeditufail
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
UNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADUUNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADUAurovilleConsulting
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain PRIYANK JAIN
 
Offshore Wind Energy Market Trends and Forecast 2014 - 2022
Offshore Wind Energy Market Trends and Forecast 2014 - 2022Offshore Wind Energy Market Trends and Forecast 2014 - 2022
Offshore Wind Energy Market Trends and Forecast 2014 - 2022collinsR1
 
Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022
Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022 Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022
Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022 collinsR1
 

Similaire à Dulhasti Power Plant Case Study (20)

The Untold Story of Konkan Railway
The Untold Story of Konkan RailwayThe Untold Story of Konkan Railway
The Untold Story of Konkan Railway
 
DABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdfDABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdf
 
Capacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel IndustryCapacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel Industry
 
Tehri dam
Tehri damTehri dam
Tehri dam
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 
Dabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxDabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
Time overruns welcome to power line
Time overruns   welcome to power lineTime overruns   welcome to power line
Time overruns welcome to power line
 
5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdf5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdf
 
J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...
J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...
J-Impacts of Different Funding Sources on Long-lead Items Procurement in Indo...
 
0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant
0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant
0647 Project Development of the Wayang Windu Unit 2 Geothermal Power Plant
 
Djibouti geothermal project study
Djibouti geothermal project studyDjibouti geothermal project study
Djibouti geothermal project study
 
Hydro power presentation
Hydro power presentationHydro power presentation
Hydro power presentation
 
Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
UNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADUUNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADU
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain
 
Offshore Wind Energy Market Trends and Forecast 2014 - 2022
Offshore Wind Energy Market Trends and Forecast 2014 - 2022Offshore Wind Energy Market Trends and Forecast 2014 - 2022
Offshore Wind Energy Market Trends and Forecast 2014 - 2022
 
Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022
Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022 Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022
Offshore Wind Energy Installed Capacity to Reach 52,120.9 MW by 2022
 

Plus de Karthik Murali

WNE Communicator 2015 Featured Article
WNE Communicator 2015 Featured ArticleWNE Communicator 2015 Featured Article
WNE Communicator 2015 Featured ArticleKarthik Murali
 
Thesis Part II EMGT 699
Thesis Part II EMGT 699Thesis Part II EMGT 699
Thesis Part II EMGT 699Karthik Murali
 
Thesis Part I EMGT 698
Thesis Part I EMGT 698Thesis Part I EMGT 698
Thesis Part I EMGT 698Karthik Murali
 
Leagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm IntegrationLeagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm IntegrationKarthik Murali
 
Application of Mathematics
Application of MathematicsApplication of Mathematics
Application of MathematicsKarthik Murali
 
Michelle Kowalsky's Recommendation
Michelle Kowalsky's RecommendationMichelle Kowalsky's Recommendation
Michelle Kowalsky's RecommendationKarthik Murali
 
Matthew Fox's Recommendation
Matthew Fox's RecommendationMatthew Fox's Recommendation
Matthew Fox's RecommendationKarthik Murali
 
Dr. Julie Drzymalski's Recommendation
Dr. Julie Drzymalski's RecommendationDr. Julie Drzymalski's Recommendation
Dr. Julie Drzymalski's RecommendationKarthik Murali
 
Dr. Christian Salmon's Recommendation
Dr. Christian Salmon's RecommendationDr. Christian Salmon's Recommendation
Dr. Christian Salmon's RecommendationKarthik Murali
 
Prof. Mike Bloom's Recommendation
Prof. Mike Bloom's RecommendationProf. Mike Bloom's Recommendation
Prof. Mike Bloom's RecommendationKarthik Murali
 
DSLR Image Quality Analysis using Minitab
DSLR Image Quality Analysis using MinitabDSLR Image Quality Analysis using Minitab
DSLR Image Quality Analysis using MinitabKarthik Murali
 
Leagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm IntegrationLeagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm IntegrationKarthik Murali
 
Framework for a Software Quality Rating System
Framework for a Software Quality Rating SystemFramework for a Software Quality Rating System
Framework for a Software Quality Rating SystemKarthik Murali
 
A Study on the Need for a Software Quality Rating System
A Study on the Need for a Software Quality Rating SystemA Study on the Need for a Software Quality Rating System
A Study on the Need for a Software Quality Rating SystemKarthik Murali
 

Plus de Karthik Murali (14)

WNE Communicator 2015 Featured Article
WNE Communicator 2015 Featured ArticleWNE Communicator 2015 Featured Article
WNE Communicator 2015 Featured Article
 
Thesis Part II EMGT 699
Thesis Part II EMGT 699Thesis Part II EMGT 699
Thesis Part II EMGT 699
 
Thesis Part I EMGT 698
Thesis Part I EMGT 698Thesis Part I EMGT 698
Thesis Part I EMGT 698
 
Leagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm IntegrationLeagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm Integration
 
Application of Mathematics
Application of MathematicsApplication of Mathematics
Application of Mathematics
 
Michelle Kowalsky's Recommendation
Michelle Kowalsky's RecommendationMichelle Kowalsky's Recommendation
Michelle Kowalsky's Recommendation
 
Matthew Fox's Recommendation
Matthew Fox's RecommendationMatthew Fox's Recommendation
Matthew Fox's Recommendation
 
Dr. Julie Drzymalski's Recommendation
Dr. Julie Drzymalski's RecommendationDr. Julie Drzymalski's Recommendation
Dr. Julie Drzymalski's Recommendation
 
Dr. Christian Salmon's Recommendation
Dr. Christian Salmon's RecommendationDr. Christian Salmon's Recommendation
Dr. Christian Salmon's Recommendation
 
Prof. Mike Bloom's Recommendation
Prof. Mike Bloom's RecommendationProf. Mike Bloom's Recommendation
Prof. Mike Bloom's Recommendation
 
DSLR Image Quality Analysis using Minitab
DSLR Image Quality Analysis using MinitabDSLR Image Quality Analysis using Minitab
DSLR Image Quality Analysis using Minitab
 
Leagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm IntegrationLeagile Manufacturing Paradigm Integration
Leagile Manufacturing Paradigm Integration
 
Framework for a Software Quality Rating System
Framework for a Software Quality Rating SystemFramework for a Software Quality Rating System
Framework for a Software Quality Rating System
 
A Study on the Need for a Software Quality Rating System
A Study on the Need for a Software Quality Rating SystemA Study on the Need for a Software Quality Rating System
A Study on the Need for a Software Quality Rating System
 

Dernier

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 

Dernier (20)

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

Dulhasti Power Plant Case Study

  • 1. Dulhasti Power Plant Project Abstract Begun in 1985, the Dulhasti power project set in the northern Indian provinces of Jammu and Kashmir, is a renowned example of a disaster in project cost estimation and delivery. During the inception stage, the project’s cost was estimated to be 1.6 Billion Rupees (about $50 Million). By the time the contract was let, the cost estimates had risen to 4.5 Billion Rupees and later it rose to 8, 11, 16 and 24 Billion Rupees (nearly $750 Million). Till 2004, the project was not completed, although well over $1 Billion was spent, just pursuing it. This study and analysis highlights those areas which experienced the big hits in the cost estimation procedures and what steps did the Indian Govt. take in order to sustain the budgetary perspective and complete the project. Karthik Murali | EMGT 709 Western New England University March 2nd, 2013 karthik.murali@wne.edu
  • 2. Case Study – Dulhasti Power Plant Project Contents Contents ......................................................................... 1 Summary......................................................................... 1 The Challenges................................................................ 2 Initial Challenge .............................................................. 3 Political Issues................................................................. 3 Geographical Issue ......................................................... 5 Project’s Frontier ............................................................ 6 Conclusion ...................................................................... 8 Appendix – Figures & Images ......................................... 8 Bibliography.................................................................... 9 Summary The idea of the project was a very straightforward concept. Dulhasti was designed as a 390MW hydroelectric power plant to be built on Chandra River, which is a swift-flowing tributary of the Chenab River in the Doda region, a rugged, mountainous section of the Himalayas, and several hundred kilometers form larger cities. The project dealt with, 1. Building a dam 2. Erect a hydroelectric generating station 3. String hundreds of miles of transmission lines The transmission lines were to be built in a way that they start near the headwaters of a system of rivers flowing onto the plain south of the mountain region. The contract of the project was finalized initially for $50 Million which led the contracting organizations anticipate that the project could be completed in a reasonable time frame. Adv. Engr. Cost Estimation | March 5th, 2013 1
  • 3. Case Study – Dulhasti Power Plant Project The Challenges The driving factor that led to the decision of the construction of a hydro electrical power plant was the geographical plus points and the natural factors that acted as an added advantage. Mountains, rivers that were large enough to provide the water capacity to run a hydroelectric plant for Dulhasti dimensions were some of the naturally available support instruments. The following were the challenges observed during the progress of the project, Figure 1 Positives Challenges Although there were two strong positives i.e. anchoring points that led to the initiation of the project, the challenges ousted the advantageous factors of the overall proposition. The geographical plus points were not complementary to the problems the logistics would face and there were political issues with the neighboring country which indirectly led to additional costs. These problems eventually led to a huge time delay in the completion and delivery of the Dulhasti Power Plant. Adv. Engr. Cost Estimation | March 5th, 2013 2
  • 4. Case Study – Dulhasti Power Plant Project Initial Challenge The contract for the power generation project was first awarded to a French Consortium. They immediately reverted and asked for an upward price revision. The Indian Govt. refused, having a doubt on the French Consortium that it had known all along that their initial bid was too low and were hoping to simply “buy” the project prior to renegotiating. Given that the Indian Govt. had refused the initial price quote revision, this resulted into a second bidding process. There was a wide competition from other European countries then in the field. However, the second bid offer by the French was surprisingly much lower than the first one. Although this process initially appeared to save the Indian Govt. a lot of money, it was not a good and smooth beginning to the partnership between the Govt. and the French Consortium. Political Issues The site selected for the project, unfortunately, came with some serious drawbacks. Jammu & Kashmir shares the border with Pakistan. As history being a strong and true witness, India and its neighboring country have had lot of problems. It is persistent from 1947, the year India got independence and experienced a partition with Pakistan. Jammu & Kashmir has been the epicenter of numerous and serious clashes between separatist forces supported by the Pakistan Govt. and the Indian Army units stationed in the region to keep the peace. The construction of a power plant in such a disputed area would certainly provoke some sort of a reaction by the nationalist groups, using terrorism as their chief means of opposition. Adv. Engr. Cost Estimation | March 5th, 2013 3
  • 5. Case Study – Dulhasti Power Plant Project Figure 2 The power plant was to be constructed at the Kishtwar district in Jammu which is just a few miles away from the Indo-Pak border. The Kishtwar region is prone to external attacks and influences across the border. The construction of the dam would become an obvious target to the terrorists and it could end up endangering the nearby inhabited villages and the national roadways of India which is one of the prime sources for material transportation for the Indian Army. This led to the inclusion of additional charges of security for the site and the surrounding areas, and it undoubtedly became prohibitively expensive. The initial estimation would have certainly not made any provision for security – around the site and the neighboring areas, this uncounted area must have gone rising till the final completion of the project. Adv. Engr. Cost Estimation | March 5th, 2013 4
  • 6. Case Study – Dulhasti Power Plant Project The security has to be given right from the time the project work starts on the construction site and it has to be stabilized and continued even after the completion of the power plant in order to ensure that the massive effort put in does not go in vain. Geographical Issue As mentioned earlier, the construction site was situated in the mountainous region of Jammu & Kashmir provinces, the site was intended to capitalize on the proximity of the large river systems capable of providing the water capacity that was needed to run a hydroelectric plant of Dulhasti’s dimensions. The geographical challenge – creation of a large plant in a region that almost totally devoid of supporting infrastructure. This also included an adequate logistics network (roadways and railways). The ideology of building the power plant in the foothills of the Himalayas may sound flabbergasting and look very scenic when done, but it was absolutely not cost effective, particularly as almost all the supplies had to be brought in with air transportation metering up the cost bar exorbitantly. All the raw materials viz. cement, wood, stone and steel had to be hauled by helicopters for miles over snowbound areas. Not to forget, the climate conditions. It snows for more than half a year in Jammu and Kashmir and convincing labor (highest authority engineers to skilled laborers who do the hardcore jobs) to work in those conditions was impossible without paying them a fat packet of money each month. This also surpassed the initial estimation. Adv. Engr. Cost Estimation | March 5th, 2013 5
  • 7. Case Study – Dulhasti Power Plant Project Project’s Frontier The following graph explains the project’s timeline in general. The power plant initiation to completion is spread over a span of 22 long years. The big impact on the project’s progress was due to the Kargil War (fought between India & Pakistan over seizing the territory of Kargil which lies in the Indian occupied Kashmir) that went on for more than 90 long days i.e. from May to August 1999. The impact was worsened since it was the same year the project underwent its second major revision with regards to structure, logistics and other important dynamics that were the active catalysts in the project. Figure 3 1985 1990 1995 2000 2005 2010 Project's Overall Span French Cosortium 1st Bid 1st Major Revision 2nd Major Revision Kargil War Effects French Consortium Backs Off New Contract Norwegian Co. There was more to come. After the Kargil War subsided; although the after effects were bad, the project had no time to recoil and gain a stable resumption. Adv. Engr. Cost Estimation | March 5th, 2013 6
  • 8. Case Study – Dulhasti Power Plant Project The reason being the French Consortium which was in-charge of the whole program backed off. They had pulled out due to some major differences with the Indian Govt. over the cost and the work policy. This forced the Indian Govt. to reissue the bid and this time the project was awarded to a Norwegian Co. that led the project work with complete charge from the year 2002 till the completion of the completion i.e. the year 2007. The following graph shows the cost graph for the Dulhasti Power Plant. It started with an estimation of 50 Million $ in its year of inception and shows an exponential raise to 1.5 Billion $ till completion. This jump is enormous and disastrous at the same time as it becomes a vivid study for cost estimation failure and project delivery. Figure 4 Dulhasti Power Plant's Cost 1600 1400 in Million $ 1200 1000 800 600 400 200 0 1985 1987 1990 1995 2000 2002 2005 2007 Year The work on the plant continued in fits and starts for over 20 years. By the turn of the century, over $1 Billion had been spent on the Dulhasti project and the plant was still not operational. Further, in order to offset the expense of the project, the cost of power to be generated by the plant has risen by over 500%, making the plant an inefficient producer of electrical power for the countryside. Adv. Engr. Cost Estimation | March 5th, 2013 7
  • 9. Case Study – Dulhasti Power Plant Project Conclusion The Dulhasti Hydroelectric Power Plant finally became operational on the 7 th of April, 2007. It has been generating 1907 Million units of electricity in a 90% dependable year. It is one of the major accomplishments for NHPC (National Hydroelectric Power Corporation) thereby building one of the most important HPPs in India, thus allowing for an integrated and efficient power development. The Dulhasti Power Plant serves eight states and the capital of India – Delhi, Jammu & Kashmir, Himachal Pradesh, Punjab, Haryana, Uttar Pradesh, Rajasthan, Chandigarh and Uttaranchal. Appendix – Figures & Images Exhibit Title Figure 1 SmartArt Diagram – Beam Balance Figure 2 Northern Provinces of India Figure 3 Project’s Timeline Figure 4 Dulhasti Power Plant Cost Graph Image Courtesy www.google.com/images Adv. Engr. Cost Estimation | March 5th, 2013 8
  • 10. Case Study – Dulhasti Power Plant Project Bibliography 1. Blog, H. (2010, October 29th). Issues and Problems in Hydro Power Development in India. Retrieved from HydroPowerStation.Com: http://hydropowerstation.com/?tag=dulhasti-hydroelectric-project 2. Engineering, T. (2007, Apri 10). Dulhasti Dam & Hydro Electric Power Project. Retrieved from Tractabel-Engineering: http://www.tractebel-engineeringgdfsuez.com/reference/dul-hasti-dam-and-hydroelectric-power-project/ 3. Govt. of India. (2007). Project Implementation Status Report of Central Sector Projects. Infrastructure and Project Management Division. New Delhi: Ministry of Statistics and Programme Implementation. 4. Knowledge, M. H. (2012, November 7th). Working Challenges in Adverse Geological Conditions. Retrieved from Blogspot.Com: http://mmmhydropower.blogspot.com/2012/11/working-challenges-inadverse_8814.html 5. NHPC. (2008). Dulhasti Power Plant Project. Kishtwar, Jammu & Kashmir, India. Retrieved from http://www.youtube.com/watch?v=q9A6kbDdQKk 6. Parihar, P. (2010, February 10th). Kishtwar - Ek Jannat. Retrieved from Blogspot.Com: http://mykishtwar.blogspot.com/2010/02/dul-hasti-project.html 7. PM News Bureau. (2005, December 5th). Dulhasti Project by March 2006. Retrieved from Project Monitor.Com: http://www.projectsmonitor.com/detailnews.asp?newsid=10119 8. Rocky, R. (2007, April 7th). Dulhasti - A Ray of Hope for the Dark J&K. Retrieved from Indian Express.Com: http://www.indianexpress.com/news/dulhasti-a-ray-of-hope-for-dark--jk/28049/0 Adv. Engr. Cost Estimation | March 5th, 2013 9