CONTROLLINGWHY, HOW AND WHAT
CONTROLLING
• a process of measuring performance and taking action
to ensure desired results. Its purpose is
straightforward – to make sure that plans are
achieved, that actual performance meets or surpasses
objectives.
• Planning – to set the direction
• Organizing – to create structures
• Leading – to inspire effort
• Controlling – to ensure results
TYPES OF CONTROLS
FEEDFORWARD CONTROLS
• called PRELIMINARY CONTROLS, take place before a work activity
begins. Also, preventive in nature. The goal is to solve problems before
they occur by asking an important but often-neglected question:
“WHAT NEEDS TO BE DONE BEFORE WE BEGIN?”
They ensure:
• Objectives are clear
• Proper directions are established
• Right resources are available to accomplish them
CONCURRENT CONTROLS
• called STEERING CONTROLS, focus on what happens during the work
process. They make sure things are being done according to plan. The
goal is to solve problems as they are occurring. The key question is:
“WHAT CAN WE DO TO IMPROVE THINGS RIGHT NOW?”
FEEDBACK CONTROLS
• Called POSTACTION CONTROLS, take place after work is completed.
They focus on the quality of end results rather than on inputs and
activities. It is largely reactive. The goals are to solve problems after they
occur and prevent future ones. They ask the question: “NOW THAT
WE ARE FINISHED, HOW WELL DID WE DO?”
TWO BROAD OPERATIONS WITH
RESPECT TO CONTROL
INTERNAL CONTROL
• this strategy allows motivated individuals and groups to exercise
self-discipline in fulfilling jobs expectations. Alternatively, managers
can take direct action to control the behavior of others.
EXTERNAL CONTROL
• this strategy occurs through personal supervision and the use of
formal administrative systems.
STEPS IN THE CONTROL PROCESS
FOUR STEPS IN THE
CONTROL PROCESS
• ESTABLISH OBJECTIVES
AND STANDARDS
• MEASURE PERFORMANCE
RESULTS
• COMPARE RESULTS WITH
OBJECTIVES AND
STANDARDS
• TAKE CORRECTIVE ACTION
STEP 1: ESTABLISH OBJECTIVES AND
STANDARDS
• the process begins with planning, when performance objectives and
standards for measuring them are set. It can’t start without them.
• Performance objectives should represent key results that one wants
to accomplish. The word “key” in the prior sentence is important. The
focus in planning should be on describing “critical” or “essential” results
that will make a substantial performance difference.
• Standards are important, too. As key results are identified, one also has
to specify the standards and measures that will be uses to evaluate their
accomplishment.
TWO TYPES OF STANDARDS
• OUTPUT STANDARDS
-- measure actual outcomes or work results.
• INPUT STANDARDS
-- measure work efforts. These are often used in situations
where outputs are difficult or expensive to measure.
STEP 2: MEASURE PERFORMANCE RESULTS
• measure actual performance. The goal is to assess results based on
output standards and/or input standards. Measurement must be
accurate enough to spot significant differences between what is
really taking place and what was originally planned. Without it,
effective control is not possible. And a willingness to measure has
its rewards: what gets measured tends to happen.
STEP 3: COMPARE RESULTS WITH OBJECTIVES
AND STANDARDS
• You can remember Step 3 by this control equation.
Need for action = Desired performance – Actual performance
• Dealing with an identified need for action is like any other problem solving. It
can point toward:
performance threat or deficiency – when actual is less than desired. Or
it can point toward a possible
performance opportunity – when actual is more than desired.
NOTE:
Historical Comparison
Relative Comparison
STEP 4: TAKE CORRECTIVE ACTION
• To take any action necessary to correct problems or make investments.
Management by Exception – the practice of giving attention to situations
that show the greatest need for action. It can save valuable time, energy, and
other resources by focusing attention on high-priority areas.
TWO TYPES OF EXCEPTIONS
• Problem Situation
– must be understood so corrective action can restore performance to the
desired level
• Opportunity Situation
– must be understood with the goal of continuing or increasing the high level of
accomplishment in the future.
CONTROL SYSTEMS AND
TECHNIQUES
EMPLOYEE DISCIPLINE SYSTEMS
• Discipline – the act of influencing behavior through reprimand
• Progressive Discipline – ties reprimands to the severity and frequency
of the employee’s infractions. Penalties for misbehavior vary according to
the significance of the problem.
PROJECT MANAGEMENT
- Is responsibility for the overall planning, supervision and control of projects.
• Projects – one-time events with unique components and an objective that
must be met within a defined time period.
TWO SPECIAL TECHNIQUES
GANTT CHART
• Developed by Henry Gantt, an industrial engineer, it graphically displays the
scheduling of tasks required to complete a project. It has become a mainstay of
project management ever since.
CPM/PERT
• Network modeling approaches that originated separately and have now
converged.
INFORMATION AND FINANCIAL CONTROLS
• In business, the analysis of a firm’s financial performance is an important
aspect of managerial control. At a minimum, managers should be able to
understand:
1. Liquidity – ability to generate cash to pay bills
2. Leverage – ability to earn more in returns than the cost of debt
3. Asset Management – ability to use resources efficiently and operate at
minimum cost
4. Profitability – ability to earn revenues greater than costs
Liquidity
• Current Ratio = Current Assets / Current Liabilities
Leverage
• Debt Ratio = Total Debts / Total Assets
Asset Management
• Inventory Turnover = Sales / Average Inventory
Profitability
• Net Margin = Net Profit after Taxes / Sales
• Return on Assets = Net Profit after Taxes / Total Assets
END
THANK YOU 

Contenu connexe

Tendances

control technique's
control technique'scontrol technique's
control technique's
chetan birla
 
Management control of projects
Management control of projectsManagement control of projects
Management control of projects
Sai Mahesh
 
Attachments 2004 06_1
Attachments 2004 06_1Attachments 2004 06_1
Attachments 2004 06_1
Cibin Mathew
 
Management Control of Projects
Management Control of ProjectsManagement Control of Projects
Management Control of Projects
E P John
 

Tendances (20)

control technique's
control technique'scontrol technique's
control technique's
 
Art of Controlling - Principles of Management
Art of Controlling - Principles of ManagementArt of Controlling - Principles of Management
Art of Controlling - Principles of Management
 
Controlling
ControllingControlling
Controlling
 
Controlling (2)
Controlling (2)Controlling (2)
Controlling (2)
 
Controlling ppt
Controlling pptControlling ppt
Controlling ppt
 
Controlling
ControllingControlling
Controlling
 
Principles of management – mgt101
Principles of management – mgt101Principles of management – mgt101
Principles of management – mgt101
 
Managerial control
Managerial controlManagerial control
Managerial control
 
Controlling
ControllingControlling
Controlling
 
Managerial Control
Managerial ControlManagerial Control
Managerial Control
 
Management control of projects
Management control of projectsManagement control of projects
Management control of projects
 
Controlling-Type, Process, Barriers &Techniques
Controlling-Type, Process, Barriers &TechniquesControlling-Type, Process, Barriers &Techniques
Controlling-Type, Process, Barriers &Techniques
 
6 pom kc controlling
6 pom kc controlling6 pom kc controlling
6 pom kc controlling
 
Controlling
ControllingControlling
Controlling
 
Techniques of controlling
Techniques of controllingTechniques of controlling
Techniques of controlling
 
Controlling
ControllingControlling
Controlling
 
The controlling process
The controlling processThe controlling process
The controlling process
 
control techniques
control techniquescontrol techniques
control techniques
 
Attachments 2004 06_1
Attachments 2004 06_1Attachments 2004 06_1
Attachments 2004 06_1
 
Management Control of Projects
Management Control of ProjectsManagement Control of Projects
Management Control of Projects
 

Similaire à Mgt function8 controlling 2

Controlling mangament and its process
Controlling mangament and its processControlling mangament and its process
Controlling mangament and its process
Anant Agarwal
 
Controlling hardcopy
Controlling hardcopyControlling hardcopy
Controlling hardcopy
Aizell Bernal
 
7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx
sleeperharwell
 
conrolling process and management business studies
conrolling process and management business studiesconrolling process and management business studies
conrolling process and management business studies
anant agarwal
 
Unit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and ComtrolUnit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and Comtrol
Dayanand Huded
 

Similaire à Mgt function8 controlling 2 (20)

Lecture 7. CONTROL.pptx
Lecture 7. CONTROL.pptxLecture 7. CONTROL.pptx
Lecture 7. CONTROL.pptx
 
10.CONTROLLING.pptx
10.CONTROLLING.pptx10.CONTROLLING.pptx
10.CONTROLLING.pptx
 
Controlling
ControllingControlling
Controlling
 
Principles of Management Controlling
Principles of Management ControllingPrinciples of Management Controlling
Principles of Management Controlling
 
Controlling 17.9.22.pptx
Controlling 17.9.22.pptxControlling 17.9.22.pptx
Controlling 17.9.22.pptx
 
Controlling 17.9.22.pptx
Controlling 17.9.22.pptxControlling 17.9.22.pptx
Controlling 17.9.22.pptx
 
Controlling 2 ppt
Controlling 2 pptControlling 2 ppt
Controlling 2 ppt
 
Controlling mangament and its process
Controlling mangament and its processControlling mangament and its process
Controlling mangament and its process
 
Written Report Group 1
Written Report Group 1Written Report Group 1
Written Report Group 1
 
Controlling hardcopy
Controlling hardcopyControlling hardcopy
Controlling hardcopy
 
7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx
 
Controlling process
Controlling processControlling process
Controlling process
 
Controlling
ControllingControlling
Controlling
 
Control.ppt
Control.pptControl.ppt
Control.ppt
 
conrolling process and management business studies
conrolling process and management business studiesconrolling process and management business studies
conrolling process and management business studies
 
Unit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and ComtrolUnit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and Comtrol
 
unit5-230511154739-Strategic Management.pdf
unit5-230511154739-Strategic Management.pdfunit5-230511154739-Strategic Management.pdf
unit5-230511154739-Strategic Management.pdf
 
CONTROLLING.ppt
CONTROLLING.pptCONTROLLING.ppt
CONTROLLING.ppt
 
Controlling in management
Controlling in managementControlling in management
Controlling in management
 
Ebbpa3 b ch 9
Ebbpa3 b   ch 9Ebbpa3 b   ch 9
Ebbpa3 b ch 9
 

Dernier

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Dernier (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Mgt function8 controlling 2

  • 2. CONTROLLING • a process of measuring performance and taking action to ensure desired results. Its purpose is straightforward – to make sure that plans are achieved, that actual performance meets or surpasses objectives.
  • 3. • Planning – to set the direction • Organizing – to create structures • Leading – to inspire effort • Controlling – to ensure results
  • 5. FEEDFORWARD CONTROLS • called PRELIMINARY CONTROLS, take place before a work activity begins. Also, preventive in nature. The goal is to solve problems before they occur by asking an important but often-neglected question: “WHAT NEEDS TO BE DONE BEFORE WE BEGIN?” They ensure: • Objectives are clear • Proper directions are established • Right resources are available to accomplish them
  • 6. CONCURRENT CONTROLS • called STEERING CONTROLS, focus on what happens during the work process. They make sure things are being done according to plan. The goal is to solve problems as they are occurring. The key question is: “WHAT CAN WE DO TO IMPROVE THINGS RIGHT NOW?”
  • 7. FEEDBACK CONTROLS • Called POSTACTION CONTROLS, take place after work is completed. They focus on the quality of end results rather than on inputs and activities. It is largely reactive. The goals are to solve problems after they occur and prevent future ones. They ask the question: “NOW THAT WE ARE FINISHED, HOW WELL DID WE DO?”
  • 8. TWO BROAD OPERATIONS WITH RESPECT TO CONTROL
  • 9. INTERNAL CONTROL • this strategy allows motivated individuals and groups to exercise self-discipline in fulfilling jobs expectations. Alternatively, managers can take direct action to control the behavior of others.
  • 10. EXTERNAL CONTROL • this strategy occurs through personal supervision and the use of formal administrative systems.
  • 11. STEPS IN THE CONTROL PROCESS
  • 12. FOUR STEPS IN THE CONTROL PROCESS • ESTABLISH OBJECTIVES AND STANDARDS • MEASURE PERFORMANCE RESULTS • COMPARE RESULTS WITH OBJECTIVES AND STANDARDS • TAKE CORRECTIVE ACTION
  • 13. STEP 1: ESTABLISH OBJECTIVES AND STANDARDS • the process begins with planning, when performance objectives and standards for measuring them are set. It can’t start without them. • Performance objectives should represent key results that one wants to accomplish. The word “key” in the prior sentence is important. The focus in planning should be on describing “critical” or “essential” results that will make a substantial performance difference. • Standards are important, too. As key results are identified, one also has to specify the standards and measures that will be uses to evaluate their accomplishment.
  • 14. TWO TYPES OF STANDARDS
  • 15. • OUTPUT STANDARDS -- measure actual outcomes or work results. • INPUT STANDARDS -- measure work efforts. These are often used in situations where outputs are difficult or expensive to measure.
  • 16. STEP 2: MEASURE PERFORMANCE RESULTS • measure actual performance. The goal is to assess results based on output standards and/or input standards. Measurement must be accurate enough to spot significant differences between what is really taking place and what was originally planned. Without it, effective control is not possible. And a willingness to measure has its rewards: what gets measured tends to happen.
  • 17. STEP 3: COMPARE RESULTS WITH OBJECTIVES AND STANDARDS • You can remember Step 3 by this control equation. Need for action = Desired performance – Actual performance • Dealing with an identified need for action is like any other problem solving. It can point toward: performance threat or deficiency – when actual is less than desired. Or it can point toward a possible performance opportunity – when actual is more than desired. NOTE: Historical Comparison Relative Comparison
  • 18. STEP 4: TAKE CORRECTIVE ACTION • To take any action necessary to correct problems or make investments. Management by Exception – the practice of giving attention to situations that show the greatest need for action. It can save valuable time, energy, and other resources by focusing attention on high-priority areas.
  • 19. TWO TYPES OF EXCEPTIONS
  • 20. • Problem Situation – must be understood so corrective action can restore performance to the desired level • Opportunity Situation – must be understood with the goal of continuing or increasing the high level of accomplishment in the future.
  • 22. EMPLOYEE DISCIPLINE SYSTEMS • Discipline – the act of influencing behavior through reprimand • Progressive Discipline – ties reprimands to the severity and frequency of the employee’s infractions. Penalties for misbehavior vary according to the significance of the problem.
  • 23. PROJECT MANAGEMENT - Is responsibility for the overall planning, supervision and control of projects. • Projects – one-time events with unique components and an objective that must be met within a defined time period.
  • 25. GANTT CHART • Developed by Henry Gantt, an industrial engineer, it graphically displays the scheduling of tasks required to complete a project. It has become a mainstay of project management ever since.
  • 26. CPM/PERT • Network modeling approaches that originated separately and have now converged.
  • 27. INFORMATION AND FINANCIAL CONTROLS • In business, the analysis of a firm’s financial performance is an important aspect of managerial control. At a minimum, managers should be able to understand: 1. Liquidity – ability to generate cash to pay bills 2. Leverage – ability to earn more in returns than the cost of debt 3. Asset Management – ability to use resources efficiently and operate at minimum cost 4. Profitability – ability to earn revenues greater than costs
  • 28. Liquidity • Current Ratio = Current Assets / Current Liabilities Leverage • Debt Ratio = Total Debts / Total Assets Asset Management • Inventory Turnover = Sales / Average Inventory Profitability • Net Margin = Net Profit after Taxes / Sales • Return on Assets = Net Profit after Taxes / Total Assets