Title:
Brief advice on some corrective measures to be used before and after crossing the ground or rock due to
induced breakdown during the excavation phase of a tunnel in an urban area using the traditional NATM
System or using a TBM-EPB
by Luigi Franco, LAMANNA (*)
1. Introduction
Below I would like to illustrate, through a simple schematic representation, the procedure to be adopted to cross an
area in which there is a "fault", and at the same time try to reduce the consequent damage, following a possible
"collapse" of the soil / rock, during the excavation phase of a tunnel for the metropolitan and / or railway network,
using a TBM-EPB Mechanized Cutter.
The methodological techniques that are usually adopted are very varied, however our only goal, through this
memory, is only to suggest, based on our experience, the types of consumables to be used in such situations, for
engineering applied in underground and highly urbanized environments, and therefore requires a preventive study,
which must be increasingly technologically advanced, to determine the real impact of the construction of these
underground lines on the buildings present on the surface.
Photo 01 – Some examples of subsidence in the metropolitan area
2. Brief and concise illustration of the "subsidence" in situ
We are all aware that if a "collapse" of the ground should occur,during the excavation phase, the TBM will be blocked
because a large "quantity of earth and / or a mass of rock" has entered the cracks, through the cutting disc [cutter],
present on the rotating head of the mechanized cutter
So, first of all, the TBM operator will try to try to "delete any errors", in particular, by performing some actions to be
able to unlock, pulling the TBM back. Therefore, as a first activity, he will try to:
- remove the block "of the earth or rock mass";
- stabilize the "ground / rock" in front of the rotating head, called in the jargon "excavation face";
- it is then to evaluate whether it is necessary to create a "unlocking pilot tunnel", this is necessary to get in front of
the "rotating cutting head" [of the mechanized cutter], which is the external part on which the tools are placed
[cutters], whose function is to break up the soil, to remove the latter [the earth] or the collapsed rock mass,
performing reinforcement treatments, by means of rapid injections of particular "chemical resins" and verify the
causes of the "collapse and / or the phenomenon of subsidence" that has arisen, assess any damage [even the TBM
cutter itself can suffer considerable damage] and make very important decisions on how to intervene.
All
photos
illustred
are
copied
from
the
WEB
Once all this has been done, which requires very long treatment times to eliminate the elastic component of the
deformation, the TBM can be started again and immediately afterwards, the excavation can be continued.
Thus described it seems very simple, but in reality we are faced with a truly complex geological event because, during
the excavation phase with a TBM-EPB, and in a highly urbanized area, it is necessary to have preventive control, to
respect fundamental constraints. In particular:
1. avoid damage to the infrastructures and buildings on the surface present in the urbanized area;
2. guarantee the safety of workers in all phases of work because the staff has to work in small spaces and many
times, to unlock the TBM head, small charges must be detonated, creating the problem of manually removing the
rock fragments;
3. check the normal increase in stresses in the temporary lining as a result of the decay of the soil resistance
parameters, asymmetrical loads (due to geomorphology, in particular in the vicinity of another cavity), and soil
heterogeneity;
4. avoid the triggering and re-mobilization of instability phenomena of the excavation side;
5. recover the most difficult part which is the plastic component through the injection of a stabilizing resin
formulation.
Photo 02 – Example of the subsidence phenomenon outside the metropolitan area
I would like to point out that the construction of metropolitan tunnels in urban environments inevitably produces
an alteration of the stress-strain state of the ground. The effect is felt at the level of the country / road level in a
more sensitive way the more superficial the tunnels themselves are: the mechanized excavation and the ways in
which this is carried out inevitably produce the development of subsidence that also spread over great distances
and can sometimes have a catastrophic impact on the urban environment due to the presence of artefacts and
infrastructures close to the excavations [v. buildings, bridges, roads, railway lines, etc.] and this particularly
conditions the choice of the excavation technique, especially the one in which mechanized TBM-EPB cutters are
used, or those with the traditional system [NATM Method] or even open pit [Cut and Cover], where all must prevent
and minimize any subsidence phenomena that may occur on the surface.
I remind the technicians of the sector that many times the phenomenon of "subsidence", during the excavation
phase, in particular using TBM-EPB, is caused by consolidation processes of clayey sediments due to a decrease
in water content or due to external loads , given their particularity of presenting a high compressibility.
However, the factors that most influence the movements induced by the excavation are due to the tension variations
associated with the various construction phases, in the realization of deep excavations, which involve variations in
the stress state, in the hydraulic boundary conditions and, above all, in the thrust conditions of the surrounding land
that can give rise to appreciable displacements on the surface.
All
photos
illustred
are
copied
from
the
WEB
Fig. 01 – Graphic representation of the subsidence basin in correspondence of a superficial tunnel. There subsidence curve varies according
to the type of terrain encountered (coarse-grained soils K = 0.2-0.3 while fine-grained soils the value will be K = 0.6-0.7)
A significant proportion of the displacements produced by the construction of an excavation with the traditional
[NATM Method] or open pit [Cut and Cover] system occurs already before the excavation in the phase of
construction of the support works which, as for the subsequent construction phases, can be understood through the
determination of the so-called "stress path". In fact, by ideally subjecting an element of soil to such stress paths, it
is easy to demonstrate that subsequent inversions of the "stress paths" can be associated with important variations
in the stiffness characteristics of the soils and consequently greater deformations induced in the surrounding volume.
Therefore, the geotechnical and environmental problems connected to the construction of metropolitan or railway
infrastructures, as well as the alteration of the stress equilibrium induced by the excavation, can induce subsidence
of the ground strictly connected with a potential damage to the interference of the buildings [Building Condition
Survey BCS and Building Risk Assessment BRA] and the civil structures existing on the surface, as they are all linked
to the effects that the construction of deep excavations, and therefore involves, as on the physical environment that
surrounds them, an interference with the underground services etc., but will be subject to an in-depth future
memory. However, it should be noted that the construction of underground works, in particular tunnels or
underground and railway stations, is always subject to certain constraints that greatly depend on the conditions of
the place and the type of work to be built.
It is in fact very important to remember that the construction of tunnels for metropolitan and railway transport
requires, in addition to stabilizing the excavation, also the difficult control of the deformation during the entire life
of the work, a requirement which can be met by means of a considerable limitation of the maximum pressures that
are determined on the lining and on the concrete prefabricated segments, definitive in the long term, resulting in
the limitation of the formation and / or failure of the lining. I would like to underline how well the designers of
modern infrastructures are aware that the behavior, particularly that of the rock, whether pushing or swelling, is not
uniform along the tunnel and that therefore the development of pressures in the long term can be extremely
variable.
I would like to point out that, when using the excavation technique using the traditional NATM Method system, a
shotcrete coating, used without particular measures, is not suitable when one is in the presence of pushing or
swelling soils and / or rocks. In these cases our main objective will be to limit the deformation of the ground and /
or the rock by means of a temporary support, but it is often not sufficient to contain the deformation of the rock
and is damaged or completely destroyed by subsidence.
Longitudinal subsidence profile
Excavation face
Extensione of the susubsidence
Transverse subsidence profile
All
photos
illustred
are
copied
from
the
WEB
Fig. 02 – NATM Method – Possible ground movements induced by the construction of underground structures. The
color photo illustrates control parameters of foundation buildings [Risk classification according to Rankin, 1988]
However, without using the appropriate precautions, the ground and / or the rock slowly "pushes" the already
broken lining until a position of equilibrium is reached or the excavation collapses. Therefore, one of the appropriate
countermeasures is to introduce yielding ribs together with anchors [a topic already addressed in a previous
memoir].
2.1 - Anchoring to the rock
I would like to briefly illustrate the excavation of tunnels, with the traditional NATM method, which takes place
according to the following phases, because I would like to underline once again what I describe at the bottom of the
conclusion of this point 2.1):
- excavation, carried out with hydraulic hammers operated by compressed air or gas, depending on the expected
behavior of the soil;
- removal of debris;
- safety by laying a pre-coating with metal supporting structural elements (ribs) and subsequent application of
reinforced Spritz-Beton (coating).
In particular, the anchoring to the rock takes place through a structural element operating in traction, capable of
transmitting forces to the ground.
Functional parts of the anchor are:
- the locking device and the distribution plate placed at the head of the bar;
- the reinforcement consisting of steel or glass fiber bars or profiles;
- mechanical expansion anchoring device, or as we want to underline later, by means of a particular formulation of
silicate resin (organo-mineral and non-polluting), in the terminal section of the structural element in order to
guarantee a perfect union between rock and bar .
DIRECTION OF EXCAVATION
All
photos
illustred
are
copied
from
the
WEB
Photo 03 – From our experience of tests done in the laboratory using a climatic chamber we have
I was able to verify that the steel bar did not suffer any corrosion and that the particular resin formulated
silicatica has not undergone any degradation but is able to pass aging tests of more than 100 years (500 years)
In the recent past, not to mention even today, the fixing of the steel iron bar was done by injecting a cement mortar.
I would like to underline that the resistance of the anchor depends on the resistance of the reinforcement, on the
adhesion (which can be guaranteed over time only by the injection of the particular formulation of silicate resin)
between rock and bar as well as on the nature of the ground.
The silicate resin formulation that I suggest is a non-polluting product, does not catch fire, is not corrosive,
penetrates cracks of the order of 0.005 inches and also blocks any water present in the subsoil.
3. Some hypotheses to solve the problems that are encountered
The campaign of preventive geognostic investigations being studied aims to characterize the stratigraphy from a
geological, geotechnical and environmental point of view by means of in situ tests along the route of the future
underground or railway line.
In recent decades, the new metropolitan lines and in particular the high-speed railway ones provide for the
construction of tunnels, even of large diameter for the railway ones, and which develop in extremely variable rock
masses, using mechanized TBM-type cutters, even in high convergence rock masses. But thanks to the technological
progress in the field of cutting tools [cutters] and in the power / thrust of modern TBMs, it is now very rare that a
rock formation can be considered economically “unmillable”.
In fact, today the TBM has been developed to operate in adverse rocky conditions and in particular in the presence
of high convergence rock masses and subsidence of the excavation face, even with large diameters [12-15 meters].
The ability of the TBM to operate in such adverse excavation conditions is an essential element in the case of large
diameter tunnels and in the presence of complex geological formations.
In fact, when digging in the presence of a water table, in addition to allowing dry machining, this [the TBM] is able
to ensure the stability of the excavation face, through the control of neutral pressures. The apparently most
advantageous stabilization technique results in a "catchment" of the aquifer which, however, entails inevitable
resentments on the regime of the underground water table in the construction phase.
Particularly interesting and innovative are the most modern techniques for limiting induced settlements for the
protection of existing structures on the surface, through soil consolidation, carried out directly in the construction
phase to compensate for induced resentments.
3.1 - Brief summary of the consolidation intervention in a fault area and in the presence of water flows
Another of the most important aspects during the excavation phases by means of a TBM of a blind hole tunnel in a
fault zone with water flows whose presence, many times, has not been identified by the boreholes. In addition to
All
photos
illustred
are
copied
from
the
WEB
causing discomfort in the work environment, these cause instability, especially in difficult terrain. It is therefore
necessary to adopt particular measures, such as the immediate stop of the TBM, to make investigative holes to
obtain information on the nature of the material and the extent of the fault zone, then proceed with a waterproofing
and consolidation through injections of sub-holes horizontal radial pattern (nr. 8 ÷ 10 holes, inclined from 3° ÷ 12°),
of one-component hydro-reactive polyurethane resin of the PU-8402-FOAM type (or a modified formulation called
PU-8408-FOAM type) and then look for to stabilize the landslide front with the insertion and injection of a particular
formulation of organo-mineral resin (foam) of the SILEX-330-FOAM type.
The peculiarity of this new PU-8408-FOAM type product is that, during injection, if the resin comes into contact with
water, it increases in volume, if it does not find water, it hardens without foaming and at the same time pushes the
porous material in the innermost layers forming an impermeable and compact layer of variable thickness.
Fig 04 - Schematic representation of excavation near a fault. Interception of the fault. Unstable material: clay, sand, debris, ect.
Furthermore, the presence of several extended faults, and if there is a high tendency of the front to collapse, in
addition to what has been previously described, it is necessary to create a protective umbrella for the consolidation
of the front up to and beyond 3 meters by intervening on the healthy rock, injecting some product. of the SILEX-330-
FOAM type and if necessary another product of the SILEX-304-STONE type [non-expansive] which, thanks to its high
fluidity, the latter resinous formulation is able to penetrate even through cracks of a few hundred microns in width
In fact, the mixture of a resinous nature tends to follow the major cracks, where the pressure losses are less high, to
the detriment of the minor cracks which remain open.
To solve this, I suggest interrupting the injection for at least 5 minutes, waiting for the already injected product to
catalyze and repeat the treatment until the rejection pressure is reached.
Fig. 05 - Schematic representation of the approach phase with radial perforation and injection (no. 8 holes) of resin type PU-8402-FOAM
INTERCEPTED EOLOGICAL ANOMALY
PROBE HOLES
TBM-EPB
TBM-EPB
Injection of resin
type PU-8402-PU
APPROACH PHASE WITH RADIAL PERFORATION
AND INJECTION
3.1.1) - Some considerations on the injection of polyurethane foam of the "PU-8402-FOAM" type to block the
water on the excavation face.
The range of polyurethane formulations allows the structural consolidation of a large part of the soil, but the use of
one or the other product must be evaluated on site based on the geomorphological characteristics found.
As already mentioned, since most of the products are two-component, they must be injected by means of special
pumps with a static mixer in the head. The component feed pipes, which are separated, can be several meters long,
as long as the pump has sufficient pressure.
Furthermore, as previously mentioned, the type of product "PU-8402-FOAM", being a single-component product
that reacts only in the presence of water or moist soil, having a very long pot-life (even for several days, if stored at
dry), there are no limits of use, subject to sufficient pumping pressure, to the length of the injection pipes.
Fig. 06 - Schematic representation of the approach phase to 3-5 m. with radial perforation and injection (no. 12 holes)
of resin type SILEX-330-FOAM
It should be borne in mind that many of the products mentioned above have been studied and formulated precisely
for the control of water inflows in tunnels, mines and underground works in general. I repeat, the product type "PU-
8402-FOAM" is a polyurethane resin formulation designed specifically for the rapid blocking of water during
excavation with TBM-EPB cutters. When the formulation comes into contact with water, a chemical reaction rapidly
takes place which leads to the formation of a consolidating foam with closed cells, characterized by absolute
impermeability and chemical stability.
I specify that during practical applications on site, to allow the advancement of the TBM, even in difficult soils and
with high water flows, the expansion factor is linked to the quantity of catalyst introduced since, the formulation
type "PU-8402 - FOAM ", is a single-component product that reacts only in the presence of water; in the absence of
water, it remains stable, in the form of a gel, even for several years, and consequently the blocking power of water
is determined by the amount of water present and the pressure of the same and the quantity of catalyst introduced
(from 1 ÷ 5%).
The information described in this study experience led me to conclude that the consolidation and waterproofing
injection interventions in an underground environment, especially in the vicinity of water sources intended for
human consumption, require greater attention and knowledge in the choice of products to be injected. In fact, the
problem of water outflows in tunnels and in underground works in general, must not be seen only as a cause of
delay or increase in costs in the construction phase, but as a rehabilitation and prevention action in order to make
our intervention compatible with environmental protection.
4 - Some hypotheses of preventive safety to avoid in situ subsidence
The route of a tunnel considered that develops in an urbanized environment, the tunnel underpass, with reduced
coverage of the underground line as well as the lithological nature of the subsoil, highlighted by means of a detailed
cost-benefit analysis, it is necessary to decide the most suitable excavation method , as an alternative to the
TBM-EPB
Injection of resin
type SILEX-330-FOAM
APPROACH PHASE WITH RADIAL PERFORATION
AND INJECTION – 3-5 m
traditional type, and therefore it is necessary to operate with preventive interventions to contain the excavation in
order to limit subsidence on the surface.
Fig. 07 – Scheme of the stabilization and / or consolidation phase of the ground (bearing capacity), even in the presence of pressurized
groundwater, before excavation with TBM along the path of the future tunnel by injection of resin from above. This type of intervention
must be carried out under the control of the environmental impact. This type of treatment can be carried out when it is possible to
intervene from above, as the tunnel is not very deep, within the metropolitan areas.
A method of treating the stability of the ground of the excavation face is that by means of injections of cement
mixtures and / or resinous formulations which arises from the need to improve the characteristics of mechanical
resistance and impermeability of porous soils or rock masses. The improvement can be obtained with various
injection techniques which can be classified according to the level of inlet pressure and according to the type of
mixtures used. In the construction of metropolitan and / or metropolitan tunnels in urban areas, in recent decades
there has been a notable development, worldwide, on the use of the mechanized balanced pressure shield [TBM-
EPB Earth Pressure Balance Machine] and on the function of chemistry in the treatment of soils through a series of
mixtures that produce the maintenance and stability of the soil of the excavation face.
The mixes can be used in consolidating and / or waterproofing treatments [preventive and otherwise] to allow the
excavation phase in conditions of maximum safety as well as reducing surface subsidence and soil permeability.
5- Conclusions
The design and construction of a tunnel, as we have mentioned above in this brief memoir, is conditioned by multiple
factors that can vary over time according to the evolution of the preliminary knowledge to the final stages, thus
allowing, many times, to adapt the project to the geological-technical conditions that gradually meet.
The convenience of carrying out consolidation interventions, to be defined according to the geological characteristics
and also by the excavation methods, are the fundamental tool for maintaining the integrity of the core at the face
and allowing the advancement of the cutter in an environment that has not already collapsed.
Much has already been illustrated in various articles on the traditional NATM system. There is a wide range of
publications both of a general nature and on specific experiences. While the purpose of this new article of mine is
to draw attention to how some particular types of resinous formulations are participating in the rapid evolution in
progress of the new ways of building new infrastructural tunnels and not with the use of TBMs.
Current TBMs are proving to be able to overcome the exceptional events that may be encountered during excavation
very well, in particular during the excavation of a deep and very high-coverage tunnel, where the forces of nature
can generate unpredictable and extremely critical conditions and that, at the same time, these conditions can be
faced and overcome by innovative methodologies and technologies, as demonstrated daily by the competence and
dedication of many technicians in the sector.
TBM-EPB
The introduction of cement injections as a useful means for filling any voids on the back of a coating or for
consolidating the soil or rock surrounding a cavity is now superseded by the use of new silicate-based resinous
formulas (CFC-free and halogens) because these harden in a few minutes and also because the same resins can
participate in supporting part of the load in a short time and be able to combine with the particular geological
conditions that arise.
Fig. 08 – Examples of consolidation underthe roads and manufactured before digging a tunnel for underground
Furthermore, the choice between the different excavation systems is substantially dictated by the geotechnical and
geomechanical characteristics of the soil and the cost / benefit ratio of the intervention. Remembering that
construction times and costs cannot yet be predicted. But finally today the construction of the tunnels has finally
been industrialized for any terrain and tension conditions because the excavation progress no longer depends on
the ground but the terrain is modified in order to proceed as quickly as possible.
In fact, the discussion of these topics, as I have always pointed out in my articles, can often seem trivial. Also to
clarify that preliminary investigations are necessary, both in the design and construction phases, and that the
application of injection procedures, the types and characteristics of the mixtures, as well as their methods, have
become essential in the construction of a tunnel. However, my only purpose is to have, on the basis of the mutual
knowledge and experience of the readers, through the effort to use a simple and respectful language made up of
information exchange, which in this context has nothing to do with deep emotions or with vested interests, but to
arrive all together, through observations, theories, through our cognitive abilities, also made by the different
professional roles, of those who deal with this particular sector, without decentralizing ourselves from our reference
information, we will not be able to understand some of our colleagues and therefore everything would be nothing
more than a simple flawed information. But is not so. Because we need the insights needed for greater
understanding, as well as pre-containment measures. However, the conflicting opinions that can emerge from all
gallery experts, as has happened in the past, are being examined by the undersigned author.
(*) Luigi Franco, LAMANNA
Independent Technical Consultant in the sector of Tunnelling, Mining and Underground Technology
President of the Fondazione Internazionale di Centro Studi e Ricerche, ONG
132, via dei Serpenti, 00184 ROMA, Italy, U.E.
Email: lamannaluigifranco1@gmail.com

Contenu connexe

Tendances

Chapter 9 Of Rock Engineering
Chapter 9 Of  Rock  EngineeringChapter 9 Of  Rock  Engineering
Chapter 9 Of Rock EngineeringNgo Hung Long
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
Slope stability analysis using flac 3D
Slope stability analysis using flac 3DSlope stability analysis using flac 3D
Slope stability analysis using flac 3Dgopal karmakar
 
Behaviour of Anchored Pile Wall Under Dynamic Load & Earthquake
Behaviour of Anchored Pile Wall Under Dynamic Load & EarthquakeBehaviour of Anchored Pile Wall Under Dynamic Load & Earthquake
Behaviour of Anchored Pile Wall Under Dynamic Load & EarthquakeIJERDJOURNAL
 
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)Yury Lyapichev
 
Seismic ssi effects and liquification
Seismic ssi effects and liquificationSeismic ssi effects and liquification
Seismic ssi effects and liquificationArpan Banerjee
 
Seismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZSeismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZLawrence Galvez
 
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...SJ BASHA
 
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCETemporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCEBill Morales MSc
 
Mihalis presentation final 10092011
Mihalis presentation final 10092011Mihalis presentation final 10092011
Mihalis presentation final 10092011ILIAS MICHALIS
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Mohit Shukla
 
Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب...
 Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب... Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب...
Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب...Dr.Youssef Hammida
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experiencegifanta
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015ILIAS MICHALIS
 
Tunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisTunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisILIAS MICHALIS
 
S8 trabajo muros de contención-re2
 S8   trabajo muros de contención-re2 S8   trabajo muros de contención-re2
S8 trabajo muros de contención-re2VITORINOCHAVEZMONTER
 
Auvinet exc foundations and geotechnical hazards
Auvinet  exc foundations and geotechnical hazards Auvinet  exc foundations and geotechnical hazards
Auvinet exc foundations and geotechnical hazards cfpbolivia
 
SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...
SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...
SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...IAEME Publication
 

Tendances (20)

Chapter 9 Of Rock Engineering
Chapter 9 Of  Rock  EngineeringChapter 9 Of  Rock  Engineering
Chapter 9 Of Rock Engineering
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Slope stability analysis using flac 3D
Slope stability analysis using flac 3DSlope stability analysis using flac 3D
Slope stability analysis using flac 3D
 
Behaviour of Anchored Pile Wall Under Dynamic Load & Earthquake
Behaviour of Anchored Pile Wall Under Dynamic Load & EarthquakeBehaviour of Anchored Pile Wall Under Dynamic Load & Earthquake
Behaviour of Anchored Pile Wall Under Dynamic Load & Earthquake
 
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
 
Seismic ssi effects and liquification
Seismic ssi effects and liquificationSeismic ssi effects and liquification
Seismic ssi effects and liquification
 
Seismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZSeismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZ
 
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
 
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCETemporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCE
 
Mihalis presentation final 10092011
Mihalis presentation final 10092011Mihalis presentation final 10092011
Mihalis presentation final 10092011
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب...
 Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب... Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب...
Transfer Slabs Beams Design Tall Building- تصميم بلا طات وجوائز التحويل الأب...
 
Soil Structure Interaction
Soil Structure InteractionSoil Structure Interaction
Soil Structure Interaction
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experience
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Tunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisTunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_Konstantis
 
S8 trabajo muros de contención-re2
 S8   trabajo muros de contención-re2 S8   trabajo muros de contención-re2
S8 trabajo muros de contención-re2
 
Soil structure interaction
Soil   structure interactionSoil   structure interaction
Soil structure interaction
 
Auvinet exc foundations and geotechnical hazards
Auvinet  exc foundations and geotechnical hazards Auvinet  exc foundations and geotechnical hazards
Auvinet exc foundations and geotechnical hazards
 
SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...
SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...
SOIL STRUCTURE INTERACTION STUDY ON PLANE BUILDING FRAME SUPPORTED ON PILE GR...
 

Similaire à 2022_03_ENG_Subsidence.pdf

Athens pecker 2005
Athens pecker 2005Athens pecker 2005
Athens pecker 2005gefyra-rion
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsYury Lyapichev
 
Geo trans2004 pecker
Geo trans2004 peckerGeo trans2004 pecker
Geo trans2004 peckergefyra-rion
 
Presentazione torino 5 aprile 2016 vancouver con note
Presentazione torino 5 aprile 2016 vancouver con notePresentazione torino 5 aprile 2016 vancouver con note
Presentazione torino 5 aprile 2016 vancouver con noteGuido Bentivoglio
 
Pillar design - a case study
Pillar design - a case studyPillar design - a case study
Pillar design - a case studyTIKESHWAR MAHTO
 
Inelastic seismic response of single-story structure in hilly areas owing to ...
Inelastic seismic response of single-story structure in hilly areas owing to ...Inelastic seismic response of single-story structure in hilly areas owing to ...
Inelastic seismic response of single-story structure in hilly areas owing to ...IRJET Journal
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concreteErankajKumar
 
Ramchandra seminar report doc
Ramchandra seminar report docRamchandra seminar report doc
Ramchandra seminar report docRamchandra Verma
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnelspartha sharma
 
Mokpo symposium pecker 2006
Mokpo symposium pecker 2006Mokpo symposium pecker 2006
Mokpo symposium pecker 2006gefyra-rion
 
Geo-Tech Studies for Longwall
Geo-Tech Studies for LongwallGeo-Tech Studies for Longwall
Geo-Tech Studies for LongwallVR M
 
Underground Coal Mining Study
Underground Coal Mining StudyUnderground Coal Mining Study
Underground Coal Mining StudyOnur Tuncay
 

Similaire à 2022_03_ENG_Subsidence.pdf (20)

2021_ENG_DIC_SOIL CONDITIONING.pdf
2021_ENG_DIC_SOIL CONDITIONING.pdf2021_ENG_DIC_SOIL CONDITIONING.pdf
2021_ENG_DIC_SOIL CONDITIONING.pdf
 
Dfi2005 pecker
Dfi2005 peckerDfi2005 pecker
Dfi2005 pecker
 
Athens pecker 2005
Athens pecker 2005Athens pecker 2005
Athens pecker 2005
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDs
 
Geo trans2004 pecker
Geo trans2004 peckerGeo trans2004 pecker
Geo trans2004 pecker
 
Presentazione torino 5 aprile 2016 vancouver con note
Presentazione torino 5 aprile 2016 vancouver con notePresentazione torino 5 aprile 2016 vancouver con note
Presentazione torino 5 aprile 2016 vancouver con note
 
Pillar design - a case study
Pillar design - a case studyPillar design - a case study
Pillar design - a case study
 
Pillar design
Pillar designPillar design
Pillar design
 
Auckland
AucklandAuckland
Auckland
 
Inelastic seismic response of single-story structure in hilly areas owing to ...
Inelastic seismic response of single-story structure in hilly areas owing to ...Inelastic seismic response of single-story structure in hilly areas owing to ...
Inelastic seismic response of single-story structure in hilly areas owing to ...
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
 
Ramchandra seminar report doc
Ramchandra seminar report docRamchandra seminar report doc
Ramchandra seminar report doc
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Pecker aci2003
Pecker aci2003Pecker aci2003
Pecker aci2003
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
Mokpo symposium pecker 2006
Mokpo symposium pecker 2006Mokpo symposium pecker 2006
Mokpo symposium pecker 2006
 
Cut and cover
Cut and coverCut and cover
Cut and cover
 
Longwall_top_coal_caving.pptx
Longwall_top_coal_caving.pptxLongwall_top_coal_caving.pptx
Longwall_top_coal_caving.pptx
 
Geo-Tech Studies for Longwall
Geo-Tech Studies for LongwallGeo-Tech Studies for Longwall
Geo-Tech Studies for Longwall
 
Underground Coal Mining Study
Underground Coal Mining StudyUnderground Coal Mining Study
Underground Coal Mining Study
 

Plus de FONDAZIONE INT.LE CENTRO STUDI E RICERCHE-ONLUS (NGO)

Plus de FONDAZIONE INT.LE CENTRO STUDI E RICERCHE-ONLUS (NGO) (20)

Use of FOAM in underground works
Use of FOAM in underground works Use of FOAM in underground works
Use of FOAM in underground works
 
Trust Company
Trust CompanyTrust Company
Trust Company
 
Illustration of the various materials for the construction and repair of bridges
Illustration of the various materials for the construction and repair of bridgesIllustration of the various materials for the construction and repair of bridges
Illustration of the various materials for the construction and repair of bridges
 
Study of particular polymeric materials of the 4.0 series for the constructio...
Study of particular polymeric materials of the 4.0 series for the constructio...Study of particular polymeric materials of the 4.0 series for the constructio...
Study of particular polymeric materials of the 4.0 series for the constructio...
 
Some brief considerations on the machanized evolution of metropolitan tunnel ...
Some brief considerations on the machanized evolution of metropolitan tunnel ...Some brief considerations on the machanized evolution of metropolitan tunnel ...
Some brief considerations on the machanized evolution of metropolitan tunnel ...
 
Geopolitics and the difficulty of procuring raw materials
Geopolitics and the difficulty of procuring raw materialsGeopolitics and the difficulty of procuring raw materials
Geopolitics and the difficulty of procuring raw materials
 
45 years - LAMANNA
45 years -  LAMANNA45 years -  LAMANNA
45 years - LAMANNA
 
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
 
2022_ENG_TBM
2022_ENG_TBM2022_ENG_TBM
2022_ENG_TBM
 
Proyests
ProyestsProyests
Proyests
 
Rock reinforcement and rock support
Rock reinforcement and rock supportRock reinforcement and rock support
Rock reinforcement and rock support
 
Civil Defense Shelters
Civil Defense SheltersCivil Defense Shelters
Civil Defense Shelters
 
New technology for filling and clogging the void that is created in the back ...
New technology for filling and clogging the void that is created in the back ...New technology for filling and clogging the void that is created in the back ...
New technology for filling and clogging the void that is created in the back ...
 
2020_Esempi di intasamento a tergo dei conci in cls prefabbricato-compresso (...
2020_Esempi di intasamento a tergo dei conci in cls prefabbricato-compresso (...2020_Esempi di intasamento a tergo dei conci in cls prefabbricato-compresso (...
2020_Esempi di intasamento a tergo dei conci in cls prefabbricato-compresso (...
 
2021_ENG_Extraction of rare earths from the seabed
2021_ENG_Extraction of rare earths from the seabed2021_ENG_Extraction of rare earths from the seabed
2021_ENG_Extraction of rare earths from the seabed
 
2021_ES_Extracción de tierras raras del fondo marino
2021_ES_Extracción de tierras raras del fondo marino2021_ES_Extracción de tierras raras del fondo marino
2021_ES_Extracción de tierras raras del fondo marino
 
2021_EN_The future miners of the earth
2021_EN_The future miners of the earth2021_EN_The future miners of the earth
2021_EN_The future miners of the earth
 
2020_Repair and reinforcement of the cortical layer of concrete inside a rail...
2020_Repair and reinforcement of the cortical layer of concrete inside a rail...2020_Repair and reinforcement of the cortical layer of concrete inside a rail...
2020_Repair and reinforcement of the cortical layer of concrete inside a rail...
 
2020_Ground stabilization treatments in front of the excavation face of a tun...
2020_Ground stabilization treatments in front of the excavation face of a tun...2020_Ground stabilization treatments in front of the excavation face of a tun...
2020_Ground stabilization treatments in front of the excavation face of a tun...
 
2022_03_PRESENTAZIONE L.L.F..pdf
2022_03_PRESENTAZIONE L.L.F..pdf2022_03_PRESENTAZIONE L.L.F..pdf
2022_03_PRESENTAZIONE L.L.F..pdf
 

Dernier

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Dernier (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

2022_03_ENG_Subsidence.pdf

  • 1. Title: Brief advice on some corrective measures to be used before and after crossing the ground or rock due to induced breakdown during the excavation phase of a tunnel in an urban area using the traditional NATM System or using a TBM-EPB by Luigi Franco, LAMANNA (*) 1. Introduction Below I would like to illustrate, through a simple schematic representation, the procedure to be adopted to cross an area in which there is a "fault", and at the same time try to reduce the consequent damage, following a possible "collapse" of the soil / rock, during the excavation phase of a tunnel for the metropolitan and / or railway network, using a TBM-EPB Mechanized Cutter. The methodological techniques that are usually adopted are very varied, however our only goal, through this memory, is only to suggest, based on our experience, the types of consumables to be used in such situations, for engineering applied in underground and highly urbanized environments, and therefore requires a preventive study, which must be increasingly technologically advanced, to determine the real impact of the construction of these underground lines on the buildings present on the surface. Photo 01 – Some examples of subsidence in the metropolitan area 2. Brief and concise illustration of the "subsidence" in situ We are all aware that if a "collapse" of the ground should occur,during the excavation phase, the TBM will be blocked because a large "quantity of earth and / or a mass of rock" has entered the cracks, through the cutting disc [cutter], present on the rotating head of the mechanized cutter So, first of all, the TBM operator will try to try to "delete any errors", in particular, by performing some actions to be able to unlock, pulling the TBM back. Therefore, as a first activity, he will try to: - remove the block "of the earth or rock mass"; - stabilize the "ground / rock" in front of the rotating head, called in the jargon "excavation face"; - it is then to evaluate whether it is necessary to create a "unlocking pilot tunnel", this is necessary to get in front of the "rotating cutting head" [of the mechanized cutter], which is the external part on which the tools are placed [cutters], whose function is to break up the soil, to remove the latter [the earth] or the collapsed rock mass, performing reinforcement treatments, by means of rapid injections of particular "chemical resins" and verify the causes of the "collapse and / or the phenomenon of subsidence" that has arisen, assess any damage [even the TBM cutter itself can suffer considerable damage] and make very important decisions on how to intervene. All photos illustred are copied from the WEB
  • 2. Once all this has been done, which requires very long treatment times to eliminate the elastic component of the deformation, the TBM can be started again and immediately afterwards, the excavation can be continued. Thus described it seems very simple, but in reality we are faced with a truly complex geological event because, during the excavation phase with a TBM-EPB, and in a highly urbanized area, it is necessary to have preventive control, to respect fundamental constraints. In particular: 1. avoid damage to the infrastructures and buildings on the surface present in the urbanized area; 2. guarantee the safety of workers in all phases of work because the staff has to work in small spaces and many times, to unlock the TBM head, small charges must be detonated, creating the problem of manually removing the rock fragments; 3. check the normal increase in stresses in the temporary lining as a result of the decay of the soil resistance parameters, asymmetrical loads (due to geomorphology, in particular in the vicinity of another cavity), and soil heterogeneity; 4. avoid the triggering and re-mobilization of instability phenomena of the excavation side; 5. recover the most difficult part which is the plastic component through the injection of a stabilizing resin formulation. Photo 02 – Example of the subsidence phenomenon outside the metropolitan area I would like to point out that the construction of metropolitan tunnels in urban environments inevitably produces an alteration of the stress-strain state of the ground. The effect is felt at the level of the country / road level in a more sensitive way the more superficial the tunnels themselves are: the mechanized excavation and the ways in which this is carried out inevitably produce the development of subsidence that also spread over great distances and can sometimes have a catastrophic impact on the urban environment due to the presence of artefacts and infrastructures close to the excavations [v. buildings, bridges, roads, railway lines, etc.] and this particularly conditions the choice of the excavation technique, especially the one in which mechanized TBM-EPB cutters are used, or those with the traditional system [NATM Method] or even open pit [Cut and Cover], where all must prevent and minimize any subsidence phenomena that may occur on the surface. I remind the technicians of the sector that many times the phenomenon of "subsidence", during the excavation phase, in particular using TBM-EPB, is caused by consolidation processes of clayey sediments due to a decrease in water content or due to external loads , given their particularity of presenting a high compressibility. However, the factors that most influence the movements induced by the excavation are due to the tension variations associated with the various construction phases, in the realization of deep excavations, which involve variations in the stress state, in the hydraulic boundary conditions and, above all, in the thrust conditions of the surrounding land that can give rise to appreciable displacements on the surface. All photos illustred are copied from the WEB
  • 3. Fig. 01 – Graphic representation of the subsidence basin in correspondence of a superficial tunnel. There subsidence curve varies according to the type of terrain encountered (coarse-grained soils K = 0.2-0.3 while fine-grained soils the value will be K = 0.6-0.7) A significant proportion of the displacements produced by the construction of an excavation with the traditional [NATM Method] or open pit [Cut and Cover] system occurs already before the excavation in the phase of construction of the support works which, as for the subsequent construction phases, can be understood through the determination of the so-called "stress path". In fact, by ideally subjecting an element of soil to such stress paths, it is easy to demonstrate that subsequent inversions of the "stress paths" can be associated with important variations in the stiffness characteristics of the soils and consequently greater deformations induced in the surrounding volume. Therefore, the geotechnical and environmental problems connected to the construction of metropolitan or railway infrastructures, as well as the alteration of the stress equilibrium induced by the excavation, can induce subsidence of the ground strictly connected with a potential damage to the interference of the buildings [Building Condition Survey BCS and Building Risk Assessment BRA] and the civil structures existing on the surface, as they are all linked to the effects that the construction of deep excavations, and therefore involves, as on the physical environment that surrounds them, an interference with the underground services etc., but will be subject to an in-depth future memory. However, it should be noted that the construction of underground works, in particular tunnels or underground and railway stations, is always subject to certain constraints that greatly depend on the conditions of the place and the type of work to be built. It is in fact very important to remember that the construction of tunnels for metropolitan and railway transport requires, in addition to stabilizing the excavation, also the difficult control of the deformation during the entire life of the work, a requirement which can be met by means of a considerable limitation of the maximum pressures that are determined on the lining and on the concrete prefabricated segments, definitive in the long term, resulting in the limitation of the formation and / or failure of the lining. I would like to underline how well the designers of modern infrastructures are aware that the behavior, particularly that of the rock, whether pushing or swelling, is not uniform along the tunnel and that therefore the development of pressures in the long term can be extremely variable. I would like to point out that, when using the excavation technique using the traditional NATM Method system, a shotcrete coating, used without particular measures, is not suitable when one is in the presence of pushing or swelling soils and / or rocks. In these cases our main objective will be to limit the deformation of the ground and / or the rock by means of a temporary support, but it is often not sufficient to contain the deformation of the rock and is damaged or completely destroyed by subsidence. Longitudinal subsidence profile Excavation face Extensione of the susubsidence Transverse subsidence profile All photos illustred are copied from the WEB
  • 4. Fig. 02 – NATM Method – Possible ground movements induced by the construction of underground structures. The color photo illustrates control parameters of foundation buildings [Risk classification according to Rankin, 1988] However, without using the appropriate precautions, the ground and / or the rock slowly "pushes" the already broken lining until a position of equilibrium is reached or the excavation collapses. Therefore, one of the appropriate countermeasures is to introduce yielding ribs together with anchors [a topic already addressed in a previous memoir]. 2.1 - Anchoring to the rock I would like to briefly illustrate the excavation of tunnels, with the traditional NATM method, which takes place according to the following phases, because I would like to underline once again what I describe at the bottom of the conclusion of this point 2.1): - excavation, carried out with hydraulic hammers operated by compressed air or gas, depending on the expected behavior of the soil; - removal of debris; - safety by laying a pre-coating with metal supporting structural elements (ribs) and subsequent application of reinforced Spritz-Beton (coating). In particular, the anchoring to the rock takes place through a structural element operating in traction, capable of transmitting forces to the ground. Functional parts of the anchor are: - the locking device and the distribution plate placed at the head of the bar; - the reinforcement consisting of steel or glass fiber bars or profiles; - mechanical expansion anchoring device, or as we want to underline later, by means of a particular formulation of silicate resin (organo-mineral and non-polluting), in the terminal section of the structural element in order to guarantee a perfect union between rock and bar . DIRECTION OF EXCAVATION All photos illustred are copied from the WEB
  • 5. Photo 03 – From our experience of tests done in the laboratory using a climatic chamber we have I was able to verify that the steel bar did not suffer any corrosion and that the particular resin formulated silicatica has not undergone any degradation but is able to pass aging tests of more than 100 years (500 years) In the recent past, not to mention even today, the fixing of the steel iron bar was done by injecting a cement mortar. I would like to underline that the resistance of the anchor depends on the resistance of the reinforcement, on the adhesion (which can be guaranteed over time only by the injection of the particular formulation of silicate resin) between rock and bar as well as on the nature of the ground. The silicate resin formulation that I suggest is a non-polluting product, does not catch fire, is not corrosive, penetrates cracks of the order of 0.005 inches and also blocks any water present in the subsoil. 3. Some hypotheses to solve the problems that are encountered The campaign of preventive geognostic investigations being studied aims to characterize the stratigraphy from a geological, geotechnical and environmental point of view by means of in situ tests along the route of the future underground or railway line. In recent decades, the new metropolitan lines and in particular the high-speed railway ones provide for the construction of tunnels, even of large diameter for the railway ones, and which develop in extremely variable rock masses, using mechanized TBM-type cutters, even in high convergence rock masses. But thanks to the technological progress in the field of cutting tools [cutters] and in the power / thrust of modern TBMs, it is now very rare that a rock formation can be considered economically “unmillable”. In fact, today the TBM has been developed to operate in adverse rocky conditions and in particular in the presence of high convergence rock masses and subsidence of the excavation face, even with large diameters [12-15 meters]. The ability of the TBM to operate in such adverse excavation conditions is an essential element in the case of large diameter tunnels and in the presence of complex geological formations. In fact, when digging in the presence of a water table, in addition to allowing dry machining, this [the TBM] is able to ensure the stability of the excavation face, through the control of neutral pressures. The apparently most advantageous stabilization technique results in a "catchment" of the aquifer which, however, entails inevitable resentments on the regime of the underground water table in the construction phase. Particularly interesting and innovative are the most modern techniques for limiting induced settlements for the protection of existing structures on the surface, through soil consolidation, carried out directly in the construction phase to compensate for induced resentments. 3.1 - Brief summary of the consolidation intervention in a fault area and in the presence of water flows Another of the most important aspects during the excavation phases by means of a TBM of a blind hole tunnel in a fault zone with water flows whose presence, many times, has not been identified by the boreholes. In addition to All photos illustred are copied from the WEB
  • 6. causing discomfort in the work environment, these cause instability, especially in difficult terrain. It is therefore necessary to adopt particular measures, such as the immediate stop of the TBM, to make investigative holes to obtain information on the nature of the material and the extent of the fault zone, then proceed with a waterproofing and consolidation through injections of sub-holes horizontal radial pattern (nr. 8 ÷ 10 holes, inclined from 3° ÷ 12°), of one-component hydro-reactive polyurethane resin of the PU-8402-FOAM type (or a modified formulation called PU-8408-FOAM type) and then look for to stabilize the landslide front with the insertion and injection of a particular formulation of organo-mineral resin (foam) of the SILEX-330-FOAM type. The peculiarity of this new PU-8408-FOAM type product is that, during injection, if the resin comes into contact with water, it increases in volume, if it does not find water, it hardens without foaming and at the same time pushes the porous material in the innermost layers forming an impermeable and compact layer of variable thickness. Fig 04 - Schematic representation of excavation near a fault. Interception of the fault. Unstable material: clay, sand, debris, ect. Furthermore, the presence of several extended faults, and if there is a high tendency of the front to collapse, in addition to what has been previously described, it is necessary to create a protective umbrella for the consolidation of the front up to and beyond 3 meters by intervening on the healthy rock, injecting some product. of the SILEX-330- FOAM type and if necessary another product of the SILEX-304-STONE type [non-expansive] which, thanks to its high fluidity, the latter resinous formulation is able to penetrate even through cracks of a few hundred microns in width In fact, the mixture of a resinous nature tends to follow the major cracks, where the pressure losses are less high, to the detriment of the minor cracks which remain open. To solve this, I suggest interrupting the injection for at least 5 minutes, waiting for the already injected product to catalyze and repeat the treatment until the rejection pressure is reached. Fig. 05 - Schematic representation of the approach phase with radial perforation and injection (no. 8 holes) of resin type PU-8402-FOAM INTERCEPTED EOLOGICAL ANOMALY PROBE HOLES TBM-EPB TBM-EPB Injection of resin type PU-8402-PU APPROACH PHASE WITH RADIAL PERFORATION AND INJECTION
  • 7. 3.1.1) - Some considerations on the injection of polyurethane foam of the "PU-8402-FOAM" type to block the water on the excavation face. The range of polyurethane formulations allows the structural consolidation of a large part of the soil, but the use of one or the other product must be evaluated on site based on the geomorphological characteristics found. As already mentioned, since most of the products are two-component, they must be injected by means of special pumps with a static mixer in the head. The component feed pipes, which are separated, can be several meters long, as long as the pump has sufficient pressure. Furthermore, as previously mentioned, the type of product "PU-8402-FOAM", being a single-component product that reacts only in the presence of water or moist soil, having a very long pot-life (even for several days, if stored at dry), there are no limits of use, subject to sufficient pumping pressure, to the length of the injection pipes. Fig. 06 - Schematic representation of the approach phase to 3-5 m. with radial perforation and injection (no. 12 holes) of resin type SILEX-330-FOAM It should be borne in mind that many of the products mentioned above have been studied and formulated precisely for the control of water inflows in tunnels, mines and underground works in general. I repeat, the product type "PU- 8402-FOAM" is a polyurethane resin formulation designed specifically for the rapid blocking of water during excavation with TBM-EPB cutters. When the formulation comes into contact with water, a chemical reaction rapidly takes place which leads to the formation of a consolidating foam with closed cells, characterized by absolute impermeability and chemical stability. I specify that during practical applications on site, to allow the advancement of the TBM, even in difficult soils and with high water flows, the expansion factor is linked to the quantity of catalyst introduced since, the formulation type "PU-8402 - FOAM ", is a single-component product that reacts only in the presence of water; in the absence of water, it remains stable, in the form of a gel, even for several years, and consequently the blocking power of water is determined by the amount of water present and the pressure of the same and the quantity of catalyst introduced (from 1 ÷ 5%). The information described in this study experience led me to conclude that the consolidation and waterproofing injection interventions in an underground environment, especially in the vicinity of water sources intended for human consumption, require greater attention and knowledge in the choice of products to be injected. In fact, the problem of water outflows in tunnels and in underground works in general, must not be seen only as a cause of delay or increase in costs in the construction phase, but as a rehabilitation and prevention action in order to make our intervention compatible with environmental protection. 4 - Some hypotheses of preventive safety to avoid in situ subsidence The route of a tunnel considered that develops in an urbanized environment, the tunnel underpass, with reduced coverage of the underground line as well as the lithological nature of the subsoil, highlighted by means of a detailed cost-benefit analysis, it is necessary to decide the most suitable excavation method , as an alternative to the TBM-EPB Injection of resin type SILEX-330-FOAM APPROACH PHASE WITH RADIAL PERFORATION AND INJECTION – 3-5 m
  • 8. traditional type, and therefore it is necessary to operate with preventive interventions to contain the excavation in order to limit subsidence on the surface. Fig. 07 – Scheme of the stabilization and / or consolidation phase of the ground (bearing capacity), even in the presence of pressurized groundwater, before excavation with TBM along the path of the future tunnel by injection of resin from above. This type of intervention must be carried out under the control of the environmental impact. This type of treatment can be carried out when it is possible to intervene from above, as the tunnel is not very deep, within the metropolitan areas. A method of treating the stability of the ground of the excavation face is that by means of injections of cement mixtures and / or resinous formulations which arises from the need to improve the characteristics of mechanical resistance and impermeability of porous soils or rock masses. The improvement can be obtained with various injection techniques which can be classified according to the level of inlet pressure and according to the type of mixtures used. In the construction of metropolitan and / or metropolitan tunnels in urban areas, in recent decades there has been a notable development, worldwide, on the use of the mechanized balanced pressure shield [TBM- EPB Earth Pressure Balance Machine] and on the function of chemistry in the treatment of soils through a series of mixtures that produce the maintenance and stability of the soil of the excavation face. The mixes can be used in consolidating and / or waterproofing treatments [preventive and otherwise] to allow the excavation phase in conditions of maximum safety as well as reducing surface subsidence and soil permeability. 5- Conclusions The design and construction of a tunnel, as we have mentioned above in this brief memoir, is conditioned by multiple factors that can vary over time according to the evolution of the preliminary knowledge to the final stages, thus allowing, many times, to adapt the project to the geological-technical conditions that gradually meet. The convenience of carrying out consolidation interventions, to be defined according to the geological characteristics and also by the excavation methods, are the fundamental tool for maintaining the integrity of the core at the face and allowing the advancement of the cutter in an environment that has not already collapsed. Much has already been illustrated in various articles on the traditional NATM system. There is a wide range of publications both of a general nature and on specific experiences. While the purpose of this new article of mine is to draw attention to how some particular types of resinous formulations are participating in the rapid evolution in progress of the new ways of building new infrastructural tunnels and not with the use of TBMs. Current TBMs are proving to be able to overcome the exceptional events that may be encountered during excavation very well, in particular during the excavation of a deep and very high-coverage tunnel, where the forces of nature can generate unpredictable and extremely critical conditions and that, at the same time, these conditions can be faced and overcome by innovative methodologies and technologies, as demonstrated daily by the competence and dedication of many technicians in the sector. TBM-EPB
  • 9. The introduction of cement injections as a useful means for filling any voids on the back of a coating or for consolidating the soil or rock surrounding a cavity is now superseded by the use of new silicate-based resinous formulas (CFC-free and halogens) because these harden in a few minutes and also because the same resins can participate in supporting part of the load in a short time and be able to combine with the particular geological conditions that arise. Fig. 08 – Examples of consolidation underthe roads and manufactured before digging a tunnel for underground Furthermore, the choice between the different excavation systems is substantially dictated by the geotechnical and geomechanical characteristics of the soil and the cost / benefit ratio of the intervention. Remembering that construction times and costs cannot yet be predicted. But finally today the construction of the tunnels has finally been industrialized for any terrain and tension conditions because the excavation progress no longer depends on the ground but the terrain is modified in order to proceed as quickly as possible. In fact, the discussion of these topics, as I have always pointed out in my articles, can often seem trivial. Also to clarify that preliminary investigations are necessary, both in the design and construction phases, and that the application of injection procedures, the types and characteristics of the mixtures, as well as their methods, have become essential in the construction of a tunnel. However, my only purpose is to have, on the basis of the mutual knowledge and experience of the readers, through the effort to use a simple and respectful language made up of information exchange, which in this context has nothing to do with deep emotions or with vested interests, but to arrive all together, through observations, theories, through our cognitive abilities, also made by the different professional roles, of those who deal with this particular sector, without decentralizing ourselves from our reference information, we will not be able to understand some of our colleagues and therefore everything would be nothing more than a simple flawed information. But is not so. Because we need the insights needed for greater understanding, as well as pre-containment measures. However, the conflicting opinions that can emerge from all gallery experts, as has happened in the past, are being examined by the undersigned author. (*) Luigi Franco, LAMANNA Independent Technical Consultant in the sector of Tunnelling, Mining and Underground Technology President of the Fondazione Internazionale di Centro Studi e Ricerche, ONG 132, via dei Serpenti, 00184 ROMA, Italy, U.E. Email: lamannaluigifranco1@gmail.com