1. Title:
Brief advice on some corrective measures to be used before and after crossing the ground or rock due to
induced breakdown during the excavation phase of a tunnel in an urban area using the traditional NATM
System or using a TBM-EPB
by Luigi Franco, LAMANNA (*)
1. Introduction
Below I would like to illustrate, through a simple schematic representation, the procedure to be adopted to cross an
area in which there is a "fault", and at the same time try to reduce the consequent damage, following a possible
"collapse" of the soil / rock, during the excavation phase of a tunnel for the metropolitan and / or railway network,
using a TBM-EPB Mechanized Cutter.
The methodological techniques that are usually adopted are very varied, however our only goal, through this
memory, is only to suggest, based on our experience, the types of consumables to be used in such situations, for
engineering applied in underground and highly urbanized environments, and therefore requires a preventive study,
which must be increasingly technologically advanced, to determine the real impact of the construction of these
underground lines on the buildings present on the surface.
Photo 01 – Some examples of subsidence in the metropolitan area
2. Brief and concise illustration of the "subsidence" in situ
We are all aware that if a "collapse" of the ground should occur,during the excavation phase, the TBM will be blocked
because a large "quantity of earth and / or a mass of rock" has entered the cracks, through the cutting disc [cutter],
present on the rotating head of the mechanized cutter
So, first of all, the TBM operator will try to try to "delete any errors", in particular, by performing some actions to be
able to unlock, pulling the TBM back. Therefore, as a first activity, he will try to:
- remove the block "of the earth or rock mass";
- stabilize the "ground / rock" in front of the rotating head, called in the jargon "excavation face";
- it is then to evaluate whether it is necessary to create a "unlocking pilot tunnel", this is necessary to get in front of
the "rotating cutting head" [of the mechanized cutter], which is the external part on which the tools are placed
[cutters], whose function is to break up the soil, to remove the latter [the earth] or the collapsed rock mass,
performing reinforcement treatments, by means of rapid injections of particular "chemical resins" and verify the
causes of the "collapse and / or the phenomenon of subsidence" that has arisen, assess any damage [even the TBM
cutter itself can suffer considerable damage] and make very important decisions on how to intervene.
All
photos
illustred
are
copied
from
the
WEB
2. Once all this has been done, which requires very long treatment times to eliminate the elastic component of the
deformation, the TBM can be started again and immediately afterwards, the excavation can be continued.
Thus described it seems very simple, but in reality we are faced with a truly complex geological event because, during
the excavation phase with a TBM-EPB, and in a highly urbanized area, it is necessary to have preventive control, to
respect fundamental constraints. In particular:
1. avoid damage to the infrastructures and buildings on the surface present in the urbanized area;
2. guarantee the safety of workers in all phases of work because the staff has to work in small spaces and many
times, to unlock the TBM head, small charges must be detonated, creating the problem of manually removing the
rock fragments;
3. check the normal increase in stresses in the temporary lining as a result of the decay of the soil resistance
parameters, asymmetrical loads (due to geomorphology, in particular in the vicinity of another cavity), and soil
heterogeneity;
4. avoid the triggering and re-mobilization of instability phenomena of the excavation side;
5. recover the most difficult part which is the plastic component through the injection of a stabilizing resin
formulation.
Photo 02 – Example of the subsidence phenomenon outside the metropolitan area
I would like to point out that the construction of metropolitan tunnels in urban environments inevitably produces
an alteration of the stress-strain state of the ground. The effect is felt at the level of the country / road level in a
more sensitive way the more superficial the tunnels themselves are: the mechanized excavation and the ways in
which this is carried out inevitably produce the development of subsidence that also spread over great distances
and can sometimes have a catastrophic impact on the urban environment due to the presence of artefacts and
infrastructures close to the excavations [v. buildings, bridges, roads, railway lines, etc.] and this particularly
conditions the choice of the excavation technique, especially the one in which mechanized TBM-EPB cutters are
used, or those with the traditional system [NATM Method] or even open pit [Cut and Cover], where all must prevent
and minimize any subsidence phenomena that may occur on the surface.
I remind the technicians of the sector that many times the phenomenon of "subsidence", during the excavation
phase, in particular using TBM-EPB, is caused by consolidation processes of clayey sediments due to a decrease
in water content or due to external loads , given their particularity of presenting a high compressibility.
However, the factors that most influence the movements induced by the excavation are due to the tension variations
associated with the various construction phases, in the realization of deep excavations, which involve variations in
the stress state, in the hydraulic boundary conditions and, above all, in the thrust conditions of the surrounding land
that can give rise to appreciable displacements on the surface.
All
photos
illustred
are
copied
from
the
WEB
3. Fig. 01 – Graphic representation of the subsidence basin in correspondence of a superficial tunnel. There subsidence curve varies according
to the type of terrain encountered (coarse-grained soils K = 0.2-0.3 while fine-grained soils the value will be K = 0.6-0.7)
A significant proportion of the displacements produced by the construction of an excavation with the traditional
[NATM Method] or open pit [Cut and Cover] system occurs already before the excavation in the phase of
construction of the support works which, as for the subsequent construction phases, can be understood through the
determination of the so-called "stress path". In fact, by ideally subjecting an element of soil to such stress paths, it
is easy to demonstrate that subsequent inversions of the "stress paths" can be associated with important variations
in the stiffness characteristics of the soils and consequently greater deformations induced in the surrounding volume.
Therefore, the geotechnical and environmental problems connected to the construction of metropolitan or railway
infrastructures, as well as the alteration of the stress equilibrium induced by the excavation, can induce subsidence
of the ground strictly connected with a potential damage to the interference of the buildings [Building Condition
Survey BCS and Building Risk Assessment BRA] and the civil structures existing on the surface, as they are all linked
to the effects that the construction of deep excavations, and therefore involves, as on the physical environment that
surrounds them, an interference with the underground services etc., but will be subject to an in-depth future
memory. However, it should be noted that the construction of underground works, in particular tunnels or
underground and railway stations, is always subject to certain constraints that greatly depend on the conditions of
the place and the type of work to be built.
It is in fact very important to remember that the construction of tunnels for metropolitan and railway transport
requires, in addition to stabilizing the excavation, also the difficult control of the deformation during the entire life
of the work, a requirement which can be met by means of a considerable limitation of the maximum pressures that
are determined on the lining and on the concrete prefabricated segments, definitive in the long term, resulting in
the limitation of the formation and / or failure of the lining. I would like to underline how well the designers of
modern infrastructures are aware that the behavior, particularly that of the rock, whether pushing or swelling, is not
uniform along the tunnel and that therefore the development of pressures in the long term can be extremely
variable.
I would like to point out that, when using the excavation technique using the traditional NATM Method system, a
shotcrete coating, used without particular measures, is not suitable when one is in the presence of pushing or
swelling soils and / or rocks. In these cases our main objective will be to limit the deformation of the ground and /
or the rock by means of a temporary support, but it is often not sufficient to contain the deformation of the rock
and is damaged or completely destroyed by subsidence.
Longitudinal subsidence profile
Excavation face
Extensione of the susubsidence
Transverse subsidence profile
All
photos
illustred
are
copied
from
the
WEB
4. Fig. 02 – NATM Method – Possible ground movements induced by the construction of underground structures. The
color photo illustrates control parameters of foundation buildings [Risk classification according to Rankin, 1988]
However, without using the appropriate precautions, the ground and / or the rock slowly "pushes" the already
broken lining until a position of equilibrium is reached or the excavation collapses. Therefore, one of the appropriate
countermeasures is to introduce yielding ribs together with anchors [a topic already addressed in a previous
memoir].
2.1 - Anchoring to the rock
I would like to briefly illustrate the excavation of tunnels, with the traditional NATM method, which takes place
according to the following phases, because I would like to underline once again what I describe at the bottom of the
conclusion of this point 2.1):
- excavation, carried out with hydraulic hammers operated by compressed air or gas, depending on the expected
behavior of the soil;
- removal of debris;
- safety by laying a pre-coating with metal supporting structural elements (ribs) and subsequent application of
reinforced Spritz-Beton (coating).
In particular, the anchoring to the rock takes place through a structural element operating in traction, capable of
transmitting forces to the ground.
Functional parts of the anchor are:
- the locking device and the distribution plate placed at the head of the bar;
- the reinforcement consisting of steel or glass fiber bars or profiles;
- mechanical expansion anchoring device, or as we want to underline later, by means of a particular formulation of
silicate resin (organo-mineral and non-polluting), in the terminal section of the structural element in order to
guarantee a perfect union between rock and bar .
DIRECTION OF EXCAVATION
All
photos
illustred
are
copied
from
the
WEB
5. Photo 03 – From our experience of tests done in the laboratory using a climatic chamber we have
I was able to verify that the steel bar did not suffer any corrosion and that the particular resin formulated
silicatica has not undergone any degradation but is able to pass aging tests of more than 100 years (500 years)
In the recent past, not to mention even today, the fixing of the steel iron bar was done by injecting a cement mortar.
I would like to underline that the resistance of the anchor depends on the resistance of the reinforcement, on the
adhesion (which can be guaranteed over time only by the injection of the particular formulation of silicate resin)
between rock and bar as well as on the nature of the ground.
The silicate resin formulation that I suggest is a non-polluting product, does not catch fire, is not corrosive,
penetrates cracks of the order of 0.005 inches and also blocks any water present in the subsoil.
3. Some hypotheses to solve the problems that are encountered
The campaign of preventive geognostic investigations being studied aims to characterize the stratigraphy from a
geological, geotechnical and environmental point of view by means of in situ tests along the route of the future
underground or railway line.
In recent decades, the new metropolitan lines and in particular the high-speed railway ones provide for the
construction of tunnels, even of large diameter for the railway ones, and which develop in extremely variable rock
masses, using mechanized TBM-type cutters, even in high convergence rock masses. But thanks to the technological
progress in the field of cutting tools [cutters] and in the power / thrust of modern TBMs, it is now very rare that a
rock formation can be considered economically “unmillable”.
In fact, today the TBM has been developed to operate in adverse rocky conditions and in particular in the presence
of high convergence rock masses and subsidence of the excavation face, even with large diameters [12-15 meters].
The ability of the TBM to operate in such adverse excavation conditions is an essential element in the case of large
diameter tunnels and in the presence of complex geological formations.
In fact, when digging in the presence of a water table, in addition to allowing dry machining, this [the TBM] is able
to ensure the stability of the excavation face, through the control of neutral pressures. The apparently most
advantageous stabilization technique results in a "catchment" of the aquifer which, however, entails inevitable
resentments on the regime of the underground water table in the construction phase.
Particularly interesting and innovative are the most modern techniques for limiting induced settlements for the
protection of existing structures on the surface, through soil consolidation, carried out directly in the construction
phase to compensate for induced resentments.
3.1 - Brief summary of the consolidation intervention in a fault area and in the presence of water flows
Another of the most important aspects during the excavation phases by means of a TBM of a blind hole tunnel in a
fault zone with water flows whose presence, many times, has not been identified by the boreholes. In addition to
All
photos
illustred
are
copied
from
the
WEB
6. causing discomfort in the work environment, these cause instability, especially in difficult terrain. It is therefore
necessary to adopt particular measures, such as the immediate stop of the TBM, to make investigative holes to
obtain information on the nature of the material and the extent of the fault zone, then proceed with a waterproofing
and consolidation through injections of sub-holes horizontal radial pattern (nr. 8 ÷ 10 holes, inclined from 3° ÷ 12°),
of one-component hydro-reactive polyurethane resin of the PU-8402-FOAM type (or a modified formulation called
PU-8408-FOAM type) and then look for to stabilize the landslide front with the insertion and injection of a particular
formulation of organo-mineral resin (foam) of the SILEX-330-FOAM type.
The peculiarity of this new PU-8408-FOAM type product is that, during injection, if the resin comes into contact with
water, it increases in volume, if it does not find water, it hardens without foaming and at the same time pushes the
porous material in the innermost layers forming an impermeable and compact layer of variable thickness.
Fig 04 - Schematic representation of excavation near a fault. Interception of the fault. Unstable material: clay, sand, debris, ect.
Furthermore, the presence of several extended faults, and if there is a high tendency of the front to collapse, in
addition to what has been previously described, it is necessary to create a protective umbrella for the consolidation
of the front up to and beyond 3 meters by intervening on the healthy rock, injecting some product. of the SILEX-330-
FOAM type and if necessary another product of the SILEX-304-STONE type [non-expansive] which, thanks to its high
fluidity, the latter resinous formulation is able to penetrate even through cracks of a few hundred microns in width
In fact, the mixture of a resinous nature tends to follow the major cracks, where the pressure losses are less high, to
the detriment of the minor cracks which remain open.
To solve this, I suggest interrupting the injection for at least 5 minutes, waiting for the already injected product to
catalyze and repeat the treatment until the rejection pressure is reached.
Fig. 05 - Schematic representation of the approach phase with radial perforation and injection (no. 8 holes) of resin type PU-8402-FOAM
INTERCEPTED EOLOGICAL ANOMALY
PROBE HOLES
TBM-EPB
TBM-EPB
Injection of resin
type PU-8402-PU
APPROACH PHASE WITH RADIAL PERFORATION
AND INJECTION
7. 3.1.1) - Some considerations on the injection of polyurethane foam of the "PU-8402-FOAM" type to block the
water on the excavation face.
The range of polyurethane formulations allows the structural consolidation of a large part of the soil, but the use of
one or the other product must be evaluated on site based on the geomorphological characteristics found.
As already mentioned, since most of the products are two-component, they must be injected by means of special
pumps with a static mixer in the head. The component feed pipes, which are separated, can be several meters long,
as long as the pump has sufficient pressure.
Furthermore, as previously mentioned, the type of product "PU-8402-FOAM", being a single-component product
that reacts only in the presence of water or moist soil, having a very long pot-life (even for several days, if stored at
dry), there are no limits of use, subject to sufficient pumping pressure, to the length of the injection pipes.
Fig. 06 - Schematic representation of the approach phase to 3-5 m. with radial perforation and injection (no. 12 holes)
of resin type SILEX-330-FOAM
It should be borne in mind that many of the products mentioned above have been studied and formulated precisely
for the control of water inflows in tunnels, mines and underground works in general. I repeat, the product type "PU-
8402-FOAM" is a polyurethane resin formulation designed specifically for the rapid blocking of water during
excavation with TBM-EPB cutters. When the formulation comes into contact with water, a chemical reaction rapidly
takes place which leads to the formation of a consolidating foam with closed cells, characterized by absolute
impermeability and chemical stability.
I specify that during practical applications on site, to allow the advancement of the TBM, even in difficult soils and
with high water flows, the expansion factor is linked to the quantity of catalyst introduced since, the formulation
type "PU-8402 - FOAM ", is a single-component product that reacts only in the presence of water; in the absence of
water, it remains stable, in the form of a gel, even for several years, and consequently the blocking power of water
is determined by the amount of water present and the pressure of the same and the quantity of catalyst introduced
(from 1 ÷ 5%).
The information described in this study experience led me to conclude that the consolidation and waterproofing
injection interventions in an underground environment, especially in the vicinity of water sources intended for
human consumption, require greater attention and knowledge in the choice of products to be injected. In fact, the
problem of water outflows in tunnels and in underground works in general, must not be seen only as a cause of
delay or increase in costs in the construction phase, but as a rehabilitation and prevention action in order to make
our intervention compatible with environmental protection.
4 - Some hypotheses of preventive safety to avoid in situ subsidence
The route of a tunnel considered that develops in an urbanized environment, the tunnel underpass, with reduced
coverage of the underground line as well as the lithological nature of the subsoil, highlighted by means of a detailed
cost-benefit analysis, it is necessary to decide the most suitable excavation method , as an alternative to the
TBM-EPB
Injection of resin
type SILEX-330-FOAM
APPROACH PHASE WITH RADIAL PERFORATION
AND INJECTION – 3-5 m
8. traditional type, and therefore it is necessary to operate with preventive interventions to contain the excavation in
order to limit subsidence on the surface.
Fig. 07 – Scheme of the stabilization and / or consolidation phase of the ground (bearing capacity), even in the presence of pressurized
groundwater, before excavation with TBM along the path of the future tunnel by injection of resin from above. This type of intervention
must be carried out under the control of the environmental impact. This type of treatment can be carried out when it is possible to
intervene from above, as the tunnel is not very deep, within the metropolitan areas.
A method of treating the stability of the ground of the excavation face is that by means of injections of cement
mixtures and / or resinous formulations which arises from the need to improve the characteristics of mechanical
resistance and impermeability of porous soils or rock masses. The improvement can be obtained with various
injection techniques which can be classified according to the level of inlet pressure and according to the type of
mixtures used. In the construction of metropolitan and / or metropolitan tunnels in urban areas, in recent decades
there has been a notable development, worldwide, on the use of the mechanized balanced pressure shield [TBM-
EPB Earth Pressure Balance Machine] and on the function of chemistry in the treatment of soils through a series of
mixtures that produce the maintenance and stability of the soil of the excavation face.
The mixes can be used in consolidating and / or waterproofing treatments [preventive and otherwise] to allow the
excavation phase in conditions of maximum safety as well as reducing surface subsidence and soil permeability.
5- Conclusions
The design and construction of a tunnel, as we have mentioned above in this brief memoir, is conditioned by multiple
factors that can vary over time according to the evolution of the preliminary knowledge to the final stages, thus
allowing, many times, to adapt the project to the geological-technical conditions that gradually meet.
The convenience of carrying out consolidation interventions, to be defined according to the geological characteristics
and also by the excavation methods, are the fundamental tool for maintaining the integrity of the core at the face
and allowing the advancement of the cutter in an environment that has not already collapsed.
Much has already been illustrated in various articles on the traditional NATM system. There is a wide range of
publications both of a general nature and on specific experiences. While the purpose of this new article of mine is
to draw attention to how some particular types of resinous formulations are participating in the rapid evolution in
progress of the new ways of building new infrastructural tunnels and not with the use of TBMs.
Current TBMs are proving to be able to overcome the exceptional events that may be encountered during excavation
very well, in particular during the excavation of a deep and very high-coverage tunnel, where the forces of nature
can generate unpredictable and extremely critical conditions and that, at the same time, these conditions can be
faced and overcome by innovative methodologies and technologies, as demonstrated daily by the competence and
dedication of many technicians in the sector.
TBM-EPB
9. The introduction of cement injections as a useful means for filling any voids on the back of a coating or for
consolidating the soil or rock surrounding a cavity is now superseded by the use of new silicate-based resinous
formulas (CFC-free and halogens) because these harden in a few minutes and also because the same resins can
participate in supporting part of the load in a short time and be able to combine with the particular geological
conditions that arise.
Fig. 08 – Examples of consolidation underthe roads and manufactured before digging a tunnel for underground
Furthermore, the choice between the different excavation systems is substantially dictated by the geotechnical and
geomechanical characteristics of the soil and the cost / benefit ratio of the intervention. Remembering that
construction times and costs cannot yet be predicted. But finally today the construction of the tunnels has finally
been industrialized for any terrain and tension conditions because the excavation progress no longer depends on
the ground but the terrain is modified in order to proceed as quickly as possible.
In fact, the discussion of these topics, as I have always pointed out in my articles, can often seem trivial. Also to
clarify that preliminary investigations are necessary, both in the design and construction phases, and that the
application of injection procedures, the types and characteristics of the mixtures, as well as their methods, have
become essential in the construction of a tunnel. However, my only purpose is to have, on the basis of the mutual
knowledge and experience of the readers, through the effort to use a simple and respectful language made up of
information exchange, which in this context has nothing to do with deep emotions or with vested interests, but to
arrive all together, through observations, theories, through our cognitive abilities, also made by the different
professional roles, of those who deal with this particular sector, without decentralizing ourselves from our reference
information, we will not be able to understand some of our colleagues and therefore everything would be nothing
more than a simple flawed information. But is not so. Because we need the insights needed for greater
understanding, as well as pre-containment measures. However, the conflicting opinions that can emerge from all
gallery experts, as has happened in the past, are being examined by the undersigned author.
(*) Luigi Franco, LAMANNA
Independent Technical Consultant in the sector of Tunnelling, Mining and Underground Technology
President of the Fondazione Internazionale di Centro Studi e Ricerche, ONG
132, via dei Serpenti, 00184 ROMA, Italy, U.E.
Email: lamannaluigifranco1@gmail.com