The document discusses the Tower of Jam Gadang, which is an iconic landmark in the city of Bukittinggi, West Sumatra, Indonesia. The tower was built between 1925-1927 at the initiative of Hendrik Roelof Rook Maaker, the city secretary of Fort de Kock (now known as Bukittinggi). It was a gift from Queen Wilhelmina of the Netherlands. Yazid Rajo Mangkuto oversaw the construction as the architect, while Haji Moran executed it, with St. Gigi ameh as the foreman.
1. TUE 3
ROOM 10
- MAULANA RIZKY DWI CAHYO
(5101422068)
- KHANSA LUTFIA HAFIDZ (5101422069)
- ROMADHONI SALSABILLA N R.
(5101422070)
- AGUSTINA MUTIARA SIWI (5101422071)
- ADAM KENSYAH PUTRA (5101422072)
- AHMAD KHAIRUL YANI (5101422073)
The Tower
of Jam
Gadang
2. TUE 3
ROOM 10
- MAULANA RIZKY DWI CAHYO
(5101422068)
- KHANSA LUTFIA HAFIDZ (5101422069)
- ROMADHONI SALSABILLA N R.
(5101422070)
- AGUSTINA MUTIARA SIWI (5101422071)
- ADAM KENSYAH PUTRA (5101422072)
- AHMAD KHAIRUL YANI (5101422073)
The Tower of Jam Gadang is an icon or
marker of the city of Bukuttinggi, West
Sumatra, Indonesia. Jam Gadang was built
in 1925-1927 at the inisiative of Hendrik
Roelof Rook Maaker, controleur or city
secretary of Fort the kock, which is now
known as the city of Bukittinggi.
LOCATION
The Tower
of Jam
Gadang
3. HISTORICAL
This clock is a gift from the Queen of the
Netherlands Wihelmina. An architect of
Gadang city, Yazid Rajo Mangkuto acted as
the person in the charger of the contruction,
while the executor of the construction was
handled by Haji Moran with its foreman St.
Gigi ameh.
The Tower of Jam Gadang is an icon or
marker of the city of Bukuttinggi, West
Sumatra, Indonesia. Jam Gadang was built
in 1925-1927 at the inisiative of Hendrik
Roelof Rook Maaker, controleur or city
secretary of Fort the kock, which is now
known as the city of Bukittinggi.
LOCATION
The Tower
of Jam
Gadang
4. HISTORICAL
This clock is a gift from the Queen of the
Netherlands Wihelmina. An architect of
Gadang city, Yazid Rajo Mangkuto acted as
the person in the charger of the contruction,
while the executor of the construction was
handled by Haji Moran with its foreman St.
Gigi ameh.
Tower of Gadang clock standing 26 meters
high is considered as a benchmark for the
central point (zero point) of Bukittinggi
City. The construction at the clock does not
use metal and cement frames, but uses a
mixture of limestone, egg white, and sand.
CONSTUCTION
The Tower
of Jam
Gadang