7.0
PRODUCT
REALIZATION
Mr. Manoj Kumar Maharana
Sr. Engineer [Dept. of Electrical ]
BLA Power Pvt Ltd
1
BLA Power Pvt. Ltd BLA Power Pvt. Ltd
ISO 9001:2000
Balancing the Equation
6.2 Human
Resources
6.3
Infrastructure
6.4 Work
Environment
7 .0 Product
Realization
8.0
Measurement,
Analysis and
Improvement
8.2.1 Customer
Satisfaction
5.4.1 Quality
Objectives
+
+
+
=
=
A B C=+
4/17/2014 www.brainybetty.com 4
• Processes,
• Documents
• Service time,
• Delivery time,
• Number of complaints, etc.
• Required verification
• Validation
• Monitoring
• Inspection
• Test activities
• Records needed to
provide evidence that
Realization processes
resulting service meet the
requirements.
7.2 Customer Related Processes
7.2.1
Determination Of
Requirements to
the Product
• Delivery activities & Post delivery activities such as
> Warranty provisions & Contractual Obligations
> such as Maintenance services.
> Recycling Or Final disposal.
• Statutory & Regulatory requirement applicable to product.
7.2.2
Review Of
Requirement
Related to the
Product/Services
The organization shall review the requirements related to product
[ submission of tenders, acceptance of contracts or orders, acceptance
of changes to contracts or orders ]
•Product requirements are defined
•Contract or order requirements differing from those previously
expressed are resolved.
•The organization has the ability to meet the defined requirements.
•Records should maintained of the results of the review & actions.
7.2.3
Customer
Communication
Determine and implement effective arrangements for communicating
with customers in relation to
•Product information
•Enquiries, contracts or order handling, including amendments,
•Customer feedback, including customer complaints
7.4 Purchasing
7.4.1
Purchasing Process
• Approved indent from store.
•Enquires send to min 3 suppliers to submit quotation
•Comparative statement made.
•After Approval of quotation purchase order issued to supplier.
•Evaluation Done suppliers based on Quality, and delivery of products
Grade A- Material supplied OK , Material received in time.
Grade B -Material supplied OK, Material received late.
Grade C -Material supplied Rej. , Material received in time.
Grade B -Material supplied Rej. , Material received late.
7.4.2
Purchasing
Information
describing the product/ service to be purchased including :
a. Requirement for approval of product, procedures, processes
b. Requirement for qualification of personnel.
c. Quality management system requirements.
d. The organization ensures purchase requirements contained in
purchasing documents, prior to their communication to the supplier.
7.4.3
Verification Of
Purchasing
Product
Establishes and implements
• Inspection and other activities necessary for verification of the
purchased material with the specified purchasing requirements.
• Checking at party’s premises/& at our premises
4/17/2014 www.brainybetty.com 8
7.5 Production & Service Provision
7.5.1
Control Of
Production & Service
Provision
Production and service provision under controlled conditions
including as applicable:
•Description of the characteristics of the product.
• Availability of work instructions, as necessary.
• Use of suitable equipments.
•Availability and use of the measure and monitoring equipments.
•Implementation of monitoring and measurement.
•The implementation of product release, delivery and post- delivery
activities includes meeting customer complaints
7.5.3
Identification &
Traceability
•Un-inspected material/product is marked with white tag/paint
• ok material is marked with green tag/paint
•rejected material is marked with red tag/paint
•Under Re-Process is marked with yellow tag/paint
•Incoming materials are identified by Shape & Size, date of receipt
and tag on it
7.5.5
Preservation Of
Product
•Including constituent parts, during internal processing and
delivery in order to maintain conformity to product requirement
•Preservation shall include identification, handling packing, storage
and protection
• Soft copies of all back-up data recorded on computers during
internal processing is preserved.
7.6 Control of Monitoring & Measuring
Equipments
Provide evidence of conformity of product / components to the established requirements.
Based on this need, the necessary monitoring & measuring equipments are to be
identified & made available.
The required monitoring / measurement procedure are established
Established a suitable system for all monitoring / measuring equipments :
•Calibration/verification should done at regular intervals. In this process measuring
equipments are adjusted or re adjusted.
•Source of calibration or calibration agency.
•Tractability of calibration / verification to national or international standards.
•The equipments have unique identification number to determine and identify their
calibration status. ‘C’ for Calibrated , ‘UC’ for un-Calibrated & ‘OO’ for out of order.
Protection from damage, deterioration during handling, maintenance & storage.
• Action should be taken to the not conforming to the requirement is assessed & recorded.
• Maintains records of calibration & / verification.
•If Computer software is used for measurement, it shall be ensured prior to release for use
that computer software satisfies the requirements.
•Maintains the list of monitoring & measuring equipments including calibration status.
4/17/2014 www.brainybetty.com 11
12
Poor
Product
Quality
High
Product
Quality
Satisfied
Customer
s
Increased
Sales
(Locally & Exports)
Improved
Economy
Higher
Revenue
Greater possibility
of Investment
and Development
Dissatisfi
ed
Customer
s
Less
Revenue
Pressure on the
government to provide
employment
opportunities
Economic
Depression
No
Improvement
& decreased
Employment
Decrease
d Sales
Happy Citizens
13
Improved Quality
Reduced Waste
Reduced Costs
Less Pressure on
the Economy
Positive Balance of
Trade
(Export >Imports)
Special Thanks
• for Guidance
Mr. Kalpesh Goswami
Sr. Manager [ Dept. Of Inst. ]
Acknowledgement [suggested reading]
• ANSI/ASQ 9000:2000 Quality Management Systems – Fundamentals and Vocabulary
• ANSI/ASQ 9001:2000 Quality Management Systems – Requirements, December
13,2000
• Quality Management System manual Doc No: BLAPOWER/M/QMSM/01
14

Contenu connexe

Tendances

Process Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical DevicesProcess Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical DevicesRina Nir
 
ISO-13485-2016.pptx
ISO-13485-2016.pptxISO-13485-2016.pptx
ISO-13485-2016.pptxPradeepa J
 
Change management system
Change management systemChange management system
Change management systemmanusb07
 
PECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control systemDeveshDRA
 
BPR review and batch release
BPR review and batch release BPR review and batch release
BPR review and batch release Dr. Amsavel A
 
CCF PPT By Amit Gupta.pptx
CCF PPT By Amit Gupta.pptxCCF PPT By Amit Gupta.pptx
CCF PPT By Amit Gupta.pptxamitgupta273294
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.AKunal Roy
 
role of quality system and audit in pharmaceutical manufacturing environment....
role of quality system and audit in pharmaceutical manufacturing environment....role of quality system and audit in pharmaceutical manufacturing environment....
role of quality system and audit in pharmaceutical manufacturing environment....MridulBindra2
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanWolfgang Kuchinke
 
Audit Check List
Audit Check ListAudit Check List
Audit Check Listspschandel
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485WQA APAC
 
Good Documentation Practice (GDP)
Good Documentation Practice (GDP)Good Documentation Practice (GDP)
Good Documentation Practice (GDP)AsthaNeupane
 
Good Documentation Practice
Good Documentation PracticeGood Documentation Practice
Good Documentation PracticeManpreet Rait
 
Design & Development.pptx
Design & Development.pptxDesign & Development.pptx
Design & Development.pptxPradeepa J
 
Vendor Audit
Vendor Audit Vendor Audit
Vendor Audit PRAVADA
 
Deviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaDeviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaSubhash Sanghani
 

Tendances (20)

Process Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical DevicesProcess Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical Devices
 
ISO-13485-2016.pptx
ISO-13485-2016.pptxISO-13485-2016.pptx
ISO-13485-2016.pptx
 
Change management system
Change management systemChange management system
Change management system
 
ISO Standard 13485
ISO Standard 13485ISO Standard 13485
ISO Standard 13485
 
PECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical Devices
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control system
 
BPR review and batch release
BPR review and batch release BPR review and batch release
BPR review and batch release
 
CCF PPT By Amit Gupta.pptx
CCF PPT By Amit Gupta.pptxCCF PPT By Amit Gupta.pptx
CCF PPT By Amit Gupta.pptx
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.A
 
role of quality system and audit in pharmaceutical manufacturing environment....
role of quality system and audit in pharmaceutical manufacturing environment....role of quality system and audit in pharmaceutical manufacturing environment....
role of quality system and audit in pharmaceutical manufacturing environment....
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master Plan
 
Audit Check List
Audit Check ListAudit Check List
Audit Check List
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485
 
change control
change controlchange control
change control
 
Vendor qualification
Vendor qualification Vendor qualification
Vendor qualification
 
Good Documentation Practice (GDP)
Good Documentation Practice (GDP)Good Documentation Practice (GDP)
Good Documentation Practice (GDP)
 
Good Documentation Practice
Good Documentation PracticeGood Documentation Practice
Good Documentation Practice
 
Design & Development.pptx
Design & Development.pptxDesign & Development.pptx
Design & Development.pptx
 
Vendor Audit
Vendor Audit Vendor Audit
Vendor Audit
 
Deviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaDeviation and root cause analysis in Pharma
Deviation and root cause analysis in Pharma
 

En vedette

The use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structuresThe use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structuresPeter McCready
 
Korea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high northKorea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high northInnovation Norway
 
Calibration of MMDs to meet QMS
Calibration of MMDs to meet QMSCalibration of MMDs to meet QMS
Calibration of MMDs to meet QMSAmsavel Vel
 
Norsok standards for oil and gas
Norsok standards for oil and gasNorsok standards for oil and gas
Norsok standards for oil and gasmarco garofanello
 
Zigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powerZigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powereSAT Journals
 
Robots for Industrial Inspection
Robots for Industrial InspectionRobots for Industrial Inspection
Robots for Industrial Inspectionmarshallbutler
 
Polyinform_pipelines inspection_english
Polyinform_pipelines inspection_englishPolyinform_pipelines inspection_english
Polyinform_pipelines inspection_englishPolyinform
 
Corrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineriesCorrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineriesK R SONI
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in constructionIsidro Sid Calayag
 
Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)Hassan Habib
 
Under water welding.smnr
Under water welding.smnrUnder water welding.smnr
Under water welding.smnrChuchu Beera
 
Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008Isidro Sid Calayag
 
Energy Oil Gas Presentation
Energy  Oil  Gas  PresentationEnergy  Oil  Gas  Presentation
Energy Oil Gas Presentationjlai
 

En vedette (20)

The use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structuresThe use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structures
 
Autonomous Underwater Vehicle (AUVs)
Autonomous Underwater Vehicle (AUVs)Autonomous Underwater Vehicle (AUVs)
Autonomous Underwater Vehicle (AUVs)
 
Korea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high northKorea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high north
 
OPTICLINE C200 C1000 BY JENOPTIK
OPTICLINE C200 C1000 BY JENOPTIKOPTICLINE C200 C1000 BY JENOPTIK
OPTICLINE C200 C1000 BY JENOPTIK
 
Calibration of MMDs to meet QMS
Calibration of MMDs to meet QMSCalibration of MMDs to meet QMS
Calibration of MMDs to meet QMS
 
Norsok standards for oil and gas
Norsok standards for oil and gasNorsok standards for oil and gas
Norsok standards for oil and gas
 
Emm unit i
Emm unit   iEmm unit   i
Emm unit i
 
hull inspection class
hull inspection classhull inspection class
hull inspection class
 
Zigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powerZigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar power
 
Robots for Industrial Inspection
Robots for Industrial InspectionRobots for Industrial Inspection
Robots for Industrial Inspection
 
Polyinform_pipelines inspection_english
Polyinform_pipelines inspection_englishPolyinform_pipelines inspection_english
Polyinform_pipelines inspection_english
 
Corrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineriesCorrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineries
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
 
Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)
 
Under water welding.smnr
Under water welding.smnrUnder water welding.smnr
Under water welding.smnr
 
Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008
 
Energy Oil Gas Presentation
Energy  Oil  Gas  PresentationEnergy  Oil  Gas  Presentation
Energy Oil Gas Presentation
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Underwater welding
Underwater weldingUnderwater welding
Underwater welding
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 

Similaire à ISO Clause No 7 Production Realization

presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxAhmedAltantawi
 
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTIONPHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTIONPrincy Agarwal
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation Ankush Sule
 
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONValidation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONManikant Prasad Shah
 
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxNikitaSahu39
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfabdo badr
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptxGargiVaghela
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation Pramod Pal
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTAynetuTerefe2
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfMILRAB1
 
GMP Training: Process validation
GMP Training: Process validation GMP Training: Process validation
GMP Training: Process validation Dr. Amsavel A
 

Similaire à ISO Clause No 7 Production Realization (20)

Validation
ValidationValidation
Validation
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Cairo Iso 2000
Cairo Iso 2000Cairo Iso 2000
Cairo Iso 2000
 
Iso 9000 2000
Iso 9000 2000Iso 9000 2000
Iso 9000 2000
 
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTIONPHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
 
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONValidation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
 
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
 
Commercial Grade Item Dedication
Commercial Grade Item DedicationCommercial Grade Item Dedication
Commercial Grade Item Dedication
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
 
Verification process
Verification processVerification process
Verification process
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPT
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Dr. ajmal nasir
Dr. ajmal nasirDr. ajmal nasir
Dr. ajmal nasir
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdf
 
Vendor certification
Vendor certificationVendor certification
Vendor certification
 
GMP Training: Process validation
GMP Training: Process validation GMP Training: Process validation
GMP Training: Process validation
 

Plus de MANOJ KUMAR MAHARANA

Plus de MANOJ KUMAR MAHARANA (6)

eres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppteres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppt
 
CMAA.pdf
CMAA.pdfCMAA.pdf
CMAA.pdf
 
Facility
FacilityFacility
Facility
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plant
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 

Dernier

Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Reviewyalehistoricalreview
 
Team Dynamics: A Journey to Excellence
Team Dynamics: A Journey to ExcellenceTeam Dynamics: A Journey to Excellence
Team Dynamics: A Journey to ExcellenceGDSC PJATK
 
Disaster management for class 10 students
Disaster management for class 10 studentsDisaster management for class 10 students
Disaster management for class 10 studentsmadhav072009
 
Management 13th Edition by Richard L. Daft test bank.docx
Management 13th Edition by Richard L. Daft test bank.docxManagement 13th Edition by Richard L. Daft test bank.docx
Management 13th Edition by Richard L. Daft test bank.docxssuserf63bd7
 
Leading People - Harvard Manage Mentor Certificate
Leading People - Harvard Manage Mentor CertificateLeading People - Harvard Manage Mentor Certificate
Leading People - Harvard Manage Mentor CertificateVICTOR MAESTRE RAMIREZ
 
LECTURE maintenance management is important 1.pptx
LECTURE maintenance management is important 1.pptxLECTURE maintenance management is important 1.pptx
LECTURE maintenance management is important 1.pptxshahzadnasim3
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importanceajay0134
 
TEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdf
TEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdfTEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdf
TEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdfmarcuskenyatta275
 
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out PackagingW.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out PackagingWilliam (Bill) H. Bender, FCSI
 
Marketing Management 16 Global Edition by Philip Kotler test bank.docx
Marketing Management 16 Global Edition by Philip Kotler test bank.docxMarketing Management 16 Global Edition by Philip Kotler test bank.docx
Marketing Management 16 Global Edition by Philip Kotler test bank.docxssuserf63bd7
 
DrupalCamp Atlanta 2022 - Effective Project Management
DrupalCamp Atlanta 2022 - Effective Project ManagementDrupalCamp Atlanta 2022 - Effective Project Management
DrupalCamp Atlanta 2022 - Effective Project ManagementNorah Medlin
 

Dernier (11)

Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
Team Dynamics: A Journey to Excellence
Team Dynamics: A Journey to ExcellenceTeam Dynamics: A Journey to Excellence
Team Dynamics: A Journey to Excellence
 
Disaster management for class 10 students
Disaster management for class 10 studentsDisaster management for class 10 students
Disaster management for class 10 students
 
Management 13th Edition by Richard L. Daft test bank.docx
Management 13th Edition by Richard L. Daft test bank.docxManagement 13th Edition by Richard L. Daft test bank.docx
Management 13th Edition by Richard L. Daft test bank.docx
 
Leading People - Harvard Manage Mentor Certificate
Leading People - Harvard Manage Mentor CertificateLeading People - Harvard Manage Mentor Certificate
Leading People - Harvard Manage Mentor Certificate
 
LECTURE maintenance management is important 1.pptx
LECTURE maintenance management is important 1.pptxLECTURE maintenance management is important 1.pptx
LECTURE maintenance management is important 1.pptx
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
TEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdf
TEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdfTEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdf
TEST BANK for Operations Management, 14th Edition by William J. Stevenson,.pdf
 
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out PackagingW.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
 
Marketing Management 16 Global Edition by Philip Kotler test bank.docx
Marketing Management 16 Global Edition by Philip Kotler test bank.docxMarketing Management 16 Global Edition by Philip Kotler test bank.docx
Marketing Management 16 Global Edition by Philip Kotler test bank.docx
 
DrupalCamp Atlanta 2022 - Effective Project Management
DrupalCamp Atlanta 2022 - Effective Project ManagementDrupalCamp Atlanta 2022 - Effective Project Management
DrupalCamp Atlanta 2022 - Effective Project Management
 

ISO Clause No 7 Production Realization

  • 1. 4/17/2014 7.0 PRODUCT REALIZATION Mr. Manoj Kumar Maharana Sr. Engineer [Dept. of Electrical ] BLA Power Pvt Ltd 1 BLA Power Pvt. Ltd BLA Power Pvt. Ltd
  • 2.
  • 3. ISO 9001:2000 Balancing the Equation 6.2 Human Resources 6.3 Infrastructure 6.4 Work Environment 7 .0 Product Realization 8.0 Measurement, Analysis and Improvement 8.2.1 Customer Satisfaction 5.4.1 Quality Objectives + + + = = A B C=+
  • 5. • Processes, • Documents • Service time, • Delivery time, • Number of complaints, etc. • Required verification • Validation • Monitoring • Inspection • Test activities • Records needed to provide evidence that Realization processes resulting service meet the requirements.
  • 6. 7.2 Customer Related Processes 7.2.1 Determination Of Requirements to the Product • Delivery activities & Post delivery activities such as > Warranty provisions & Contractual Obligations > such as Maintenance services. > Recycling Or Final disposal. • Statutory & Regulatory requirement applicable to product. 7.2.2 Review Of Requirement Related to the Product/Services The organization shall review the requirements related to product [ submission of tenders, acceptance of contracts or orders, acceptance of changes to contracts or orders ] •Product requirements are defined •Contract or order requirements differing from those previously expressed are resolved. •The organization has the ability to meet the defined requirements. •Records should maintained of the results of the review & actions. 7.2.3 Customer Communication Determine and implement effective arrangements for communicating with customers in relation to •Product information •Enquiries, contracts or order handling, including amendments, •Customer feedback, including customer complaints
  • 7. 7.4 Purchasing 7.4.1 Purchasing Process • Approved indent from store. •Enquires send to min 3 suppliers to submit quotation •Comparative statement made. •After Approval of quotation purchase order issued to supplier. •Evaluation Done suppliers based on Quality, and delivery of products Grade A- Material supplied OK , Material received in time. Grade B -Material supplied OK, Material received late. Grade C -Material supplied Rej. , Material received in time. Grade B -Material supplied Rej. , Material received late. 7.4.2 Purchasing Information describing the product/ service to be purchased including : a. Requirement for approval of product, procedures, processes b. Requirement for qualification of personnel. c. Quality management system requirements. d. The organization ensures purchase requirements contained in purchasing documents, prior to their communication to the supplier. 7.4.3 Verification Of Purchasing Product Establishes and implements • Inspection and other activities necessary for verification of the purchased material with the specified purchasing requirements. • Checking at party’s premises/& at our premises
  • 9. 7.5 Production & Service Provision 7.5.1 Control Of Production & Service Provision Production and service provision under controlled conditions including as applicable: •Description of the characteristics of the product. • Availability of work instructions, as necessary. • Use of suitable equipments. •Availability and use of the measure and monitoring equipments. •Implementation of monitoring and measurement. •The implementation of product release, delivery and post- delivery activities includes meeting customer complaints 7.5.3 Identification & Traceability •Un-inspected material/product is marked with white tag/paint • ok material is marked with green tag/paint •rejected material is marked with red tag/paint •Under Re-Process is marked with yellow tag/paint •Incoming materials are identified by Shape & Size, date of receipt and tag on it 7.5.5 Preservation Of Product •Including constituent parts, during internal processing and delivery in order to maintain conformity to product requirement •Preservation shall include identification, handling packing, storage and protection • Soft copies of all back-up data recorded on computers during internal processing is preserved.
  • 10. 7.6 Control of Monitoring & Measuring Equipments Provide evidence of conformity of product / components to the established requirements. Based on this need, the necessary monitoring & measuring equipments are to be identified & made available. The required monitoring / measurement procedure are established Established a suitable system for all monitoring / measuring equipments : •Calibration/verification should done at regular intervals. In this process measuring equipments are adjusted or re adjusted. •Source of calibration or calibration agency. •Tractability of calibration / verification to national or international standards. •The equipments have unique identification number to determine and identify their calibration status. ‘C’ for Calibrated , ‘UC’ for un-Calibrated & ‘OO’ for out of order. Protection from damage, deterioration during handling, maintenance & storage. • Action should be taken to the not conforming to the requirement is assessed & recorded. • Maintains records of calibration & / verification. •If Computer software is used for measurement, it shall be ensured prior to release for use that computer software satisfies the requirements. •Maintains the list of monitoring & measuring equipments including calibration status.
  • 12. 12 Poor Product Quality High Product Quality Satisfied Customer s Increased Sales (Locally & Exports) Improved Economy Higher Revenue Greater possibility of Investment and Development Dissatisfi ed Customer s Less Revenue Pressure on the government to provide employment opportunities Economic Depression No Improvement & decreased Employment Decrease d Sales Happy Citizens
  • 13. 13 Improved Quality Reduced Waste Reduced Costs Less Pressure on the Economy Positive Balance of Trade (Export >Imports)
  • 14. Special Thanks • for Guidance Mr. Kalpesh Goswami Sr. Manager [ Dept. Of Inst. ] Acknowledgement [suggested reading] • ANSI/ASQ 9000:2000 Quality Management Systems – Fundamentals and Vocabulary • ANSI/ASQ 9001:2000 Quality Management Systems – Requirements, December 13,2000 • Quality Management System manual Doc No: BLAPOWER/M/QMSM/01 14