SlideShare une entreprise Scribd logo
1  sur  12
Télécharger pour lire hors ligne
Hall
1960
3695 4680
UTILITY
SITTING ROOM
Mat Well
ENTRANCE HALL
BATHROOM
BEDROOM BEDROOM
BOOT ROOM
DINING AREA
LIVING AREA
KITCHEN
Proposed 2- storey extension
Remove existing door, build up wall,
insert new full height toughened glazed
window to detail. Make good all works
Remove existing window, build up wall,
insert new corner window with steel beams
over and steel column for support. Make good
all works
4723
2805
2030
3120
1025
2515
3120
Demolish existing sub-standard extension
Break out existing wall and
form new window ope
Block up existing window
Remove part of existing 700mm
solid wall and doorway, Steel
Beam over to specification.
Remove existing wall and window and
install new bi-folding doors with steel
above to form new opening to evening
patio
Install new Velux rooflights to new roof
Open Ceiling to roof of extension
Break open existing wall, remove
patio door and install new bifolding
door system
Large Velux rooflight tunnels,
either side of ridge
Evening Patio
+Open Ceiling to underside of eaves
+2.45m high flat ceiling
HOT-PRESS
WC Area of ground floor extension = 34.66m2
Area of first floor extension = 22.08m2
Total floor area of extension = 56.74m2
15714 3300
3680 1060
800 2080
7600
4826
4330
280
3199
3550
9588
8170
500
2 No. Velux rooflight, either side of ridge
Remove existing door and
replace with Toughened
glass window
Remove existing window, block up
and make good all works
NOTE: All existing windows to be removed and replace
with double/triple glazed 'Low E' Argon filled windows
New full height toughened glazed
window to detail. Make good all works
+2.45m Ceiling Height
+2.45m Ceiling Height
+2.45m Ceiling Height
+2.45m Ceiling Height
+2.45m Ceiling Height
+2.45m Ceiling Height
Break out part of existing
wall, window to form new
entrance hall and stairway
Break open existing wall, insert new door
to access proposed extension
2 No. window opes to be reduced to accomodate
kitchen worktops, new windows 1100mm high
3800
Triple Glazed Argon Filled
Low-E, U-PVC Windows
as per Spec.
Min U-Value 1.4 W/m2K
320mm Cavity Wall
filled with 80mm HD
Insulation (Kooltherm K5
EWB or equal & approved),
to achieve a min U-Value of
0.15 W/m2K.
Sand & Cement Plaster to
act as airtight layer internally.
Concrete Path around New
Extension, to provide level
access to Front Door .
ACO drain to be installed
in front of Door.
Fully Accessible Front
Door with glazed screen.
Velux Window.
Min U0-Value 1.4 W/m2K.
Light Tunnel to kitchen.
Boxed Out in Plasterboard.
Insulation Layer and AirTight
Membrane to continue
around light tunnel to ensure
continuity of both between
ceiling level and window.
New ESB Meter located in
original position
Accessible Guest Bathroom.
Toilet CL located min
400mm from wall.
1200x750mm Clear Space
Stairs to Architect/Client's
Detail. Hardwood Handrail.
15 Steps of Equal Rise
from GF FFL to FF FFL
(Approx 190mm Rise,
220mm Going)
SCALE 1:50 @ A1, 1:100 @ A3
Proposed floor area extension = 34.66m2
5
GROUND FLOOR PLAN
NOTES:
Foundations
Width of foundations to be at
least 3 times width of external
walls, min 1 layer of A393
Mesh.
Ground Floor
75mm Screed on Min.
on 125mm Thick 25N20 Slab
on 100mm Kingspan
Kooltherm Floorboard (or
similar)
on Radon Barrier.
on 50mm sand blinding.
on Min 250mm Hardcore
filling (Clean permeable
granular fill) compacted in
layers of 225mm.
Existing floors to be leveled
and made good. Existing
floor in the proposed kitchen
area to be insulated 100mm
insulation, to be
approved,with 75mm screed
over and made good.
Explore further, as this will
reduce ceiling heights in
dining and living areas or
create steps. Client's
preference is final.
First Floor
225mm x 44mm Timber Floor
Joists at 350mm Centres.
Bridging at 1200mm centres.
12.5mm plasterboard fixed to
the underside of joists and
surface skimmed.
Wall Construction
320mm Cavity Wall, 100mm
block inner leaf, 80mm HD
Insulation (Kooltherm K5
EWB or equal & approved)
fixed securely to inner leaf
over full height of wall, and
100mm coloured render
blockwork outer leaf, to
achieve a min U-Value of
0.15 W/m2K.
Windows:
Aluclad Frames.
Low E Argon Filled.
Win Min U-Value 1.4 W/m2K
Door Min U-Value 1.6 W/mwK
All windows to comply with
Current Building Regulations
TGD Part B re Escape ope - Min
850mm high x 550 wide, Min
800 above floor level.
Max 1100 above floor level.
All rooms to have background
ventilation to the outside.
Pitched Roof Construction:
Tiles to be laid to
Manufacturers's Instructions.
on 55 x 33mm Battens
on Breather Membrane,
On Proprietary Roof Trusses to
spec & manufacturer's design.
Roof Insulated at ceiling Level
with 300 mm Fibre Insulation
between and over joists, to
achieve a
min U-value of U=0.13 W/m2K.
Eaves > Ridge Ventilation.
Solar Panels
To be positioned on the back or
side elevations as required for a
SE/SW orientation.
Thermal - 2.5m long x 2.0m
high - 30 Evacuated Tubes.
PV - 1.6m long x 1 m high.
Granite cills to windows
on front elevation only,
Widows W1,W2,W3,W4,W5,
W6,W7.
Existing chimney stack,
hearth, fireplace and all
associated to be
decommissioned,
demolished and removed.
Make good all works.
Walls, on both side of
existing fireplace, to be set
back in line with each other,
and new wall in place of
chimney breast, to create
one new flushed wall. Make
good all works.
Refer to Detail A, boxing
in of existing random rubble
wall, conc. ring beam, to
create a flushed finished wall
from floor to open ceiling.
Existing alcove to be filled in,
plasterboard, painted etc. to
match exising/proposed wall
Refer to Detail A, boxing
in of existing random rubble
wall, conc. ring beam, to
create a flushed finished wall
from floor to open ceiling. Retain exsiting alvove, open
to floor level, create shelving
throughout. Make good all
works. Doors or open
shelving as per client's spec.
Existing double breasted chimney,
stack, hearth, fireplace and all
associated to be decommissioned,
demolished and removed. Make good
all works.
Investigate ceiling heights on site with
B.Surv.
Remove superficial non-structural
ceiling beams
Remove superficial/decorative,
non-structural, timber ceiling beams
Retain all existing structural beams,
box in with plasterboard. Create flush
finish.
1000mm concrete footpath around
existing dwelling and proposed extension,
as shown.
Ground levels to reduced/built up around existing
dwelling and extension, as required, to create equal
levels throughout. Levels to allow for 150mm high
footpath riser and 150mm single step riser to external doors.
1000mm concrete footpath around
existing dwelling and proposed extension,
as shown.
Ground levels to reduced/built up around existing
dwelling and extension, as required, to create equal
levels throughout. Levels to allow for 150mm high
footpath riser and 150mm single step riser to external doors.
Finished Floor Level
+0.300
Path Level
+0.150
Ground Level
+0.000
Tile finish to Client's Spec.
2no203x133x30kgsteelbeamovertoengineer'sdetail
2no 203x133x30kg steel beam over to engineer's detail
2no 203x133x30kg steel beam over to engineer's detail
Tile finish to Client's Spec.
Tile finish to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Tile finish to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
1no203x133x30kgsteelbeamovertoengineer'sdetail
SVP
AJ
GG
GGGGGG
GG
GG GG GG
AJ
To Soakpit
AJ
To Soakpit
SVP
SVP
MH MH
MH
MH
To New
Wastewater
Treatment System
PublicWatermain
Proposed Boiler House
Extract vents (8 No 9" x 3"
(8000mm2)
Wall vent to match colour of
External render / wall finish.
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
20/05/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS2
TITLE:
TENDER
T-001
1/100
GROUND FLOOR PLAN
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
MASTER BEDROOM
Landing
4205
VOID TO ENTRANCE
HALL BELOW
Walk-in
Wardrobe
(linen storage)
En-Suite
Lower existing window ope &
cill level and install new
window
BEDROOM 2
LINEN-PRESS
1488
2no. Velux rooflights
above entrance hall
4911
3280
2191
1850
4899 1350
900
Install new Velux rooflights to existing roof
Install new Velux rooflight to existing roof
Install new Velux rooflight to existing roof
SHOWER ROOM
OFFICE
Existing ceilings on first floor level to be
raised to min. 2.4m high
3449
4558
1909
3114
Elec. Shower
80mm Acoustic Insulation to
existing timber partitions
forming dormer roof
100mm Timber Stud Wall,
with Acoustic Insulation.
Landing
100mm Timber Stud Wall,
with Acoustic Insulation to
form new linen store in
dormer roof.
A
Lower existing window ope &
cill level and install new
window
320mm Cavity Wall
filled with 80mm HD
Insulation (Kooltherm K5
EWB or equal & approved),
to achieve a min U-Value of
0.15 W/m2K.
Sand & Cement Plaster to
act as airtight layer internally.
A
FIRST FLOOR PLAN
B B
6 SCALE 1:50 @ A1, 1:100 @ A3
Proposed floor area extension = 22.08m2
1735
1047
2630
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Wooden Floor finish
to Client's Spec.
Tile finish to Client's Spec.
Tile finish to Client's Spec.
SVP
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
19/05/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS2
TITLE:
TENDER
T-002
1/100
FIRST FLOOR PLAN
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
5920
2423
Large Velux rooflight tunnels,
either side of ridge
Install new Velux rooflights to new roof
Widen ope, lower existing
window cill level and install
new window
Remove existing door, build up wall,
insert new full height toughened glazed
window to detail. Make good all works
Remove existing window, build up wall,
insert new corner window as shown. Make good
all works
Proposed 2- storey extension
1100
Moulded Plinth to
Match Window
Surround.
Coloured Nap
Render as per
Spec
Paving Rising at Max 1:20
slope to provide level
access to front door.
ACO drain to be installed
in front of Door.
Fully Accessible Front
Door with glazed screen.
Refer to Door Schedule.
SCALE 1:50 @ A1, 1:100 @ A3
FRONT ELEVATION
1
W1 W2
W4
W6 W7
W9
W15 W16
W17 W18 W19
D1
5996
2498
2653
4032
Install new Velux rooflights to new roof
2 No. Velux rooflight, either side of ridge
New corner window as shown. Make good
all works
Proposed 2- storey extension
2800
SCALE 1:50 @ A1, 1:100 @ A3
4
SIDE ELEVATION
W9
W10 W11
W21 W22
W23
W20
W1W5
W8
6150
2653
4032
5528
Large Velux rooflight tunnels,
either side of ridge
Remove existing door and
replace with Toughened
glass window
Break open existing wall, remove
patio door and install new bifolding
door system
W12
W13
W25
W24
W27
W11
W26
D3
Remove existing wall and window and
install new bi-folding doors with steel
beam above to form new opening to
evening patioRemove existing window, block up
and make good all works
2 No. Velux rooflight, either side of ridge
Solar Panels to be
positioned on the back or
side elevations as required
for a SE/SW orientation.
Thermal - 2.5m long x 2.0m
high - 30 Evacuated Tubes.
PV - 1.6m long x 1 m high.
See M&E Spec for Exact
Quantities. and Specification
SCALE 1:50 @ A1, 1:100 @ A3
SIDE ELEVATION
3
W14
D2
W3
W28
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
14/05/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS1
TITLE:
TENDER
T-003
1/100
ELEVATIONS
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
Trial Hole
T2
T3
T1
p3
P2
P1
7017
2300mm
9000
1000
1000
5231
157097
143871
11398
71627
13792
8434
2814
40720
132360
15216
7959
Location of Public Site Notice
Existing Recessed Entrance to
Dwelling
Existing Dwelling
Existing Garden
Proposed Aswaflow Treatment
System and Percolation Area
supplied and installed as per
Molloy Precast Specifications
Existing mature boundary
Existing mature boundary
Proposed extension
A
A
+98.55
Existing Dwelling
FFL +98.35
FRH +104.27
FFL +98.30
FRH +104.22
+98.15
+98.15
+98.30
+98.20
+98.90
+98.95
+98.90
+99.00
+99.10
+99.00
+99.10
+99.00
Existing Dwelling
Proposed saokaway
Existing saokaway
Existing septic tank to
be decomissioned & removed
from site
7714
Existing mains waterline
Existing septic tan
area
Existing septic tank & percolation
area
Flow of water
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
20/05/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE.
PROJECT
TITLE:
TENDER
T-004
1/500
SITE LAYOUT PLAN
JAMES & CARMEL O'BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
Extension to side of dwelling, minor
alterations to elevations, installation of a new
wastewater treatment system
Trial Hole
T2
T3
T1
p3
P2
P1
7017
2300mm
9000
1000
1000
5231
157097
63102
143871
11398
71627
13792
8434
2814
40720
132360
15216
7959
Location of Public Site Notice
Existing Recessed Entrance to
Dwelling
Existing Dwelling
Existing Garden
Aswaflow Treatment System and Percolation
Area supplied and installed as per Molloy
Precast Specifications
Existing mature
boundary
Existing mature
boundary
Existing mature
boundary
Existing mature boundary
Site under
application
outlined in red
Proposed
extension
A
A
+98.55
Proposed Extension
FFL +98.35
FRH +104.27
FFL +98.30
FRH +104.22
+98.15
+98.15
+98.30
+98.20
+98.90
+98.95
+98.90
+99.00 +99.10
+99.00
+99.10
+99.00
+99.10
+99.30
+99.40
+99.40
+99.60
+99.90
+99.60
+100.10
+99.70
+100.00
Existing
Neighbouring
Dwellings
Proposed saokaway Existing saokaway
Existing septic tank
to be decommissioned
and removed
7714
Existing mains waterline
Existing septic tank & percolation area
Existing septic tank & percolation area
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
20/05/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE.
PROJECT
TITLE:
TENDER
T-005
1/1000
SITE LAYOUT PLAN
JAMES & CARMEL O'BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
Extension to side of dwelling, minor
alterations to elevations, installation of a new
wastewater treatment system
ROAD
gl98.100
gl98.900
Proposed Extension
F.R.H. = 81.901
1/200 fall
Inlet pipe:
I.L. 97.685
Site Boundary
Aswaflow Treatment System Proposed percolation area
gl97.900
gl98.150
gl98.200
gl98.450
Outlet Pipe:
I.L. 74.875
Percolation pipe: I.L. 97.784
300mm topsoil on Geotextile membrane,
on 150mm subsoil on,
100mm dia. percolation pipe, on
300mm subsoil
Longitudinal Site Section
Scale 1:250
Proposed Extension
F.F.L.=75.75
Existing Ground Level 75.60
2450
2300
1800
1725
1/100 fall 1/100 fall
550
300
2188
Base of percolation trench
Base of trial hole, no watertable encountered
3676
2339
3073
950
Discharge hose
Aerator
Siphon hose
Input
Outlet
2300mm
AJ's to be
installed by others.
Grade pipes only at 1:200
Protected flushing valve &
inspection cambers
AJ's to be
installed by others.
Treatment System & Percolation Area - Plan
Scale 1:100
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
20/05/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE.
PROJECT
TITLE:
TENDER
T-006
1/500
LONGITUDINAL SITE SECTION A-A
PERCOLATION DETAILS
JAMES & CARMEL O'BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
Extension to side of dwelling, minor
alterations to elevations, installation of a new
wastewater treatment system
Typical Section through Percolation Area
Scale nts
Section through Treatment System
Scale nts
SCALE 1:50 @ A1, 1:100 @ A3
Proposed floor area extension = 34.66m2
5
FOUNDATION PLAN
Radon:
Max distance to radon sump
of 15m. Max area 250m2.
Cross Vent Gaps to be left in
rising walls to allow Radon
Gas to reach the Radon
Sump. Gap to be 12,500
mm2 per metre run of wall
(eg a quarter of a block in
each 4 block length.
75mm Screed on Min.
on 125mm Thick 25N20 Slab
on 100mm Kingspan Kooltherm
Floorboard (or similar)
on Radon Barrier.
on 50mm sand blinding.
on Min 250mm Hardcore filling
(Clean permeable granular fill)
compacted in layers of 225mm.
Radon Sump Proprietary
Collection Box for max 250sqm
floor area (max distance 15m).
terminates outside and is
capped.
320mm Cavity Wall on 960 x
300mm Reinforced Concrete
Foundations with min 1 layer of
A393 Mesh.
See Foundation Detail 1.
Cross Vent Gaps to be left in
rising walls to allow Radon Gas
to reach the Radon Sump as
per Building Regulation
Requirements. Gap to be
12,500 mm2 per metre run of
wall (eg a quarter of a block in
each 4 block length.
100mm Blockwork Wall on
700mm x 300mm Reinforced
Concrete Foundations with min
1 layer of A393 Mesh. See
Foundation Detail 2.
215mm Blockwork Wall on
815mm x 300mm Reinforced
Concrete Foundations with min
1 layer of A393 Mesh. See
Foundation Detail 3.
.
215mm Blockwork Wall on
815mm x 300mm Reinforced
Concrete Foundations with min
1 layer of A393 Mesh. See
Foundation Detail 3.
.
Radon:
Max distance to radon sump
of 15m. Max area 250m2.
Cross Vent Gaps to be left in
rising walls to allow Radon
Gas to reach the Radon
Sump. Gap to be 12,500
mm2 per metre run of wall
(eg a quarter of a block in
each 4 block length.
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
06/06/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS1
TITLE:
TENDER
T-007
1/100
FOUNDATION PLAN
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
1065
300
980180
75mm Screed on Min. on
125mm Thick 25N20 Subfloor Slab
All Services Laid Prior To Pouring & Power
Floated To Smooth Level Finish
S&C Screed is Airtight Layer - to be fully sealed
and taped to wall prior to S&C plastering.
165mmCavity Wall filled with 120mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K.
300x 1050mm Reinforced Concrete Foundation
below 350mm Cavity Wall
25N20 Concrete, with min 1 Layer of A393
Mesh.
25mm High Density Vertical Insulation
separating the warm concrete slab from the
structural wall. Lightweight Concrete Blocks to
be used where the insulation layer meets the
wall.
Min. 120mm HD Floor Insulation - K3
Kooltherm Floorboard or equal and approved.
1200 Gauge D.P.M Laid to Manufacturers
Instructions.
Proprietary Radon Barrier, Continuous with all
joints lapped and sealed, and with the
appropriate number of sumps and outlets.
Foundation Detail 1
SCALE 1:10 @ A1, 1:20 @ A3
1
Min 50mm Sand Blinding.
Min 250mm Hardcore Filling (Clean graded
crushed stone) Compacted in Layers of 225mm.
Radon Pipe 100mm pipe to sump
Pipe Terminates outside and is capped.
All penetrations of radon layer sealed with
resisting sealing tape.
Fountation Depth and Hardcore
Depth vary due to sloping site.
Refer to Long Section, T03
Drawing 2 for more info.
Formation Level -1200mm
300
75mm Screed on Min. on
125mm Thick 25N20 Subfloor Slab
All Services Laid Prior To Pouring & Power
Floated To Smooth Level Finish
300x 700mm Reinforced Concrete Foundation
below Single Leaf Blockwork Wall.
25N20 Concrete, with min 1 Layer of A393
Mesh.
25mm High Density Vertical Insulation
separating the warm concrete slab from the
structural wall.
Min. 120mm HD Floor Insulation - K3
Kooltherm Floorboard or equal and approved.
1200 Gauge D.P.M Laid to Manufacturers
Instructions.
Proprietary Radon Barrier, Continuous with all
joints lapped and sealed, and with the
appropriate number of sumps and outlets.
Min 35mm Sand Blinding.
Min 250mm Hardcore Filling (Clean graded
crushed stone) Compacted in Layers of
225mm.
700
25012012575
Foundation Detail 2
SCALE 1:10 @ A1, 1:20 @ A3
2
495
Formation Level -1200mm
Lightweight Concrete Blocks to be used where
the insulation layer meets the wall.
300
75mm Screed on Min. on
125mm Thick 25N20 Subfloor Slab
All Services Laid Prior To Pouring & Power
Floated To Smooth Level Finish
300x 815mm Reinforced Concrete Foundation
below 215mm Blockwork Wall.
25N20 Concrete, with min 1 Layer of A393
Mesh.
25mm High Density Vertical Insulation
separating the warm concrete slab from the
structural wall. Lightweight Concrete Blocks to
be used where the insulation layer meets the
wall.
Min. 120mm HD Floor Insulation - K3
Kooltherm Floorboard or equal and approved.
1200 Gauge D.P.M Laid to Manufacturers
Instructions.
Proprietary Radon Barrier, Continuous with all
joints lapped and sealed, and with the
appropriate number of sumps and outlets.
Min 35mm Sand Blinding.
Min 250mm Hardcore Filling (Clean graded
crushed stone) Compacted in Layers of
225mm.
815
25012012575
Foundation Detail 3
SCALE 1:10 @ A1, 1:20 @ A3
3
495
240
Formation Level -1200mm
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
04/06/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS2
TITLE:
TENDER
T-D-001
As Shown
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
FOUNDATION AND FLOOR DETAILS
ACCEPTABLE CONSTRUCTION DETAILS
Sign off required to ensure Thermal Bridging Value
165mmCavity Wall filled with 120mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K. Insulation to be secured firmly
against the innter leaf of the cavity.
225mm x 44mm Timber Joists (C16) at
350mm Centres, supported on wall hangers.
To take floor loadings as noted in
Specification.
Allow for min 12mm Carpet
on 18mm Plywood.
Thicknesses as noted in Specification.
12.5mm Proprietary Fire Grade Plasterboard
with joints taped and filled and backed by
timber with Skim Finish to Ceilings, as noted in
Specification.
Airtight layer must continue past intermediate
floor, either through continuous S&C render
layer or through installation of airtight
membrane taped to primed blockwork prior to
fitting joist hangers.
Acoustic Insulation to be fitted between Joists
to reduce sound transfer between rooms..
165mmCavity Wall filled with 120mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K. Insulation to be secured firmly
against the innter leaf of the cavity.
75mm Screed to first floor.
All services to be laid in screed.
Carpet on Substrate.
Thicknesses as noted in Specification.
50mm Timber Lats to be fixed to underside of
concrete floor to provide zone for services.
12.5mm Plasterboard with Skim Finish to
Ceilings, as noted in Specification.
Airtight layer must continue past intermediate
floor, either through continuous S&C render
layer or through installation of airtight
membrane taped to primed blockwork prior to
installing the concrete slab.
85mm Wide Reinforced Concrete Slab with
A142 Mesh, on Floor Hangers.
To take floor loadings as noted in
Specification.
First Floor Detail 1
SCALE 1:10 @ A1, 1:20 @ A3
1
First Floor Detail 2
SCALE 1:10 @ A1, 1:20 @ A3
2
INTERMEDIATE FLOOR DETAILS
ACCEPTABLE CONSTRUCTION DETAILS
Sign off required to ensure Thermal Bridging Value
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
04/06/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS
TITLE:
TENDER
T-D-002
As Shown
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
165mmCavity Wall filled with 120mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K. Insulation to be secured firmly
against the innter leaf of the cavity.
Timber Stud Partition. 100mm x 44mm
Timber Joists (C14) at 400mm Centres.
12.5mm Proprietary Fire Grade Plasterboard
with joints taped and filled and backed by
timber with Skim Finish to Ceilings, as noted in
Specification.
Acoustic Insulation to be fitted between Studs
to reduce sound transfer between rooms..
165mmCavity Wall filled with 120mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K. Insulation to be secured firmly
against the innter leaf of the cavity.
100mm Blockwork Wall, with Sand and
Cement Render on Both Sides to form airtight
layer.
12.5mm Plasterboard to both sides.
Moisture Resistant Plasterboard to be used in
wet rooms, eg bathrooms, ensuites etc.
165mmCavity Wall filled with 120mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K. Insulation to be secured firmly
against the innter leaf of the cavity.
215mm Blockwork Separating Wall to Semi-D,
with Sand and Cement Render on Both Sides
to form airtight layer.
15mm Firmacell Boards at Party Wall for
Additional Sound Insulation.
Ensure Insulation is firmly secured against the
inner leaf of cavity wall, as per manufacturers
instructions.
Proprietary Cavity Closer between houses, to
suit width of the cavity (165mm), to be fitted to
manufacturers instructions.
Ensure Insulation continues across the
abutment zone, and is firmly secured against
the inner leaf of cavity wall, as per
manufacturers instructions.
All penetrations through the air tight layer to
be full sealed.
All penetrations through the air tight layer to
be full sealed.
External Wall to be Sand and Cement
Rendered before fixing Stud Partitions to
ensure continuity of air tight layer. All
penetrations through the air tight layer to be
full sealed.
Wall Junction Detail 1
SCALE 1:10 @ A1, 1:20 @ A3
1
Wall Junction Detail 2
SCALE 1:10 @ A1, 1:20 @ A3
2
Wall Junction Detail 3
SCALE 1:10 @ A1, 1:20 @ A3
3
Where fire-rating is required for
compartmentation in Semi-D (See Drawings),
Standard Blockwork should suffice.
Ensure all penetrations are fully sealed.
Where fire-rating is required to partitions for
compartmentation in Semi-D, (see drawings)
Ensure 12.5mm Plasterboard with all joints
taped and filled, on either side of Timber
Stud Partition (44mm Timber Studs at
400mm Centres.)
WALL TYPES AND JUNCTIONS
INTERMEDIATE FLOOR DETAILS
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
04/06/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS
TITLE:
TENDER
T-D-003
As Shown
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
2 Coats Sand & Cement Plaster
With Napped Finish.
Wall Ties - min 4.9 per sq m.
as noted in Specification
100mm Block Inner Leaf
Steelite Lintel to fully close cavity
320mm Cavity to include 80mm Kooltherm
K5 EWB (or equal and approved)
100mm Block Outer Leaf
Triple Glazed Low-e, Argon Filled Window.
Min U-Value 1.4W/m2K.
Fitted in the Line of the Insulation.
Stepped DPC
Weathered and Throated Cill
on DPC.
Hardwood Window Board
Carefully Fitted HD Insulation to
minimize thermal bridges. Thermal
resistance through the cavity
closer of not less than 0.45
m2K/W.
Wall Ties - min 4 per sq m.
As noted in Specification
100mm Block Inner Leaf
100mm Brick Outer Leaf (where
noted on elevations)
Triple Glazed Low-e, Argon Filled Window.
Min U-Value 1.4W/m2K.
Fitted in the Line of the Insulation.
Stepped DPC
Weathered and Throated Cill
on DPC.
Hardwood Window Board
Carefully Fitted HD Insulation to
minimize thermal bridges.
Moulded Window Surround / Lintel
Reinforced Precast Concrete Lintel
120mm Cavity to include 80mm Kooltherm
K5 EWB (or equal and approved)
Window Detail 1
SCALE 1:10 @ A1, 1:20 @ A3
1
Window Detail 3
SCALE 1:10 @ A1, 1:20 @ A3
3
Proprietary Cavity Closer to
ensure compliance with fire
regulations.
Insulation tightly fitted to close cavity
To eusure the cavity is fully closed,
Plasterboartd to be tightly fitted to the
underside of the lintel and tight against the
window frame, with skim coat plaster finish.
Triple Glazed Low-e, Argon Filled Window.
Min U-Value 1.4W/m2K.
Fitted in the Line of the Insulation.
Airtight Membrane to extend from blockwork
wall (where not S&C rendered), to be sealed
to Window Frame with Air Tight Tape.
Proprietary Cavity Closer or Block of Insulation
to insure the insulation layer remains
continuous between the wall insulation and the
window and ensure fully sealed for fire regs.
Min 150mm Wide Vertical DPC to be installed
against outer leaf and firmly fixed in position.
Triple Glazed Low-e, Argon Filled Window.
Min U-Value 1.4W/m2K.
Fitted in the Line of the Insulation.
Airtight Membrane to extend from blockwork
wall (where not S&C rendered), to be sealed
to Window Frame with Air Tight Tape.
Proprietary Cavity Closer or Block of Insulation
to insure the insulation layer remains
continuous between the wall insulation and the
window and to ensure fully sealed for fire regs.
Min 150mm Wide Vertical DPC to be installed
against outer leaf and firmly fixed in position.
Moulded Window Surround to be provided
where indicated on elevations.
Window Detail 2
SCALE 1:10 @ A1, 1:20 @ A3
2
Window Detail 4
SCALE 1:10 @ A1, 1:20 @ A3
4
100mm Block Inner Leaf
100mm Brick Outer Leaf (where
noted on elevations)
New Triple Glazed Door
Min U-Value 1.3W/m2K.
Fitted in the Line of the Insulation.
Stepped DPC
Moulded Window Surround / Lintel
Reinforced Precast Concrete Lintel
120mm Cavity to include 80mm Kooltherm
K5 EWB (or equal and approved)
Wall Ties - min 4 per sq m.
As noted in Specification
75mm Screed on Min. on
125mm Thick 25N20 Subfloor Slab
All Services Laid Prior To Pouring & Power
Floated To Smooth Level Finish
S&C Screed is Airtight Layer - to be fully sealed
and taped to wall prior to S&C plastering.
25mm High Density Vertical Insulation
separating the warm concrete slab from the
structural wall. Lightweight Concrete Blocks to
be used where the insulation layer meets the
wall.
Min. 120mm HD Floor Insulation - K3
Kooltherm Floorboard or equal and approved.
1200 Gauge D.P.M Laid to Manufacturers
Instructions.
Proprietary Radon Barrier, Continuous with all
joints lapped and sealed, and with the
appropriate number of sumps and outlets.
Finished Level of Flooring
Concrete Cill with max slope of 15 degrees.
Max threshold height of 15mm where level
access is required.
Aco Drainage Channel or Equal and Approved
where Level Access Threshold Provided.
Door unit to have proprietary lower threshold
system as required where level access
requirement is noted on drawings.
Door Threshold Detail
SCALE 1:10 @ A1, 1:20 @ A3
5
Min. 120mm HD Floor Insulation - K3
Kooltherm Floorboard or equal and approved.
1200 Gauge D.P.M Laid to Manufacturers
Instructions.
Proprietary Radon Barrier, Continuous with all
joints lapped and sealed, and with the
appropriate number of sumps and outlets.
Concrete Cill with max slope of 15 degrees.
Max threshold height of 15mm where level
access is required.
Aco Drainage Channel or Equal and Approved
where Level Access Threshold Provided.
75mm Screed on Min. on
125mm Thick 25N20 Subfloor Slab
All Services Laid Prior To Pouring & Power
Floated To Smooth Level Finish
S&C Screed is Airtight Layer - to be fully sealed
and taped to wall prior to S&C plastering.
25mm High Density Vertical Insulation
separating the warm concrete slab from the
structural wall.
Lightweight Concrete Blocks to be used where
the insulation layer meets the wall.
Triple Glazed Low-e, Argon Filled Window.
Min U-Value 1.4W/m2K.
Fitted in the Line of the Insulation.
Full Height Glazing Detail
SCALE 1:10 @ A1, 1:20 @ A3
6
Steelite Lintel to fully close cavity
100mm Block Outer Leaf
Triple Glazed Low-e, Argon Filled Window.
Min U-Value 1.4W/m2K.
Fitted in the Line of the Insulation.
Stepped DPC
Lightweight Concrete Blocks to be used where
the insulation layer meets the wall.
Airtight Membrane taped to Window Frame,
and taped back to primed blockwork wall at
first floor level.
WINDOWS AND DOORS DETAILS - HEAD, CILL AND JAMB.
ACCEPTABLE CONSTRUCTION DETAILS
Sign off required to ensure Thermal Bridging Value
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
04/06/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS
TITLE:
TENDER
T-D-004
As Shown
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
Slates to be laid to Manufacturers's Instructions.
50mm Clear Ventilation Gap Using
Proprietary Spacers Under Sarking
Felt Where Necessary Along Eaves
Black PVC Soffit and Fascia, with Vent to provide
continuous air ventilation gap to cold roof space.
120mmCavity Wall filled with 80mm HD
Insulation (Kooltherm K5 EWB or equal and
approved to achieve a minimum U-Value of
0.15 W/m2K.
55 x 33mm Battens on Breather Membrane
2 Coats Sand & Cement Plaster
With Napped Finish
on 100mm Block Outer Leaf
Slate Cavity Closer.
Black PVC Gutters and Downpipes,
Laid and Fixed to Manufacturer's Instructions
Sarking Felt to lap into Gutter.
Min 300mm Insulation between and
above Ceiling Joists to Continue down
to insulation in wall, providing a
continuous insulation layer.
225mm Rafters to be Strapped to wall
with 30x5mm Galvanised Straps.
100 x 75mm Wall Plate with 12mm
Rawl bolts @ 1m Centres.
12.5mm Sand & Cement Plaster Layer to
100mm Inner Blockwork Wall.
S&C Plaster acts as airtight layer, all
penetrations to be sealed and plastered over.
Airtight Membrane at Ceiling Level (on Warm
Side of Insulation), above Plasterboard Ceiling. -
All penetrations to be taped and sealed. AIrtight
Layer membrane to be taped down to blockwork
wall before plastering and plastered over to seal.
Continuous Insulation between Wall
and Roof.
Roof Detail 1
SCALE 1:10 @ A1, 1:20 @ A3
1
Additional Wall Ties at top of Wall to firmly tie
two leaves of cavity wall together
ROOF DETAILS
ACCEPTABLE CONSTRUCTION DETAILS
Sign off required to ensure Thermal Bridging Value
ISSUE:
PROJECT NO:
1515
DRAWN / CHECKED
JD/MD
DRAWING NO:
SCALE:
REV NO:
DATE
04/06/2015
CLIENT:
LOCATION:
FARRELL'S CROSS, KILDARE, CO. KILDARE.
PROJECT
RENOVATIONS & REFURBISHMENTS
TITLE:
TENDER
T-D-006
As Shown
JAMES & CARMEL O BRIEN
Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446
E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com

Contenu connexe

Tendances

Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
False ceiling materials
False ceiling materialsFalse ceiling materials
False ceiling materialsMudra Redkar
 
Aluminum partition wall
Aluminum partition wallAluminum partition wall
Aluminum partition wallZuber Memon
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final projectAuburn University
 
false celling pop details
false celling pop detailsfalse celling pop details
false celling pop detailsAjay Bhanushali
 
Visual Dictionary Terrazzo
Visual Dictionary TerrazzoVisual Dictionary Terrazzo
Visual Dictionary Terrazzoterrazzo
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsKHUSHBU SHAH
 
Visual dictionary-Vault
Visual dictionary-VaultVisual dictionary-Vault
Visual dictionary-VaultVault
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionarymasonry
 
False Ceiling Materials
False Ceiling  Materials False Ceiling  Materials
False Ceiling Materials Muhammad Kamran
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor planDanny Chiverton
 
Fireplace construction by chakamba j
Fireplace construction by  chakamba jFireplace construction by  chakamba j
Fireplace construction by chakamba jJohn Chakamba
 
False Ceiling Material
False Ceiling MaterialFalse Ceiling Material
False Ceiling MaterialKarthika M
 
FALSE CEILING
FALSE CEILINGFALSE CEILING
FALSE CEILINGSAL S S
 

Tendances (20)

Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
False ceiling materials
False ceiling materialsFalse ceiling materials
False ceiling materials
 
final dcc
final dccfinal dcc
final dcc
 
Aluminum partition wall
Aluminum partition wallAluminum partition wall
Aluminum partition wall
 
False ceiling
False ceilingFalse ceiling
False ceiling
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final project
 
visual dictionary
visual dictionaryvisual dictionary
visual dictionary
 
Types of ground floors
Types of ground floorsTypes of ground floors
Types of ground floors
 
false celling pop details
false celling pop detailsfalse celling pop details
false celling pop details
 
Visual Dictionary Terrazzo
Visual Dictionary TerrazzoVisual Dictionary Terrazzo
Visual Dictionary Terrazzo
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity walls
 
Visual dictionary-Vault
Visual dictionary-VaultVisual dictionary-Vault
Visual dictionary-Vault
 
False ceiling
False ceilingFalse ceiling
False ceiling
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
False Ceiling Materials
False Ceiling  Materials False Ceiling  Materials
False Ceiling Materials
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
Fireplace construction by chakamba j
Fireplace construction by  chakamba jFireplace construction by  chakamba j
Fireplace construction by chakamba j
 
False Ceiling Material
False Ceiling MaterialFalse Ceiling Material
False Ceiling Material
 
FALSE CEILING
FALSE CEILINGFALSE CEILING
FALSE CEILING
 

En vedette

Cavity Walling
Cavity WallingCavity Walling
Cavity WallingDjCurrie
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton PortfolioMark Thornton
 
Student l1 cavity wall construction
Student l1 cavity wall constructionStudent l1 cavity wall construction
Student l1 cavity wall constructionLuke D'Arcy
 
Tutor l1 cavity wall construction
Tutor l1 cavity wall constructionTutor l1 cavity wall construction
Tutor l1 cavity wall constructionLuke D'Arcy
 
How to build a besser block wall
How to build a besser block wallHow to build a besser block wall
How to build a besser block wallkristenjames
 
Merged document
Merged documentMerged document
Merged documentWC Yan
 
Structural engineer s pocket book
Structural engineer s pocket bookStructural engineer s pocket book
Structural engineer s pocket bookThomas Britto
 
Tutor l1 brickwork bonding
Tutor l1 brickwork bondingTutor l1 brickwork bonding
Tutor l1 brickwork bondingLuke D'Arcy
 
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and StoneAncon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and StoneLBS Builders Merchants
 
RECORDING STUDIO ACOUSTICS
RECORDING STUDIO ACOUSTICSRECORDING STUDIO ACOUSTICS
RECORDING STUDIO ACOUSTICSShivangi Saini
 
Walls timber-for slideshare
Walls timber-for slideshareWalls timber-for slideshare
Walls timber-for slideshareJulian Swindell
 
Acoustics for a music studio
Acoustics for a music studioAcoustics for a music studio
Acoustics for a music studioayan baraniya
 

En vedette (20)

Cavity Walling
Cavity WallingCavity Walling
Cavity Walling
 
Cavity walls
Cavity wallsCavity walls
Cavity walls
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
 
Student l1 cavity wall construction
Student l1 cavity wall constructionStudent l1 cavity wall construction
Student l1 cavity wall construction
 
ADVANTAGES OF CAVITY WALLS
ADVANTAGES OF CAVITY WALLSADVANTAGES OF CAVITY WALLS
ADVANTAGES OF CAVITY WALLS
 
Tutor l1 cavity wall construction
Tutor l1 cavity wall constructionTutor l1 cavity wall construction
Tutor l1 cavity wall construction
 
How to build a besser block wall
How to build a besser block wallHow to build a besser block wall
How to build a besser block wall
 
Merged document
Merged documentMerged document
Merged document
 
Construction, Chemicals and Waterproofing
Construction, Chemicals and Waterproofing Construction, Chemicals and Waterproofing
Construction, Chemicals and Waterproofing
 
Groundworks and Civil Engineering Products
Groundworks and Civil Engineering ProductsGroundworks and Civil Engineering Products
Groundworks and Civil Engineering Products
 
Structural engineer s pocket book
Structural engineer s pocket bookStructural engineer s pocket book
Structural engineer s pocket book
 
Tutor l1 brickwork bonding
Tutor l1 brickwork bondingTutor l1 brickwork bonding
Tutor l1 brickwork bonding
 
Masonry Components
Masonry ComponentsMasonry Components
Masonry Components
 
Brick and Block Cavity Wall
Brick and Block Cavity WallBrick and Block Cavity Wall
Brick and Block Cavity Wall
 
Auditorium
AuditoriumAuditorium
Auditorium
 
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and StoneAncon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
 
RECORDING STUDIO ACOUSTICS
RECORDING STUDIO ACOUSTICSRECORDING STUDIO ACOUSTICS
RECORDING STUDIO ACOUSTICS
 
Walls timber-for slideshare
Walls timber-for slideshareWalls timber-for slideshare
Walls timber-for slideshare
 
Acoustics for a music studio
Acoustics for a music studioAcoustics for a music studio
Acoustics for a music studio
 
Neufert 3rd edition - Architect's Data
Neufert 3rd edition - Architect's DataNeufert 3rd edition - Architect's Data
Neufert 3rd edition - Architect's Data
 

Similaire à 1515-T_Drawings

House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsAyla Damon
 
Wakefield Avenue Congleton Rev B
Wakefield Avenue Congleton Rev BWakefield Avenue Congleton Rev B
Wakefield Avenue Congleton Rev BKen Crook
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSSin Byrne
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4siyabulela mxalisa
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsAyla Damon
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSSin Byrne
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlowTej Raj Upreti
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Lozier Scope of Work
Lozier Scope of Work Lozier Scope of Work
Lozier Scope of Work Nakul Kongovi
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurantkristienadana
 
Acotec installation in residential and commercial project
Acotec installation in residential  and commercial projectAcotec installation in residential  and commercial project
Acotec installation in residential and commercial projectShridhar Rao
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213Adam Barnett
 
Plan emira merignac 33700
Plan emira merignac 33700Plan emira merignac 33700
Plan emira merignac 33700Stephane Bounmy
 
false ceiling ppt.pptx
false ceiling ppt.pptxfalse ceiling ppt.pptx
false ceiling ppt.pptxSAKSHIVASWANI3
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolioAndrew Johnson
 

Similaire à 1515-T_Drawings (20)

House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & Elevations
 
Wakefield Avenue Congleton Rev B
Wakefield Avenue Congleton Rev BWakefield Avenue Congleton Rev B
Wakefield Avenue Congleton Rev B
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-Layouts
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
15-106 3
15-106 315-106 3
15-106 3
 
Lozier Scope of Work
Lozier Scope of Work Lozier Scope of Work
Lozier Scope of Work
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
Acotec installation in residential and commercial project
Acotec installation in residential  and commercial projectAcotec installation in residential  and commercial project
Acotec installation in residential and commercial project
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213
 
Plan emira merignac 33700
Plan emira merignac 33700Plan emira merignac 33700
Plan emira merignac 33700
 
false ceiling ppt.pptx
false ceiling ppt.pptxfalse ceiling ppt.pptx
false ceiling ppt.pptx
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolio
 

1515-T_Drawings

  • 1. Hall 1960 3695 4680 UTILITY SITTING ROOM Mat Well ENTRANCE HALL BATHROOM BEDROOM BEDROOM BOOT ROOM DINING AREA LIVING AREA KITCHEN Proposed 2- storey extension Remove existing door, build up wall, insert new full height toughened glazed window to detail. Make good all works Remove existing window, build up wall, insert new corner window with steel beams over and steel column for support. Make good all works 4723 2805 2030 3120 1025 2515 3120 Demolish existing sub-standard extension Break out existing wall and form new window ope Block up existing window Remove part of existing 700mm solid wall and doorway, Steel Beam over to specification. Remove existing wall and window and install new bi-folding doors with steel above to form new opening to evening patio Install new Velux rooflights to new roof Open Ceiling to roof of extension Break open existing wall, remove patio door and install new bifolding door system Large Velux rooflight tunnels, either side of ridge Evening Patio +Open Ceiling to underside of eaves +2.45m high flat ceiling HOT-PRESS WC Area of ground floor extension = 34.66m2 Area of first floor extension = 22.08m2 Total floor area of extension = 56.74m2 15714 3300 3680 1060 800 2080 7600 4826 4330 280 3199 3550 9588 8170 500 2 No. Velux rooflight, either side of ridge Remove existing door and replace with Toughened glass window Remove existing window, block up and make good all works NOTE: All existing windows to be removed and replace with double/triple glazed 'Low E' Argon filled windows New full height toughened glazed window to detail. Make good all works +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height Break out part of existing wall, window to form new entrance hall and stairway Break open existing wall, insert new door to access proposed extension 2 No. window opes to be reduced to accomodate kitchen worktops, new windows 1100mm high 3800 Triple Glazed Argon Filled Low-E, U-PVC Windows as per Spec. Min U-Value 1.4 W/m2K 320mm Cavity Wall filled with 80mm HD Insulation (Kooltherm K5 EWB or equal & approved), to achieve a min U-Value of 0.15 W/m2K. Sand & Cement Plaster to act as airtight layer internally. Concrete Path around New Extension, to provide level access to Front Door . ACO drain to be installed in front of Door. Fully Accessible Front Door with glazed screen. Velux Window. Min U0-Value 1.4 W/m2K. Light Tunnel to kitchen. Boxed Out in Plasterboard. Insulation Layer and AirTight Membrane to continue around light tunnel to ensure continuity of both between ceiling level and window. New ESB Meter located in original position Accessible Guest Bathroom. Toilet CL located min 400mm from wall. 1200x750mm Clear Space Stairs to Architect/Client's Detail. Hardwood Handrail. 15 Steps of Equal Rise from GF FFL to FF FFL (Approx 190mm Rise, 220mm Going) SCALE 1:50 @ A1, 1:100 @ A3 Proposed floor area extension = 34.66m2 5 GROUND FLOOR PLAN NOTES: Foundations Width of foundations to be at least 3 times width of external walls, min 1 layer of A393 Mesh. Ground Floor 75mm Screed on Min. on 125mm Thick 25N20 Slab on 100mm Kingspan Kooltherm Floorboard (or similar) on Radon Barrier. on 50mm sand blinding. on Min 250mm Hardcore filling (Clean permeable granular fill) compacted in layers of 225mm. Existing floors to be leveled and made good. Existing floor in the proposed kitchen area to be insulated 100mm insulation, to be approved,with 75mm screed over and made good. Explore further, as this will reduce ceiling heights in dining and living areas or create steps. Client's preference is final. First Floor 225mm x 44mm Timber Floor Joists at 350mm Centres. Bridging at 1200mm centres. 12.5mm plasterboard fixed to the underside of joists and surface skimmed. Wall Construction 320mm Cavity Wall, 100mm block inner leaf, 80mm HD Insulation (Kooltherm K5 EWB or equal & approved) fixed securely to inner leaf over full height of wall, and 100mm coloured render blockwork outer leaf, to achieve a min U-Value of 0.15 W/m2K. Windows: Aluclad Frames. Low E Argon Filled. Win Min U-Value 1.4 W/m2K Door Min U-Value 1.6 W/mwK All windows to comply with Current Building Regulations TGD Part B re Escape ope - Min 850mm high x 550 wide, Min 800 above floor level. Max 1100 above floor level. All rooms to have background ventilation to the outside. Pitched Roof Construction: Tiles to be laid to Manufacturers's Instructions. on 55 x 33mm Battens on Breather Membrane, On Proprietary Roof Trusses to spec & manufacturer's design. Roof Insulated at ceiling Level with 300 mm Fibre Insulation between and over joists, to achieve a min U-value of U=0.13 W/m2K. Eaves > Ridge Ventilation. Solar Panels To be positioned on the back or side elevations as required for a SE/SW orientation. Thermal - 2.5m long x 2.0m high - 30 Evacuated Tubes. PV - 1.6m long x 1 m high. Granite cills to windows on front elevation only, Widows W1,W2,W3,W4,W5, W6,W7. Existing chimney stack, hearth, fireplace and all associated to be decommissioned, demolished and removed. Make good all works. Walls, on both side of existing fireplace, to be set back in line with each other, and new wall in place of chimney breast, to create one new flushed wall. Make good all works. Refer to Detail A, boxing in of existing random rubble wall, conc. ring beam, to create a flushed finished wall from floor to open ceiling. Existing alcove to be filled in, plasterboard, painted etc. to match exising/proposed wall Refer to Detail A, boxing in of existing random rubble wall, conc. ring beam, to create a flushed finished wall from floor to open ceiling. Retain exsiting alvove, open to floor level, create shelving throughout. Make good all works. Doors or open shelving as per client's spec. Existing double breasted chimney, stack, hearth, fireplace and all associated to be decommissioned, demolished and removed. Make good all works. Investigate ceiling heights on site with B.Surv. Remove superficial non-structural ceiling beams Remove superficial/decorative, non-structural, timber ceiling beams Retain all existing structural beams, box in with plasterboard. Create flush finish. 1000mm concrete footpath around existing dwelling and proposed extension, as shown. Ground levels to reduced/built up around existing dwelling and extension, as required, to create equal levels throughout. Levels to allow for 150mm high footpath riser and 150mm single step riser to external doors. 1000mm concrete footpath around existing dwelling and proposed extension, as shown. Ground levels to reduced/built up around existing dwelling and extension, as required, to create equal levels throughout. Levels to allow for 150mm high footpath riser and 150mm single step riser to external doors. Finished Floor Level +0.300 Path Level +0.150 Ground Level +0.000 Tile finish to Client's Spec. 2no203x133x30kgsteelbeamovertoengineer'sdetail 2no 203x133x30kg steel beam over to engineer's detail 2no 203x133x30kg steel beam over to engineer's detail Tile finish to Client's Spec. Tile finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Tile finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. 1no203x133x30kgsteelbeamovertoengineer'sdetail SVP AJ GG GGGGGG GG GG GG GG AJ To Soakpit AJ To Soakpit SVP SVP MH MH MH MH To New Wastewater Treatment System PublicWatermain Proposed Boiler House Extract vents (8 No 9" x 3" (8000mm2) Wall vent to match colour of External render / wall finish. ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 20/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS2 TITLE: TENDER T-001 1/100 GROUND FLOOR PLAN JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 2. MASTER BEDROOM Landing 4205 VOID TO ENTRANCE HALL BELOW Walk-in Wardrobe (linen storage) En-Suite Lower existing window ope & cill level and install new window BEDROOM 2 LINEN-PRESS 1488 2no. Velux rooflights above entrance hall 4911 3280 2191 1850 4899 1350 900 Install new Velux rooflights to existing roof Install new Velux rooflight to existing roof Install new Velux rooflight to existing roof SHOWER ROOM OFFICE Existing ceilings on first floor level to be raised to min. 2.4m high 3449 4558 1909 3114 Elec. Shower 80mm Acoustic Insulation to existing timber partitions forming dormer roof 100mm Timber Stud Wall, with Acoustic Insulation. Landing 100mm Timber Stud Wall, with Acoustic Insulation to form new linen store in dormer roof. A Lower existing window ope & cill level and install new window 320mm Cavity Wall filled with 80mm HD Insulation (Kooltherm K5 EWB or equal & approved), to achieve a min U-Value of 0.15 W/m2K. Sand & Cement Plaster to act as airtight layer internally. A FIRST FLOOR PLAN B B 6 SCALE 1:50 @ A1, 1:100 @ A3 Proposed floor area extension = 22.08m2 1735 1047 2630 Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Wooden Floor finish to Client's Spec. Tile finish to Client's Spec. Tile finish to Client's Spec. SVP ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 19/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS2 TITLE: TENDER T-002 1/100 FIRST FLOOR PLAN JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 3. 5920 2423 Large Velux rooflight tunnels, either side of ridge Install new Velux rooflights to new roof Widen ope, lower existing window cill level and install new window Remove existing door, build up wall, insert new full height toughened glazed window to detail. Make good all works Remove existing window, build up wall, insert new corner window as shown. Make good all works Proposed 2- storey extension 1100 Moulded Plinth to Match Window Surround. Coloured Nap Render as per Spec Paving Rising at Max 1:20 slope to provide level access to front door. ACO drain to be installed in front of Door. Fully Accessible Front Door with glazed screen. Refer to Door Schedule. SCALE 1:50 @ A1, 1:100 @ A3 FRONT ELEVATION 1 W1 W2 W4 W6 W7 W9 W15 W16 W17 W18 W19 D1 5996 2498 2653 4032 Install new Velux rooflights to new roof 2 No. Velux rooflight, either side of ridge New corner window as shown. Make good all works Proposed 2- storey extension 2800 SCALE 1:50 @ A1, 1:100 @ A3 4 SIDE ELEVATION W9 W10 W11 W21 W22 W23 W20 W1W5 W8 6150 2653 4032 5528 Large Velux rooflight tunnels, either side of ridge Remove existing door and replace with Toughened glass window Break open existing wall, remove patio door and install new bifolding door system W12 W13 W25 W24 W27 W11 W26 D3 Remove existing wall and window and install new bi-folding doors with steel beam above to form new opening to evening patioRemove existing window, block up and make good all works 2 No. Velux rooflight, either side of ridge Solar Panels to be positioned on the back or side elevations as required for a SE/SW orientation. Thermal - 2.5m long x 2.0m high - 30 Evacuated Tubes. PV - 1.6m long x 1 m high. See M&E Spec for Exact Quantities. and Specification SCALE 1:50 @ A1, 1:100 @ A3 SIDE ELEVATION 3 W14 D2 W3 W28 ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 14/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS1 TITLE: TENDER T-003 1/100 ELEVATIONS JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 4. Trial Hole T2 T3 T1 p3 P2 P1 7017 2300mm 9000 1000 1000 5231 157097 143871 11398 71627 13792 8434 2814 40720 132360 15216 7959 Location of Public Site Notice Existing Recessed Entrance to Dwelling Existing Dwelling Existing Garden Proposed Aswaflow Treatment System and Percolation Area supplied and installed as per Molloy Precast Specifications Existing mature boundary Existing mature boundary Proposed extension A A +98.55 Existing Dwelling FFL +98.35 FRH +104.27 FFL +98.30 FRH +104.22 +98.15 +98.15 +98.30 +98.20 +98.90 +98.95 +98.90 +99.00 +99.10 +99.00 +99.10 +99.00 Existing Dwelling Proposed saokaway Existing saokaway Existing septic tank to be decomissioned & removed from site 7714 Existing mains waterline Existing septic tan area Existing septic tank & percolation area Flow of water ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 20/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE. PROJECT TITLE: TENDER T-004 1/500 SITE LAYOUT PLAN JAMES & CARMEL O'BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com Extension to side of dwelling, minor alterations to elevations, installation of a new wastewater treatment system
  • 5. Trial Hole T2 T3 T1 p3 P2 P1 7017 2300mm 9000 1000 1000 5231 157097 63102 143871 11398 71627 13792 8434 2814 40720 132360 15216 7959 Location of Public Site Notice Existing Recessed Entrance to Dwelling Existing Dwelling Existing Garden Aswaflow Treatment System and Percolation Area supplied and installed as per Molloy Precast Specifications Existing mature boundary Existing mature boundary Existing mature boundary Existing mature boundary Site under application outlined in red Proposed extension A A +98.55 Proposed Extension FFL +98.35 FRH +104.27 FFL +98.30 FRH +104.22 +98.15 +98.15 +98.30 +98.20 +98.90 +98.95 +98.90 +99.00 +99.10 +99.00 +99.10 +99.00 +99.10 +99.30 +99.40 +99.40 +99.60 +99.90 +99.60 +100.10 +99.70 +100.00 Existing Neighbouring Dwellings Proposed saokaway Existing saokaway Existing septic tank to be decommissioned and removed 7714 Existing mains waterline Existing septic tank & percolation area Existing septic tank & percolation area ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 20/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE. PROJECT TITLE: TENDER T-005 1/1000 SITE LAYOUT PLAN JAMES & CARMEL O'BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com Extension to side of dwelling, minor alterations to elevations, installation of a new wastewater treatment system
  • 6. ROAD gl98.100 gl98.900 Proposed Extension F.R.H. = 81.901 1/200 fall Inlet pipe: I.L. 97.685 Site Boundary Aswaflow Treatment System Proposed percolation area gl97.900 gl98.150 gl98.200 gl98.450 Outlet Pipe: I.L. 74.875 Percolation pipe: I.L. 97.784 300mm topsoil on Geotextile membrane, on 150mm subsoil on, 100mm dia. percolation pipe, on 300mm subsoil Longitudinal Site Section Scale 1:250 Proposed Extension F.F.L.=75.75 Existing Ground Level 75.60 2450 2300 1800 1725 1/100 fall 1/100 fall 550 300 2188 Base of percolation trench Base of trial hole, no watertable encountered 3676 2339 3073 950 Discharge hose Aerator Siphon hose Input Outlet 2300mm AJ's to be installed by others. Grade pipes only at 1:200 Protected flushing valve & inspection cambers AJ's to be installed by others. Treatment System & Percolation Area - Plan Scale 1:100 ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 20/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE. PROJECT TITLE: TENDER T-006 1/500 LONGITUDINAL SITE SECTION A-A PERCOLATION DETAILS JAMES & CARMEL O'BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com Extension to side of dwelling, minor alterations to elevations, installation of a new wastewater treatment system Typical Section through Percolation Area Scale nts Section through Treatment System Scale nts
  • 7. SCALE 1:50 @ A1, 1:100 @ A3 Proposed floor area extension = 34.66m2 5 FOUNDATION PLAN Radon: Max distance to radon sump of 15m. Max area 250m2. Cross Vent Gaps to be left in rising walls to allow Radon Gas to reach the Radon Sump. Gap to be 12,500 mm2 per metre run of wall (eg a quarter of a block in each 4 block length. 75mm Screed on Min. on 125mm Thick 25N20 Slab on 100mm Kingspan Kooltherm Floorboard (or similar) on Radon Barrier. on 50mm sand blinding. on Min 250mm Hardcore filling (Clean permeable granular fill) compacted in layers of 225mm. Radon Sump Proprietary Collection Box for max 250sqm floor area (max distance 15m). terminates outside and is capped. 320mm Cavity Wall on 960 x 300mm Reinforced Concrete Foundations with min 1 layer of A393 Mesh. See Foundation Detail 1. Cross Vent Gaps to be left in rising walls to allow Radon Gas to reach the Radon Sump as per Building Regulation Requirements. Gap to be 12,500 mm2 per metre run of wall (eg a quarter of a block in each 4 block length. 100mm Blockwork Wall on 700mm x 300mm Reinforced Concrete Foundations with min 1 layer of A393 Mesh. See Foundation Detail 2. 215mm Blockwork Wall on 815mm x 300mm Reinforced Concrete Foundations with min 1 layer of A393 Mesh. See Foundation Detail 3. . 215mm Blockwork Wall on 815mm x 300mm Reinforced Concrete Foundations with min 1 layer of A393 Mesh. See Foundation Detail 3. . Radon: Max distance to radon sump of 15m. Max area 250m2. Cross Vent Gaps to be left in rising walls to allow Radon Gas to reach the Radon Sump. Gap to be 12,500 mm2 per metre run of wall (eg a quarter of a block in each 4 block length. ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 06/06/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS1 TITLE: TENDER T-007 1/100 FOUNDATION PLAN JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 8. 1065 300 980180 75mm Screed on Min. on 125mm Thick 25N20 Subfloor Slab All Services Laid Prior To Pouring & Power Floated To Smooth Level Finish S&C Screed is Airtight Layer - to be fully sealed and taped to wall prior to S&C plastering. 165mmCavity Wall filled with 120mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. 300x 1050mm Reinforced Concrete Foundation below 350mm Cavity Wall 25N20 Concrete, with min 1 Layer of A393 Mesh. 25mm High Density Vertical Insulation separating the warm concrete slab from the structural wall. Lightweight Concrete Blocks to be used where the insulation layer meets the wall. Min. 120mm HD Floor Insulation - K3 Kooltherm Floorboard or equal and approved. 1200 Gauge D.P.M Laid to Manufacturers Instructions. Proprietary Radon Barrier, Continuous with all joints lapped and sealed, and with the appropriate number of sumps and outlets. Foundation Detail 1 SCALE 1:10 @ A1, 1:20 @ A3 1 Min 50mm Sand Blinding. Min 250mm Hardcore Filling (Clean graded crushed stone) Compacted in Layers of 225mm. Radon Pipe 100mm pipe to sump Pipe Terminates outside and is capped. All penetrations of radon layer sealed with resisting sealing tape. Fountation Depth and Hardcore Depth vary due to sloping site. Refer to Long Section, T03 Drawing 2 for more info. Formation Level -1200mm 300 75mm Screed on Min. on 125mm Thick 25N20 Subfloor Slab All Services Laid Prior To Pouring & Power Floated To Smooth Level Finish 300x 700mm Reinforced Concrete Foundation below Single Leaf Blockwork Wall. 25N20 Concrete, with min 1 Layer of A393 Mesh. 25mm High Density Vertical Insulation separating the warm concrete slab from the structural wall. Min. 120mm HD Floor Insulation - K3 Kooltherm Floorboard or equal and approved. 1200 Gauge D.P.M Laid to Manufacturers Instructions. Proprietary Radon Barrier, Continuous with all joints lapped and sealed, and with the appropriate number of sumps and outlets. Min 35mm Sand Blinding. Min 250mm Hardcore Filling (Clean graded crushed stone) Compacted in Layers of 225mm. 700 25012012575 Foundation Detail 2 SCALE 1:10 @ A1, 1:20 @ A3 2 495 Formation Level -1200mm Lightweight Concrete Blocks to be used where the insulation layer meets the wall. 300 75mm Screed on Min. on 125mm Thick 25N20 Subfloor Slab All Services Laid Prior To Pouring & Power Floated To Smooth Level Finish 300x 815mm Reinforced Concrete Foundation below 215mm Blockwork Wall. 25N20 Concrete, with min 1 Layer of A393 Mesh. 25mm High Density Vertical Insulation separating the warm concrete slab from the structural wall. Lightweight Concrete Blocks to be used where the insulation layer meets the wall. Min. 120mm HD Floor Insulation - K3 Kooltherm Floorboard or equal and approved. 1200 Gauge D.P.M Laid to Manufacturers Instructions. Proprietary Radon Barrier, Continuous with all joints lapped and sealed, and with the appropriate number of sumps and outlets. Min 35mm Sand Blinding. Min 250mm Hardcore Filling (Clean graded crushed stone) Compacted in Layers of 225mm. 815 25012012575 Foundation Detail 3 SCALE 1:10 @ A1, 1:20 @ A3 3 495 240 Formation Level -1200mm ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 04/06/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS2 TITLE: TENDER T-D-001 As Shown JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com FOUNDATION AND FLOOR DETAILS ACCEPTABLE CONSTRUCTION DETAILS Sign off required to ensure Thermal Bridging Value
  • 9. 165mmCavity Wall filled with 120mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. Insulation to be secured firmly against the innter leaf of the cavity. 225mm x 44mm Timber Joists (C16) at 350mm Centres, supported on wall hangers. To take floor loadings as noted in Specification. Allow for min 12mm Carpet on 18mm Plywood. Thicknesses as noted in Specification. 12.5mm Proprietary Fire Grade Plasterboard with joints taped and filled and backed by timber with Skim Finish to Ceilings, as noted in Specification. Airtight layer must continue past intermediate floor, either through continuous S&C render layer or through installation of airtight membrane taped to primed blockwork prior to fitting joist hangers. Acoustic Insulation to be fitted between Joists to reduce sound transfer between rooms.. 165mmCavity Wall filled with 120mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. Insulation to be secured firmly against the innter leaf of the cavity. 75mm Screed to first floor. All services to be laid in screed. Carpet on Substrate. Thicknesses as noted in Specification. 50mm Timber Lats to be fixed to underside of concrete floor to provide zone for services. 12.5mm Plasterboard with Skim Finish to Ceilings, as noted in Specification. Airtight layer must continue past intermediate floor, either through continuous S&C render layer or through installation of airtight membrane taped to primed blockwork prior to installing the concrete slab. 85mm Wide Reinforced Concrete Slab with A142 Mesh, on Floor Hangers. To take floor loadings as noted in Specification. First Floor Detail 1 SCALE 1:10 @ A1, 1:20 @ A3 1 First Floor Detail 2 SCALE 1:10 @ A1, 1:20 @ A3 2 INTERMEDIATE FLOOR DETAILS ACCEPTABLE CONSTRUCTION DETAILS Sign off required to ensure Thermal Bridging Value ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 04/06/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS TITLE: TENDER T-D-002 As Shown JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 10. 165mmCavity Wall filled with 120mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. Insulation to be secured firmly against the innter leaf of the cavity. Timber Stud Partition. 100mm x 44mm Timber Joists (C14) at 400mm Centres. 12.5mm Proprietary Fire Grade Plasterboard with joints taped and filled and backed by timber with Skim Finish to Ceilings, as noted in Specification. Acoustic Insulation to be fitted between Studs to reduce sound transfer between rooms.. 165mmCavity Wall filled with 120mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. Insulation to be secured firmly against the innter leaf of the cavity. 100mm Blockwork Wall, with Sand and Cement Render on Both Sides to form airtight layer. 12.5mm Plasterboard to both sides. Moisture Resistant Plasterboard to be used in wet rooms, eg bathrooms, ensuites etc. 165mmCavity Wall filled with 120mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. Insulation to be secured firmly against the innter leaf of the cavity. 215mm Blockwork Separating Wall to Semi-D, with Sand and Cement Render on Both Sides to form airtight layer. 15mm Firmacell Boards at Party Wall for Additional Sound Insulation. Ensure Insulation is firmly secured against the inner leaf of cavity wall, as per manufacturers instructions. Proprietary Cavity Closer between houses, to suit width of the cavity (165mm), to be fitted to manufacturers instructions. Ensure Insulation continues across the abutment zone, and is firmly secured against the inner leaf of cavity wall, as per manufacturers instructions. All penetrations through the air tight layer to be full sealed. All penetrations through the air tight layer to be full sealed. External Wall to be Sand and Cement Rendered before fixing Stud Partitions to ensure continuity of air tight layer. All penetrations through the air tight layer to be full sealed. Wall Junction Detail 1 SCALE 1:10 @ A1, 1:20 @ A3 1 Wall Junction Detail 2 SCALE 1:10 @ A1, 1:20 @ A3 2 Wall Junction Detail 3 SCALE 1:10 @ A1, 1:20 @ A3 3 Where fire-rating is required for compartmentation in Semi-D (See Drawings), Standard Blockwork should suffice. Ensure all penetrations are fully sealed. Where fire-rating is required to partitions for compartmentation in Semi-D, (see drawings) Ensure 12.5mm Plasterboard with all joints taped and filled, on either side of Timber Stud Partition (44mm Timber Studs at 400mm Centres.) WALL TYPES AND JUNCTIONS INTERMEDIATE FLOOR DETAILS ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 04/06/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS TITLE: TENDER T-D-003 As Shown JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 11. 2 Coats Sand & Cement Plaster With Napped Finish. Wall Ties - min 4.9 per sq m. as noted in Specification 100mm Block Inner Leaf Steelite Lintel to fully close cavity 320mm Cavity to include 80mm Kooltherm K5 EWB (or equal and approved) 100mm Block Outer Leaf Triple Glazed Low-e, Argon Filled Window. Min U-Value 1.4W/m2K. Fitted in the Line of the Insulation. Stepped DPC Weathered and Throated Cill on DPC. Hardwood Window Board Carefully Fitted HD Insulation to minimize thermal bridges. Thermal resistance through the cavity closer of not less than 0.45 m2K/W. Wall Ties - min 4 per sq m. As noted in Specification 100mm Block Inner Leaf 100mm Brick Outer Leaf (where noted on elevations) Triple Glazed Low-e, Argon Filled Window. Min U-Value 1.4W/m2K. Fitted in the Line of the Insulation. Stepped DPC Weathered and Throated Cill on DPC. Hardwood Window Board Carefully Fitted HD Insulation to minimize thermal bridges. Moulded Window Surround / Lintel Reinforced Precast Concrete Lintel 120mm Cavity to include 80mm Kooltherm K5 EWB (or equal and approved) Window Detail 1 SCALE 1:10 @ A1, 1:20 @ A3 1 Window Detail 3 SCALE 1:10 @ A1, 1:20 @ A3 3 Proprietary Cavity Closer to ensure compliance with fire regulations. Insulation tightly fitted to close cavity To eusure the cavity is fully closed, Plasterboartd to be tightly fitted to the underside of the lintel and tight against the window frame, with skim coat plaster finish. Triple Glazed Low-e, Argon Filled Window. Min U-Value 1.4W/m2K. Fitted in the Line of the Insulation. Airtight Membrane to extend from blockwork wall (where not S&C rendered), to be sealed to Window Frame with Air Tight Tape. Proprietary Cavity Closer or Block of Insulation to insure the insulation layer remains continuous between the wall insulation and the window and ensure fully sealed for fire regs. Min 150mm Wide Vertical DPC to be installed against outer leaf and firmly fixed in position. Triple Glazed Low-e, Argon Filled Window. Min U-Value 1.4W/m2K. Fitted in the Line of the Insulation. Airtight Membrane to extend from blockwork wall (where not S&C rendered), to be sealed to Window Frame with Air Tight Tape. Proprietary Cavity Closer or Block of Insulation to insure the insulation layer remains continuous between the wall insulation and the window and to ensure fully sealed for fire regs. Min 150mm Wide Vertical DPC to be installed against outer leaf and firmly fixed in position. Moulded Window Surround to be provided where indicated on elevations. Window Detail 2 SCALE 1:10 @ A1, 1:20 @ A3 2 Window Detail 4 SCALE 1:10 @ A1, 1:20 @ A3 4 100mm Block Inner Leaf 100mm Brick Outer Leaf (where noted on elevations) New Triple Glazed Door Min U-Value 1.3W/m2K. Fitted in the Line of the Insulation. Stepped DPC Moulded Window Surround / Lintel Reinforced Precast Concrete Lintel 120mm Cavity to include 80mm Kooltherm K5 EWB (or equal and approved) Wall Ties - min 4 per sq m. As noted in Specification 75mm Screed on Min. on 125mm Thick 25N20 Subfloor Slab All Services Laid Prior To Pouring & Power Floated To Smooth Level Finish S&C Screed is Airtight Layer - to be fully sealed and taped to wall prior to S&C plastering. 25mm High Density Vertical Insulation separating the warm concrete slab from the structural wall. Lightweight Concrete Blocks to be used where the insulation layer meets the wall. Min. 120mm HD Floor Insulation - K3 Kooltherm Floorboard or equal and approved. 1200 Gauge D.P.M Laid to Manufacturers Instructions. Proprietary Radon Barrier, Continuous with all joints lapped and sealed, and with the appropriate number of sumps and outlets. Finished Level of Flooring Concrete Cill with max slope of 15 degrees. Max threshold height of 15mm where level access is required. Aco Drainage Channel or Equal and Approved where Level Access Threshold Provided. Door unit to have proprietary lower threshold system as required where level access requirement is noted on drawings. Door Threshold Detail SCALE 1:10 @ A1, 1:20 @ A3 5 Min. 120mm HD Floor Insulation - K3 Kooltherm Floorboard or equal and approved. 1200 Gauge D.P.M Laid to Manufacturers Instructions. Proprietary Radon Barrier, Continuous with all joints lapped and sealed, and with the appropriate number of sumps and outlets. Concrete Cill with max slope of 15 degrees. Max threshold height of 15mm where level access is required. Aco Drainage Channel or Equal and Approved where Level Access Threshold Provided. 75mm Screed on Min. on 125mm Thick 25N20 Subfloor Slab All Services Laid Prior To Pouring & Power Floated To Smooth Level Finish S&C Screed is Airtight Layer - to be fully sealed and taped to wall prior to S&C plastering. 25mm High Density Vertical Insulation separating the warm concrete slab from the structural wall. Lightweight Concrete Blocks to be used where the insulation layer meets the wall. Triple Glazed Low-e, Argon Filled Window. Min U-Value 1.4W/m2K. Fitted in the Line of the Insulation. Full Height Glazing Detail SCALE 1:10 @ A1, 1:20 @ A3 6 Steelite Lintel to fully close cavity 100mm Block Outer Leaf Triple Glazed Low-e, Argon Filled Window. Min U-Value 1.4W/m2K. Fitted in the Line of the Insulation. Stepped DPC Lightweight Concrete Blocks to be used where the insulation layer meets the wall. Airtight Membrane taped to Window Frame, and taped back to primed blockwork wall at first floor level. WINDOWS AND DOORS DETAILS - HEAD, CILL AND JAMB. ACCEPTABLE CONSTRUCTION DETAILS Sign off required to ensure Thermal Bridging Value ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 04/06/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS TITLE: TENDER T-D-004 As Shown JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com
  • 12. Slates to be laid to Manufacturers's Instructions. 50mm Clear Ventilation Gap Using Proprietary Spacers Under Sarking Felt Where Necessary Along Eaves Black PVC Soffit and Fascia, with Vent to provide continuous air ventilation gap to cold roof space. 120mmCavity Wall filled with 80mm HD Insulation (Kooltherm K5 EWB or equal and approved to achieve a minimum U-Value of 0.15 W/m2K. 55 x 33mm Battens on Breather Membrane 2 Coats Sand & Cement Plaster With Napped Finish on 100mm Block Outer Leaf Slate Cavity Closer. Black PVC Gutters and Downpipes, Laid and Fixed to Manufacturer's Instructions Sarking Felt to lap into Gutter. Min 300mm Insulation between and above Ceiling Joists to Continue down to insulation in wall, providing a continuous insulation layer. 225mm Rafters to be Strapped to wall with 30x5mm Galvanised Straps. 100 x 75mm Wall Plate with 12mm Rawl bolts @ 1m Centres. 12.5mm Sand & Cement Plaster Layer to 100mm Inner Blockwork Wall. S&C Plaster acts as airtight layer, all penetrations to be sealed and plastered over. Airtight Membrane at Ceiling Level (on Warm Side of Insulation), above Plasterboard Ceiling. - All penetrations to be taped and sealed. AIrtight Layer membrane to be taped down to blockwork wall before plastering and plastered over to seal. Continuous Insulation between Wall and Roof. Roof Detail 1 SCALE 1:10 @ A1, 1:20 @ A3 1 Additional Wall Ties at top of Wall to firmly tie two leaves of cavity wall together ROOF DETAILS ACCEPTABLE CONSTRUCTION DETAILS Sign off required to ensure Thermal Bridging Value ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 04/06/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS TITLE: TENDER T-D-006 As Shown JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: mark@dalyhudson.com E-mail: jolene@dalyhudson.comwww.dalyhudson.com