STEEL CITY MAFIA
MIHIR SANGODKAR
AISHWARY KUMAR GUPTA
NISHA JAIN
XLRI
Jamshedpur
IIMB
RAN-NEETI
2016
2
22 days
Number of days to
raise PO and take
delivery of raw
material62%
Percentage of
bottlenecks occurring
during Procurement
75%
Time spent in non
value adding process
Year 2014 -15
75
650% increase
Line stoppages per
year
Production
Capacity of ABC
Motors Ltd
2 Million
CASE FACTS
8.7% Growth rate of Indian auto industry
23.4 Million Production of vehicles in 2014 -15
13% Passenger vehicles as % of automobiles
81% Market share of 2 wheelers in auto industry
7.1% auto industry as percentage of GDP
15% Increase in auto exports
INDUSTRY ANALYSIS
SOP currently followed by Procurement Team
PO raised by Line
Manager
Approval of PO from
Production Head
Approval of PO from
Procurement
Department
Approval from Finance
Dept. & Procurement Head
and PO is issued to Vendor
Vendor commences
production as per order
Vendor starts production for the
order. Quality Department
checks quality of material.
Daily raw material
consumption to be
punched in MRP system
Once the quantity reaches
the reorder point, a
Purchase order is
generated automatically up
to the extent of maximum
inventory
PO issued to Vendor &
production commences
Order received from
vendor is checked by the
Quality Department &
supplied to Production
Department
Mean time of 11 Days for PO to reach vendor out of
which ~8 days wasted in Non-Value Added activities
01
Vendor unaware of order quantity leading to inflated
lead times
02
Varying specifications leads to delay from vendor
03
Production schedule not made available to vendor
04
Production schedule to be decided on fortnightly basis by a cross-functional
team of production and procurement team & shared with vendor
01
Material Resource Planning Module should be implemented. Automatic
requisition will be raised for consumables based on reorder quantity and
daily consumption quantities based on production schedule
02
Modified SOP for Procurement of raw materials
This will reduce approvals required for each and every PO and blanket
approval can be given by Production & Finance Team for a period of time.
03
STANDARD OPERATING PROCEDURE
THE PRODUCTION TEAM
PRODUCTION
TEAM
Production department wants the
Production team wants Procurement
team to respond to clarifications faster
The demand from production team is not
well defined.
The demand order by production does not
have a fixed schedule and is described as
“erratic”
Lack of Clarifications in the PRs by the
production team
Lack of luxury vendor options cause an
amplification of these ambiguities
Non Standard Order Techniques
Non Standard Order Quantitates
These cause the Vendors to not match the
order quantities having not synced with
the new installation capacity
Case Analysis
Date
Safety Stock
Required
31st Jan 3280
10th Feb 6560
1st May 8200
31st Jun 820
Safety Stock Calculations
5
VENDORS : DETAILED ANALYSIS
Cannot blame vendors as there is lack of
standardisation in quality requirements by the
production department
Lack of a penalty clause in Vendor Contract, in case
of delay in supply or quality issues, thus cannot
enforce deadlines
Dynamic production schedules and irregularity in
order time and quantity, thus cannot blame vendor
Lack of the option to switch to other vendor
Varying quality specifications and inability to forecast
demand due to unpredictable order quantities leading to
changes in vendor production levels
Irregularity and disparity in the demand cannot be a
reason to justify quality failures by the vendors.
Inability of the vendor to keep inventory, due to high
costs of holding inventory
Increased return of the inventory, without proper
mention of the policy requirements and changes.
ORGANIZATION STRUCTURE
PRODUCTION
DEPARTMENT
PROCUREMENT
DEPARTMENT
VENDOR
Production Planning to be done fortnightly,
to be shared with vendor
The Standard Operating Procedure
to be revised
Implement Purchase Order
Management Module
Implementation of Material Resource
Planning Module
Ensure order is of standard quantities at
periodic intervals
Vendor to be incentivized for on-
time full deliveries
Alternate vendors to be explored to
reduce the current bargaining
power of vendors
Contractual obligation for the
vendors to maintain specified levels
of safety stock
Strict quality control at vendor end
to ensure full deliveries
Penalty clause to be included in the
modified contract with vendors
RECOMMENDATIONS
THANK YOU

Contenu connexe

En vedette

Asian paints ylp final (1)
Asian paints ylp final (1)Asian paints ylp final (1)
Asian paints ylp final (1)Nivas Ramalingam
 
Patanjali: Business Model and effects on the FMCG sector in India
Patanjali: Business Model and effects on the FMCG sector in IndiaPatanjali: Business Model and effects on the FMCG sector in India
Patanjali: Business Model and effects on the FMCG sector in IndiaMihir Sangodkar
 
Hindustan Unilever Limited Marketing Strategies
Hindustan Unilever Limited Marketing StrategiesHindustan Unilever Limited Marketing Strategies
Hindustan Unilever Limited Marketing StrategiesKoushik Dutta
 
Marketing Strategies of HUL
Marketing Strategies of HULMarketing Strategies of HUL
Marketing Strategies of HULPiyush Gupta
 
HINDUSTAN UNILEVER LIMITED PPT
HINDUSTAN UNILEVER LIMITED PPT HINDUSTAN UNILEVER LIMITED PPT
HINDUSTAN UNILEVER LIMITED PPT FELIN FRANCIS
 
Research Project Report on Growth of Venture Capital Finance in India and Rol...
Research Project Report on Growth of Venture Capital Finance in India and Rol...Research Project Report on Growth of Venture Capital Finance in India and Rol...
Research Project Report on Growth of Venture Capital Finance in India and Rol...Piyush Gupta
 
What Makes Great Infographics
What Makes Great InfographicsWhat Makes Great Infographics
What Makes Great InfographicsSlideShare
 
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareSTOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareEmpowered Presentations
 
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingHow To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingContent Marketing Institute
 
Masters of SlideShare
Masters of SlideShareMasters of SlideShare
Masters of SlideShareKapost
 
10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation OptimizationOneupweb
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksSlideShare
 

En vedette (14)

Hul final ppt
Hul final pptHul final ppt
Hul final ppt
 
Asian paints ylp final (1)
Asian paints ylp final (1)Asian paints ylp final (1)
Asian paints ylp final (1)
 
Patanjali: Business Model and effects on the FMCG sector in India
Patanjali: Business Model and effects on the FMCG sector in IndiaPatanjali: Business Model and effects on the FMCG sector in India
Patanjali: Business Model and effects on the FMCG sector in India
 
Hindustan Unilever Limited Marketing Strategies
Hindustan Unilever Limited Marketing StrategiesHindustan Unilever Limited Marketing Strategies
Hindustan Unilever Limited Marketing Strategies
 
Marketing Strategies of HUL
Marketing Strategies of HULMarketing Strategies of HUL
Marketing Strategies of HUL
 
HINDUSTAN UNILEVER LIMITED PPT
HINDUSTAN UNILEVER LIMITED PPT HINDUSTAN UNILEVER LIMITED PPT
HINDUSTAN UNILEVER LIMITED PPT
 
Research Project Report on Growth of Venture Capital Finance in India and Rol...
Research Project Report on Growth of Venture Capital Finance in India and Rol...Research Project Report on Growth of Venture Capital Finance in India and Rol...
Research Project Report on Growth of Venture Capital Finance in India and Rol...
 
What Makes Great Infographics
What Makes Great InfographicsWhat Makes Great Infographics
What Makes Great Infographics
 
You Suck At PowerPoint!
You Suck At PowerPoint!You Suck At PowerPoint!
You Suck At PowerPoint!
 
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareSTOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
 
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content MarketingHow To Get More From SlideShare - Super-Simple Tips For Content Marketing
How To Get More From SlideShare - Super-Simple Tips For Content Marketing
 
Masters of SlideShare
Masters of SlideShareMasters of SlideShare
Masters of SlideShare
 
10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization10 Ways to Win at SlideShare SEO & Presentation Optimization
10 Ways to Win at SlideShare SEO & Presentation Optimization
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
 

Similaire à Steel City Mafia Tackles Auto Industry Bottlenecks

Vendor selection
Vendor selectionVendor selection
Vendor selectionaqsa fatima
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationDeekshitha HS
 
Assignment 1 opm
Assignment 1 opmAssignment 1 opm
Assignment 1 opmmaharakmal
 
Operations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleOperations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleIRJET Journal
 
Tsc case study.appliedmaterials supply chain
Tsc case study.appliedmaterials supply chainTsc case study.appliedmaterials supply chain
Tsc case study.appliedmaterials supply chainPR Reddy M
 
KukadeCv_1_-1_-_Copy_-_Copy
KukadeCv_1_-1_-_Copy_-_CopyKukadeCv_1_-1_-_Copy_-_Copy
KukadeCv_1_-1_-_Copy_-_CopyRavindra Kukade
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationShihabPatel
 
vendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdfvendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdfVaibhavwagh48
 
Continuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventoryContinuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventoryDr. Tapish Panwar
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalAndrew Si
 
Staying ahead of industry changes.pdf
Staying ahead of industry changes.pdfStaying ahead of industry changes.pdf
Staying ahead of industry changes.pdfSubrat Kumar Dash
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) Deepika V S
 
Avery Denisson case study (1).pptx
Avery Denisson case study (1).pptxAvery Denisson case study (1).pptx
Avery Denisson case study (1).pptxKajalJoshi40
 

Similaire à Steel City Mafia Tackles Auto Industry Bottlenecks (20)

Vendor selection
Vendor selectionVendor selection
Vendor selection
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Assignment 1 opm
Assignment 1 opmAssignment 1 opm
Assignment 1 opm
 
Operations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleOperations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) Cycle
 
Tsc case study.appliedmaterials supply chain
Tsc case study.appliedmaterials supply chainTsc case study.appliedmaterials supply chain
Tsc case study.appliedmaterials supply chain
 
KukadeCv_1_-1_-_Copy_-_Copy
KukadeCv_1_-1_-_Copy_-_CopyKukadeCv_1_-1_-_Copy_-_Copy
KukadeCv_1_-1_-_Copy_-_Copy
 
Resume 19-May
Resume 19-MayResume 19-May
Resume 19-May
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
vendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdfvendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdf
 
Cal Tech Presentation 2015
Cal Tech Presentation 2015Cal Tech Presentation 2015
Cal Tech Presentation 2015
 
Resume
Resume Resume
Resume
 
Continuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventoryContinuous replenishment and vendor managed inventory
Continuous replenishment and vendor managed inventory
 
Re Engineering
Re Engineering Re Engineering
Re Engineering
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-External
 
Staying ahead of industry changes.pdf
Staying ahead of industry changes.pdfStaying ahead of industry changes.pdf
Staying ahead of industry changes.pdf
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2)
 
Avery Denisson case study (1).pptx
Avery Denisson case study (1).pptxAvery Denisson case study (1).pptx
Avery Denisson case study (1).pptx
 
GMP-VENDORS SELECTION
GMP-VENDORS SELECTIONGMP-VENDORS SELECTION
GMP-VENDORS SELECTION
 
Resume_Arup Barman Roy
Resume_Arup Barman RoyResume_Arup Barman Roy
Resume_Arup Barman Roy
 

Dernier

call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书zdzoqco
 
如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一fjjwgk
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样whjjkkk
 
IPCR-Individual-Performance-Commitment-and-Review.doc
IPCR-Individual-Performance-Commitment-and-Review.docIPCR-Individual-Performance-Commitment-and-Review.doc
IPCR-Individual-Performance-Commitment-and-Review.docTykebernardo
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Forth
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreForth
 
(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一
(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一
(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一gfghbihg
 
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制miwhjk
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样umasea
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一F La
 
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Forth
 
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Program Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissProgram Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissForth
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书zdzoqco
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsMihajloManjak
 

Dernier (20)

call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
 
如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证书)加州大学欧文分校毕业证毕业证成绩单原版一比一
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
 
IPCR-Individual-Performance-Commitment-and-Review.doc
IPCR-Individual-Performance-Commitment-and-Review.docIPCR-Individual-Performance-Commitment-and-Review.doc
IPCR-Individual-Performance-Commitment-and-Review.doc
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
 
(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一
(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一
(USQ毕业证)南昆士兰大学毕业证学位证成绩单修改留信学历认证原版一比一
 
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一
 
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
 
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Program Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissProgram Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian Williss
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and Qualifications
 
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Servicesauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
 

Steel City Mafia Tackles Auto Industry Bottlenecks

  • 1. STEEL CITY MAFIA MIHIR SANGODKAR AISHWARY KUMAR GUPTA NISHA JAIN XLRI Jamshedpur IIMB RAN-NEETI 2016
  • 2. 2 22 days Number of days to raise PO and take delivery of raw material62% Percentage of bottlenecks occurring during Procurement 75% Time spent in non value adding process Year 2014 -15 75 650% increase Line stoppages per year Production Capacity of ABC Motors Ltd 2 Million CASE FACTS 8.7% Growth rate of Indian auto industry 23.4 Million Production of vehicles in 2014 -15 13% Passenger vehicles as % of automobiles 81% Market share of 2 wheelers in auto industry 7.1% auto industry as percentage of GDP 15% Increase in auto exports INDUSTRY ANALYSIS
  • 3. SOP currently followed by Procurement Team PO raised by Line Manager Approval of PO from Production Head Approval of PO from Procurement Department Approval from Finance Dept. & Procurement Head and PO is issued to Vendor Vendor commences production as per order Vendor starts production for the order. Quality Department checks quality of material. Daily raw material consumption to be punched in MRP system Once the quantity reaches the reorder point, a Purchase order is generated automatically up to the extent of maximum inventory PO issued to Vendor & production commences Order received from vendor is checked by the Quality Department & supplied to Production Department Mean time of 11 Days for PO to reach vendor out of which ~8 days wasted in Non-Value Added activities 01 Vendor unaware of order quantity leading to inflated lead times 02 Varying specifications leads to delay from vendor 03 Production schedule not made available to vendor 04 Production schedule to be decided on fortnightly basis by a cross-functional team of production and procurement team & shared with vendor 01 Material Resource Planning Module should be implemented. Automatic requisition will be raised for consumables based on reorder quantity and daily consumption quantities based on production schedule 02 Modified SOP for Procurement of raw materials This will reduce approvals required for each and every PO and blanket approval can be given by Production & Finance Team for a period of time. 03 STANDARD OPERATING PROCEDURE
  • 4. THE PRODUCTION TEAM PRODUCTION TEAM Production department wants the Production team wants Procurement team to respond to clarifications faster The demand from production team is not well defined. The demand order by production does not have a fixed schedule and is described as “erratic” Lack of Clarifications in the PRs by the production team Lack of luxury vendor options cause an amplification of these ambiguities Non Standard Order Techniques Non Standard Order Quantitates These cause the Vendors to not match the order quantities having not synced with the new installation capacity Case Analysis Date Safety Stock Required 31st Jan 3280 10th Feb 6560 1st May 8200 31st Jun 820 Safety Stock Calculations
  • 5. 5 VENDORS : DETAILED ANALYSIS Cannot blame vendors as there is lack of standardisation in quality requirements by the production department Lack of a penalty clause in Vendor Contract, in case of delay in supply or quality issues, thus cannot enforce deadlines Dynamic production schedules and irregularity in order time and quantity, thus cannot blame vendor Lack of the option to switch to other vendor Varying quality specifications and inability to forecast demand due to unpredictable order quantities leading to changes in vendor production levels Irregularity and disparity in the demand cannot be a reason to justify quality failures by the vendors. Inability of the vendor to keep inventory, due to high costs of holding inventory Increased return of the inventory, without proper mention of the policy requirements and changes. ORGANIZATION STRUCTURE
  • 6. PRODUCTION DEPARTMENT PROCUREMENT DEPARTMENT VENDOR Production Planning to be done fortnightly, to be shared with vendor The Standard Operating Procedure to be revised Implement Purchase Order Management Module Implementation of Material Resource Planning Module Ensure order is of standard quantities at periodic intervals Vendor to be incentivized for on- time full deliveries Alternate vendors to be explored to reduce the current bargaining power of vendors Contractual obligation for the vendors to maintain specified levels of safety stock Strict quality control at vendor end to ensure full deliveries Penalty clause to be included in the modified contract with vendors RECOMMENDATIONS