1  sur  26
Sonal Arora
Nishant Mittal
Gaurav Raizada
Shubham Gupta
Manisha Bhardwaj
SR.
NO.
T O P I C SLIDE
NO.
1 INTRODUCTION TO BULLET TRAIN
2 TYPES OF BULLET TRAIN
TECHNOLOGIES
3 PRODUCT MIX OF BULLET TRAIN
4 PRICE MIX OF BULLET TRAIN
5 PLACE MIX OF BULLET TRAIN
6 PROMOTION MIX OF BULLET
TRAIN
7 CONCLUSION
INTRODUCTION
Introduction
 High-speed rail / BULLET TRAIN is a type of rail transport significantly
faster than traditional rail traffic, using an integrated system of
specialized rolling stock and dedicated tracks.
 Started in JAPAN in 1964, From SHINKANSEN TO TOKYO, with speed of
145 Km/ Hr
BULLET TRAIN :In INDIA
•The proposed 534km Mumbai- Ahmedabad high-speed link,
which is in early stage of development, will be India's maiden high-
speed rail project. The decision to carry out its feasibility study was
taken in September 2013.
• During the Indian prime minister's visit to Japan in My 2013, the
prime ministers of both countries decided to co-finance a detailed
joint feasibility study for the Mumbai- Ahmedabad HSR. The Japan
Internal Cooperation Agency (JICA) was given the go-ahead for
the study in September 2013.
The Bullet Train Track
Type of Magnet Uses
This train uses superconducting electric magnets in the
vehicle to levitate and propel the train. These magnets
are cooled by liquid helium or liquid nitrogen. This
means that once electrified these magnets do not require
additional energy.
Seating Capacity & classes
 The train has three seprate classes namely buisness
class, green class, ordinary class.
 E 5 Series shinkansen train configured with ten cars
and has a capacity to carry 731 passenger.
 658 seats of ordinary class, 55 seats are of green class
and 18 seats are in buisness class.
Better for the Environment
 Less energy consumption because no rail-track friction
 Requires no fossil fuel which can harm the environment.
 Less noise pollution since the train never hits the track
 MagLev guideways and trains take up less space than
conventional trains
Two types of bullet train Technologies
 Electromagnetic suspension (EMS)
 Electrodynamic suspension (EDS)
Electromagnetic suspension (EMS)
In current electromagnetic suspension (EMS) systems,
the rail is situated between the upper and lower edges
and use electromagnets to levitate the train
Electrodynamic suspension (EDS)
In electrodynamic suspension (EDS), both the rail
and the train exert a magnetic field
COST
 According to news media, the costs for
constructing such rail lines in India are estimated
to be Rs 700-1000 million per km.
 the Mumbai-Ahmedabad route of 500 km, will
cost Rs 370 billion to build and to make a profit,
passengers will have to be charged Rs 5 per km.
Application Information
Safety
 The trains are virtually impossible to derail
because the train is wrapped around the track.
 Collisions between trains are unlikely because
computers are controlling the trains movements.
Maintenance
 There is very little maintenance because there is
no contact between the parts.
Comfort
 The ride is smooth while not
accelerating.
Economic Efficency
 The initial investment is similar to other high
speed rail roads. (Maglift is $20-$40 million per
mile and I-279 in Pittsburg cost $37 million per
mile 17 years ago.)
 Operating expenses are half of that of other
railroads.
 A train is composed of sections that each
contain 100 seats, and a train can have between
2 and 10 sections.
Bullet vs. Conventional Trains
Bullet Trains Conventional Trains
No Friction = Less
Maintenance
Routine Maintenance
Needed
No Engine = No fuel
required
Engine requires fossil fuels
Speeds in excess of
300 mph
Speeds up to 110 mph
BULLET TRAIN WITH RELATION
TO MARKETING MIX
PRODUCT MIX
•If deemed feasible, the high-speed railway line construction between Mumbai
and Ahmedabad is expected to take ten years to complete.
•The project is expected to be implemented through a public private
partnership (PPP) mode on a design, build, finance, operate and transfer
(DBFOT) basis with Maharashtra and Gujarat state governments along with
Indian Railways as public stakeholders.
•The pre-feasibility study had projected around 26.6 million passengers using
the high-speed line in 2021 and 104 million passengers in 2041.
•The 534km line is expected to be built with elevated tracks along the existing
rail route. The major stations along the high-speed line will include Surat,
Bharuch and Vadodara. The travel time between Mumbai and Ahmedabad is
expected to be reduced to less than two hours compared to the current express
journey time of more than six hours between the two cities.
PRICE MIX
 It will be seasonal
 It can be fluctuate according to time(flexibility)
 Auto- Price mechanism as on Airliner services
 There is no subsidy or price reduction will be done till the investment get
recovered.
 Ticket price may be equivalent to A/C First Class Ticket on Rajdhani train on
same route
PLACE MIX
Distribution channel
 We will buy technology directly
through the country japan.
 And we will pay royalty to them
 Our plan is to run bullet train
between ahemdabad to mumbai
Warehousing/ SHED
• There will be two sheds
• One at virar(mumbai)
• And second at mehsana
(ahemdabad)
PROMOTION MIX
 As a highly anticipated Project, very less advertisement campaign will be
needed.
 All Electronic and print media will cover the project in prime time as it is
very ambitious and unique project
 Promotional activities will be done at stations and through billboards
along route
 Will do advertisement on catering of railway food and station.
CONCLUSION
• We are hoping that this project will revolutionise Rail Travel
experience in INDIA and will write a new chapter in History of India .
• We will provide word class amenities and experience to our Indian
customers at a price of A/C first class and but reducing travel time by
more than half.
• We are sure that this venture will be profitable to both the Developers/
Investors and Consumers and it will be a win- win situation for all
including government.
• www.wikipedia.com
• www.pib.nic.in
• www.google.co.in
• www.railway-technology.com
Bullet train in india

Contenu connexe

Tendances

Tendances (20)

Bullet train project in india
Bullet train project in indiaBullet train project in india
Bullet train project in india
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
 
Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
ppt on bullet trains
ppt on bullet trains ppt on bullet trains
ppt on bullet trains
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway CorriodorBULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
High speed rails in india ppt
High speed rails in india pptHigh speed rails in india ppt
High speed rails in india ppt
 
Mumbai Local
Mumbai LocalMumbai Local
Mumbai Local
 
Railways
RailwaysRailways
Railways
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railways
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail Mumbai
 
RAILWAYS
RAILWAYSRAILWAYS
RAILWAYS
 
Indian transportation system
Indian transportation systemIndian transportation system
Indian transportation system
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Dhaka metro rail project
Dhaka metro rail projectDhaka metro rail project
Dhaka metro rail project
 

Similaire à Bullet train in india

Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
Saravanan rulez
 
Ten remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaTen remarkable infrastructure developments in india
Ten remarkable infrastructure developments in india
Sandeep Patel
 

Similaire à Bullet train in india (20)

Piyush
PiyushPiyush
Piyush
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Bullet train feasibility
Bullet train feasibilityBullet train feasibility
Bullet train feasibility
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 
Sky bus
Sky busSky bus
Sky bus
 
Metro project
Metro project Metro project
Metro project
 
Does india currently need a bullet trainhigh speed train or does the governme...
Does india currently need a bullet trainhigh speed train or does the governme...Does india currently need a bullet trainhigh speed train or does the governme...
Does india currently need a bullet trainhigh speed train or does the governme...
 
Talgo Paper by Rajesh Prasad, IRSE in December 2012
Talgo Paper by Rajesh Prasad, IRSE in December 2012Talgo Paper by Rajesh Prasad, IRSE in December 2012
Talgo Paper by Rajesh Prasad, IRSE in December 2012
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
Bullet train .
Bullet train .Bullet train .
Bullet train .
 
Ten remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaTen remarkable infrastructure developments in india
Ten remarkable infrastructure developments in india
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
A Study on High Speed Rails in India
A Study on High Speed Rails in IndiaA Study on High Speed Rails in India
A Study on High Speed Rails in India
 
sky bus
sky bussky bus
sky bus
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 

Dernier

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 

Dernier (20)

Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 

Bullet train in india

  • 1.
  • 2. Sonal Arora Nishant Mittal Gaurav Raizada Shubham Gupta Manisha Bhardwaj
  • 3.
  • 4. SR. NO. T O P I C SLIDE NO. 1 INTRODUCTION TO BULLET TRAIN 2 TYPES OF BULLET TRAIN TECHNOLOGIES 3 PRODUCT MIX OF BULLET TRAIN 4 PRICE MIX OF BULLET TRAIN 5 PLACE MIX OF BULLET TRAIN 6 PROMOTION MIX OF BULLET TRAIN 7 CONCLUSION
  • 6. Introduction  High-speed rail / BULLET TRAIN is a type of rail transport significantly faster than traditional rail traffic, using an integrated system of specialized rolling stock and dedicated tracks.  Started in JAPAN in 1964, From SHINKANSEN TO TOKYO, with speed of 145 Km/ Hr
  • 7. BULLET TRAIN :In INDIA •The proposed 534km Mumbai- Ahmedabad high-speed link, which is in early stage of development, will be India's maiden high- speed rail project. The decision to carry out its feasibility study was taken in September 2013. • During the Indian prime minister's visit to Japan in My 2013, the prime ministers of both countries decided to co-finance a detailed joint feasibility study for the Mumbai- Ahmedabad HSR. The Japan Internal Cooperation Agency (JICA) was given the go-ahead for the study in September 2013.
  • 8. The Bullet Train Track Type of Magnet Uses This train uses superconducting electric magnets in the vehicle to levitate and propel the train. These magnets are cooled by liquid helium or liquid nitrogen. This means that once electrified these magnets do not require additional energy.
  • 9. Seating Capacity & classes  The train has three seprate classes namely buisness class, green class, ordinary class.  E 5 Series shinkansen train configured with ten cars and has a capacity to carry 731 passenger.  658 seats of ordinary class, 55 seats are of green class and 18 seats are in buisness class.
  • 10. Better for the Environment  Less energy consumption because no rail-track friction  Requires no fossil fuel which can harm the environment.  Less noise pollution since the train never hits the track  MagLev guideways and trains take up less space than conventional trains
  • 11. Two types of bullet train Technologies  Electromagnetic suspension (EMS)  Electrodynamic suspension (EDS)
  • 12. Electromagnetic suspension (EMS) In current electromagnetic suspension (EMS) systems, the rail is situated between the upper and lower edges and use electromagnets to levitate the train
  • 13. Electrodynamic suspension (EDS) In electrodynamic suspension (EDS), both the rail and the train exert a magnetic field
  • 14. COST  According to news media, the costs for constructing such rail lines in India are estimated to be Rs 700-1000 million per km.  the Mumbai-Ahmedabad route of 500 km, will cost Rs 370 billion to build and to make a profit, passengers will have to be charged Rs 5 per km.
  • 15. Application Information Safety  The trains are virtually impossible to derail because the train is wrapped around the track.  Collisions between trains are unlikely because computers are controlling the trains movements. Maintenance  There is very little maintenance because there is no contact between the parts.
  • 16. Comfort  The ride is smooth while not accelerating. Economic Efficency  The initial investment is similar to other high speed rail roads. (Maglift is $20-$40 million per mile and I-279 in Pittsburg cost $37 million per mile 17 years ago.)  Operating expenses are half of that of other railroads.  A train is composed of sections that each contain 100 seats, and a train can have between 2 and 10 sections.
  • 17. Bullet vs. Conventional Trains Bullet Trains Conventional Trains No Friction = Less Maintenance Routine Maintenance Needed No Engine = No fuel required Engine requires fossil fuels Speeds in excess of 300 mph Speeds up to 110 mph
  • 18. BULLET TRAIN WITH RELATION TO MARKETING MIX
  • 19. PRODUCT MIX •If deemed feasible, the high-speed railway line construction between Mumbai and Ahmedabad is expected to take ten years to complete. •The project is expected to be implemented through a public private partnership (PPP) mode on a design, build, finance, operate and transfer (DBFOT) basis with Maharashtra and Gujarat state governments along with Indian Railways as public stakeholders. •The pre-feasibility study had projected around 26.6 million passengers using the high-speed line in 2021 and 104 million passengers in 2041. •The 534km line is expected to be built with elevated tracks along the existing rail route. The major stations along the high-speed line will include Surat, Bharuch and Vadodara. The travel time between Mumbai and Ahmedabad is expected to be reduced to less than two hours compared to the current express journey time of more than six hours between the two cities.
  • 20. PRICE MIX  It will be seasonal  It can be fluctuate according to time(flexibility)  Auto- Price mechanism as on Airliner services  There is no subsidy or price reduction will be done till the investment get recovered.  Ticket price may be equivalent to A/C First Class Ticket on Rajdhani train on same route
  • 21. PLACE MIX Distribution channel  We will buy technology directly through the country japan.  And we will pay royalty to them  Our plan is to run bullet train between ahemdabad to mumbai Warehousing/ SHED • There will be two sheds • One at virar(mumbai) • And second at mehsana (ahemdabad)
  • 22. PROMOTION MIX  As a highly anticipated Project, very less advertisement campaign will be needed.  All Electronic and print media will cover the project in prime time as it is very ambitious and unique project  Promotional activities will be done at stations and through billboards along route  Will do advertisement on catering of railway food and station.
  • 23.
  • 24. CONCLUSION • We are hoping that this project will revolutionise Rail Travel experience in INDIA and will write a new chapter in History of India . • We will provide word class amenities and experience to our Indian customers at a price of A/C first class and but reducing travel time by more than half. • We are sure that this venture will be profitable to both the Developers/ Investors and Consumers and it will be a win- win situation for all including government.
  • 25. • www.wikipedia.com • www.pib.nic.in • www.google.co.in • www.railway-technology.com