MAINTENANCE PLAN
ENGRO POWERGEN QADIRPUR LTD.
227 MWCCP
GROUP MEMBERS:
 Tariq Jamil 17
 Nauman Khan 20
 Haider Zia 35
 Muhammad Arsalan Khan 47
MAINTENENANCE ENGINEERING (ME-403)
Engro PowerGen Qadirpur Ltd.
 Part of the Engro Corp
 Engro’s first Independent Power Project (IPP)
 A combined Cycle power plant producing 227MW
 Situated in Qadirpur, Sindh
 Incorporated in the year 2008
 The Sindh Engro Coal Mining Company Limited is a joint venture between the
Government of Sindh and Engro Powergen, to mine coal from Thar Block II
Maintenance Plan
 Advance planning for maintenance is a necessity for utility, industrial,
independent power producers and cogeneration plants operators in order to
minimize downtime.
 The primary factors that affect the maintenance planning process are :
MAINTENANCE EFFORT
Primary maintenance effort is attributed to five basic
systems:
 Controls and accessories,
 Combustion,
 Turbine,
 Generator
Balance-of-plant.
The basic design and recommended
maintenance of GE heavy-duty gas turbine
 Maximum periods of operation between inspection and
overhauls
 In-place, on-site inspection and maintenance
 Use of local trade skills to disassemble, inspect and re-
assemble
 In addition to maintenance of the basic gas turbine, the
control devices, fuel metering equipment, gas turbine
auxiliaries, load package, and other station auxiliaries
also require periodic servicing
Engro PowerGen’s approach to
maintenance planning of a GT
• A gas fuel unit operating continuous duty, with no water or
steam injection, is established as the baseline condition which
sets the maximum recommended maintenance intervals.
• For operation that differs from the baseline, maintenance
factors are established that determine the increased level
of maintenance that is required.
• For example, a maintenance factor of two would indicate
a maintenance interval that is half of the baseline interval
Gas turbines wear
 Thermal mechanical fatigue is the dominant limiter of life
for peaking machines, while creep, oxidation, and
corrosion are the dominant limiters of life for continuous
duty machines
 Table shows the wear
occurs in GT
A graphical display of the GE approach
 In this figure, the inspection interval recommendation is defined by the
rectangle established by the starts and hours criteria.
 An alternative to the GE approach, which is sometimes employed by other
manufacturers, converts each start cycle to an equivalent number of
operating hours (EOH) with inspection intervals based on the equivalent hours
count.
CYCLIC EFFECTS
 For the starts-based maintenance criteria, operating
factors associated with the cyclic effects produced during
start-up, operation and shutdown of the turbine must be
considered
 Operating conditions other than the standard start-up and
shutdown sequence can potentially reduce the cyclic life
of the hot gas path components and rotor, and if present,
will require more frequent maintenance and parts
refurbishment and/or replacement
Non Destructive Testing (NDT)
 Thermal mechanical fatigue testing has found that the number of
cycles that a part can withstand before cracking occurs is strongly
influenced by the total strain range and the maximum metal
temperature experienced.
 Any operating condition that significantly increases the strain range
and/or the maximum metal temperature over the normal cycle
conditions will act to reduce the fatigue life and increase the starts-
based maintenance factor.
ROTOR PARTS
 In addition to the hot gas path components, the rotor structure
maintenance and refurbishment requirements are impacted by the
cyclic effects associated with startup, operation and shutdown, as
well as loading and off-load characteristics.
 Disassembly and inspection of all rotor components is required when
the accumulated rotor starts or hours reach the inspection limits.
 For the rotor, the thermal condition when the start-up sequence is
initiated is a major factor in determining the rotor maintenance
interval and individual rotor component life.
 Large rotors with their longer thermal time constants develop higher
thermal stresses than smaller rotors undergoing the same startup time
sequence.
COMBUSTION PARTS
 A typical combustion system contains transition pieces, combustion
liners, flow sleeves, head-end assemblies containing fuel nozzles and
cartridges, end caps and end covers, and assorted other hardware
including cross-fire tubes, spark plugs and flame detectors.
 GE provides several types of combustion systems including standard
combustors, Multi-Nozzle Quiet Combustors (MNQC), Integrated
Gasification Combined Cycle (IGCC) combustors and Dry Low NOx
(DLN) combustors.
 Each of these combustion systems have unique operating
characteristics and modes of operation with differing responses to
operational variables affecting maintenance and refurbishment
requirements.
Combustion Parts Maintenance
 The maintenance and refurbishment requirements of combustion parts are
impacted by many of the same factors as hot gas path parts including start
cycle, trips, fuel type and quality, firing temperature and use of steam or
water injection for either emissions control or power augmentation.
 Combustion maintenance is performed, if required, following each
combustion inspection (or repair) interval.
 Replacement intervals are usually defined by a recommended number of
combustion (or repair)intervals and are usually combustion component
specific.
MAINTENANCE INSPECTIONS
 Maintenance inspection types may be broadly classified as stand-by, running
and disassembly inspections.
 The stand-by inspection is performed during off-peak periods when the unit
is not operating and includes routine servicing of accessory systems and
device calibration.
 The running inspection is performed by observing key operating parameters
while the turbine is running.
 The disassembly inspection requires opening the turbine for inspection of
internal components and is performed in varying degrees.
Shut down inspection
VIBRATION LEVEL
 The vibration signature of the unit should be observed and recorded.
Minor changes will occur with changes in operating conditions.
However, large changes or a continuously increasing trend give
indications of the need to apply corrective action.
FUEL FLOW AND PRESSURE
 The fuel system should be observed for the general fuel flow versus
load relationship. Fuel pressures through the system should be
observed. Changes in fuel pressure can indicate the fuel nozzle
passages are plugged, or that fuel metering elements are damaged
our out of calibration.
Combustion Inspection – key elements
Gas turbine major inspection – key elements
Major Inspection
Typical major inspection requirements for machines are:
 All radial and axial clearances are checked against their original values
(opening and closing).
 Casings, shells and frames/diffusers are inspected for cracks and erosion.
 Compressor inlet and compressor flow-path are inspected for fouling, erosion,
corrosion and leakage. The IGVs are inspected, looking for corrosion, bushing
wear and vane cracking.
 Rotor and stator compressor blades are checked for tip clearance, rubs,
impact damage, corrosion pitting, bowing and cracking.
 Turbine stationary shrouds are checked for clearance, erosion, rubbing,
cracking and build-up.
 Seals and hook fits of turbine nozzles and diaphragms are inspected for rubs,
erosion, fretting or thermal deterioration.
 Bearing liners and seals are inspected for clearance and wear.
 Inlet systems are inspected for corrosion, cracked silencers and loose parts.
CONCLUSION
 To achieve maximum gas turbine availability, an owner must
understand not only his equipment, but the factors affecting it.
 This includes the training of operating and maintenance personnel,
following the manufacturer's recommendations, regular periodic
inspections and the stocking of spare parts for immediate
replacement.
 The recording of operating data, and analysis of these data, are
essential to preventative and planned maintenance.
 It should be recognized that, while the manufacturer provides general
maintenance recommendations, it is the equipment user who has the
major impact upon the proper maintenance and operation of
equipment
Conclusion
 The level and quality of a rigorous maintenance program have a direct
impact on equipment reliability and availability. Therefore, a rigorous
maintenance program, which optimizes both maintenance cost and
availability, is vital to the user. A rigorous maintenance program will
minimize overall costs, keep outage downtimes to a minimum,
improve starting and running reliability and provide increased
availability and revenue-earning ability for GE gas turbine users.

Contenu connexe

Tendances

Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINESAI SHARATH GAMPA
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
INVENTORY MANAGEMENT IN A TPS SECTION.
INVENTORY MANAGEMENT IN A TPS SECTION.INVENTORY MANAGEMENT IN A TPS SECTION.
INVENTORY MANAGEMENT IN A TPS SECTION.Manohar Tatwawadi
 
Maintenance strategies for improvement of productivity at industry
Maintenance strategies for improvement of productivity at industryMaintenance strategies for improvement of productivity at industry
Maintenance strategies for improvement of productivity at industryGreejesh Prakash
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing SystemSalil Vaidya
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Turbine-Over-Hauling-Procedure - Siemens - Recommends Birkosit
Turbine-Over-Hauling-Procedure - Siemens - Recommends BirkositTurbine-Over-Hauling-Procedure - Siemens - Recommends Birkosit
Turbine-Over-Hauling-Procedure - Siemens - Recommends BirkositProject Sales Corp
 
Steam turbine condition monitoring
Steam turbine condition monitoringSteam turbine condition monitoring
Steam turbine condition monitoringAbdul Abbasi
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Electrohydraulic governing system
Electrohydraulic governing systemElectrohydraulic governing system
Electrohydraulic governing systemAshvani Shukla
 
Gas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleGas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleAli Rafiei
 
Gas turbine power plant
Gas turbine power plantGas turbine power plant
Gas turbine power plantTarek Erin
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantSHIVAJI CHOUDHURY
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Hydro Power Plant Starting Stoping sequence
Hydro Power Plant Starting Stoping sequenceHydro Power Plant Starting Stoping sequence
Hydro Power Plant Starting Stoping sequenceMahajan Saurabh
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenancepradhyot05
 

Tendances (20)

Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINE
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
INVENTORY MANAGEMENT IN A TPS SECTION.
INVENTORY MANAGEMENT IN A TPS SECTION.INVENTORY MANAGEMENT IN A TPS SECTION.
INVENTORY MANAGEMENT IN A TPS SECTION.
 
Maintenance strategies for improvement of productivity at industry
Maintenance strategies for improvement of productivity at industryMaintenance strategies for improvement of productivity at industry
Maintenance strategies for improvement of productivity at industry
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Turbine-Over-Hauling-Procedure - Siemens - Recommends Birkosit
Turbine-Over-Hauling-Procedure - Siemens - Recommends BirkositTurbine-Over-Hauling-Procedure - Siemens - Recommends Birkosit
Turbine-Over-Hauling-Procedure - Siemens - Recommends Birkosit
 
Steam turbine condition monitoring
Steam turbine condition monitoringSteam turbine condition monitoring
Steam turbine condition monitoring
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Electrohydraulic governing system
Electrohydraulic governing systemElectrohydraulic governing system
Electrohydraulic governing system
 
Gas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleGas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -Sample
 
Gas turbine power plant
Gas turbine power plantGas turbine power plant
Gas turbine power plant
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power Plant
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Hydro Power Plant Starting Stoping sequence
Hydro Power Plant Starting Stoping sequenceHydro Power Plant Starting Stoping sequence
Hydro Power Plant Starting Stoping sequence
 
200 mw FSSS
200 mw FSSS200 mw FSSS
200 mw FSSS
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 

En vedette

Project 3 - Maintenance Plan
Project 3 - Maintenance PlanProject 3 - Maintenance Plan
Project 3 - Maintenance PlanKai Yun Pang
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1Vijay Raskar
 
4.software management
4.software management4.software management
4.software managementDeepak Sharma
 
Creating and measuring value: Alternative operations and maintenance business...
Creating and measuring value: Alternative operations and maintenance business...Creating and measuring value: Alternative operations and maintenance business...
Creating and measuring value: Alternative operations and maintenance business...Shaun West
 
Faults in electrical power system by vishal kumar from niec delhi
Faults in electrical power system by vishal kumar from niec delhiFaults in electrical power system by vishal kumar from niec delhi
Faults in electrical power system by vishal kumar from niec delhi7532993375
 
Final report atlantis water
Final report atlantis waterFinal report atlantis water
Final report atlantis waterUsman Riaz
 
3. maintenance plan
3. maintenance plan3. maintenance plan
3. maintenance planYen Min Khor
 
Recommended Maintenance Schedule for Internal Rubber Mixer
Recommended Maintenance Schedule for Internal Rubber MixerRecommended Maintenance Schedule for Internal Rubber Mixer
Recommended Maintenance Schedule for Internal Rubber MixerRubber & Tyre Machinery World
 
Electrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and TechniciansElectrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and TechniciansLiving Online
 
Gas turbine driven compressors
Gas turbine driven compressorsGas turbine driven compressors
Gas turbine driven compressorsManish Kumar
 
Murree Brewery Supply Chain
Murree Brewery Supply ChainMurree Brewery Supply Chain
Murree Brewery Supply Chaintariqmehsud
 
C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.
C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.
C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.David Holmes
 
Led tv electronics
Led tv   electronicsLed tv   electronics
Led tv electronicsShail Modi
 
Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...
Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...
Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...Fraz Shafique
 

En vedette (20)

Project 3 - Maintenance Plan
Project 3 - Maintenance PlanProject 3 - Maintenance Plan
Project 3 - Maintenance Plan
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
 
4.software management
4.software management4.software management
4.software management
 
Creating and measuring value: Alternative operations and maintenance business...
Creating and measuring value: Alternative operations and maintenance business...Creating and measuring value: Alternative operations and maintenance business...
Creating and measuring value: Alternative operations and maintenance business...
 
Faults in electrical power system by vishal kumar from niec delhi
Faults in electrical power system by vishal kumar from niec delhiFaults in electrical power system by vishal kumar from niec delhi
Faults in electrical power system by vishal kumar from niec delhi
 
Oracle eAM - Right Fit To Oil & Gas Industries
Oracle eAM - Right Fit To Oil & Gas IndustriesOracle eAM - Right Fit To Oil & Gas Industries
Oracle eAM - Right Fit To Oil & Gas Industries
 
Market plan
Market planMarket plan
Market plan
 
Plant shutdown
Plant shutdownPlant shutdown
Plant shutdown
 
Final report atlantis water
Final report atlantis waterFinal report atlantis water
Final report atlantis water
 
3. maintenance plan
3. maintenance plan3. maintenance plan
3. maintenance plan
 
Recommended Maintenance Schedule for Internal Rubber Mixer
Recommended Maintenance Schedule for Internal Rubber MixerRecommended Maintenance Schedule for Internal Rubber Mixer
Recommended Maintenance Schedule for Internal Rubber Mixer
 
Samsung electronics
Samsung electronicsSamsung electronics
Samsung electronics
 
Electrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and TechniciansElectrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and Technicians
 
SWITCH GEAR
SWITCH   GEARSWITCH   GEAR
SWITCH GEAR
 
Gas turbine driven compressors
Gas turbine driven compressorsGas turbine driven compressors
Gas turbine driven compressors
 
Murree Brewery Supply Chain
Murree Brewery Supply ChainMurree Brewery Supply Chain
Murree Brewery Supply Chain
 
C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.
C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.
C6 Fire Fighting Foam Presentation: Manufactured by Oil Technic Ltd.
 
Led tv electronics
Led tv   electronicsLed tv   electronics
Led tv electronics
 
Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...
Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...
Ravi Foods - an investment proposal to set up a dairy farm and an agri-market...
 
Switchgear
SwitchgearSwitchgear
Switchgear
 

Similaire à Maintenance plan

Maintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptxMaintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptxsaubhagyabista
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaUdhayakumar Venkataraman
 
Gas Turbine Basics.pdf
Gas Turbine Basics.pdfGas Turbine Basics.pdf
Gas Turbine Basics.pdfyusuf699644
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfssuser5599ce
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintananceAnasMirza10
 
Recovery boiler life assesment
Recovery boiler life assesmentRecovery boiler life assesment
Recovery boiler life assesmentIdris Mohiuddin
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingeSAT Publishing House
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Ashutosh Sachan
 
Use and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic RetardersUse and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic RetardersIRJET Journal
 
Energy Efficiency in Diesel Generator Operation
Energy Efficiency in Diesel Generator OperationEnergy Efficiency in Diesel Generator Operation
Energy Efficiency in Diesel Generator Operationeecfncci
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfchintanraval24
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET Journal
 

Similaire à Maintenance plan (20)

Wgp4205 turbine
Wgp4205 turbineWgp4205 turbine
Wgp4205 turbine
 
Turbina vapor
Turbina vaporTurbina vapor
Turbina vapor
 
Maintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptxMaintenance of Panauti Hydropower ppt Subham Kandel.pptx
Maintenance of Panauti Hydropower ppt Subham Kandel.pptx
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
Gas Turbine Basics.pdf
Gas Turbine Basics.pdfGas Turbine Basics.pdf
Gas Turbine Basics.pdf
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdf
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintanance
 
Recovery boiler life assesment
Recovery boiler life assesmentRecovery boiler life assesment
Recovery boiler life assesment
 
Compressors
CompressorsCompressors
Compressors
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
 
1q05 performancemonitoring
1q05 performancemonitoring1q05 performancemonitoring
1q05 performancemonitoring
 
Use and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic RetardersUse and effectiveness of Hydraulic Retarders
Use and effectiveness of Hydraulic Retarders
 
Energy Efficiency in Diesel Generator Operation
Energy Efficiency in Diesel Generator OperationEnergy Efficiency in Diesel Generator Operation
Energy Efficiency in Diesel Generator Operation
 
At6702 uw
At6702 uwAt6702 uw
At6702 uw
 
Boiler Performance Monitoring
Boiler Performance MonitoringBoiler Performance Monitoring
Boiler Performance Monitoring
 
04 ingestive-cleaning-es9-62-rev-l-pdf
04 ingestive-cleaning-es9-62-rev-l-pdf04 ingestive-cleaning-es9-62-rev-l-pdf
04 ingestive-cleaning-es9-62-rev-l-pdf
 
Combustion control
Combustion controlCombustion control
Combustion control
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
 

Plus de Nauman khan

Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell designNauman khan
 
Noise and Vibration Hazards
Noise and Vibration HazardsNoise and Vibration Hazards
Noise and Vibration HazardsNauman khan
 
Pakistan ordinance factories (pof)
Pakistan ordinance factories (pof)Pakistan ordinance factories (pof)
Pakistan ordinance factories (pof)Nauman khan
 
Electrical hazards
Electrical hazardsElectrical hazards
Electrical hazardsNauman khan
 
Health And Safety
Health And SafetyHealth And Safety
Health And SafetyNauman khan
 
design of ger train by nauman khan
design of ger train by nauman khandesign of ger train by nauman khan
design of ger train by nauman khanNauman khan
 
Operational final (2)
Operational final (2)Operational final (2)
Operational final (2)Nauman khan
 
Ent9 the organizational plan
Ent9 the organizational planEnt9 the organizational plan
Ent9 the organizational planNauman khan
 
Ent8 the marketing plan
Ent8 the marketing planEnt8 the marketing plan
Ent8 the marketing planNauman khan
 
Operational plan
Operational planOperational plan
Operational planNauman khan
 

Plus de Nauman khan (14)

Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
 
Noise and Vibration Hazards
Noise and Vibration HazardsNoise and Vibration Hazards
Noise and Vibration Hazards
 
Pakistan ordinance factories (pof)
Pakistan ordinance factories (pof)Pakistan ordinance factories (pof)
Pakistan ordinance factories (pof)
 
Electrical hazards
Electrical hazardsElectrical hazards
Electrical hazards
 
Fire hazards
Fire hazardsFire hazards
Fire hazards
 
Health And Safety
Health And SafetyHealth And Safety
Health And Safety
 
solar-ponds
 solar-ponds solar-ponds
solar-ponds
 
7 quality tools
7 quality tools7 quality tools
7 quality tools
 
7 quality tools
7 quality tools7 quality tools
7 quality tools
 
design of ger train by nauman khan
design of ger train by nauman khandesign of ger train by nauman khan
design of ger train by nauman khan
 
Operational final (2)
Operational final (2)Operational final (2)
Operational final (2)
 
Ent9 the organizational plan
Ent9 the organizational planEnt9 the organizational plan
Ent9 the organizational plan
 
Ent8 the marketing plan
Ent8 the marketing planEnt8 the marketing plan
Ent8 the marketing plan
 
Operational plan
Operational planOperational plan
Operational plan
 

Dernier

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 

Dernier (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 

Maintenance plan

  • 1. MAINTENANCE PLAN ENGRO POWERGEN QADIRPUR LTD. 227 MWCCP GROUP MEMBERS:  Tariq Jamil 17  Nauman Khan 20  Haider Zia 35  Muhammad Arsalan Khan 47 MAINTENENANCE ENGINEERING (ME-403)
  • 2. Engro PowerGen Qadirpur Ltd.  Part of the Engro Corp  Engro’s first Independent Power Project (IPP)  A combined Cycle power plant producing 227MW  Situated in Qadirpur, Sindh  Incorporated in the year 2008  The Sindh Engro Coal Mining Company Limited is a joint venture between the Government of Sindh and Engro Powergen, to mine coal from Thar Block II
  • 3. Maintenance Plan  Advance planning for maintenance is a necessity for utility, industrial, independent power producers and cogeneration plants operators in order to minimize downtime.  The primary factors that affect the maintenance planning process are :
  • 4. MAINTENANCE EFFORT Primary maintenance effort is attributed to five basic systems:  Controls and accessories,  Combustion,  Turbine,  Generator Balance-of-plant.
  • 5. The basic design and recommended maintenance of GE heavy-duty gas turbine  Maximum periods of operation between inspection and overhauls  In-place, on-site inspection and maintenance  Use of local trade skills to disassemble, inspect and re- assemble  In addition to maintenance of the basic gas turbine, the control devices, fuel metering equipment, gas turbine auxiliaries, load package, and other station auxiliaries also require periodic servicing
  • 6. Engro PowerGen’s approach to maintenance planning of a GT • A gas fuel unit operating continuous duty, with no water or steam injection, is established as the baseline condition which sets the maximum recommended maintenance intervals. • For operation that differs from the baseline, maintenance factors are established that determine the increased level of maintenance that is required. • For example, a maintenance factor of two would indicate a maintenance interval that is half of the baseline interval
  • 7. Gas turbines wear  Thermal mechanical fatigue is the dominant limiter of life for peaking machines, while creep, oxidation, and corrosion are the dominant limiters of life for continuous duty machines  Table shows the wear occurs in GT
  • 8. A graphical display of the GE approach  In this figure, the inspection interval recommendation is defined by the rectangle established by the starts and hours criteria.
  • 9.  An alternative to the GE approach, which is sometimes employed by other manufacturers, converts each start cycle to an equivalent number of operating hours (EOH) with inspection intervals based on the equivalent hours count.
  • 10. CYCLIC EFFECTS  For the starts-based maintenance criteria, operating factors associated with the cyclic effects produced during start-up, operation and shutdown of the turbine must be considered  Operating conditions other than the standard start-up and shutdown sequence can potentially reduce the cyclic life of the hot gas path components and rotor, and if present, will require more frequent maintenance and parts refurbishment and/or replacement
  • 11. Non Destructive Testing (NDT)  Thermal mechanical fatigue testing has found that the number of cycles that a part can withstand before cracking occurs is strongly influenced by the total strain range and the maximum metal temperature experienced.  Any operating condition that significantly increases the strain range and/or the maximum metal temperature over the normal cycle conditions will act to reduce the fatigue life and increase the starts- based maintenance factor.
  • 12. ROTOR PARTS  In addition to the hot gas path components, the rotor structure maintenance and refurbishment requirements are impacted by the cyclic effects associated with startup, operation and shutdown, as well as loading and off-load characteristics.  Disassembly and inspection of all rotor components is required when the accumulated rotor starts or hours reach the inspection limits.  For the rotor, the thermal condition when the start-up sequence is initiated is a major factor in determining the rotor maintenance interval and individual rotor component life.  Large rotors with their longer thermal time constants develop higher thermal stresses than smaller rotors undergoing the same startup time sequence.
  • 13. COMBUSTION PARTS  A typical combustion system contains transition pieces, combustion liners, flow sleeves, head-end assemblies containing fuel nozzles and cartridges, end caps and end covers, and assorted other hardware including cross-fire tubes, spark plugs and flame detectors.  GE provides several types of combustion systems including standard combustors, Multi-Nozzle Quiet Combustors (MNQC), Integrated Gasification Combined Cycle (IGCC) combustors and Dry Low NOx (DLN) combustors.  Each of these combustion systems have unique operating characteristics and modes of operation with differing responses to operational variables affecting maintenance and refurbishment requirements.
  • 14. Combustion Parts Maintenance  The maintenance and refurbishment requirements of combustion parts are impacted by many of the same factors as hot gas path parts including start cycle, trips, fuel type and quality, firing temperature and use of steam or water injection for either emissions control or power augmentation.  Combustion maintenance is performed, if required, following each combustion inspection (or repair) interval.  Replacement intervals are usually defined by a recommended number of combustion (or repair)intervals and are usually combustion component specific.
  • 15. MAINTENANCE INSPECTIONS  Maintenance inspection types may be broadly classified as stand-by, running and disassembly inspections.  The stand-by inspection is performed during off-peak periods when the unit is not operating and includes routine servicing of accessory systems and device calibration.  The running inspection is performed by observing key operating parameters while the turbine is running.  The disassembly inspection requires opening the turbine for inspection of internal components and is performed in varying degrees.
  • 17. VIBRATION LEVEL  The vibration signature of the unit should be observed and recorded. Minor changes will occur with changes in operating conditions. However, large changes or a continuously increasing trend give indications of the need to apply corrective action. FUEL FLOW AND PRESSURE  The fuel system should be observed for the general fuel flow versus load relationship. Fuel pressures through the system should be observed. Changes in fuel pressure can indicate the fuel nozzle passages are plugged, or that fuel metering elements are damaged our out of calibration.
  • 19. Gas turbine major inspection – key elements
  • 20. Major Inspection Typical major inspection requirements for machines are:  All radial and axial clearances are checked against their original values (opening and closing).  Casings, shells and frames/diffusers are inspected for cracks and erosion.  Compressor inlet and compressor flow-path are inspected for fouling, erosion, corrosion and leakage. The IGVs are inspected, looking for corrosion, bushing wear and vane cracking.  Rotor and stator compressor blades are checked for tip clearance, rubs, impact damage, corrosion pitting, bowing and cracking.  Turbine stationary shrouds are checked for clearance, erosion, rubbing, cracking and build-up.  Seals and hook fits of turbine nozzles and diaphragms are inspected for rubs, erosion, fretting or thermal deterioration.  Bearing liners and seals are inspected for clearance and wear.  Inlet systems are inspected for corrosion, cracked silencers and loose parts.
  • 21. CONCLUSION  To achieve maximum gas turbine availability, an owner must understand not only his equipment, but the factors affecting it.  This includes the training of operating and maintenance personnel, following the manufacturer's recommendations, regular periodic inspections and the stocking of spare parts for immediate replacement.  The recording of operating data, and analysis of these data, are essential to preventative and planned maintenance.  It should be recognized that, while the manufacturer provides general maintenance recommendations, it is the equipment user who has the major impact upon the proper maintenance and operation of equipment
  • 22. Conclusion  The level and quality of a rigorous maintenance program have a direct impact on equipment reliability and availability. Therefore, a rigorous maintenance program, which optimizes both maintenance cost and availability, is vital to the user. A rigorous maintenance program will minimize overall costs, keep outage downtimes to a minimum, improve starting and running reliability and provide increased availability and revenue-earning ability for GE gas turbine users.