ROSEMONT 138-KV
TRANSMISSION LINE PROJECT



     Team Building and
    Technology Transfer

      November 12, 2008
PURPOSE AND NEED



•  Rosemont Copper Company has requested TEP to
   provide electric power to the Rosemont operations
•  The proposed 138-kV transmission line and substation
   would be needed to provided adequate and reliable
   power for operation of the proposed Rosemont facilities
•  No existing transmission lines and substations could
   serve this purpose and need




                                                             2
PROJECT DESCRIPTION


•  Up to 28 miles of 138-kV transmission line connecting from either the
   Vail or South substations to the proposed Rosemont Substation
   (located on private land). The proposed 138-kV transmission line will
   require a new 100-foot-wide right-of-way
•  Project area (approximately 560 square miles) consists
   predominantly of land owned by Arizona State Land Department,
   private, U.S. National Forest, and interspersed with some BLM land
•  The planning process will demonstrate a thorough comparison of
   alternatives, including how information will be gathered during the
   public planning process and used to identify the preferred and
   alternative route(s)



                                                                           3
PROJECT AREA
PROJECT DESCRIPTION (CONTINUED)


•  The planning process will be summarized in a Certificate
   of Environmental Compatibility (CEC) application, which
   is required by the Arizona Corporation Commission
   (ACC) for construction and operation of the 138-kV
   transmission line




                                                              5
SITING AND PLANNING PROCESS


•  Comprehensive planning process consisting of six key tasks
•  Studies will include environmental and engineering analysis, along
   with agency/public input
•  Several alternatives will be identified and evaluated to meet the
   project purpose and need
•  TEP/Rosemont Copper Company will identify a preferred route for
   permitting and construction, as well as alternative routes
•  TEP will prepare and file a CEC application to be reviewed by the
   Arizona Power Plant and Transmission Line Siting Committee
•  The ACC will make a final decision to approve (with any conditions)
   or deny the CEC application


                                                                         6
ENVIRONMENTAL PLANNING PROCESS




                                 7
ENVIRONMENTAL STUDIES


•    Environmental resources
      –  Land use (existing/future land use and jurisdictional planning guidelines)
      –  Visual (scenic quality, sensitive viewers, and scenic management
         guidelines)
      –  Cultural (National Register or eligible sites and archaeological sites)
      –  Biology (wildlife, vegetation, special status species, critical habitat)
•    Environmental studies will be coordinated with SWCA and WestLand
     Resources to ensure consistency with the EIS




                                                                                      8
ENVIRONMENTAL STUDIES


•    Environmental resources:
      –  Land use
         (existing/future land use and jurisdictional planning guidelines)
      –  Visual
         (scenic quality, sensitive viewers, and scenic management guidelines)
      –  Cultural
         (National Register or eligible sites and archaeological sites)
      –  Biology
         (wildlife, vegetation, special status species, critical habitat)

•    Environmental studies will be coordinated with SWCA and WestLand
     Resources to ensure consistency with the EIS



                                                                                 9
PUBLIC PARTICIPATION


•    Community stakeholder group
•    Project fact sheet/newsletters
•    Project mailing list
•    Toll-free project information line
•    TEP website (www.tep.com)
•    Media briefings
•    Project newsletters mailed to community, including
     residents, landowners, and other interested parties



                                                           10

Contenu connexe

Tendances

Historic Metal Truss Bridge Management Plan
Historic Metal Truss Bridge Management Plan Historic Metal Truss Bridge Management Plan
Historic Metal Truss Bridge Management Plan
preservationcombination
 

Tendances (20)

Session 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPBSession 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPB
 
Yash ramdaree.pptx
Yash ramdaree.pptxYash ramdaree.pptx
Yash ramdaree.pptx
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
 
The 4th NENA workshop - Iraq
The 4th NENA workshop - IraqThe 4th NENA workshop - Iraq
The 4th NENA workshop - Iraq
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816
 
Greenway to Park Conversion
Greenway to Park ConversionGreenway to Park Conversion
Greenway to Park Conversion
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
Outputs and recommendations from the Baltic Sea-basin Checkpoint Workshop
Outputs and recommendations from the Baltic Sea-basin Checkpoint WorkshopOutputs and recommendations from the Baltic Sea-basin Checkpoint Workshop
Outputs and recommendations from the Baltic Sea-basin Checkpoint Workshop
 
Arcadis Design Lake Accotink Dredging Public Meeting December 2020
Arcadis Design Lake Accotink Dredging Public Meeting December 2020 Arcadis Design Lake Accotink Dredging Public Meeting December 2020
Arcadis Design Lake Accotink Dredging Public Meeting December 2020
 
1 - MoWR - Overview of HP-III Workshop-16th Sep
1 - MoWR - Overview of HP-III Workshop-16th Sep1 - MoWR - Overview of HP-III Workshop-16th Sep
1 - MoWR - Overview of HP-III Workshop-16th Sep
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
Agricultural Soils Research Data in Tasmania, Australia; Policies, Collaborat...
Agricultural Soils Research Data in Tasmania, Australia;Policies, Collaborat...Agricultural Soils Research Data in Tasmania, Australia;Policies, Collaborat...
Agricultural Soils Research Data in Tasmania, Australia; Policies, Collaborat...
 
Soil management at metrolinx
Soil management at metrolinx Soil management at metrolinx
Soil management at metrolinx
 
Historic Metal Truss Bridge Management Plan
Historic Metal Truss Bridge Management Plan Historic Metal Truss Bridge Management Plan
Historic Metal Truss Bridge Management Plan
 
ONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECC
ONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECCONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECC
ONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECC
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentation
 
Transportation facility update.pdf 1
Transportation facility update.pdf 1Transportation facility update.pdf 1
Transportation facility update.pdf 1
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
 
Jordplan in English
Jordplan in EnglishJordplan in English
Jordplan in English
 
PennDOT Management Plan for Historic Metal Truss Bridges
PennDOT Management Plan for Historic Metal Truss BridgesPennDOT Management Plan for Historic Metal Truss Bridges
PennDOT Management Plan for Historic Metal Truss Bridges
 

Similaire à Certificate of Environmental Compliance

Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
riseagrant
 
Environmental modeling and environmental impact assessments final
Environmental modeling and environmental impact assessments finalEnvironmental modeling and environmental impact assessments final
Environmental modeling and environmental impact assessments final
Sanjay Singh
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
Sweet Water
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Sweet Water
 
Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...
Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...
Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...
Texas Alliance of Groundwater Districts
 
Andy Steven_Overview of TERN's Australian Coastal Ecosystems Facility
Andy Steven_Overview of TERN's Australian Coastal Ecosystems FacilityAndy Steven_Overview of TERN's Australian Coastal Ecosystems Facility
Andy Steven_Overview of TERN's Australian Coastal Ecosystems Facility
TERN Australia
 
LLW challenges and developments FINAL pptx
LLW challenges and developments FINAL pptxLLW challenges and developments FINAL pptx
LLW challenges and developments FINAL pptx
Peter ORMAI
 
Biodiversity Information Networks: dataflows for interdisciplinary science
Biodiversity Information Networks: dataflows for interdisciplinary scienceBiodiversity Information Networks: dataflows for interdisciplinary science
Biodiversity Information Networks: dataflows for interdisciplinary science
Bruno Danis
 
Biodiversity Information Networks: Dataflows for interdisciplinary sciences
Biodiversity Information Networks: Dataflows for interdisciplinary sciencesBiodiversity Information Networks: Dataflows for interdisciplinary sciences
Biodiversity Information Networks: Dataflows for interdisciplinary sciences
GBIF_NPT
 
GIS Presentation - Master of Env Students
GIS Presentation - Master of Env StudentsGIS Presentation - Master of Env Students
GIS Presentation - Master of Env Students
Keshav Letourneau
 

Similaire à Certificate of Environmental Compliance (20)

EcoTas13 Caddy-Retalic TERN Infrastructure
EcoTas13 Caddy-Retalic TERN InfrastructureEcoTas13 Caddy-Retalic TERN Infrastructure
EcoTas13 Caddy-Retalic TERN Infrastructure
 
Energy Security and Innovation Observing System for the Subsurface (ESIOS) Up...
Energy Security and Innovation Observing System for the Subsurface (ESIOS) Up...Energy Security and Innovation Observing System for the Subsurface (ESIOS) Up...
Energy Security and Innovation Observing System for the Subsurface (ESIOS) Up...
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative Energy
 
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
 
Environmental modeling and environmental impact assessments final
Environmental modeling and environmental impact assessments finalEnvironmental modeling and environmental impact assessments final
Environmental modeling and environmental impact assessments final
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision--  Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision-- Jeffrey Mengler
 
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey MenglerClean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
Clean Rivers, Clean Lake 8 -- Green Infrastructure Vision -- Jeffrey Mengler
 
DART AARG Presentation Siena 2009
DART AARG Presentation Siena 2009DART AARG Presentation Siena 2009
DART AARG Presentation Siena 2009
 
Massachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.pptMassachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.ppt
 
Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...
Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...
Introduction to the U.S. Geological Survey and USGS-GCD Cooperative Studies, ...
 
Andy Steven_Overview of TERN's Australian Coastal Ecosystems Facility
Andy Steven_Overview of TERN's Australian Coastal Ecosystems FacilityAndy Steven_Overview of TERN's Australian Coastal Ecosystems Facility
Andy Steven_Overview of TERN's Australian Coastal Ecosystems Facility
 
LLW challenges and developments FINAL pptx
LLW challenges and developments FINAL pptxLLW challenges and developments FINAL pptx
LLW challenges and developments FINAL pptx
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Item 5: Introduction to the Global Spectral Calibration Library
Item 5: Introduction to the Global Spectral Calibration LibraryItem 5: Introduction to the Global Spectral Calibration Library
Item 5: Introduction to the Global Spectral Calibration Library
 
Planning for Watershed Restoration by Neil Stichert
Planning for Watershed Restoration by Neil StichertPlanning for Watershed Restoration by Neil Stichert
Planning for Watershed Restoration by Neil Stichert
 
Section 106 Considerations for Electric Infrastructure Projects
Section 106 Considerations for Electric Infrastructure ProjectsSection 106 Considerations for Electric Infrastructure Projects
Section 106 Considerations for Electric Infrastructure Projects
 
Biodiversity Information Networks: dataflows for interdisciplinary science
Biodiversity Information Networks: dataflows for interdisciplinary scienceBiodiversity Information Networks: dataflows for interdisciplinary science
Biodiversity Information Networks: dataflows for interdisciplinary science
 
Biodiversity Information Networks: Dataflows for interdisciplinary sciences
Biodiversity Information Networks: Dataflows for interdisciplinary sciencesBiodiversity Information Networks: Dataflows for interdisciplinary sciences
Biodiversity Information Networks: Dataflows for interdisciplinary sciences
 
GIS Presentation - Master of Env Students
GIS Presentation - Master of Env StudentsGIS Presentation - Master of Env Students
GIS Presentation - Master of Env Students
 
LCW Restoration Plan & EIR - Public Workshop #1
LCW Restoration Plan & EIR - Public Workshop #1 LCW Restoration Plan & EIR - Public Workshop #1
LCW Restoration Plan & EIR - Public Workshop #1
 

Plus de Hudbay Minerals Inc.

Plus de Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 

Dernier

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Dernier (20)

Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

Certificate of Environmental Compliance

  • 1. ROSEMONT 138-KV TRANSMISSION LINE PROJECT Team Building and Technology Transfer November 12, 2008
  • 2. PURPOSE AND NEED •  Rosemont Copper Company has requested TEP to provide electric power to the Rosemont operations •  The proposed 138-kV transmission line and substation would be needed to provided adequate and reliable power for operation of the proposed Rosemont facilities •  No existing transmission lines and substations could serve this purpose and need 2
  • 3. PROJECT DESCRIPTION •  Up to 28 miles of 138-kV transmission line connecting from either the Vail or South substations to the proposed Rosemont Substation (located on private land). The proposed 138-kV transmission line will require a new 100-foot-wide right-of-way •  Project area (approximately 560 square miles) consists predominantly of land owned by Arizona State Land Department, private, U.S. National Forest, and interspersed with some BLM land •  The planning process will demonstrate a thorough comparison of alternatives, including how information will be gathered during the public planning process and used to identify the preferred and alternative route(s) 3
  • 5. PROJECT DESCRIPTION (CONTINUED) •  The planning process will be summarized in a Certificate of Environmental Compatibility (CEC) application, which is required by the Arizona Corporation Commission (ACC) for construction and operation of the 138-kV transmission line 5
  • 6. SITING AND PLANNING PROCESS •  Comprehensive planning process consisting of six key tasks •  Studies will include environmental and engineering analysis, along with agency/public input •  Several alternatives will be identified and evaluated to meet the project purpose and need •  TEP/Rosemont Copper Company will identify a preferred route for permitting and construction, as well as alternative routes •  TEP will prepare and file a CEC application to be reviewed by the Arizona Power Plant and Transmission Line Siting Committee •  The ACC will make a final decision to approve (with any conditions) or deny the CEC application 6
  • 8. ENVIRONMENTAL STUDIES •  Environmental resources –  Land use (existing/future land use and jurisdictional planning guidelines) –  Visual (scenic quality, sensitive viewers, and scenic management guidelines) –  Cultural (National Register or eligible sites and archaeological sites) –  Biology (wildlife, vegetation, special status species, critical habitat) •  Environmental studies will be coordinated with SWCA and WestLand Resources to ensure consistency with the EIS 8
  • 9. ENVIRONMENTAL STUDIES •  Environmental resources: –  Land use (existing/future land use and jurisdictional planning guidelines) –  Visual (scenic quality, sensitive viewers, and scenic management guidelines) –  Cultural (National Register or eligible sites and archaeological sites) –  Biology (wildlife, vegetation, special status species, critical habitat) •  Environmental studies will be coordinated with SWCA and WestLand Resources to ensure consistency with the EIS 9
  • 10. PUBLIC PARTICIPATION •  Community stakeholder group •  Project fact sheet/newsletters •  Project mailing list •  Toll-free project information line •  TEP website (www.tep.com) •  Media briefings •  Project newsletters mailed to community, including residents, landowners, and other interested parties 10