SlideShare une entreprise Scribd logo
1  sur  48
IIP201
Study of Corrosion in Boilers
Guru Govind Singh Super Thermal Plant
Presentation By:
Sajeed Mahaboob
2011ME1111
Supervised By:
Er. Tarun Sharma
Asst. Executive Engineer, GGSSTP, PSPCL
13-10-2015 1
Introduction
• Location – Rupnagar, Punjab, India
About 50 km from Chandigarh on Chandigarh-Nangal highway NH-
21 near Ghanauli railway station.
• Super Thermal Plant?
• What was the need of a power plant?
13-10-2015 2
Salient features of GGSSTP
1. No. of Houses 6
2. No. of Units 6
3. Total Generator Capacity 6×210 MW = 1260 MW
4. Source of Water Supply From Nangal Hydel Channel
5. Fuel used Coal from coal fields of Bihar, West Bengal &
Madhya Pradesh
6. Turbine 210 MW 3 Cylinder mixed flow tandem coupled
3000 rpm BHEL make.
7. Generator 247 MVA, 15.75 KV, 9050 A at 0.82 lag, 50 Hz,
double star two pole
8. Total energy contribution annually 6942 MUs
9. Cost per unit Rs. 1.8413-10-2015 3
Typical power plant layout
https://en.wikipedia.org/wiki/Super_thermal_power_station
13-10-2015 4
Main Parts of the Plant
• Coal Handling
• D-M Water Plant
• Boiler
• Turbine
• Generator
• Transformer
• Ash handling
• Switchyard
• Control room
13-10-2015 5
Working principle
• Coal based thermal power plant works on the principal of Modified
Rankine Cycle.
• The Rankine cycle is a model
that is used to predict the
performance of steam engines.
• The Rankine cycle is an idealised
thermodynamic cycle of a heat
engine that converts heat into
mechanical work.
https://en.wikipedia.org/wiki/Rankine_cycle13-10-2015 6
Internship
• Our internship was based on the understanding the working of
following departments:
1. Feeder Section
2. Boiler Section
3. Fly Ash Section
• The project assigned to us was ‘Study of different reasons of corrosion
in the boiler’
13-10-2015 7
Coal Handling
13-10-2015 8
Coal Feeder Section
• Coal consumption for one unit per day - 3000 ton
• Each raw coalbunker has capacity of 680 tons
• Total 6 units in the coal feeder section
• XRP 803 mills (4)
• HP 08 mills (2)
• Each unit has 6 bowl mills (total 36)
13-10-2015 9
Overview of coal handling plant
http://www.pspcl.in/docs/gurugobind.htm
13-10-2015 10
Coal handling plant functions
• Unloading of coal wagons.
• Reclaiming of crushed and uncrushed coal.
• Coal crushing.
• Removal of unwanted particular from the coal.
• Coal feeding to the raw coalbunkers of running units.
13-10-2015 11
Wagon Tippler
• A rake is a train containing about 58-60 wagons.
• Each wagon contains about 58 tons of coal.
• Equipment's Used
• Water Sprinkler System
• Dust Extraction System
13-10-2015 12
W/T Drive System
www.slideshare.net/shrikant.khating/coal-handling-plant-chp
13-10-2015 13
Layout
www.slideshare.net/shrikant.khating/coal-handling-plant-chp
13-10-2015 14
Crush House
Two Stage Crushing System is used in Plant.
Primary Crusher (Double Roll Crusher)
Secondary Crusher (Rotary Breaker Crusher and Impact Crusher)
W / T
DRCR RBCR Impact
250 mm 80 mm
600 mm
20-25 mm
13-10-2015 15
http://www.paulsengineering.com/double-roll-crusher-555231.html
Double Roll Crusher
13-10-2015 16
Rotary Breaker Crusher
http://terrasource.com/equipment/bradford-breakers-by-pennsylvania-crusher-brand
13-10-2015 17
Impact Crusher
http://minyu.com/content/products.php?act=detail&c_id=1813-10-2015 18
Raw Coal Feeders (Bowl Mill)
• Coal is pulverized in the bowl mill (grounded to a powder form).
• Two types
XRP 803 mills (4)
HP 08 mills (2)
• The basic features of Bowl Mill (Pulveriser) supplied by BHEL are:
Medium speed range of 40 to 60 rpm
Input coal size is 25 mm while output is 65-75 micron
Crushing of coal by replaceable bull ring segment and grinding rolls
13-10-2015 19
Raw Coal Feeders (Continued…)
• Speed reduction by two method :
single stage worm & worm wheel set
Planetary Gear Box
• Working Principle :
• Raw coal gets ground between the grinding rolls and bull ring
segments installed on the revolving Bowl.
Springs exert necessary pressure on rolls for grinding.
• Hot air through the mill picks up the lighter particles and takes
them through the classifier(also removes coal moisture)
Fine coal air mixture leaves the mill and enters the fuel piping
system.
• Tramp iron pieces which are not required to grind, leave the Bowl
due to centrifugal force and are removed through the reject removal
system.
13-10-2015 20
XRP 803 mill
XRP803:
Itstands for
X - Frequency of power supply (50 cycles /sec)
R - Raymond,theinventor of bowl mills.
P- Pressurizedtype, withprimary air fancomingbeforethemill
80- Diameter of mill ininches
3- No. of rollers inthemill
13-10-2015 21
HP 08
HP08:
Itstandsfor:
H-HighPerformancemills
P-Pressurizedtype,withprimaryairfancomingbeforethemill
13-10-2015 22
Boilers
13-10-2015 23
BM1-Boiler Maintenance Section
• A boiler is a combination of systems and equipment in which chemical
energy is converted into thermal energy, which is then transferred to
working fluid, so as to convert it into steam at high temperature and
pressure.
• In GGSSTP,
6 boilers for 6 units. Each boiler is a 210 MW Radiant Reheat, Natural
Circulation, Single drum, Semi-outdoor, Dry bottom, Water Tube and
designed for coal as principle fuel.
• HFO firing capacity is equivalent to 22.5% boiler Maximum
Continuous Rating.
• Four burners are capable for 7.5% boiler MCR heat input
13-10-2015 24
Continued…
• The complete furnace section is of fusion welded wall type, arranged
as a gas and pressure tight envelop.
• The extended sidewall section (where re-heaters are located) is
covered with water-cooled fin welded walls.
• The maximum flue gas velocity in the pressure part system is limited
to 10-12 m/sec at 100% boiler MCR load.
• All headers are located outside the gas path, except for the
economizer inlet header; intermediate headers and LTSH inlet header
are located in the low gas temperature section.
• Two re-heaters and de-super heaters are provided at the inlet of the re-
heater for emergency control of final reheated steam.
13-10-2015 25
Working of a Power Plant Boiler
• Boiler in a power plant has two functions.
i. The Combustion system
ii. Water and steam system
• Conversion of Water to Steam evolves in three stages
i. Sensible heat addition
ii. Latent heat addition
iii.Superheating
13-10-2015 26
Coal Flow In a Boiler
• Air carries the dry coal powder from the pulverisers to the burners in
the boiler furnace.
• In the burners the coal powder is mixed with the required amount of
Combustion air and burned in the furnace.
http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/13-10-2015 27
Boiler’s Components (Coal to Heat)
• Air system
• Forced Draft Fan
• Air Heater
• Primary Air Fan
• flue gas system
• Induced Draft Fan
• Electrostatic Precipitators
• Stack
• Balanced Draft
13-10-2015 28
Sensible Heat Addition
• Feed Water Pump
Pumps the water at high pressure into the boiler from the feed water
tank.
• Pre-Heating
Feed water heaters, using extracted steam from the turbine, adds a part of
the sensible heat even before the water enters the boiler.
• Economiser
Economiser is the Set of coils made from steel tubes located in the tail end
of a boiler.
13-10-2015 29
http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/
13-10-2015 30
Latent Heat Addition
• Drum
• A large cylindrical vessel that functions as the storage and feeding
point for water and the collection point for water and steam mixture.
• Largest and most important pressure part in the boiler.
• Water Walls
• Water filled tubes that form the walls of the furnace.
• Water Walls get the water from the ‘downcomers’
• Lower density than the water in the downcomers.
• This density difference creates a circulation of water from the drum,
through the downcomers, water walls and back to the drum.
• Steam collects at the upper half of the drum
13-10-2015 31
http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/
13-10-2015 32
Super Heater/Re-Heater
Furnace (1156C)
Platen SH (1026C)
Reheater (920C)
Final SH (666C)
LTSH (346C)
Economizer (140C)
APH
ESP
Induced Daft Fan
Chimney.
13-10-2015 33
http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/
Dry Fly Ash
13-10-2015 34
Dry Fly Ash Section
• The plant obtains 64 tons per hour ash in one unit.
• The ash is collected in an intermediate silo.
• The ash then moves down to stage called DV-1 into six different
containers. The containers in DV-1 have a secondary pipe which is
used to suck anything inside it into the silo a few seconds before the
ash is released into the container to ensure that a large pressure
difference between the silo and the container.
• The ash then moves to stage DV-2. This stage also has a container
only smaller than DV-1 but the process is same.
• After DV-2, the final stage is DV-3 when the ash is transferred from
DV-2 containers to nearby cement factories.
13-10-2015 35
Project
Corrosion In Boilers
13-10-2015 36
Introduction
In coal based thermal power plant, following type of corrosion are
possible:
• Water/gas/acid corrosion
• High Temperature corrosion
• Low Temperature corrosion
• Oil ash corrosion
• Stress corrosion
• Fatigue corrosion
13-10-2015 37
Water/Gas/Acid Corrosion
• This is basically a low temperature corrosion but it is caused by the presence of
gas or steam drops and acids present in the flowing water.
• Basically, Corrosion’s origin varies widely but it is mainly caused due to the
action of dissolved oxygen, and corrosion currents set up as a result of
heterogeneities on metal surfaces, or to the iron being directly attacked by the
water.
• Low make up feed water pH can cause serious acid attack on metal surfaces in the
pre-boiler and boiler system. Feed water can also become acidic from
contamination of the system.
• Acidic corrosion can also be caused by chemical cleaning operations (overheating
of the cleaning solution, excessive exposure of metal to cleaning agent, high
cleaning agent concentration).
13-10-2015 38
High Temperature Corrosion
• This is usually take place in parts which usually come in the contact of hot gas
containing certain contaminants like:
1. Vanadium Compounds
2. Sulphate Compounds
• These compounds can form compounds during
combustion having a low melting point.
• These liquid melted salts are strongly corrosive for
stainless steel and other alloys normally inert
against the corrosion and high temperatures.
https://en.wikipedia.org/wiki/High-temperature_corrosion
13-10-2015 39
Low Temperature Corrosion
• Using fuels with sulphur in steam generating units yields a potential hazard of
sulphur corrosion at the cold end of the boiler.
• Sulphur in the fuel is oxidized chiefly to sulphur dioxide (SO2) during
combustion. Some sulphur trioxide (SO3) is also formed, and combines with water
to form sulphuric acid, which condenses on and attacks low temperature boiler
surfaces.
http://www.chec.kt.dtu.dk/Our-Research/Facilities/Experimental-Facilities-within-CHEC/Low-Temperature-Corrosion13-10-2015 40
Oil Ash Corrosion
• All fossil fuels, with the possible exception of natural gas, contain constituents
that will promote corrosion on the fire side of boiler components.
• Fly-ash and soot-blower are not by themselves corrosive, but both remove the
protective iron-oxide layer.
• The cleaned steel is then exposed to the high temperature flue-gas environment,
and an oxide film reforms.
http://hghouston.com/our-services/corrosion-control.aspx13-10-2015 41
Stress Corrosion
• Stress corrosion may result in either inter-crystalline or trans-granular cracking of
carbon steel. It is caused by a combination of metal stress and the presence of a
corrosive.
http://www.qualitymarineservices.net/other_corrosion.htmlhttps://en.wikipedia.org/wiki/Stress_corrosion_cracking
13-10-2015 42
Fatigue Corrosion
• Corrosion fatigue is fatigue in a corrosive environment.
• It is the mechanical degradation of a material under the joint action
of corrosion and cyclic loading.
• More highly stressed parts of tubes (such as bends, or at other areas
close to supports) may be the most vulnerable.
• Additional thermal stresses could be imposed on the end tubes from
the boiler frames.
13-10-2015 43
Prevention of Corrosion
• Feed Water Treatment
• Aeration
• Deaeration
• Ion Exchange
• Chemical Treatment
• Protective layers in Boilers
13-10-2015 44
Concerned Images
13-10-2015 45
Concerned Images
13-10-2015 46
References
• V. Chawla, A. Chawla, D. Puri, S. Prakash, P. Gurbuxani and B. Sidhu (2011) "Hot Corrosion & Erosion Problems in Coal
Based Power Plants in India and Possible Solutions – A Review," Journal of Minerals and Materials Characterization and
Engineering, Vol. 10, No. 4, pp. 367-386.
• Patel, R.D. and Patel, I. J. (2015) 'A Review paper on Erosion and Corrosion behavior of Coal combustion chamber',
International Journal for Innovative Research in Science and Technology, Vol. 1, No. 7, pp. 72-76.
• Boiler. (2015, August 3). Retrieved from https://en.wikipedia.org/wiki/Boiler
• Air preheater. (2015, May 16). Retrieved from https://en.wikipedia.org/wiki/Air_preheater
• http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/
• https://en.wikipedia.org/wiki/Super_thermal_power_station
• http://www.pspcl.in/docs/gurugobind.htm
• http://www.qualitymarineservices.net/other_corrosion.html
• http://hghouston.com/our-services/corrosion-control.aspx
• http://www.chec.kt.dtu.dk/Our-Research/Facilities/Experimental-Facilities-within-CHEC/Low-Temperature-Corrosion
• http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/
• www.slideshare.net/shrikant.khating/coal-handling-plant-chp
13-10-2015 47
13-10-2015 48

Contenu connexe

Tendances

The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoringManohar Tatwawadi
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesManohar Tatwawadi
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2Mohammad Basid
 
example hydrogen seal oil presentation
example hydrogen seal oil presentationexample hydrogen seal oil presentation
example hydrogen seal oil presentationSteve Ford
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedureAshvani Shukla
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boilerMilap Desai
 
Oxygen treatment for super critical power plants
Oxygen treatment for super critical power plantsOxygen treatment for super critical power plants
Oxygen treatment for super critical power plantsSantosh Pardhi
 
Bowl mill in thermal power plant
Bowl mill in thermal power plantBowl mill in thermal power plant
Bowl mill in thermal power plantHarmanSinghWalia
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
classifications and working of mills in a power plant
classifications and working of mills in a power plantclassifications and working of mills in a power plant
classifications and working of mills in a power plantVVDVARAPRASAD
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss MethodRajeev Saini
 

Tendances (20)

Boiler turbe failores
Boiler turbe failoresBoiler turbe failores
Boiler turbe failores
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoring
 
Introduction of Fired heaters
Introduction of Fired heatersIntroduction of Fired heaters
Introduction of Fired heaters
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
example hydrogen seal oil presentation
example hydrogen seal oil presentationexample hydrogen seal oil presentation
example hydrogen seal oil presentation
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Oxygen treatment for super critical power plants
Oxygen treatment for super critical power plantsOxygen treatment for super critical power plants
Oxygen treatment for super critical power plants
 
Bowl mill in thermal power plant
Bowl mill in thermal power plantBowl mill in thermal power plant
Bowl mill in thermal power plant
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
classifications and working of mills in a power plant
classifications and working of mills in a power plantclassifications and working of mills in a power plant
classifications and working of mills in a power plant
 
Boilers
BoilersBoilers
Boilers
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss Method
 
Pulverized coal-burner
Pulverized coal-burnerPulverized coal-burner
Pulverized coal-burner
 

Similaire à Study of corrosion and erosion in boilers

KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andalANIL kumar
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator TrainingVedant Sumaria
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plantArpit Budania
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
GANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIAGANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIA1996kuldeep
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant sagar20jain
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawarKeshav Meena
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavmukesh yadav
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222Ankit Poonia
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaPrakash Sharma
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power PlantHimanshu Dixit
 

Similaire à Study of corrosion and erosion in boilers (20)

KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plant
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
GANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIAGANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIA
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharma
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 

Plus de Sajeed Mahaboob

Managerial ethics and Social responsibility
Managerial ethics and Social responsibilityManagerial ethics and Social responsibility
Managerial ethics and Social responsibilitySajeed Mahaboob
 
Morpheme, morph, allomorph
Morpheme, morph, allomorphMorpheme, morph, allomorph
Morpheme, morph, allomorphSajeed Mahaboob
 
Water Level Indicator (Mini project)
Water Level Indicator (Mini project)Water Level Indicator (Mini project)
Water Level Indicator (Mini project)Sajeed Mahaboob
 
The concept of Core Competency
The concept of Core CompetencyThe concept of Core Competency
The concept of Core CompetencySajeed Mahaboob
 
Design and development of horizontal tensile testing machine (5kN)
Design and development of horizontal tensile testing machine (5kN)Design and development of horizontal tensile testing machine (5kN)
Design and development of horizontal tensile testing machine (5kN)Sajeed Mahaboob
 
Banana Fiber Reinforced Composite Materials
Banana Fiber Reinforced Composite MaterialsBanana Fiber Reinforced Composite Materials
Banana Fiber Reinforced Composite MaterialsSajeed Mahaboob
 
INTERROGATIVE CONSTRUCTIONS
INTERROGATIVE CONSTRUCTIONSINTERROGATIVE CONSTRUCTIONS
INTERROGATIVE CONSTRUCTIONSSajeed Mahaboob
 
Evaluation of hindi english mt systems, challenges and solutions
Evaluation of hindi english mt systems, challenges and solutionsEvaluation of hindi english mt systems, challenges and solutions
Evaluation of hindi english mt systems, challenges and solutionsSajeed Mahaboob
 
Design of a micro injection moulding machine for thermosetting moulding mater...
Design of a micro injection moulding machine for thermosetting moulding mater...Design of a micro injection moulding machine for thermosetting moulding mater...
Design of a micro injection moulding machine for thermosetting moulding mater...Sajeed Mahaboob
 
Interrogative constructions
Interrogative constructionsInterrogative constructions
Interrogative constructionsSajeed Mahaboob
 
Bilingualism and Multilingualism_Sajeed Mahaboob
Bilingualism and Multilingualism_Sajeed MahaboobBilingualism and Multilingualism_Sajeed Mahaboob
Bilingualism and Multilingualism_Sajeed MahaboobSajeed Mahaboob
 

Plus de Sajeed Mahaboob (13)

Managerial ethics and Social responsibility
Managerial ethics and Social responsibilityManagerial ethics and Social responsibility
Managerial ethics and Social responsibility
 
Morpheme, morph, allomorph
Morpheme, morph, allomorphMorpheme, morph, allomorph
Morpheme, morph, allomorph
 
Water Level Indicator (Mini project)
Water Level Indicator (Mini project)Water Level Indicator (Mini project)
Water Level Indicator (Mini project)
 
The concept of Core Competency
The concept of Core CompetencyThe concept of Core Competency
The concept of Core Competency
 
Design and development of horizontal tensile testing machine (5kN)
Design and development of horizontal tensile testing machine (5kN)Design and development of horizontal tensile testing machine (5kN)
Design and development of horizontal tensile testing machine (5kN)
 
Banana Fiber Reinforced Composite Materials
Banana Fiber Reinforced Composite MaterialsBanana Fiber Reinforced Composite Materials
Banana Fiber Reinforced Composite Materials
 
INTERROGATIVE CONSTRUCTIONS
INTERROGATIVE CONSTRUCTIONSINTERROGATIVE CONSTRUCTIONS
INTERROGATIVE CONSTRUCTIONS
 
Ocular tribology
Ocular tribologyOcular tribology
Ocular tribology
 
Evaluation of hindi english mt systems, challenges and solutions
Evaluation of hindi english mt systems, challenges and solutionsEvaluation of hindi english mt systems, challenges and solutions
Evaluation of hindi english mt systems, challenges and solutions
 
Design of a micro injection moulding machine for thermosetting moulding mater...
Design of a micro injection moulding machine for thermosetting moulding mater...Design of a micro injection moulding machine for thermosetting moulding mater...
Design of a micro injection moulding machine for thermosetting moulding mater...
 
High pressure cylinders
High pressure cylindersHigh pressure cylinders
High pressure cylinders
 
Interrogative constructions
Interrogative constructionsInterrogative constructions
Interrogative constructions
 
Bilingualism and Multilingualism_Sajeed Mahaboob
Bilingualism and Multilingualism_Sajeed MahaboobBilingualism and Multilingualism_Sajeed Mahaboob
Bilingualism and Multilingualism_Sajeed Mahaboob
 

Dernier

Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 

Dernier (20)

Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Study of corrosion and erosion in boilers

  • 1. IIP201 Study of Corrosion in Boilers Guru Govind Singh Super Thermal Plant Presentation By: Sajeed Mahaboob 2011ME1111 Supervised By: Er. Tarun Sharma Asst. Executive Engineer, GGSSTP, PSPCL 13-10-2015 1
  • 2. Introduction • Location – Rupnagar, Punjab, India About 50 km from Chandigarh on Chandigarh-Nangal highway NH- 21 near Ghanauli railway station. • Super Thermal Plant? • What was the need of a power plant? 13-10-2015 2
  • 3. Salient features of GGSSTP 1. No. of Houses 6 2. No. of Units 6 3. Total Generator Capacity 6×210 MW = 1260 MW 4. Source of Water Supply From Nangal Hydel Channel 5. Fuel used Coal from coal fields of Bihar, West Bengal & Madhya Pradesh 6. Turbine 210 MW 3 Cylinder mixed flow tandem coupled 3000 rpm BHEL make. 7. Generator 247 MVA, 15.75 KV, 9050 A at 0.82 lag, 50 Hz, double star two pole 8. Total energy contribution annually 6942 MUs 9. Cost per unit Rs. 1.8413-10-2015 3
  • 4. Typical power plant layout https://en.wikipedia.org/wiki/Super_thermal_power_station 13-10-2015 4
  • 5. Main Parts of the Plant • Coal Handling • D-M Water Plant • Boiler • Turbine • Generator • Transformer • Ash handling • Switchyard • Control room 13-10-2015 5
  • 6. Working principle • Coal based thermal power plant works on the principal of Modified Rankine Cycle. • The Rankine cycle is a model that is used to predict the performance of steam engines. • The Rankine cycle is an idealised thermodynamic cycle of a heat engine that converts heat into mechanical work. https://en.wikipedia.org/wiki/Rankine_cycle13-10-2015 6
  • 7. Internship • Our internship was based on the understanding the working of following departments: 1. Feeder Section 2. Boiler Section 3. Fly Ash Section • The project assigned to us was ‘Study of different reasons of corrosion in the boiler’ 13-10-2015 7
  • 9. Coal Feeder Section • Coal consumption for one unit per day - 3000 ton • Each raw coalbunker has capacity of 680 tons • Total 6 units in the coal feeder section • XRP 803 mills (4) • HP 08 mills (2) • Each unit has 6 bowl mills (total 36) 13-10-2015 9
  • 10. Overview of coal handling plant http://www.pspcl.in/docs/gurugobind.htm 13-10-2015 10
  • 11. Coal handling plant functions • Unloading of coal wagons. • Reclaiming of crushed and uncrushed coal. • Coal crushing. • Removal of unwanted particular from the coal. • Coal feeding to the raw coalbunkers of running units. 13-10-2015 11
  • 12. Wagon Tippler • A rake is a train containing about 58-60 wagons. • Each wagon contains about 58 tons of coal. • Equipment's Used • Water Sprinkler System • Dust Extraction System 13-10-2015 12
  • 15. Crush House Two Stage Crushing System is used in Plant. Primary Crusher (Double Roll Crusher) Secondary Crusher (Rotary Breaker Crusher and Impact Crusher) W / T DRCR RBCR Impact 250 mm 80 mm 600 mm 20-25 mm 13-10-2015 15
  • 19. Raw Coal Feeders (Bowl Mill) • Coal is pulverized in the bowl mill (grounded to a powder form). • Two types XRP 803 mills (4) HP 08 mills (2) • The basic features of Bowl Mill (Pulveriser) supplied by BHEL are: Medium speed range of 40 to 60 rpm Input coal size is 25 mm while output is 65-75 micron Crushing of coal by replaceable bull ring segment and grinding rolls 13-10-2015 19
  • 20. Raw Coal Feeders (Continued…) • Speed reduction by two method : single stage worm & worm wheel set Planetary Gear Box • Working Principle : • Raw coal gets ground between the grinding rolls and bull ring segments installed on the revolving Bowl. Springs exert necessary pressure on rolls for grinding. • Hot air through the mill picks up the lighter particles and takes them through the classifier(also removes coal moisture) Fine coal air mixture leaves the mill and enters the fuel piping system. • Tramp iron pieces which are not required to grind, leave the Bowl due to centrifugal force and are removed through the reject removal system. 13-10-2015 20
  • 21. XRP 803 mill XRP803: Itstands for X - Frequency of power supply (50 cycles /sec) R - Raymond,theinventor of bowl mills. P- Pressurizedtype, withprimary air fancomingbeforethemill 80- Diameter of mill ininches 3- No. of rollers inthemill 13-10-2015 21
  • 24. BM1-Boiler Maintenance Section • A boiler is a combination of systems and equipment in which chemical energy is converted into thermal energy, which is then transferred to working fluid, so as to convert it into steam at high temperature and pressure. • In GGSSTP, 6 boilers for 6 units. Each boiler is a 210 MW Radiant Reheat, Natural Circulation, Single drum, Semi-outdoor, Dry bottom, Water Tube and designed for coal as principle fuel. • HFO firing capacity is equivalent to 22.5% boiler Maximum Continuous Rating. • Four burners are capable for 7.5% boiler MCR heat input 13-10-2015 24
  • 25. Continued… • The complete furnace section is of fusion welded wall type, arranged as a gas and pressure tight envelop. • The extended sidewall section (where re-heaters are located) is covered with water-cooled fin welded walls. • The maximum flue gas velocity in the pressure part system is limited to 10-12 m/sec at 100% boiler MCR load. • All headers are located outside the gas path, except for the economizer inlet header; intermediate headers and LTSH inlet header are located in the low gas temperature section. • Two re-heaters and de-super heaters are provided at the inlet of the re- heater for emergency control of final reheated steam. 13-10-2015 25
  • 26. Working of a Power Plant Boiler • Boiler in a power plant has two functions. i. The Combustion system ii. Water and steam system • Conversion of Water to Steam evolves in three stages i. Sensible heat addition ii. Latent heat addition iii.Superheating 13-10-2015 26
  • 27. Coal Flow In a Boiler • Air carries the dry coal powder from the pulverisers to the burners in the boiler furnace. • In the burners the coal powder is mixed with the required amount of Combustion air and burned in the furnace. http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/13-10-2015 27
  • 28. Boiler’s Components (Coal to Heat) • Air system • Forced Draft Fan • Air Heater • Primary Air Fan • flue gas system • Induced Draft Fan • Electrostatic Precipitators • Stack • Balanced Draft 13-10-2015 28
  • 29. Sensible Heat Addition • Feed Water Pump Pumps the water at high pressure into the boiler from the feed water tank. • Pre-Heating Feed water heaters, using extracted steam from the turbine, adds a part of the sensible heat even before the water enters the boiler. • Economiser Economiser is the Set of coils made from steel tubes located in the tail end of a boiler. 13-10-2015 29
  • 31. Latent Heat Addition • Drum • A large cylindrical vessel that functions as the storage and feeding point for water and the collection point for water and steam mixture. • Largest and most important pressure part in the boiler. • Water Walls • Water filled tubes that form the walls of the furnace. • Water Walls get the water from the ‘downcomers’ • Lower density than the water in the downcomers. • This density difference creates a circulation of water from the drum, through the downcomers, water walls and back to the drum. • Steam collects at the upper half of the drum 13-10-2015 31
  • 33. Super Heater/Re-Heater Furnace (1156C) Platen SH (1026C) Reheater (920C) Final SH (666C) LTSH (346C) Economizer (140C) APH ESP Induced Daft Fan Chimney. 13-10-2015 33 http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/
  • 35. Dry Fly Ash Section • The plant obtains 64 tons per hour ash in one unit. • The ash is collected in an intermediate silo. • The ash then moves down to stage called DV-1 into six different containers. The containers in DV-1 have a secondary pipe which is used to suck anything inside it into the silo a few seconds before the ash is released into the container to ensure that a large pressure difference between the silo and the container. • The ash then moves to stage DV-2. This stage also has a container only smaller than DV-1 but the process is same. • After DV-2, the final stage is DV-3 when the ash is transferred from DV-2 containers to nearby cement factories. 13-10-2015 35
  • 37. Introduction In coal based thermal power plant, following type of corrosion are possible: • Water/gas/acid corrosion • High Temperature corrosion • Low Temperature corrosion • Oil ash corrosion • Stress corrosion • Fatigue corrosion 13-10-2015 37
  • 38. Water/Gas/Acid Corrosion • This is basically a low temperature corrosion but it is caused by the presence of gas or steam drops and acids present in the flowing water. • Basically, Corrosion’s origin varies widely but it is mainly caused due to the action of dissolved oxygen, and corrosion currents set up as a result of heterogeneities on metal surfaces, or to the iron being directly attacked by the water. • Low make up feed water pH can cause serious acid attack on metal surfaces in the pre-boiler and boiler system. Feed water can also become acidic from contamination of the system. • Acidic corrosion can also be caused by chemical cleaning operations (overheating of the cleaning solution, excessive exposure of metal to cleaning agent, high cleaning agent concentration). 13-10-2015 38
  • 39. High Temperature Corrosion • This is usually take place in parts which usually come in the contact of hot gas containing certain contaminants like: 1. Vanadium Compounds 2. Sulphate Compounds • These compounds can form compounds during combustion having a low melting point. • These liquid melted salts are strongly corrosive for stainless steel and other alloys normally inert against the corrosion and high temperatures. https://en.wikipedia.org/wiki/High-temperature_corrosion 13-10-2015 39
  • 40. Low Temperature Corrosion • Using fuels with sulphur in steam generating units yields a potential hazard of sulphur corrosion at the cold end of the boiler. • Sulphur in the fuel is oxidized chiefly to sulphur dioxide (SO2) during combustion. Some sulphur trioxide (SO3) is also formed, and combines with water to form sulphuric acid, which condenses on and attacks low temperature boiler surfaces. http://www.chec.kt.dtu.dk/Our-Research/Facilities/Experimental-Facilities-within-CHEC/Low-Temperature-Corrosion13-10-2015 40
  • 41. Oil Ash Corrosion • All fossil fuels, with the possible exception of natural gas, contain constituents that will promote corrosion on the fire side of boiler components. • Fly-ash and soot-blower are not by themselves corrosive, but both remove the protective iron-oxide layer. • The cleaned steel is then exposed to the high temperature flue-gas environment, and an oxide film reforms. http://hghouston.com/our-services/corrosion-control.aspx13-10-2015 41
  • 42. Stress Corrosion • Stress corrosion may result in either inter-crystalline or trans-granular cracking of carbon steel. It is caused by a combination of metal stress and the presence of a corrosive. http://www.qualitymarineservices.net/other_corrosion.htmlhttps://en.wikipedia.org/wiki/Stress_corrosion_cracking 13-10-2015 42
  • 43. Fatigue Corrosion • Corrosion fatigue is fatigue in a corrosive environment. • It is the mechanical degradation of a material under the joint action of corrosion and cyclic loading. • More highly stressed parts of tubes (such as bends, or at other areas close to supports) may be the most vulnerable. • Additional thermal stresses could be imposed on the end tubes from the boiler frames. 13-10-2015 43
  • 44. Prevention of Corrosion • Feed Water Treatment • Aeration • Deaeration • Ion Exchange • Chemical Treatment • Protective layers in Boilers 13-10-2015 44
  • 47. References • V. Chawla, A. Chawla, D. Puri, S. Prakash, P. Gurbuxani and B. Sidhu (2011) "Hot Corrosion & Erosion Problems in Coal Based Power Plants in India and Possible Solutions – A Review," Journal of Minerals and Materials Characterization and Engineering, Vol. 10, No. 4, pp. 367-386. • Patel, R.D. and Patel, I. J. (2015) 'A Review paper on Erosion and Corrosion behavior of Coal combustion chamber', International Journal for Innovative Research in Science and Technology, Vol. 1, No. 7, pp. 72-76. • Boiler. (2015, August 3). Retrieved from https://en.wikipedia.org/wiki/Boiler • Air preheater. (2015, May 16). Retrieved from https://en.wikipedia.org/wiki/Air_preheater • http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/ • https://en.wikipedia.org/wiki/Super_thermal_power_station • http://www.pspcl.in/docs/gurugobind.htm • http://www.qualitymarineservices.net/other_corrosion.html • http://hghouston.com/our-services/corrosion-control.aspx • http://www.chec.kt.dtu.dk/Our-Research/Facilities/Experimental-Facilities-within-CHEC/Low-Temperature-Corrosion • http://www.brighthubengineering.com/power-plants/24054-how-does-a-power-plant-boiler-work-combustion-system/ • www.slideshare.net/shrikant.khating/coal-handling-plant-chp 13-10-2015 47