SlideShare une entreprise Scribd logo
1  sur  13
Infrastructure
Development
and its impact on
Realty Market
Updated on: June 28, 2016
CASE STUDY SERIES
 Prosperity in any real estate
market is directly proportional to
its infrastructural development
 Roads and highways are the
most important infrastructure
which lay foundation to the
entire development process
 The Delhi/ NCR market, post
economic slowdown of year
2008, witnessed announcement
of many such expressways
 Through this case study, we aim
to analyse the impact in the
market with a focus on the
online search trends
Major Expressways
Announced in Delhi NCR
 1998:
Faridabad-Noida-Ghaziabad Corridor (FNG)
 2003:
Kundli-Manesar-Palwal Expressway (KMP)
 2003:
Yamuna Expressway
 2007:
Dwarka Expressway
Faridabad-Noida-
Ghaziabad Corridor (FNG)
4-lane 56 km long connecting
Faridabad and Ghaziabad via
Noida and Greater Noida
1998:
Announced
but stuck due
to political
unwillingness
2014:
Construction finally
started on 19.9 km
stretch in Noida-
Greater Noida
2015:
In July, construction
on Noida section
almost complete
2015:
In November, tender
for two bridges on
Yamuna initiated;
process is expected to
complete by mid-2016
2016:
In June, NHAI passed
proposal to convert
non-operational 43 km
stretch of FNG corridor
into NH. Work to start
by January 2017
Property Search Trends factoring FNG Corridor
Silence till year 2008
Surged in year 2009
Constant surges from
year 2010 onwards
Spikes on a regular
intervals indicate a
diversion of buyers
and investors
towards FNG
The trends clearly
show that any
development on
the corridor has
reflected in surge
in searches
Kundli – Manesar – Palwal
Expressway (KMP)
135.6 km long divided into
three sections of 45 km each
connecting Kundli and Palwal
via Manesar
2003:
1st
proposal
2009:
Layout, DPR & land acquisition
procedures completed. The
contract awarded to KMP
Expressway Ltd.
Deadline – June 2012
2012:
1st deadline
missed. New
deadline set to
May 2013
2015:
Multiple deadlines
missed. Contract
scrapped. Fresh
bids invited
2015:
January-July, the project converted
into 6-lane. Contract awarded to
Essel Infra projects for 83.32 km
between Kundli-Manesar.
Deadline-August 2018
2016:
In April, 53 km stretch
between Manesar-Palwal
opened for public
Property Search Trends factoring KMP
Searches in Kundli &
Manesar surged in 2010-11
Stabilised post 2012
Manesar saw surge in 2016
Searches in Palwal started
rising from year 2012 and
still showing upper trends
Impact of delayed
construction suppressed
property searches.
Whereas, opening of
Manesar – Palwal created
positive impact for Palwal
Kundali
Manesar
Palwal
Yamuna Expressway
India’s longest 165 km long,
6-lane controlled-access
expressway connects Greater
Noida with Agra
2003:
Yamuna
Expressway
proposed
2007:
Stuck due to
Government
change & financial
infeasibility
2007:
In December,
development
started.
Deadline - 2014
2012:
In August, project
completed ahead
of schedule.
Inaugurated by CM
Akhilesh Yadav
Property Search Trends factoring Yamuna Expressway
Property search surged with
spike in year 2009.
Remained constant till year
2013 with periodic surges
Searches rose again in 2013-14
It then slowed down afterwards
and remains so till date
Significant surge
immediately after
commencement of
construction and
completion thereby,
indicating direct impact
Dwarka Expressway (NPR)
18 km long and 150 m wide,
a high-speed link runs in a
smooth parabola from Kherki
Daula on NH8 to Dwarka
2007:
Project
Announced
2010:
Only 80% of land
acquired to
develop
2011:
In April,
development
started for 14 km
2012:
Deadline missed to
complete 14 km phase.
Litigations over land
acquisitions
2016:
Till January litigations
continued. In March,
the project got
National Highway
status, renamed NH-8A
Deadline - June, 2017
Property Search Trends factoring Dwarka Expressway
Demand for the property
around Dwarka
Expressway started
picking from year 2011
Continued till year 2013
Dipped in 2013 and
continues so till date
It is evident that
commencement of
construction impacted in
surge of property searches.
However, litigations killed
the momentum
 Though the Real estate as a sector depends upon many internal and external factors,
but infrastructure is one such which determines the future of a particular location and
the basics of any infrastructural development start with roads and connectivity. It is
thus, said that roads bring life to a location
 Unfortunately, roads and highways in our country are themselves struggling to stay
alive. As of April 2015, out of all the highway projects around 40% totalling 14,000 km
and costing around Rs 94,000 crore were delayed; 70% of these were managed by
NHAI and the total cost was close to Rs 80,500 crore
 This research report clearly indicates that property markets in and around these
highways got instant attention of investors and buyers
 However, litigation, roadblock and construction hurdles acted as speed-breakers.
Nonetheless, with NHAI's intervention in these highways, things appear to be on right
track
 As per Mr. Nitin Gadkari, Road Transport & Highway Minister, Government of India,
“Road construction in India has accelerated to an all-time high pace of 20 km per day &
should reach to 30 km per day in next 5-6 month”. It shows some acceleration in the
times to follow
For in-depth report,
please contact:
info@realtymyths.com

Contenu connexe

En vedette

India's 12th Five year Plan
India's 12th Five year PlanIndia's 12th Five year Plan
India's 12th Five year Plan
Ashok Tak
 
objectives of Current 5 year plan(2012-17)
objectives of Current 5 year plan(2012-17)objectives of Current 5 year plan(2012-17)
objectives of Current 5 year plan(2012-17)
Sweetp999
 

En vedette (12)

BUILDERS SEARCH TRENDS - DELHI/NCR MARKET
BUILDERS SEARCH TRENDS - DELHI/NCR MARKETBUILDERS SEARCH TRENDS - DELHI/NCR MARKET
BUILDERS SEARCH TRENDS - DELHI/NCR MARKET
 
Trends for affordbale housing destintion 2016
Trends for affordbale housing destintion 2016 Trends for affordbale housing destintion 2016
Trends for affordbale housing destintion 2016
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
 
FIVE YEAR PLANS OF INDIA
FIVE YEAR PLANS OF INDIAFIVE YEAR PLANS OF INDIA
FIVE YEAR PLANS OF INDIA
 
Green Buildings-passive cooling techniques
Green Buildings-passive cooling techniquesGreen Buildings-passive cooling techniques
Green Buildings-passive cooling techniques
 
Scope of Civil Engineering
Scope of Civil EngineeringScope of Civil Engineering
Scope of Civil Engineering
 
India's 12th Five year Plan
India's 12th Five year PlanIndia's 12th Five year Plan
India's 12th Five year Plan
 
objectives of Current 5 year plan(2012-17)
objectives of Current 5 year plan(2012-17)objectives of Current 5 year plan(2012-17)
objectives of Current 5 year plan(2012-17)
 
Civil Engineering
Civil EngineeringCivil Engineering
Civil Engineering
 
Surveying
Surveying Surveying
Surveying
 
Introduction to Civil Engineering
Introduction to Civil Engineering Introduction to Civil Engineering
Introduction to Civil Engineering
 
Real estate trends in 2016
Real estate trends in 2016Real estate trends in 2016
Real estate trends in 2016
 

Similaire à Impact of infrastructural development on realty market

India’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectIndia’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral project
Suresh Mandal
 

Similaire à Impact of infrastructural development on realty market (20)

Nl infrastructure july 25 - july 31 2015
Nl infrastructure july 25 - july 31 2015Nl infrastructure july 25 - july 31 2015
Nl infrastructure july 25 - july 31 2015
 
Roads Sector Report - June 2018
Roads Sector Report - June 2018Roads Sector Report - June 2018
Roads Sector Report - June 2018
 
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
 
Construction Industry Review
Construction Industry Review Construction Industry Review
Construction Industry Review
 
CASE STUDY POLICY OF NITI AYOG SALIENT FEATURES,RECOMMENDATION HIGHWAY PROJECT
CASE STUDY POLICY OF NITI AYOG SALIENT FEATURES,RECOMMENDATION HIGHWAY PROJECTCASE STUDY POLICY OF NITI AYOG SALIENT FEATURES,RECOMMENDATION HIGHWAY PROJECT
CASE STUDY POLICY OF NITI AYOG SALIENT FEATURES,RECOMMENDATION HIGHWAY PROJECT
 
Roads Sector Report May 2018
Roads Sector Report May 2018Roads Sector Report May 2018
Roads Sector Report May 2018
 
Nhdp get the fact - itp India - Highways
Nhdp   get the fact - itp India - HighwaysNhdp   get the fact - itp India - Highways
Nhdp get the fact - itp India - Highways
 
Roads Sector Report - August 2018
Roads Sector Report - August 2018Roads Sector Report - August 2018
Roads Sector Report - August 2018
 
Road ppt 14 12 15 final
Road ppt 14 12 15 finalRoad ppt 14 12 15 final
Road ppt 14 12 15 final
 
make in india- power point presentation.pdf
make in india- power point presentation.pdfmake in india- power point presentation.pdf
make in india- power point presentation.pdf
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
India’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectIndia’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral project
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
Roads Sector Report - March 2017
Roads Sector Report - March 2017Roads Sector Report - March 2017
Roads Sector Report - March 2017
 
Roads Sector Report - September 2018
Roads Sector Report - September 2018Roads Sector Report - September 2018
Roads Sector Report - September 2018
 
Roads infra
Roads infraRoads infra
Roads infra
 
Nl infrastructure sept 19 - 25, 2015
Nl infrastructure sept 19 - 25, 2015Nl infrastructure sept 19 - 25, 2015
Nl infrastructure sept 19 - 25, 2015
 
Roads Sector Report June 2017
Roads Sector Report June 2017Roads Sector Report June 2017
Roads Sector Report June 2017
 
Roads Sector Report July 2017
Roads Sector Report July 2017Roads Sector Report July 2017
Roads Sector Report July 2017
 
Roads Sector Report May 2017
Roads Sector Report May 2017Roads Sector Report May 2017
Roads Sector Report May 2017
 

Dernier

9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
delhimodel235
 
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
asmaqueen5
 
Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)
delhi24hrs1
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
delhimodel235
 
Call Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service Delhi
Call Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service DelhiCall Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service Delhi
Call Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service Delhi
asmaqueen5
 
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
delhimodel235
 
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
delhimodel235
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ - Mainstreet Equity Corp.
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
asmaqueen5
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
delhi24hrs1
 

Dernier (20)

Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
Mahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfMahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Iffco Chowk (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Iffco Chowk (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Iffco Chowk (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Iffco Chowk (Gurgaon)
 
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfVanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
 
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
 
Dausa ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Dausa ESCORT SERVICE❤CALL GIRL
Dausa ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Dausa ESCORT SERVICE❤CALL GIRLDausa ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Dausa ESCORT SERVICE❤CALL GIRL
Dausa ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Dausa ESCORT SERVICE❤CALL GIRL
 
Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Bhajanpura (Delhi)
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
 
Call Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service Delhi
Call Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service DelhiCall Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service Delhi
Call Girls In Majnu Ka Tilla (Delhi) ꧁8447779280}@꧂ Escorts Service Delhi
 
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
 
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
 
Kolte Patil Kharadi Pune E Brochure.pdf
Kolte Patil Kharadi Pune E  Brochure.pdfKolte Patil Kharadi Pune E  Brochure.pdf
Kolte Patil Kharadi Pune E Brochure.pdf
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdf
 

Impact of infrastructural development on realty market

  • 1. Infrastructure Development and its impact on Realty Market Updated on: June 28, 2016 CASE STUDY SERIES
  • 2.  Prosperity in any real estate market is directly proportional to its infrastructural development  Roads and highways are the most important infrastructure which lay foundation to the entire development process  The Delhi/ NCR market, post economic slowdown of year 2008, witnessed announcement of many such expressways  Through this case study, we aim to analyse the impact in the market with a focus on the online search trends
  • 3. Major Expressways Announced in Delhi NCR  1998: Faridabad-Noida-Ghaziabad Corridor (FNG)  2003: Kundli-Manesar-Palwal Expressway (KMP)  2003: Yamuna Expressway  2007: Dwarka Expressway
  • 4. Faridabad-Noida- Ghaziabad Corridor (FNG) 4-lane 56 km long connecting Faridabad and Ghaziabad via Noida and Greater Noida 1998: Announced but stuck due to political unwillingness 2014: Construction finally started on 19.9 km stretch in Noida- Greater Noida 2015: In July, construction on Noida section almost complete 2015: In November, tender for two bridges on Yamuna initiated; process is expected to complete by mid-2016 2016: In June, NHAI passed proposal to convert non-operational 43 km stretch of FNG corridor into NH. Work to start by January 2017
  • 5. Property Search Trends factoring FNG Corridor Silence till year 2008 Surged in year 2009 Constant surges from year 2010 onwards Spikes on a regular intervals indicate a diversion of buyers and investors towards FNG The trends clearly show that any development on the corridor has reflected in surge in searches
  • 6. Kundli – Manesar – Palwal Expressway (KMP) 135.6 km long divided into three sections of 45 km each connecting Kundli and Palwal via Manesar 2003: 1st proposal 2009: Layout, DPR & land acquisition procedures completed. The contract awarded to KMP Expressway Ltd. Deadline – June 2012 2012: 1st deadline missed. New deadline set to May 2013 2015: Multiple deadlines missed. Contract scrapped. Fresh bids invited 2015: January-July, the project converted into 6-lane. Contract awarded to Essel Infra projects for 83.32 km between Kundli-Manesar. Deadline-August 2018 2016: In April, 53 km stretch between Manesar-Palwal opened for public
  • 7. Property Search Trends factoring KMP Searches in Kundli & Manesar surged in 2010-11 Stabilised post 2012 Manesar saw surge in 2016 Searches in Palwal started rising from year 2012 and still showing upper trends Impact of delayed construction suppressed property searches. Whereas, opening of Manesar – Palwal created positive impact for Palwal Kundali Manesar Palwal
  • 8. Yamuna Expressway India’s longest 165 km long, 6-lane controlled-access expressway connects Greater Noida with Agra 2003: Yamuna Expressway proposed 2007: Stuck due to Government change & financial infeasibility 2007: In December, development started. Deadline - 2014 2012: In August, project completed ahead of schedule. Inaugurated by CM Akhilesh Yadav
  • 9. Property Search Trends factoring Yamuna Expressway Property search surged with spike in year 2009. Remained constant till year 2013 with periodic surges Searches rose again in 2013-14 It then slowed down afterwards and remains so till date Significant surge immediately after commencement of construction and completion thereby, indicating direct impact
  • 10. Dwarka Expressway (NPR) 18 km long and 150 m wide, a high-speed link runs in a smooth parabola from Kherki Daula on NH8 to Dwarka 2007: Project Announced 2010: Only 80% of land acquired to develop 2011: In April, development started for 14 km 2012: Deadline missed to complete 14 km phase. Litigations over land acquisitions 2016: Till January litigations continued. In March, the project got National Highway status, renamed NH-8A Deadline - June, 2017
  • 11. Property Search Trends factoring Dwarka Expressway Demand for the property around Dwarka Expressway started picking from year 2011 Continued till year 2013 Dipped in 2013 and continues so till date It is evident that commencement of construction impacted in surge of property searches. However, litigations killed the momentum
  • 12.  Though the Real estate as a sector depends upon many internal and external factors, but infrastructure is one such which determines the future of a particular location and the basics of any infrastructural development start with roads and connectivity. It is thus, said that roads bring life to a location  Unfortunately, roads and highways in our country are themselves struggling to stay alive. As of April 2015, out of all the highway projects around 40% totalling 14,000 km and costing around Rs 94,000 crore were delayed; 70% of these were managed by NHAI and the total cost was close to Rs 80,500 crore  This research report clearly indicates that property markets in and around these highways got instant attention of investors and buyers  However, litigation, roadblock and construction hurdles acted as speed-breakers. Nonetheless, with NHAI's intervention in these highways, things appear to be on right track  As per Mr. Nitin Gadkari, Road Transport & Highway Minister, Government of India, “Road construction in India has accelerated to an all-time high pace of 20 km per day & should reach to 30 km per day in next 5-6 month”. It shows some acceleration in the times to follow
  • 13. For in-depth report, please contact: info@realtymyths.com