Project Description
• Dairyland Power Cooperative (DPC)
• Not-for-profit Electric Generation and Transmission Cooperative
• Rural Electrification in four states – WI, MN, IA, IL
• Headquarter La Crosse, WI
• Regional Touchstone Energy Cooperative Partner
Project Description
• Rebuilt 161 kilovolt (kV) Electric Transmission Line
• Transmission line was built in 1950; 65 years old
• Need of rebuild
• Old structures
• Power and fiber optic outages due to failing structures
Original Structure
Project Description
• Rebuilt 161 kV Electric Transmission Line
• Fall 2015
• 13 miles total
• 3 miles within Van Loon Bottoms
– Black River floodplain in La Crosse County
– 0.9 miles USFWS Upper Mississippi National Wildlife and Fish Refuge
– 0.3 miles WDNR Van Loon Wildlife Area
– 1.8 miles private lands
Van Loon Bottoms
DPC ROW
USFWS
WDNR
Stantec
Project Description
• Rebuilt 161 kV Electric Transmission Line
• Uplands: 69 H-frame steel structures 500-700 feet apart
• Wetlands: 28 Y-frame steel structures 600-800 feet apart
• 3-mile Black River Floodplain
– 22 Y-frames installed with heavy-lift helicopter
– Only 65 feet of existing 80-foot right-of way used
New Y-frames
Impact Concerns
• Wetland Impacts
• Soil disturbance and compaction
• Species Impacts
• Eastern Massasauga (Sistrurus catenatus)
• State endangered; Federally proposed
• Wood Turtle (Glyptemys insculpta)
• State threathened
• Loggerhead Shrike (Lanius ludovicianus )
• State endangered
• Bell’s Vireo (Vireo belli)
• State threatened
• Cerulean Warbler (Setophaga cerulea)
• State threatened
©WDNR
Mitigation and Conservation
• DPC, AECOM, Stantec, USFWS, and WDNR
• Project-specific Mitigation and Conservation Plan
• Incidental Take Permit
• Eastern massasauga
• Wood Turtle
• Avoidance
• Loggerhead Shrike
• Bell’s Vireo
• Cerulean Warbler
Mitigation and Conservation
• Based on:
• Desktop reviews of recent aerial photography
• Discussions with USFWS and WDNR
• Habitat observations from previous field visits
• Alternative analyses –
• Relocating to CapX Project
• Three alternative routes
– Hwy 35 Route
– Seven Bridges Route
– Galesville Route
» Impacted more residences
» Increased line length
» Substantially more costly
» Greater environmental impacts
Wetland Mitigation
• Wetland Impact Minimizations
• Amphibious UTVs
• Foot Travel
• Helicopters
• Temporary Matting
• Around new structures only
• No transmission structures placed in waterbodies
• Impact monitoring by onsite Stantec Environmental Inspector,
WDNR Biologists, and USFWS Biologists
Wetland Mitigation
• Foot Travel
• Minimize soil disturbance and compaction
• Amphibious UTVs
• Argo, Hydratrek, and Marsh Master
• Transport personnel and small equipment
• Low ground pressure rubber tracks or tires
• Minimize soil disturbance and compaction
– Limited traffic in ROW to single access paths
up to 12ft wide
Wetland Mitigation
Wetland Impact Avoidance
• Helicopters
• Smaller Helicopters
• Personnel
• Small equipment
Two
Linemen
Wetland Impact Avoidance
• Helicopters
• Heavy-lift Sikorsky S-64 Air Crane
• Large equipment
― New and Old Utility Structures
― Mats
― Hammer and Power Unit
©Erik Daily, La Crosse Tribune
Hammer
Wetland Mitigation
• Impacts
• Permanent
• Approx. 0.01 acres for new structures
• Temporary
• Approx. up to 0.3 acres for new structure matting
• Approx. up to 5 acres for access routes
Wetland Mitigation
• DPC Long-term Maintenance
• Conduct a ground inspection
• Restore all areas of temporary disturbance to pre-existing or
improved habitat conditions
• Every 5 years
• Prepare and implement Vegetation Management Work Plans with
USFWS and WDNR
Species Conservation
• Avoidance
• Loggerhead Shrike
• Bell’s Vireo
• Cerulean Warbler
• Construction activities conducted after August 15 avoided breeding
season
Species Conservation
• Onsite Monitoring
• Eastern Massasauga
• Wood Turtle
• Up to two onsite Stantec Biologists
― Trained to handle and relocate species to
nearby habitat
― Hold E/T permits for target species
― Equipped with snake tongs
― VES ahead of all construction activities
― Remain near crews at all times
― Monitored from construction start
September 1 until the start of WDNR
designated species inactive season
October 31
*note eastern gartersnake hence why
I’m free handling it
Species Conservation
• Impacts
• No massasaugas or wood turtles observed during monitoring
• DPC Long-term Maintenance
• Conduct an updated endangered resources review within one
year
Species Conservation
• Additional Wildlife Sightings
• Northern Leopard Frogs
• Green Frogs
• Blue-spotted Salamanders
• Eastern Gartersnakes
• Midland Brownsnakes
• Northern Watersnakes
• Blanding's Turtle
• Snapping Turtle
• Midland Painted Turtles
• Bald Eagles
• Mink
• Wolf prints
• White-tailed Deer
Questions?

Contenu connexe

En vedette

En vedette (14)

Ideas to Make you a Social Media Rock Star
Ideas to Make you a Social Media Rock StarIdeas to Make you a Social Media Rock Star
Ideas to Make you a Social Media Rock Star
 
5 obz p
5 obz p5 obz p
5 obz p
 
Propiedadesdel arandano
Propiedadesdel arandanoPropiedadesdel arandano
Propiedadesdel arandano
 
Propiedades del arándano
Propiedades del arándanoPropiedades del arándano
Propiedades del arándano
 
Coding Project
Coding ProjectCoding Project
Coding Project
 
Propiedades del arandano
Propiedades del arandanoPropiedades del arandano
Propiedades del arandano
 
Propiedades del arándano
Propiedades del arándanoPropiedades del arándano
Propiedades del arándano
 
Bilan Mamadou - regime Ikililou
Bilan Mamadou - regime IkililouBilan Mamadou - regime Ikililou
Bilan Mamadou - regime Ikililou
 
Propiedades del arándano
Propiedades del arándanoPropiedades del arándano
Propiedades del arándano
 
Propiedades del Arándano
Propiedades del ArándanoPropiedades del Arándano
Propiedades del Arándano
 
Tarea 2. presentación powerpoint
Tarea 2. presentación powerpointTarea 2. presentación powerpoint
Tarea 2. presentación powerpoint
 
reddit genie
reddit geniereddit genie
reddit genie
 
Les couts de stock
Les couts de stock Les couts de stock
Les couts de stock
 
Potestad tributaria diapositiva
Potestad tributaria diapositivaPotestad tributaria diapositiva
Potestad tributaria diapositiva
 

Similaire à Avoiding and minimizing wetland and wildlife impacts in the Van Loon Bottoms during powerline construction

canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
MadavanR
 
Tidal power
Tidal powerTidal power
Tidal power
Melwinda
 
Mike Liddell_A new approach to intensive ecosystem research: introducing the ...
Mike Liddell_A new approach to intensive ecosystem research: introducing the ...Mike Liddell_A new approach to intensive ecosystem research: introducing the ...
Mike Liddell_A new approach to intensive ecosystem research: introducing the ...
TERN Australia
 
2012 03 The Tidal Regime of the Severn Estuary Paul Evans, Cardiff University
2012 03 The Tidal Regime of the Severn Estuary  Paul Evans, Cardiff University2012 03 The Tidal Regime of the Severn Estuary  Paul Evans, Cardiff University
2012 03 The Tidal Regime of the Severn Estuary Paul Evans, Cardiff University
SevernEstuary
 

Similaire à Avoiding and minimizing wetland and wildlife impacts in the Van Loon Bottoms during powerline construction (20)

canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
Nisqually Shellfish Growing Area Upgrades
Nisqually Shellfish Growing Area UpgradesNisqually Shellfish Growing Area Upgrades
Nisqually Shellfish Growing Area Upgrades
 
Tidal power
Tidal powerTidal power
Tidal power
 
WHS Emergency Service lessons from flood events
WHS Emergency Service lessons from flood eventsWHS Emergency Service lessons from flood events
WHS Emergency Service lessons from flood events
 
Tidal energy 2
Tidal energy 2Tidal energy 2
Tidal energy 2
 
Mike Liddell_A new approach to intensive ecosystem research: introducing the ...
Mike Liddell_A new approach to intensive ecosystem research: introducing the ...Mike Liddell_A new approach to intensive ecosystem research: introducing the ...
Mike Liddell_A new approach to intensive ecosystem research: introducing the ...
 
Nisqually Knotweed Control Project
Nisqually Knotweed Control ProjectNisqually Knotweed Control Project
Nisqually Knotweed Control Project
 
2012 03 The Tidal Regime of the Severn Estuary Paul Evans, Cardiff University
2012 03 The Tidal Regime of the Severn Estuary  Paul Evans, Cardiff University2012 03 The Tidal Regime of the Severn Estuary  Paul Evans, Cardiff University
2012 03 The Tidal Regime of the Severn Estuary Paul Evans, Cardiff University
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management Plan
 
Deveron
DeveronDeveron
Deveron
 
Phippen castonguay gmrp gmc slr symposium 2
Phippen castonguay gmrp gmc slr symposium 2Phippen castonguay gmrp gmc slr symposium 2
Phippen castonguay gmrp gmc slr symposium 2
 
Peter Phippen Sandy Update - November 2015
Peter Phippen Sandy Update - November 2015Peter Phippen Sandy Update - November 2015
Peter Phippen Sandy Update - November 2015
 
Iron Furnace TU Water Quality Monitoring Network Overview January 2013
Iron Furnace TU Water Quality Monitoring Network Overview January 2013Iron Furnace TU Water Quality Monitoring Network Overview January 2013
Iron Furnace TU Water Quality Monitoring Network Overview January 2013
 
march25 (1).ppt
march25 (1).pptmarch25 (1).ppt
march25 (1).ppt
 
SLIPP public meetings, August 2011: feature Shoreline Care presentation
SLIPP public meetings, August 2011: feature Shoreline Care presentationSLIPP public meetings, August 2011: feature Shoreline Care presentation
SLIPP public meetings, August 2011: feature Shoreline Care presentation
 
LCRA's T160 Project within the BCP
LCRA's T160 Project within the BCPLCRA's T160 Project within the BCP
LCRA's T160 Project within the BCP
 
Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83
 
Coastal defense structures
Coastal defense structuresCoastal defense structures
Coastal defense structures
 

Dernier

Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
hossanmdjobayer103
 

Dernier (20)

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 

Avoiding and minimizing wetland and wildlife impacts in the Van Loon Bottoms during powerline construction

  • 1. Avoiding and Minimizing Wetland and Wildlife Impacts in the Van Loon Bottoms During Powerline Construction Sara Viernum, Wildlife Biologist
  • 2. Project Description • Dairyland Power Cooperative (DPC) • Not-for-profit Electric Generation and Transmission Cooperative • Rural Electrification in four states – WI, MN, IA, IL • Headquarter La Crosse, WI • Regional Touchstone Energy Cooperative Partner
  • 3. Project Description • Rebuilt 161 kilovolt (kV) Electric Transmission Line • Transmission line was built in 1950; 65 years old • Need of rebuild • Old structures • Power and fiber optic outages due to failing structures Original Structure
  • 4. Project Description • Rebuilt 161 kV Electric Transmission Line • Fall 2015 • 13 miles total • 3 miles within Van Loon Bottoms – Black River floodplain in La Crosse County – 0.9 miles USFWS Upper Mississippi National Wildlife and Fish Refuge – 0.3 miles WDNR Van Loon Wildlife Area – 1.8 miles private lands
  • 5. Van Loon Bottoms DPC ROW USFWS WDNR Stantec
  • 6. Project Description • Rebuilt 161 kV Electric Transmission Line • Uplands: 69 H-frame steel structures 500-700 feet apart • Wetlands: 28 Y-frame steel structures 600-800 feet apart • 3-mile Black River Floodplain – 22 Y-frames installed with heavy-lift helicopter – Only 65 feet of existing 80-foot right-of way used New Y-frames
  • 7. Impact Concerns • Wetland Impacts • Soil disturbance and compaction • Species Impacts • Eastern Massasauga (Sistrurus catenatus) • State endangered; Federally proposed • Wood Turtle (Glyptemys insculpta) • State threathened • Loggerhead Shrike (Lanius ludovicianus ) • State endangered • Bell’s Vireo (Vireo belli) • State threatened • Cerulean Warbler (Setophaga cerulea) • State threatened ©WDNR
  • 8. Mitigation and Conservation • DPC, AECOM, Stantec, USFWS, and WDNR • Project-specific Mitigation and Conservation Plan • Incidental Take Permit • Eastern massasauga • Wood Turtle • Avoidance • Loggerhead Shrike • Bell’s Vireo • Cerulean Warbler
  • 9. Mitigation and Conservation • Based on: • Desktop reviews of recent aerial photography • Discussions with USFWS and WDNR • Habitat observations from previous field visits • Alternative analyses – • Relocating to CapX Project • Three alternative routes – Hwy 35 Route – Seven Bridges Route – Galesville Route » Impacted more residences » Increased line length » Substantially more costly » Greater environmental impacts
  • 10. Wetland Mitigation • Wetland Impact Minimizations • Amphibious UTVs • Foot Travel • Helicopters • Temporary Matting • Around new structures only • No transmission structures placed in waterbodies • Impact monitoring by onsite Stantec Environmental Inspector, WDNR Biologists, and USFWS Biologists
  • 11. Wetland Mitigation • Foot Travel • Minimize soil disturbance and compaction • Amphibious UTVs • Argo, Hydratrek, and Marsh Master • Transport personnel and small equipment • Low ground pressure rubber tracks or tires • Minimize soil disturbance and compaction – Limited traffic in ROW to single access paths up to 12ft wide
  • 13. Wetland Impact Avoidance • Helicopters • Smaller Helicopters • Personnel • Small equipment Two Linemen
  • 14. Wetland Impact Avoidance • Helicopters • Heavy-lift Sikorsky S-64 Air Crane • Large equipment ― New and Old Utility Structures ― Mats ― Hammer and Power Unit ©Erik Daily, La Crosse Tribune Hammer
  • 15. Wetland Mitigation • Impacts • Permanent • Approx. 0.01 acres for new structures • Temporary • Approx. up to 0.3 acres for new structure matting • Approx. up to 5 acres for access routes
  • 16. Wetland Mitigation • DPC Long-term Maintenance • Conduct a ground inspection • Restore all areas of temporary disturbance to pre-existing or improved habitat conditions • Every 5 years • Prepare and implement Vegetation Management Work Plans with USFWS and WDNR
  • 17. Species Conservation • Avoidance • Loggerhead Shrike • Bell’s Vireo • Cerulean Warbler • Construction activities conducted after August 15 avoided breeding season
  • 18. Species Conservation • Onsite Monitoring • Eastern Massasauga • Wood Turtle • Up to two onsite Stantec Biologists ― Trained to handle and relocate species to nearby habitat ― Hold E/T permits for target species ― Equipped with snake tongs ― VES ahead of all construction activities ― Remain near crews at all times ― Monitored from construction start September 1 until the start of WDNR designated species inactive season October 31 *note eastern gartersnake hence why I’m free handling it
  • 19. Species Conservation • Impacts • No massasaugas or wood turtles observed during monitoring • DPC Long-term Maintenance • Conduct an updated endangered resources review within one year
  • 20. Species Conservation • Additional Wildlife Sightings • Northern Leopard Frogs • Green Frogs • Blue-spotted Salamanders • Eastern Gartersnakes • Midland Brownsnakes • Northern Watersnakes • Blanding's Turtle • Snapping Turtle • Midland Painted Turtles • Bald Eagles • Mink • Wolf prints • White-tailed Deer