3rd Annual Conference on

Overseas Coal in
India
Imported Coal to fuel India’s Economic
Growth
Session 1 : Introduction – Indian coal scenario vis-à-vis Global Coal market.

           World's population is forecast to increase from six billion, currently, to over eight
   billion by 2030. With this explosion of population and particularly, with the emerging dynamic
   new economies, the pursuit of quantity-wise and quality-wise affordable and reliable source
   of energy is presenting unprecedented economic, social and environmental challenges. Energy
   is central to development & poverty reduction measures and can be described as “the
   backbone of civilization”. Finding ways to provide energy, will lift emerging nations’
   economies, provide employment and boost quality of life across the globe, and to do so in a
   way which is within the means of the common mass, is the major challenge before the energy
   providers.

          Coal is reliable, inexpensive, not subject to the vagaries of windless or sunless days and
   dirty, remains the most important fuel for energy producing around the world. About 30.3% of
   primary energy needs are met by coal and 42% of electricity is generated from coal (source:
   World coal association). About 70% of world steel production depends on coal feedstock.

          The dependency on coal is especially more in case of emerging countries like India
   with 69% of energy demand being fulfilled by coal. According to Planning Commission of India,
   India’s projected demand is slated to increase to 980.5 Mt from current demand of 634.35 Mt.

                       Projected Coal demand in XI and XII Plan                           (in Mt)

    Particulars     Demand in Terminal year of XI Plan i.e. 2011-      Projected demand in terminal
                                       12                              year of XII Plan (16-17) as per
                                                                         the WG for XII Plan period
                       Original          Mid Term            Actual            (draft report)
                       estimate          Appraisal

    Total (Mt)          731.10            713.24             634.35                 980.5



      Customer / sector-wise break up of assessed coal demand for 2016-17
 Customer / sector                   Demand assessed by WG (Mt)             Demand in % of total
                                                                                demand
    Power Utility                                    682*                         69.6
    Power Captive incl. fert.                        56.36                         5.7
    Cement                                           47.31                         4.8
    Sponge Iron                                      50.33                         5.1
    Others                                            77.3                         7.9
 Total non-coking                                  913.3                             93.2
 Coking                                            67.2**                            6.9
 Total                                             980.5                             100
Coal Production in India
                                                                              (Figs. in Mt)
         Coal Producers                   Actual production during X plan    Actual production during XI plan
                                            2002-03          2006-07           2007-08           2011-12
         CIL                                 290.69           360.91            379.46            435.83
         SCCL                                 33.23            37.71             40.60             52.21
         Other PSUs                            1.51             1.77              2.11              2.71
         Total PSUs                          325.43           400.39            422.17            490.75
         Tata Steel & Captive Blocks          11.44            24.65             28.38             41.98
         Meghalaya                             4.40             5.79              6.54              7.21
         Total Others                         15.84            30.44             34.92             49.19
         ALL INDIA                           341.27           430.83            457.08            539.94
         UG                                   63.16            57.75             58.90             51.83
         OC                                  278.11           373.08            398.18            488.11
         Total                               341.27           430.83            457.08            539.94
         Coking                               30.19            32.08             34.46             51.65
         Non-Coking                          311.08           398.75            422.63            488.29
         TOTAL                               341.27           430.83            457.08            539.94
                                            CAGR 5.6% in X Plan period        CAGR 4.35% in XI Plan period




                Coal Demand vs Availability from Indigenous
                                Sources
                                                                                 (in Mt)
        1200
                                                             980.5
        1000
                                                                 795
         800                           634.35                                        Demand
                   550                          535.42
         600              455                                                        Availability
         400                                                                         Gap
                                                                        185.5
         200                    95                  98.93
            0
                      2006-07              2011-12              2016-17
                            Terminal years of Plan period




         Furthermore, the demand-indigenous availability gap projected for 2016-17 would rise further
during successive plan periods. This necessitates immediate strategy to augment the coal production to
the extent possible to reduce the gap and import requirement. CIL, being the major coal producer and
supplier of over 40% of the commercial energy of the country has to come out with pro-active strategies
for enhancing its coal production level.
Session 2: Global Asset Acquisition - Identification and Mitigation of Key Risks:


         Government of India pushed for acquisition of coal assets abroad in the recent past, framing
guidelines for asset acquisition by Public Sector Units, this was done looking at growing demand and
increasing gap between supply and demand of coal, and it also proposed to create a ‘sovereign fund’
for the same.

After these guidelines, Coal India limited (CIL) started looking for coal assets abroad but has failed
due to following reasons:




                 • CIL wanted to play it safe and wanted to buy equity in a
  Acquiring        listed company.
   equity


                 • Agreements didn’t work out due to prices; the miners
 Agreements        were not ready as coal prices were fluctuating.


                 • CIL would have to invest in infrastructure and then
    Joint          undertake mining.
   Venture




         Strategic rationale is a key driver of evaluation and mitigation of risks. Risks in mining assets
are due to various reasons such as type of asset, commodity, geography, taxes, legal and
infrastructure etc.



                                             Risks during

                   Exploration                                             Operation
       Acquisition at fraction value                         De-risked asset
       Benefit from all the upside                           Assured supply
       Low capital risk                                      Limited value
       Bear all development costs                            Higher capital risk
       Very few undeveloped coal assets left in              Any change in law
        developed countries
       Difficulty in land acquisition due to                 Acquire at full value
        non-availability of land records
Risks Mitigation

       Modular exploration and development programs.
       Robust transaction structure.
       Robust review at each step.
       Assets from different countries should not be compared.
       Explore other options also like coal trading.
       Undertake background checks, hire legal firms if required.
       India needs to be aggressive when it comes to acquiring coal assets abroad.


    Last but not the least, the complete sector should act as a whole and not in bits-n-pieces and
there should be aggressiveness in acquiring coal assets abroad thus securing India’s energy
demand.
Session 3: Coal Imports – Challenges and Risk Mitigation Strategies:

        Importing coal becomes a challenging proposition when the quantity to be imported is large
and the infrastructure is not very good. But to feed its growing energy demand and propel its GDP
growth, India needs to overcome these challenges and develop risk mitigation strategies.


Coal import challenges:

    1. From supplier side –
            Sees distorted picture.
            Wants to understand the appetite before committing.
            Has to keep an eye on domestic coal production.
            Proper contracts.

    2. From buyer side –

               Lack of government support.
               Investment is to be made both in mines as well as infrastructure.
               If GDP grows only by 6%, there may be oversupply of electricity addition.
               Generators, discoms can’t pass on increase in fuel prices.
               Any change in law.
               Infrastructure at ports.
               Pilferages.
               Indigenous production of coking coal is just 5% of requirement.
               Inefficient coal washeries.
               Public Sector Utilities have failed to acquire any coal assets abroad.
               Language barrier.



Risk Mitigation Strategies.

       Policies should be notified for long term.
       Risk assessment should be proper.
       Buyers should take risk.
       Price pooling will help in keeping the domestic coal prices down.
       Use coal conversion technologies to meet increasing demand of steel sector.
       Mature technologies like coal gasification or upcoming technologies like coal liquefaction
        should be used.
       Encourage coastal power plants based on imported coal.
       India should invest more in coal washeries.
       Affordability studies.
       Have 3-5% improvement in all logistics.


    Thus there are various challenges both from supplier side as well as from buyer side but with
proper risk mitigation strategies these challenges can be overcome and the future secured with
respect to India’s energy needs.
Session 4: Economics of Global Coal Acquisition - Fiscal & Legal Issues:

         With increasing consumption of coal across the world, any change in law by coal rich nations has a
profound effect on the global coal prices. Thus with increase in coal prices the ‘not so attractive’ coal rich
destinations will become attractive.

        Pool pricing to have large implications and is a short term solution.
        India needs to develop national bodies/groups which can negotiate prices.
        The time between application and issuance of licenses needs to be sorted out
        There should be clarity surrounding the regulations.
        There is also some ambiguity surrounding the Domestic Market Obligation (DMO) in Indonesia.
        With change in mining law in Indonesia a coal reference price has been established thus adding to
         confusion and price rise.
        The recently introduced change requiring a 51% disinvestment of capital by foreign mining licence
         holders has come as a big setback to investors.
Session 5: Coal Logistics - Sufficing Country’s requirements

         Import of coal requires considerable logistical requirement & planning. Availability of proper
infrastructure is also a pre-requisite. Port, rail, loading & unloading and other infrastructure is
required. From ports coal in transported by railways and thus we have a very high dependency on it.
The following chart highlights the same.
                                                                              (Figs. in Mt)


Mode              2009-10                        2010-11                           2011-12


                  Dispatch            %          Dispatch              %           Dispatch             %
                                 Contribution                     Contribution                     Contribution
Rail              193.7          46.6            199.9            47.2             212.4           49.1

Road              122.3          29.4            128.6            30.3             129.2           29.9

MGR               86.6           20.9            83.6             19.7             79.3            18.3

Belt/Rope         12.5           3.1             11.7             2.8              11.2            2.7

Total             415.1                          423.8                             432.1




Problems:
               Non-availability of railway rakes in quantity required.
               Railways charging on dead freight & not on volume.
               No dedicated freight transport rail corridor.
               High time taken by railways to transport coal from ports to power plants.
               Land area is a major constraint at ports.
               Inadequate draft at ports thus limitation in handling large size vessels.
               Night navigation not available at many ports.
               Non-availability of mechanised berths at ports.
               Lack of support infrastructure – tugs, flotilla, IT systems etc.
               Environmental concerns.
               Inadequacy of dust suppresser & fire fighting equipment.
               Increasing distance between mines and plants.
               Lack of planning on business lines by railways
               Indian ‘Golden Quadrilateral’ has 25% freight capacity but has 60% freight
                movement.
               Untrained personnel.
Emerging Options & Solutions:
       Dedicated freight corridors by railways
                     Railways planning 6 dedicated freight corridors.
                     These dedicated corridors will be fully electrified & without level crossings.
                     Cost to be around Rs. 5,00,000 crore, to be funded 1/3 by government &
                         rest by debt.
                     Work on Western & Eastern dedicated freight corridor’s has started.
                     Estimated to cost 90,000 crores.
                     Land requirement is 17,000 hectares
                     Expected to reduce time by 3 times at half the running cost.
                     Mumbai – Delhi ‘Industrial corridor’ to come up along the western corridor.
                     Western & Eastern corridors to be partially funded by Japanese banks &
                         World Bank respectively.
                     Expected to come up by 2016-17.
       Inland waterways - another emerging option.
       Imported coal can be dried up at plants to reduce transportation cost.
       Blending of coal at ports can be undertaken.
       Washeries should come up near ports.
       Handling at non-major ports increasing at CAGR at 43.8% from 2008.
       Dredging is required at all ports regularly.
       Maintain train inside ports.
       Proper scheduling of trains required.



    Logistics and infrastructure are very critical for sustaining import of coal, proper logistics &
infrastructure can increase efficiency as well as reduce the overall price in the long run and hence
special attention should be given to this.
Session 6: Policies & Regulations Governing the Coal Sector
        The coal sector is an important sector when it comes to fulfilling energy demand and thus
there are a very large number of policies and regulations governing it, any change in policy can have
a profound effect on the complete sector from investment to infrastructure. Thus proper policies
and regulations are need of the hour that not only facilitate growth of coal production but also take
care that coal is produced with least impact on environment.

       Any change in policies makes logistics go haywire.
       Hence policies should be notified for long term.
       Coal export from a Indonesia has grown at 12.5% CAGR from 2000 to 2011.
       Imposition of Domestic Market Obligation (DMO) by the Indonesian government has
        become a problem for coal exporters.
       Indonesian government has banned export of unprocessed coal having a calorific value
        below 5100.
       Even Nepal has formed an environment policy of giving environment clearance in 7 days and
        finally if clearance is not given after 30 days it is deemed to be given.
Session 7: Coal Trading: Synopsis of Indian Coal Market

        With increased demand from emerging nations like India & China, the quantity of coal
traded has gone up significantly (source: World coal association), with China alone accounting for
47% of global coal consumption.


                                              World Coal Trade
                                  Steam                            Coking                        Lignite


        2009                      717Mt                            211Mt                           4Mt


        2010                      788Mt                            284Mt                           5Mt


        2011                      861Mt                            276Mt                           5Mt




         Also a distinct trend seen is that top 5 coal importing countries are situated in the continent of Asia,
largely due to the high population and fastest growing economies.




                                           Top Coal Importers (2011)
                                                  Total of which                  Steam               Coking

               PR China                               190Mt                        146Mt                 38Mt

                Japan                                 175Mt                        121Mt                 54Mt

            South Korea                               129Mt                        97Mt                  32Mt

                India                                 105Mt                        86Mt                  19Mt

           Chinese Taipei                              66Mt                        62Mt                  4Mt

               Germany                                 41Mt                        32Mt                  9Mt

                 UK                                    33Mt                        27Mt                  6Mt




         New coal discoveries and rising investment in mining infrastructure has propelled Indonesia as the top
coal exporting country with exports increasing 12.5% CAGR from 2000 to 2011. Also the long term supplier of
coal - Australia, accounts for more than half of all metallurgical or steelmaking coal traded by sea and 1/5 of
seaborne thermal coal used to generate power. With technological advancement in Shale gas fracturing United
States of America has become an emerging country for coal export and the export quantity is likely to grow
further.
Top Coal Exporters (2011e)
                                          Total of which                   Steam               Coking
       Indonesia                             309Mt                         309Mt                 0Mt
       Australia                             284Mt                         144Mt                140Mt
         Russia                              124Mt                         110Mt                14Mt
          USA                                 97Mt                          34Mt                63Mt
       Colombia                               75Mt                          75Mt                 0Mt
      South Africa                            72Mt                          72Mt                 0Mt
      Kazakhstan                              34Mt                          33Mt                 1Mt



     In Asian way of Trading, relationships are very important and even the most difficult situations can be
sorted out across the table, however things can go wrong and do go wrong especially in a Long Term
Contracts, hence it should be ensured that the Contract is governed by Laws that are workable, fair and
delivers quick justice.
Session 8: Formulating Future Road Map

         It is critical that we put in place mechanisms to ensure that the growth in the country is not
stifled due to lack of energy resources and the government should support completely as a
facilitator. Thus formulating a future road map is necessary.

       The government should be aggressive in acquiring coal assets abroad.
       Encourage captive mining to reduce dependence on coal from abroad.
       Rework working group projection – indentify target countries for long term imports
       Upgrade political efforts for stronger bilateral diplomatic relations
       Institute special fund for foreign coal acquisitions
       Have a multi-modal transport policy.
       Public-Private partnership should be introduced in all sectors related to coal imports.
       Financial Institutions should undertake proper feasibility study of projects before financing
        them.
       Formulate long term costal thermal power-generation strategy
       Diversify coal imports
       Moderate resources nationalism by greater commercial / cultural presence
       Policies should be notified for long term.
       Use technological advancements to reduce dependency on coal.
       Invest in supporting infrastructure eg. IT systems, night navigation, tug boats etc.
       Single window mechanism for approvals/clearances.
       Appointment of coal regulator – with clearly defined powers.



       There should be a holistic approach towards facing the challenges and solving them with
focus on energy security, sustainable development and exploration of technologies related to
renewable energy sources.

Contenu connexe

Tendances

2010 Financial Analysis and Accounting Statements
2010 Financial Analysis and Accounting Statements2010 Financial Analysis and Accounting Statements
2010 Financial Analysis and Accounting StatementsPetrobras
 
Automotive Industry
Automotive IndustryAutomotive Industry
Automotive IndustryAnkur Pandey
 
progress energy 07/25/2001
progress energy 07/25/2001progress energy 07/25/2001
progress energy 07/25/2001finance25
 
Deutsche Telekom 3Q 2008 earnings release
Deutsche Telekom 3Q 2008 earnings releaseDeutsche Telekom 3Q 2008 earnings release
Deutsche Telekom 3Q 2008 earnings releaseearningsreport
 
Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)guest1c66d59
 
Murphy Oil Corporation's 2002 Annual Report
	Murphy Oil Corporation's 2002 Annual Report 	Murphy Oil Corporation's 2002 Annual Report
Murphy Oil Corporation's 2002 Annual Report finance14
 
Automotive industry
Automotive industryAutomotive industry
Automotive industryfshariar
 
A ppt on electicity gen..
A   ppt on electicity gen..A   ppt on electicity gen..
A ppt on electicity gen..Jitendra Mhaske
 

Tendances (9)

2010 Financial Analysis and Accounting Statements
2010 Financial Analysis and Accounting Statements2010 Financial Analysis and Accounting Statements
2010 Financial Analysis and Accounting Statements
 
Philippine Metallic Mineral Production
Philippine Metallic Mineral ProductionPhilippine Metallic Mineral Production
Philippine Metallic Mineral Production
 
Automotive Industry
Automotive IndustryAutomotive Industry
Automotive Industry
 
progress energy 07/25/2001
progress energy 07/25/2001progress energy 07/25/2001
progress energy 07/25/2001
 
Deutsche Telekom 3Q 2008 earnings release
Deutsche Telekom 3Q 2008 earnings releaseDeutsche Telekom 3Q 2008 earnings release
Deutsche Telekom 3Q 2008 earnings release
 
Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)
 
Murphy Oil Corporation's 2002 Annual Report
	Murphy Oil Corporation's 2002 Annual Report 	Murphy Oil Corporation's 2002 Annual Report
Murphy Oil Corporation's 2002 Annual Report
 
Automotive industry
Automotive industryAutomotive industry
Automotive industry
 
A ppt on electicity gen..
A   ppt on electicity gen..A   ppt on electicity gen..
A ppt on electicity gen..
 

En vedette

Coalnomics brochure (1)
Coalnomics brochure (1)Coalnomics brochure (1)
Coalnomics brochure (1)Shivansh Tyagi
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution newShivansh Tyagi
 
Power Plus - Inside Out Of Power
Power Plus - Inside Out Of PowerPower Plus - Inside Out Of Power
Power Plus - Inside Out Of PowerShivansh Tyagi
 
Csp list channelpartners
Csp list channelpartnersCsp list channelpartners
Csp list channelpartnersShivansh Tyagi
 
Green csr-conference-backgrounder -indian powersector.com
Green csr-conference-backgrounder -indian powersector.comGreen csr-conference-backgrounder -indian powersector.com
Green csr-conference-backgrounder -indian powersector.comShivansh Tyagi
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution newShivansh Tyagi
 

En vedette (7)

My poems
My poemsMy poems
My poems
 
Coalnomics brochure (1)
Coalnomics brochure (1)Coalnomics brochure (1)
Coalnomics brochure (1)
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution new
 
Power Plus - Inside Out Of Power
Power Plus - Inside Out Of PowerPower Plus - Inside Out Of Power
Power Plus - Inside Out Of Power
 
Csp list channelpartners
Csp list channelpartnersCsp list channelpartners
Csp list channelpartners
 
Green csr-conference-backgrounder -indian powersector.com
Green csr-conference-backgrounder -indian powersector.comGreen csr-conference-backgrounder -indian powersector.com
Green csr-conference-backgrounder -indian powersector.com
 
Power plus distribution new
Power plus distribution newPower plus distribution new
Power plus distribution new
 

Similaire à Oversees coal in india

Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Ines Kkumar
 
Role of logistics and infrastructure in the development of coal market in the...
Role of logistics and infrastructure in the development of coal market in the...Role of logistics and infrastructure in the development of coal market in the...
Role of logistics and infrastructure in the development of coal market in the...Athar Naseem Shaikh
 
SAIL_Valuation_DCF Ankita & Anurag CIMP, Patna
SAIL_Valuation_DCF Ankita & Anurag CIMP, PatnaSAIL_Valuation_DCF Ankita & Anurag CIMP, Patna
SAIL_Valuation_DCF Ankita & Anurag CIMP, PatnaCIMP, Patna
 
Issues in hydro power development
Issues in hydro power developmentIssues in hydro power development
Issues in hydro power developmentIPPAI
 
hydraulic regenerative barking system
hydraulic regenerative barking systemhydraulic regenerative barking system
hydraulic regenerative barking systemAhmed Suufi
 
Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...icarb
 
The Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheThe Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheJoe Miller
 
Energy generation 10_11
Energy generation 10_11Energy generation 10_11
Energy generation 10_11rameshgoudru
 
Saudi economy 2012
Saudi economy  2012Saudi economy  2012
Saudi economy 2012Gale Pooley
 
Estimation of energy consumption for each process in the japanese steel industry
Estimation of energy consumption for each process in the japanese steel industryEstimation of energy consumption for each process in the japanese steel industry
Estimation of energy consumption for each process in the japanese steel industryนาย เอกบาน
 
Steel industry analysis
Steel industry analysisSteel industry analysis
Steel industry analysisadditya1
 
Monnet ispat and energy 2 qfy2011-291010
Monnet ispat and energy   2 qfy2011-291010Monnet ispat and energy   2 qfy2011-291010
Monnet ispat and energy 2 qfy2011-291010Angel Broking
 
Tamara babayan
Tamara babayanTamara babayan
Tamara babayanindrih
 
Business Forum: Nuclear & Renewable Energy - Yamani
Business Forum: Nuclear & Renewable Energy - YamaniBusiness Forum: Nuclear & Renewable Energy - Yamani
Business Forum: Nuclear & Renewable Energy - Yamanisustg
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)NITI Aayog
 

Similaire à Oversees coal in india (20)

Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10
 
Role of logistics and infrastructure in the development of coal market in the...
Role of logistics and infrastructure in the development of coal market in the...Role of logistics and infrastructure in the development of coal market in the...
Role of logistics and infrastructure in the development of coal market in the...
 
Iron steel-industry
Iron steel-industryIron steel-industry
Iron steel-industry
 
presentation
presentationpresentation
presentation
 
SAIL_Valuation_DCF Ankita & Anurag CIMP, Patna
SAIL_Valuation_DCF Ankita & Anurag CIMP, PatnaSAIL_Valuation_DCF Ankita & Anurag CIMP, Patna
SAIL_Valuation_DCF Ankita & Anurag CIMP, Patna
 
Issues in hydro power development
Issues in hydro power developmentIssues in hydro power development
Issues in hydro power development
 
hydraulic regenerative barking system
hydraulic regenerative barking systemhydraulic regenerative barking system
hydraulic regenerative barking system
 
Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...
 
The Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheThe Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In The
 
IPR Presenttion
IPR PresenttionIPR Presenttion
IPR Presenttion
 
Weekly Fundamental Review Company Report( 21st 27th Feb 2010)
Weekly Fundamental Review  Company Report( 21st 27th Feb 2010)Weekly Fundamental Review  Company Report( 21st 27th Feb 2010)
Weekly Fundamental Review Company Report( 21st 27th Feb 2010)
 
Energy generation 10_11
Energy generation 10_11Energy generation 10_11
Energy generation 10_11
 
Saudi economy 2012
Saudi economy  2012Saudi economy  2012
Saudi economy 2012
 
Estimation of energy consumption for each process in the japanese steel industry
Estimation of energy consumption for each process in the japanese steel industryEstimation of energy consumption for each process in the japanese steel industry
Estimation of energy consumption for each process in the japanese steel industry
 
Steel industry analysis
Steel industry analysisSteel industry analysis
Steel industry analysis
 
Monnet ispat and energy 2 qfy2011-291010
Monnet ispat and energy   2 qfy2011-291010Monnet ispat and energy   2 qfy2011-291010
Monnet ispat and energy 2 qfy2011-291010
 
Tamara babayan
Tamara babayanTamara babayan
Tamara babayan
 
Business Forum: Nuclear & Renewable Energy - Yamani
Business Forum: Nuclear & Renewable Energy - YamaniBusiness Forum: Nuclear & Renewable Energy - Yamani
Business Forum: Nuclear & Renewable Energy - Yamani
 
Q3 2009 Earning Report of Posco
Q3 2009 Earning Report of PoscoQ3 2009 Earning Report of Posco
Q3 2009 Earning Report of Posco
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)
 

Dernier

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 

Dernier (20)

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 

Oversees coal in india

  • 1. 3rd Annual Conference on Overseas Coal in India Imported Coal to fuel India’s Economic Growth
  • 2. Session 1 : Introduction – Indian coal scenario vis-à-vis Global Coal market. World's population is forecast to increase from six billion, currently, to over eight billion by 2030. With this explosion of population and particularly, with the emerging dynamic new economies, the pursuit of quantity-wise and quality-wise affordable and reliable source of energy is presenting unprecedented economic, social and environmental challenges. Energy is central to development & poverty reduction measures and can be described as “the backbone of civilization”. Finding ways to provide energy, will lift emerging nations’ economies, provide employment and boost quality of life across the globe, and to do so in a way which is within the means of the common mass, is the major challenge before the energy providers. Coal is reliable, inexpensive, not subject to the vagaries of windless or sunless days and dirty, remains the most important fuel for energy producing around the world. About 30.3% of primary energy needs are met by coal and 42% of electricity is generated from coal (source: World coal association). About 70% of world steel production depends on coal feedstock. The dependency on coal is especially more in case of emerging countries like India with 69% of energy demand being fulfilled by coal. According to Planning Commission of India, India’s projected demand is slated to increase to 980.5 Mt from current demand of 634.35 Mt. Projected Coal demand in XI and XII Plan (in Mt) Particulars Demand in Terminal year of XI Plan i.e. 2011- Projected demand in terminal 12 year of XII Plan (16-17) as per the WG for XII Plan period Original Mid Term Actual (draft report) estimate Appraisal Total (Mt) 731.10 713.24 634.35 980.5 Customer / sector-wise break up of assessed coal demand for 2016-17 Customer / sector Demand assessed by WG (Mt) Demand in % of total demand Power Utility 682* 69.6 Power Captive incl. fert. 56.36 5.7 Cement 47.31 4.8 Sponge Iron 50.33 5.1 Others 77.3 7.9 Total non-coking 913.3 93.2 Coking 67.2** 6.9 Total 980.5 100
  • 3. Coal Production in India (Figs. in Mt) Coal Producers Actual production during X plan Actual production during XI plan 2002-03 2006-07 2007-08 2011-12 CIL 290.69 360.91 379.46 435.83 SCCL 33.23 37.71 40.60 52.21 Other PSUs 1.51 1.77 2.11 2.71 Total PSUs 325.43 400.39 422.17 490.75 Tata Steel & Captive Blocks 11.44 24.65 28.38 41.98 Meghalaya 4.40 5.79 6.54 7.21 Total Others 15.84 30.44 34.92 49.19 ALL INDIA 341.27 430.83 457.08 539.94 UG 63.16 57.75 58.90 51.83 OC 278.11 373.08 398.18 488.11 Total 341.27 430.83 457.08 539.94 Coking 30.19 32.08 34.46 51.65 Non-Coking 311.08 398.75 422.63 488.29 TOTAL 341.27 430.83 457.08 539.94 CAGR 5.6% in X Plan period CAGR 4.35% in XI Plan period Coal Demand vs Availability from Indigenous Sources (in Mt) 1200 980.5 1000 795 800 634.35 Demand 550 535.42 600 455 Availability 400 Gap 185.5 200 95 98.93 0 2006-07 2011-12 2016-17 Terminal years of Plan period Furthermore, the demand-indigenous availability gap projected for 2016-17 would rise further during successive plan periods. This necessitates immediate strategy to augment the coal production to the extent possible to reduce the gap and import requirement. CIL, being the major coal producer and supplier of over 40% of the commercial energy of the country has to come out with pro-active strategies for enhancing its coal production level.
  • 4. Session 2: Global Asset Acquisition - Identification and Mitigation of Key Risks: Government of India pushed for acquisition of coal assets abroad in the recent past, framing guidelines for asset acquisition by Public Sector Units, this was done looking at growing demand and increasing gap between supply and demand of coal, and it also proposed to create a ‘sovereign fund’ for the same. After these guidelines, Coal India limited (CIL) started looking for coal assets abroad but has failed due to following reasons: • CIL wanted to play it safe and wanted to buy equity in a Acquiring listed company. equity • Agreements didn’t work out due to prices; the miners Agreements were not ready as coal prices were fluctuating. • CIL would have to invest in infrastructure and then Joint undertake mining. Venture Strategic rationale is a key driver of evaluation and mitigation of risks. Risks in mining assets are due to various reasons such as type of asset, commodity, geography, taxes, legal and infrastructure etc. Risks during Exploration Operation  Acquisition at fraction value  De-risked asset  Benefit from all the upside  Assured supply  Low capital risk  Limited value  Bear all development costs  Higher capital risk  Very few undeveloped coal assets left in  Any change in law developed countries  Difficulty in land acquisition due to  Acquire at full value non-availability of land records
  • 5. Risks Mitigation  Modular exploration and development programs.  Robust transaction structure.  Robust review at each step.  Assets from different countries should not be compared.  Explore other options also like coal trading.  Undertake background checks, hire legal firms if required.  India needs to be aggressive when it comes to acquiring coal assets abroad. Last but not the least, the complete sector should act as a whole and not in bits-n-pieces and there should be aggressiveness in acquiring coal assets abroad thus securing India’s energy demand.
  • 6. Session 3: Coal Imports – Challenges and Risk Mitigation Strategies: Importing coal becomes a challenging proposition when the quantity to be imported is large and the infrastructure is not very good. But to feed its growing energy demand and propel its GDP growth, India needs to overcome these challenges and develop risk mitigation strategies. Coal import challenges: 1. From supplier side –  Sees distorted picture.  Wants to understand the appetite before committing.  Has to keep an eye on domestic coal production.  Proper contracts. 2. From buyer side –  Lack of government support.  Investment is to be made both in mines as well as infrastructure.  If GDP grows only by 6%, there may be oversupply of electricity addition.  Generators, discoms can’t pass on increase in fuel prices.  Any change in law.  Infrastructure at ports.  Pilferages.  Indigenous production of coking coal is just 5% of requirement.  Inefficient coal washeries.  Public Sector Utilities have failed to acquire any coal assets abroad.  Language barrier. Risk Mitigation Strategies.  Policies should be notified for long term.  Risk assessment should be proper.  Buyers should take risk.  Price pooling will help in keeping the domestic coal prices down.  Use coal conversion technologies to meet increasing demand of steel sector.  Mature technologies like coal gasification or upcoming technologies like coal liquefaction should be used.  Encourage coastal power plants based on imported coal.  India should invest more in coal washeries.  Affordability studies.  Have 3-5% improvement in all logistics. Thus there are various challenges both from supplier side as well as from buyer side but with proper risk mitigation strategies these challenges can be overcome and the future secured with respect to India’s energy needs.
  • 7. Session 4: Economics of Global Coal Acquisition - Fiscal & Legal Issues: With increasing consumption of coal across the world, any change in law by coal rich nations has a profound effect on the global coal prices. Thus with increase in coal prices the ‘not so attractive’ coal rich destinations will become attractive.  Pool pricing to have large implications and is a short term solution.  India needs to develop national bodies/groups which can negotiate prices.  The time between application and issuance of licenses needs to be sorted out  There should be clarity surrounding the regulations.  There is also some ambiguity surrounding the Domestic Market Obligation (DMO) in Indonesia.  With change in mining law in Indonesia a coal reference price has been established thus adding to confusion and price rise.  The recently introduced change requiring a 51% disinvestment of capital by foreign mining licence holders has come as a big setback to investors.
  • 8. Session 5: Coal Logistics - Sufficing Country’s requirements Import of coal requires considerable logistical requirement & planning. Availability of proper infrastructure is also a pre-requisite. Port, rail, loading & unloading and other infrastructure is required. From ports coal in transported by railways and thus we have a very high dependency on it. The following chart highlights the same. (Figs. in Mt) Mode 2009-10 2010-11 2011-12 Dispatch % Dispatch % Dispatch % Contribution Contribution Contribution Rail 193.7 46.6 199.9 47.2 212.4 49.1 Road 122.3 29.4 128.6 30.3 129.2 29.9 MGR 86.6 20.9 83.6 19.7 79.3 18.3 Belt/Rope 12.5 3.1 11.7 2.8 11.2 2.7 Total 415.1 423.8 432.1 Problems:  Non-availability of railway rakes in quantity required.  Railways charging on dead freight & not on volume.  No dedicated freight transport rail corridor.  High time taken by railways to transport coal from ports to power plants.  Land area is a major constraint at ports.  Inadequate draft at ports thus limitation in handling large size vessels.  Night navigation not available at many ports.  Non-availability of mechanised berths at ports.  Lack of support infrastructure – tugs, flotilla, IT systems etc.  Environmental concerns.  Inadequacy of dust suppresser & fire fighting equipment.  Increasing distance between mines and plants.  Lack of planning on business lines by railways  Indian ‘Golden Quadrilateral’ has 25% freight capacity but has 60% freight movement.  Untrained personnel.
  • 9. Emerging Options & Solutions:  Dedicated freight corridors by railways  Railways planning 6 dedicated freight corridors.  These dedicated corridors will be fully electrified & without level crossings.  Cost to be around Rs. 5,00,000 crore, to be funded 1/3 by government & rest by debt.  Work on Western & Eastern dedicated freight corridor’s has started.  Estimated to cost 90,000 crores.  Land requirement is 17,000 hectares  Expected to reduce time by 3 times at half the running cost.  Mumbai – Delhi ‘Industrial corridor’ to come up along the western corridor.  Western & Eastern corridors to be partially funded by Japanese banks & World Bank respectively.  Expected to come up by 2016-17.  Inland waterways - another emerging option.  Imported coal can be dried up at plants to reduce transportation cost.  Blending of coal at ports can be undertaken.  Washeries should come up near ports.  Handling at non-major ports increasing at CAGR at 43.8% from 2008.  Dredging is required at all ports regularly.  Maintain train inside ports.  Proper scheduling of trains required. Logistics and infrastructure are very critical for sustaining import of coal, proper logistics & infrastructure can increase efficiency as well as reduce the overall price in the long run and hence special attention should be given to this.
  • 10. Session 6: Policies & Regulations Governing the Coal Sector The coal sector is an important sector when it comes to fulfilling energy demand and thus there are a very large number of policies and regulations governing it, any change in policy can have a profound effect on the complete sector from investment to infrastructure. Thus proper policies and regulations are need of the hour that not only facilitate growth of coal production but also take care that coal is produced with least impact on environment.  Any change in policies makes logistics go haywire.  Hence policies should be notified for long term.  Coal export from a Indonesia has grown at 12.5% CAGR from 2000 to 2011.  Imposition of Domestic Market Obligation (DMO) by the Indonesian government has become a problem for coal exporters.  Indonesian government has banned export of unprocessed coal having a calorific value below 5100.  Even Nepal has formed an environment policy of giving environment clearance in 7 days and finally if clearance is not given after 30 days it is deemed to be given.
  • 11. Session 7: Coal Trading: Synopsis of Indian Coal Market With increased demand from emerging nations like India & China, the quantity of coal traded has gone up significantly (source: World coal association), with China alone accounting for 47% of global coal consumption. World Coal Trade Steam Coking Lignite 2009 717Mt 211Mt 4Mt 2010 788Mt 284Mt 5Mt 2011 861Mt 276Mt 5Mt Also a distinct trend seen is that top 5 coal importing countries are situated in the continent of Asia, largely due to the high population and fastest growing economies. Top Coal Importers (2011) Total of which Steam Coking PR China 190Mt 146Mt 38Mt Japan 175Mt 121Mt 54Mt South Korea 129Mt 97Mt 32Mt India 105Mt 86Mt 19Mt Chinese Taipei 66Mt 62Mt 4Mt Germany 41Mt 32Mt 9Mt UK 33Mt 27Mt 6Mt New coal discoveries and rising investment in mining infrastructure has propelled Indonesia as the top coal exporting country with exports increasing 12.5% CAGR from 2000 to 2011. Also the long term supplier of coal - Australia, accounts for more than half of all metallurgical or steelmaking coal traded by sea and 1/5 of seaborne thermal coal used to generate power. With technological advancement in Shale gas fracturing United States of America has become an emerging country for coal export and the export quantity is likely to grow further.
  • 12. Top Coal Exporters (2011e) Total of which Steam Coking Indonesia 309Mt 309Mt 0Mt Australia 284Mt 144Mt 140Mt Russia 124Mt 110Mt 14Mt USA 97Mt 34Mt 63Mt Colombia 75Mt 75Mt 0Mt South Africa 72Mt 72Mt 0Mt Kazakhstan 34Mt 33Mt 1Mt In Asian way of Trading, relationships are very important and even the most difficult situations can be sorted out across the table, however things can go wrong and do go wrong especially in a Long Term Contracts, hence it should be ensured that the Contract is governed by Laws that are workable, fair and delivers quick justice.
  • 13. Session 8: Formulating Future Road Map It is critical that we put in place mechanisms to ensure that the growth in the country is not stifled due to lack of energy resources and the government should support completely as a facilitator. Thus formulating a future road map is necessary.  The government should be aggressive in acquiring coal assets abroad.  Encourage captive mining to reduce dependence on coal from abroad.  Rework working group projection – indentify target countries for long term imports  Upgrade political efforts for stronger bilateral diplomatic relations  Institute special fund for foreign coal acquisitions  Have a multi-modal transport policy.  Public-Private partnership should be introduced in all sectors related to coal imports.  Financial Institutions should undertake proper feasibility study of projects before financing them.  Formulate long term costal thermal power-generation strategy  Diversify coal imports  Moderate resources nationalism by greater commercial / cultural presence  Policies should be notified for long term.  Use technological advancements to reduce dependency on coal.  Invest in supporting infrastructure eg. IT systems, night navigation, tug boats etc.  Single window mechanism for approvals/clearances.  Appointment of coal regulator – with clearly defined powers. There should be a holistic approach towards facing the challenges and solving them with focus on energy security, sustainable development and exploration of technologies related to renewable energy sources.