About myself
• Study: Master, Construction Management and
Engineering @ TU/e
• Sept 2015 - now: BIM consultant @ Bureau Based
• Job 2012 – sept 2015: BIM employee @ Hendriks Bouw
en Ontwikkeling
Always the same problems?
Complexity in construction
• Winch (1987): construction projects are amongst the most complex of all activities.
• Gidado (1996): rapid increase in the complexity of construction processes
IT in construction to manage processes
Plan
Build
Operate
BIM
Design Support
Systems
Project Information
Systems
Facility Management
Systems
Process Mining
• Analyse Event Logs to learn from processes
https://www.youtube.com/watch?v=7oat7MatU_U
Case study’s: Construction process mining
Plan
Build
Operate
BIM
Process mining with facility
management data
Construction design
process mining
BIM based process mining
Construction design process mining
Most extreme result: validating 1 specification had 1904
process steps!
Construction design process mining
“Process mining analytics did us realize that we use our IT
systems to store information, but those systems don’t
automatically facilitate an efficient process”
-Process engineer, contractor
More info? Paper upcoming…
Process mining with facility management
data
Errors solved within 3 minutes costed 300 euros each (total
of €723600)
Process mining with facility management
data
“We can better invest in data analytics to save money than
fire our own people”
-Facility manager, Erasmus Hospital
More info? Read:
https://www.dropbox.com/s/66z1tdq48es3j5l/Case%20Stu
dy%20Erasmus%20english%20V1.pdf?dl=0
Case study: BIM based process mining
• Target: Shorten construction projects
• How: Plan, (Autonomous-) Capture, Analyse and Re-use process
data from construction sites
• With: Using BIM and Process mining techniques
Plan
CaptureAnalyse
Re-use
Case study
• Project: Schependomlaan
• Projectmanagement:
Hendriks Bouw en
Ontwikkeling
• Partners: RAAMAC:
http://raamac.cee.illinois.edu/
Case Study: Plan
1. Connect planning to IFC
2. Generate As-Planned models
Plan
CaptureAnalyse
Re-use
Case Study: Capture
1. Scan construction site with drones
2. Create As-Built Point cloud model
(Structure from motion)
3. Compare As-Built with As-Planned
4. Merge results with event log
Plan
CaptureAnalyse
Re-use
Case study: Capture: Dronescan
Case study: Capture: Dronescan
Case study: Capture: Dronescan
Case study: Capture: Compare
Case study: Analyse
1. Event log analytics
-Merge As-Planned and As-
Built in Event-logPlan
CaptureAnalyse
Re-use
Case study: Generate event log
Case study: Analyse
1. Event log analytics
1. As-Planned vs As-Built
2. Durations
3. Process variants
4. Bottlenecks
Case study: Re-use
1. Plannings Consult
Plan
CaptureAnalyse
Re-use
Case study: Re-use
1. Planning consult
Upload IFC
Search in
event-log
database
Planning advice
and risk
identification
Case study: Re-use -> Planning consult
Case study: Re-use -> Planning consult
Case study: Recap
Plan
CaptureAnalyse
Re-use
‘Data explosion’
• More devices,
• More sensors,
• More camera’s.
• Upcoming: Intelligent ways to register processes
• So: more data
BIM based Process Mining
BIM based Process Mining
BIM based Process Mining
Conclusion and discussion
1. Current IT systems can be used for process
mining, valuable data in there!
2. Process mining enables fact based problem
identification
3. BIM based process mining is possible
-Use GUIDs to connect information from different tools.
Further work
1. Automate process capturing on construction
sites.
2. Combine data from several IT systems.
3. Better/more advanced planning consult
Questions?
Want to get updates? Fill in this form: http://goo.gl/forms/yLv9AljWjG
Contact:
LinkedIn: https://nl.linkedin.com/in/stijnvanschaijk
Twitter: @stijnvanschaijk
Mail:s.v.schaijk@student.tue.nl

Contenu connexe

Tendances

Créer une organisation produit par dessus les silos
Créer une organisation produit par dessus les silosCréer une organisation produit par dessus les silos
Créer une organisation produit par dessus les silos
Sébastien Sacard
 
Presentation generale-erp-sap
Presentation generale-erp-sapPresentation generale-erp-sap
Presentation generale-erp-sap
belkadi_ad
 
Sap integration salesforce_presentation
Sap integration salesforce_presentationSap integration salesforce_presentation
Sap integration salesforce_presentation
Salesforce Deutschland
 
Gestion des déploiements & des mises en production? Gestion des changements? ...
Gestion des déploiements & des mises en production? Gestion des changements? ...Gestion des déploiements & des mises en production? Gestion des changements? ...
Gestion des déploiements & des mises en production? Gestion des changements? ...
Chantal Dutremble
 
Mise en place d’un Systéme d’Information (S.I.) en PME
Mise en place d’un Systéme d’Information (S.I.) en PMEMise en place d’un Systéme d’Information (S.I.) en PME
Mise en place d’un Systéme d’Information (S.I.) en PME
CYB@RDECHE
 

Tendances (20)

H사 RPA Approach
H사 RPA ApproachH사 RPA Approach
H사 RPA Approach
 
Building a Data Exchange with Spring Cloud Data Flow
Building a Data Exchange with Spring Cloud Data FlowBuilding a Data Exchange with Spring Cloud Data Flow
Building a Data Exchange with Spring Cloud Data Flow
 
Vmware ppt
Vmware pptVmware ppt
Vmware ppt
 
Soutenance mémoire d'ingénieur CNAM de Gaël Duperrey sur la BCI
Soutenance mémoire d'ingénieur CNAM de Gaël Duperrey sur la BCISoutenance mémoire d'ingénieur CNAM de Gaël Duperrey sur la BCI
Soutenance mémoire d'ingénieur CNAM de Gaël Duperrey sur la BCI
 
[오픈소스컨설팅]클라우드기반U2L마이그레이션 전략 및 고려사항
[오픈소스컨설팅]클라우드기반U2L마이그레이션 전략 및 고려사항[오픈소스컨설팅]클라우드기반U2L마이그레이션 전략 및 고려사항
[오픈소스컨설팅]클라우드기반U2L마이그레이션 전략 및 고려사항
 
클라우드 이행전략과 HP의 사례
클라우드 이행전략과 HP의 사례클라우드 이행전략과 HP의 사례
클라우드 이행전략과 HP의 사례
 
Hyper-V y Contenedores, una nueva forma de virtualización
Hyper-V y Contenedores, una nueva forma de virtualizaciónHyper-V y Contenedores, una nueva forma de virtualización
Hyper-V y Contenedores, una nueva forma de virtualización
 
BABOK v1.6 vs v2.0
BABOK v1.6 vs v2.0BABOK v1.6 vs v2.0
BABOK v1.6 vs v2.0
 
Lean IT et TRS - Pilotage de la performance opérationnelle
Lean IT et TRS - Pilotage de la performance opérationnelleLean IT et TRS - Pilotage de la performance opérationnelle
Lean IT et TRS - Pilotage de la performance opérationnelle
 
Créer une organisation produit par dessus les silos
Créer une organisation produit par dessus les silosCréer une organisation produit par dessus les silos
Créer une organisation produit par dessus les silos
 
Deep Dive Amazon EC2
Deep Dive Amazon EC2Deep Dive Amazon EC2
Deep Dive Amazon EC2
 
Presentation generale-erp-sap
Presentation generale-erp-sapPresentation generale-erp-sap
Presentation generale-erp-sap
 
Enterprise BPM Framework
Enterprise BPM Framework Enterprise BPM Framework
Enterprise BPM Framework
 
Sap integration salesforce_presentation
Sap integration salesforce_presentationSap integration salesforce_presentation
Sap integration salesforce_presentation
 
Schema directeur et urbanisation du si
Schema directeur et urbanisation du siSchema directeur et urbanisation du si
Schema directeur et urbanisation du si
 
AEM22-KPI Agile.pdf
AEM22-KPI Agile.pdfAEM22-KPI Agile.pdf
AEM22-KPI Agile.pdf
 
Gestion des déploiements & des mises en production? Gestion des changements? ...
Gestion des déploiements & des mises en production? Gestion des changements? ...Gestion des déploiements & des mises en production? Gestion des changements? ...
Gestion des déploiements & des mises en production? Gestion des changements? ...
 
BPMN,jBPM,BPEL
BPMN,jBPM,BPELBPMN,jBPM,BPEL
BPMN,jBPM,BPEL
 
Mise en place d’un Systéme d’Information (S.I.) en PME
Mise en place d’un Systéme d’Information (S.I.) en PMEMise en place d’un Systéme d’Information (S.I.) en PME
Mise en place d’un Systéme d’Information (S.I.) en PME
 
Introduction to SAP Business One HANA
Introduction to SAP Business One HANAIntroduction to SAP Business One HANA
Introduction to SAP Business One HANA
 

En vedette

20161124 - Final Presentation - Luuk Moonen - brede versie
20161124 - Final Presentation - Luuk Moonen - brede versie20161124 - Final Presentation - Luuk Moonen - brede versie
20161124 - Final Presentation - Luuk Moonen - brede versie
Luuk Moonen
 
A BIM-integrated approach to construction quality management
A BIM-integrated approach to construction quality managementA BIM-integrated approach to construction quality management
A BIM-integrated approach to construction quality management
Esper Achkar
 
Carlton Masters Thesis Report on Hypar Roof Construction
Carlton Masters Thesis Report on Hypar Roof ConstructionCarlton Masters Thesis Report on Hypar Roof Construction
Carlton Masters Thesis Report on Hypar Roof Construction
TSC Global
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
AELC
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
Isidro Sid Calayag
 

En vedette (20)

Case study construction design process mining
Case study construction design process miningCase study construction design process mining
Case study construction design process mining
 
Bim based process mining master thesis presentation
Bim based process mining master thesis presentation Bim based process mining master thesis presentation
Bim based process mining master thesis presentation
 
Building Information Model (BIM) based process mining
Building Information Model (BIM) based process miningBuilding Information Model (BIM) based process mining
Building Information Model (BIM) based process mining
 
A METHODOLOGICAL APPROACH TO SUPPORT BUILDING LIFE CYCLE ANALYSIS - Andy McNa...
A METHODOLOGICAL APPROACH TO SUPPORT BUILDING LIFE CYCLE ANALYSIS - Andy McNa...A METHODOLOGICAL APPROACH TO SUPPORT BUILDING LIFE CYCLE ANALYSIS - Andy McNa...
A METHODOLOGICAL APPROACH TO SUPPORT BUILDING LIFE CYCLE ANALYSIS - Andy McNa...
 
20161124 - Final Presentation - Luuk Moonen - brede versie
20161124 - Final Presentation - Luuk Moonen - brede versie20161124 - Final Presentation - Luuk Moonen - brede versie
20161124 - Final Presentation - Luuk Moonen - brede versie
 
A BIM-integrated approach to construction quality management
A BIM-integrated approach to construction quality managementA BIM-integrated approach to construction quality management
A BIM-integrated approach to construction quality management
 
SamarasingheDAS
SamarasingheDASSamarasingheDAS
SamarasingheDAS
 
Masters thesis presentation
Masters thesis presentationMasters thesis presentation
Masters thesis presentation
 
Media is corrupting our society
Media is corrupting our societyMedia is corrupting our society
Media is corrupting our society
 
Carlton Masters Thesis Report on Hypar Roof Construction
Carlton Masters Thesis Report on Hypar Roof ConstructionCarlton Masters Thesis Report on Hypar Roof Construction
Carlton Masters Thesis Report on Hypar Roof Construction
 
civil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasancivil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasan
 
keynote Beyond BIM 2015 (Ghent)
keynote Beyond BIM 2015 (Ghent)keynote Beyond BIM 2015 (Ghent)
keynote Beyond BIM 2015 (Ghent)
 
Case study process mining with facility management data
Case study process mining with facility management dataCase study process mining with facility management data
Case study process mining with facility management data
 
Quality management
Quality managementQuality management
Quality management
 
Quality induction
Quality inductionQuality induction
Quality induction
 
Quality awareness
Quality awarenessQuality awareness
Quality awareness
 
Quality Awareness Training Material
Quality Awareness Training MaterialQuality Awareness Training Material
Quality Awareness Training Material
 
Shyam Thesis Report
Shyam Thesis ReportShyam Thesis Report
Shyam Thesis Report
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 

Similaire à Process mining in the construction industry beyond bim congres

2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework
BIWUG
 
Mohamaed Abd- elazim saber-c.v-
Mohamaed Abd- elazim saber-c.v-Mohamaed Abd- elazim saber-c.v-
Mohamaed Abd- elazim saber-c.v-
Mohamed saber
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Sewell Construction
 
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
BIM For Free_28May2013_EdBartlett_BIM and lifecycle managementBIM For Free_28May2013_EdBartlett_BIM and lifecycle management
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
BIM Academy
 

Similaire à Process mining in the construction industry beyond bim congres (20)

2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework
 
bim+ Presentation BIM Manager
bim+ Presentation BIM Managerbim+ Presentation BIM Manager
bim+ Presentation BIM Manager
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEight
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
Mohamaed Abd- elazim saber-c.v-
Mohamaed Abd- elazim saber-c.v-Mohamaed Abd- elazim saber-c.v-
Mohamaed Abd- elazim saber-c.v-
 
Mining Project-Oriented Business Processes
Mining Project-Oriented Business ProcessesMining Project-Oriented Business Processes
Mining Project-Oriented Business Processes
 
Mining Project-Oriented Business Processes
Mining Project-Oriented Business ProcessesMining Project-Oriented Business Processes
Mining Project-Oriented Business Processes
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
#FiaComit Inside a digital asset
#FiaComit Inside a digital asset#FiaComit Inside a digital asset
#FiaComit Inside a digital asset
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
 
BIM model analysis
BIM model analysisBIM model analysis
BIM model analysis
 
Mas allá de BIM: Transformación digital en la industria de la construcción
Mas allá de BIM: Transformación digital en la industria de la construcción Mas allá de BIM: Transformación digital en la industria de la construcción
Mas allá de BIM: Transformación digital en la industria de la construcción
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distribution
 
Buildings as Material Banks (BAMB)#cethinking
Buildings as Material Banks (BAMB)#cethinkingBuildings as Material Banks (BAMB)#cethinking
Buildings as Material Banks (BAMB)#cethinking
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project delivery
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
BIM For Free_28May2013_EdBartlett_BIM and lifecycle managementBIM For Free_28May2013_EdBartlett_BIM and lifecycle management
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
 

Dernier

Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
nirzagarg
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
vexqp
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
gajnagarg
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
HyderabadDolls
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
ranjankumarbehera14
 
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
Health
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 

Dernier (20)

Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
Top profile Call Girls In Bihar Sharif [ 7014168258 ] Call Me For Genuine Mod...
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
 
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
 
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
 
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
 
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
 
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 

Process mining in the construction industry beyond bim congres

  • 1. Master thesis research Presentation @Beyond BIM symposium, 09-12-2015 Stijn van Schaijk Process mining in the construction industry
  • 2. About myself • Study: Master, Construction Management and Engineering @ TU/e • Sept 2015 - now: BIM consultant @ Bureau Based • Job 2012 – sept 2015: BIM employee @ Hendriks Bouw en Ontwikkeling
  • 3. Always the same problems?
  • 4. Complexity in construction • Winch (1987): construction projects are amongst the most complex of all activities. • Gidado (1996): rapid increase in the complexity of construction processes
  • 5. IT in construction to manage processes Plan Build Operate BIM Design Support Systems Project Information Systems Facility Management Systems
  • 6. Process Mining • Analyse Event Logs to learn from processes https://www.youtube.com/watch?v=7oat7MatU_U
  • 7. Case study’s: Construction process mining Plan Build Operate BIM Process mining with facility management data Construction design process mining BIM based process mining
  • 8. Construction design process mining Most extreme result: validating 1 specification had 1904 process steps!
  • 9. Construction design process mining “Process mining analytics did us realize that we use our IT systems to store information, but those systems don’t automatically facilitate an efficient process” -Process engineer, contractor More info? Paper upcoming…
  • 10. Process mining with facility management data Errors solved within 3 minutes costed 300 euros each (total of €723600)
  • 11. Process mining with facility management data “We can better invest in data analytics to save money than fire our own people” -Facility manager, Erasmus Hospital More info? Read: https://www.dropbox.com/s/66z1tdq48es3j5l/Case%20Stu dy%20Erasmus%20english%20V1.pdf?dl=0
  • 12. Case study: BIM based process mining • Target: Shorten construction projects • How: Plan, (Autonomous-) Capture, Analyse and Re-use process data from construction sites • With: Using BIM and Process mining techniques Plan CaptureAnalyse Re-use
  • 13. Case study • Project: Schependomlaan • Projectmanagement: Hendriks Bouw en Ontwikkeling • Partners: RAAMAC: http://raamac.cee.illinois.edu/
  • 14. Case Study: Plan 1. Connect planning to IFC 2. Generate As-Planned models Plan CaptureAnalyse Re-use
  • 15. Case Study: Capture 1. Scan construction site with drones 2. Create As-Built Point cloud model (Structure from motion) 3. Compare As-Built with As-Planned 4. Merge results with event log Plan CaptureAnalyse Re-use
  • 16. Case study: Capture: Dronescan
  • 17. Case study: Capture: Dronescan
  • 18. Case study: Capture: Dronescan
  • 20. Case study: Analyse 1. Event log analytics -Merge As-Planned and As- Built in Event-logPlan CaptureAnalyse Re-use
  • 21. Case study: Generate event log
  • 22. Case study: Analyse 1. Event log analytics 1. As-Planned vs As-Built 2. Durations 3. Process variants 4. Bottlenecks
  • 23. Case study: Re-use 1. Plannings Consult Plan CaptureAnalyse Re-use
  • 24. Case study: Re-use 1. Planning consult Upload IFC Search in event-log database Planning advice and risk identification
  • 25. Case study: Re-use -> Planning consult
  • 26. Case study: Re-use -> Planning consult
  • 28. ‘Data explosion’ • More devices, • More sensors, • More camera’s. • Upcoming: Intelligent ways to register processes • So: more data
  • 32. Conclusion and discussion 1. Current IT systems can be used for process mining, valuable data in there! 2. Process mining enables fact based problem identification 3. BIM based process mining is possible -Use GUIDs to connect information from different tools.
  • 33. Further work 1. Automate process capturing on construction sites. 2. Combine data from several IT systems. 3. Better/more advanced planning consult
  • 34. Questions? Want to get updates? Fill in this form: http://goo.gl/forms/yLv9AljWjG Contact: LinkedIn: https://nl.linkedin.com/in/stijnvanschaijk Twitter: @stijnvanschaijk Mail:s.v.schaijk@student.tue.nl