Tuck San’s Reefer
Workshop
Featuring
I cannot recall the particulars of this case as it
occurred over 1 year ago already. Definitely salt water
entering gang box either through bad or missing gasket
or a warped frame.
Break it down
The circuit breaker lugs were all frozen
So the wires had to be cut
Remove retaining ring from its groove with a flat
screwdriver
Spring compression retaining ring for interlock release
Pull down on on/off plunger to remove spring,
interlock mechanism and plunger
Remove the 4 screws securing breaker handle
actuator unit, top plate and breaker to frame. Lift off
breaker with actuator unit and ground pin.
Observe alignment with circuit breaker handle as it is
removed. Be careful not to disturb cam positioning
inside actuator. The plastic housing can separate.
Remove brass receptacle housing
And remove receptacle from brass housing
Stainless steel and brass clean up nicely. The brass is a
little more work but is necessary for the new receptacle
to slide into the bore. Wire brush and medium grain
crocus cloth work well. Some brass housings have a
groove at base end for a retaining ring which needs to
be scraped and brushed clean.
Once brass housings are polished clean a thick coating
of LPS 3 left to dry overnight will keep the creeping
corrosion at bay.
Reassemble
The top 1/3 at flange end of the brass housing internal
bore needs to be super clean for an easy fitting of new
receptacle so only apply a light coat of LPS 3 if any here.
Below the receptacle resting ledge a thick layer will be
good.
Dow Corning 111 valve lubricant and sealant works
well on internal bore as well as Molykote 55 o-ring
grease around receptacle o-ring. This will extend the life
of your module and reduce your maintenance load.
To prepare the receptacle wires for a quick and
smooth installation into the circuit breaker lugs they
must be shaped for a compressible helical spiral. The
wires are thick stranded gauge so a 3/8 closed end
wrench can be slipped over for bending leverage.
Do not try to cut the wires to length because
the circuit breaker lugs are not in direct
alignment with receptacle.
Install receptacle into brass housing aligning tab at
base of receptacle with notch in brass housing flange.
This prevents rotation of receptacle within housing.
After shaping the wires, the ends will need to be
trimmed flat or the contact surface between wire and
lug will be reduced. Poor contact area will result in
overheating and reduced life of circuit breaker and
receptacle.
Reassemble circuit breaker actuator to circuit
breaker.
With circuit breaker switch in off position align circuit
breaker switch handle with actuator mechanism.
Install circuit breaker and secure to frame with the 4
screws.
Lightly lubricate receptacle mating gasket with 111
and place over housing flange.
While guiding actuator ground plunger into bore of
receptacle ground pin insert wires into circuit breaker
lugs being careful not to bend any wire strands.
Tighten lugs. Bend the B phase wire to the side to
allow free movement of ground pin plunger.
Tighten the 4 receptacle housing screws evenly until
gasket touches frame plus ¼ turn or so being careful not
to squeeze out the gasket.
With circuit breaker and receptacle secured, bench test
for smooth operation.
To reassemble on/off plunger first place interlock
release mechanism in position on its actuator.
The sliding cam actuated block mounted on circuit
breaker is aligned with plunger in interlock release
mechanism.
With o-ring and shaft greased, insert on/off plunger
through faceplate and interlock release.
The cam actuated release plunger will interact with
deep groove in on/off plunger shaft.
Place spring into position into guides above interlock
release
Push on/off plunger up through interlock release, spring
and guides until groove for retaining ring is visible
above interlock release mechanism.
And insert ring between release mechanism and spring
The module is now complete and is ready for testing
in same manner as shown in 480V version with ohm
and meggar meter test equipment before installation
for use.

Contenu connexe

Tendances

Vnt gt15~25 1
Vnt gt15~25  1Vnt gt15~25  1
Vnt gt15~25 1
joffco
 

Tendances (13)

Ezyfix Modern Lever bath set install guide
Ezyfix Modern Lever  bath set install guideEzyfix Modern Lever  bath set install guide
Ezyfix Modern Lever bath set install guide
 
EZYFIX Modern Lever Install Guide
EZYFIX Modern Lever Install GuideEZYFIX Modern Lever Install Guide
EZYFIX Modern Lever Install Guide
 
Types of flanges
Types of flangesTypes of flanges
Types of flanges
 
Vnt gt15~25 1
Vnt gt15~25  1Vnt gt15~25  1
Vnt gt15~25 1
 
Tup brochure
 Tup brochure Tup brochure
Tup brochure
 
12777 coastal single pages part49
12777  coastal single pages part4912777  coastal single pages part49
12777 coastal single pages part49
 
OCHAI 002
OCHAI 002OCHAI 002
OCHAI 002
 
Tfsi pcv
Tfsi pcvTfsi pcv
Tfsi pcv
 
Hyundai hl730 tm 3 wheel loader service repair manual
Hyundai hl730 tm 3 wheel loader service repair manualHyundai hl730 tm 3 wheel loader service repair manual
Hyundai hl730 tm 3 wheel loader service repair manual
 
Types of flanges
Types of flangesTypes of flanges
Types of flanges
 
BSPT STRAIGHT CONNECTOR
BSPT STRAIGHT CONNECTORBSPT STRAIGHT CONNECTOR
BSPT STRAIGHT CONNECTOR
 
Jumbo Magnum Marshmallow Gun Assembly
Jumbo Magnum Marshmallow Gun AssemblyJumbo Magnum Marshmallow Gun Assembly
Jumbo Magnum Marshmallow Gun Assembly
 
Taphole clay for blast furnace operation
Taphole clay for blast furnace operationTaphole clay for blast furnace operation
Taphole clay for blast furnace operation
 

En vedette

Коуровская обсерватория
Коуровская обсерваторияКоуровская обсерватория
Коуровская обсерватория
URFU
 
Just Bathrooms
Just BathroomsJust Bathrooms
Just Bathrooms
jrhowden
 
Characteristics of Induction motors
Characteristics of Induction motorsCharacteristics of Induction motors
Characteristics of Induction motors
michaeljmack
 
презентация 1 термины и определения
презентация 1 термины и определенияпрезентация 1 термины и определения
презентация 1 термины и определения
URFU
 
особенности организации экскурсий для молодежной аудитории
особенности организации экскурсий для молодежной аудиторииособенности организации экскурсий для молодежной аудитории
особенности организации экскурсий для молодежной аудитории
URFU
 
Paul Johnston: The Connected Republic
Paul Johnston:  The Connected RepublicPaul Johnston:  The Connected Republic
Paul Johnston: The Connected Republic
EduSkills OECD
 

En vedette (14)

участие в круглом столе
участие в круглом столеучастие в круглом столе
участие в круглом столе
 
Presentasi komunitas cinta pejuang indonesia (kcpi)
Presentasi komunitas cinta pejuang indonesia (kcpi)Presentasi komunitas cinta pejuang indonesia (kcpi)
Presentasi komunitas cinta pejuang indonesia (kcpi)
 
Коуровская обсерватория
Коуровская обсерваторияКоуровская обсерватория
Коуровская обсерватория
 
Caterpillar 09 2016
Caterpillar 09 2016Caterpillar 09 2016
Caterpillar 09 2016
 
проверка олимпиадных работ
проверка олимпиадных работпроверка олимпиадных работ
проверка олимпиадных работ
 
конспект открытого урока по географии в 5 классе. Бодячевская М. Г.
конспект открытого урока по географии в 5 классе. Бодячевская М. Г.конспект открытого урока по географии в 5 классе. Бодячевская М. Г.
конспект открытого урока по географии в 5 классе. Бодячевская М. Г.
 
prab Brochure new
prab Brochure newprab Brochure new
prab Brochure new
 
Just Bathrooms
Just BathroomsJust Bathrooms
Just Bathrooms
 
Cinco practicas liderazgo pedagógico (1)
Cinco practicas liderazgo pedagógico (1)Cinco practicas liderazgo pedagógico (1)
Cinco practicas liderazgo pedagógico (1)
 
Characteristics of Induction motors
Characteristics of Induction motorsCharacteristics of Induction motors
Characteristics of Induction motors
 
презентация 1 термины и определения
презентация 1 термины и определенияпрезентация 1 термины и определения
презентация 1 термины и определения
 
особенности организации экскурсий для молодежной аудитории
особенности организации экскурсий для молодежной аудиторииособенности организации экскурсий для молодежной аудитории
особенности организации экскурсий для молодежной аудитории
 
Return on investment
Return on investmentReturn on investment
Return on investment
 
Paul Johnston: The Connected Republic
Paul Johnston:  The Connected RepublicPaul Johnston:  The Connected Republic
Paul Johnston: The Connected Republic
 

Similaire à 240V reefer outlet repair Tuck San

Tuck San's Reefer Workshop
Tuck San's Reefer WorkshopTuck San's Reefer Workshop
Tuck San's Reefer Workshop
Tucker Latimer
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
Don Pell
 
00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy
mohamed elbarougy
 
trouble shooting and remedy of Dam Gates
trouble shooting and remedy of Dam Gatestrouble shooting and remedy of Dam Gates
trouble shooting and remedy of Dam Gates
Tushar Dholakia
 
Plumbing care and repair
Plumbing care and repairPlumbing care and repair
Plumbing care and repair
Zulaiha Amaria
 

Similaire à 240V reefer outlet repair Tuck San (20)

Tuck San's Reefer Workshop
Tuck San's Reefer WorkshopTuck San's Reefer Workshop
Tuck San's Reefer Workshop
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
 
00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy00 elbarougy turbine Course Hapy
00 elbarougy turbine Course Hapy
 
2004 0520 Tx
2004 0520 Tx2004 0520 Tx
2004 0520 Tx
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
Well head replacement
Well head replacementWell head replacement
Well head replacement
 
trouble shooting and remedy of Dam Gates
trouble shooting and remedy of Dam Gatestrouble shooting and remedy of Dam Gates
trouble shooting and remedy of Dam Gates
 
G196 manual
G196 manualG196 manual
G196 manual
 
Fundamentals of mechanical seals
Fundamentals of mechanical sealsFundamentals of mechanical seals
Fundamentals of mechanical seals
 
Valtek MK1 Rebuild
Valtek MK1 RebuildValtek MK1 Rebuild
Valtek MK1 Rebuild
 
Plumbing care and repair
Plumbing care and repairPlumbing care and repair
Plumbing care and repair
 
Split block installation and trouble shooting 2011
Split block installation and trouble shooting 2011Split block installation and trouble shooting 2011
Split block installation and trouble shooting 2011
 
Doc 1010
Doc 1010Doc 1010
Doc 1010
 
Wall Deslagger -model WB IE, [Pub. No. 7503].pptx
Wall Deslagger -model WB IE, [Pub. No. 7503].pptxWall Deslagger -model WB IE, [Pub. No. 7503].pptx
Wall Deslagger -model WB IE, [Pub. No. 7503].pptx
 
How to adjust a thread ring gage to a truncated setting plug
How to adjust a thread ring gage to a truncated setting plugHow to adjust a thread ring gage to a truncated setting plug
How to adjust a thread ring gage to a truncated setting plug
 
Husqvarna 345 fxt brushcutter trimmer service repair manual
Husqvarna 345 fxt brushcutter trimmer service repair manualHusqvarna 345 fxt brushcutter trimmer service repair manual
Husqvarna 345 fxt brushcutter trimmer service repair manual
 
Husqvarna 343 r brushcutter trimmer service repair manual
Husqvarna 343 r brushcutter trimmer service repair manualHusqvarna 343 r brushcutter trimmer service repair manual
Husqvarna 343 r brushcutter trimmer service repair manual
 
Husqvarna 345 rx brushcutter trimmer service repair manual
Husqvarna 345 rx brushcutter trimmer service repair manualHusqvarna 345 rx brushcutter trimmer service repair manual
Husqvarna 345 rx brushcutter trimmer service repair manual
 
Husqvarna 345 rx brushcutter trimmer service repair manual
Husqvarna 345 rx brushcutter trimmer service repair manualHusqvarna 345 rx brushcutter trimmer service repair manual
Husqvarna 345 rx brushcutter trimmer service repair manual
 
Husqvarna 345 fx brushcutter trimmer service repair manual
Husqvarna 345 fx brushcutter trimmer service repair manualHusqvarna 345 fx brushcutter trimmer service repair manual
Husqvarna 345 fx brushcutter trimmer service repair manual
 

240V reefer outlet repair Tuck San

  • 2.
  • 3.
  • 4. I cannot recall the particulars of this case as it occurred over 1 year ago already. Definitely salt water entering gang box either through bad or missing gasket or a warped frame. Break it down The circuit breaker lugs were all frozen
  • 5. So the wires had to be cut
  • 6. Remove retaining ring from its groove with a flat screwdriver
  • 7. Spring compression retaining ring for interlock release
  • 8. Pull down on on/off plunger to remove spring, interlock mechanism and plunger
  • 9.
  • 10. Remove the 4 screws securing breaker handle actuator unit, top plate and breaker to frame. Lift off breaker with actuator unit and ground pin.
  • 11. Observe alignment with circuit breaker handle as it is removed. Be careful not to disturb cam positioning inside actuator. The plastic housing can separate.
  • 12.
  • 13.
  • 14.
  • 16.
  • 17. And remove receptacle from brass housing
  • 18. Stainless steel and brass clean up nicely. The brass is a little more work but is necessary for the new receptacle to slide into the bore. Wire brush and medium grain crocus cloth work well. Some brass housings have a groove at base end for a retaining ring which needs to be scraped and brushed clean. Once brass housings are polished clean a thick coating of LPS 3 left to dry overnight will keep the creeping corrosion at bay.
  • 19.
  • 20. Reassemble The top 1/3 at flange end of the brass housing internal bore needs to be super clean for an easy fitting of new receptacle so only apply a light coat of LPS 3 if any here. Below the receptacle resting ledge a thick layer will be good. Dow Corning 111 valve lubricant and sealant works well on internal bore as well as Molykote 55 o-ring grease around receptacle o-ring. This will extend the life of your module and reduce your maintenance load.
  • 21.
  • 22.
  • 23. To prepare the receptacle wires for a quick and smooth installation into the circuit breaker lugs they must be shaped for a compressible helical spiral. The wires are thick stranded gauge so a 3/8 closed end wrench can be slipped over for bending leverage.
  • 24. Do not try to cut the wires to length because the circuit breaker lugs are not in direct alignment with receptacle.
  • 25. Install receptacle into brass housing aligning tab at base of receptacle with notch in brass housing flange. This prevents rotation of receptacle within housing. After shaping the wires, the ends will need to be trimmed flat or the contact surface between wire and lug will be reduced. Poor contact area will result in overheating and reduced life of circuit breaker and receptacle.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Reassemble circuit breaker actuator to circuit breaker.
  • 31. With circuit breaker switch in off position align circuit breaker switch handle with actuator mechanism. Install circuit breaker and secure to frame with the 4 screws. Lightly lubricate receptacle mating gasket with 111 and place over housing flange. While guiding actuator ground plunger into bore of receptacle ground pin insert wires into circuit breaker lugs being careful not to bend any wire strands. Tighten lugs. Bend the B phase wire to the side to allow free movement of ground pin plunger. Tighten the 4 receptacle housing screws evenly until gasket touches frame plus ¼ turn or so being careful not to squeeze out the gasket.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. With circuit breaker and receptacle secured, bench test for smooth operation.
  • 39.
  • 40.
  • 41. To reassemble on/off plunger first place interlock release mechanism in position on its actuator.
  • 42. The sliding cam actuated block mounted on circuit breaker is aligned with plunger in interlock release mechanism. With o-ring and shaft greased, insert on/off plunger through faceplate and interlock release. The cam actuated release plunger will interact with deep groove in on/off plunger shaft.
  • 43.
  • 44. Place spring into position into guides above interlock release
  • 45. Push on/off plunger up through interlock release, spring and guides until groove for retaining ring is visible above interlock release mechanism.
  • 46. And insert ring between release mechanism and spring