Condensation
water that collects on a cool surface
because the temperature of the surface
is below the point at which moisture in
the air forms as water droplets.
1E Venkata Raju - Building Manager
Formation of condensation
2E Venkata Raju - Building Manager
Condensate on glass of water
3E Venkata Raju - Building Manager
Condensate water from AHU
4E Venkata Raju - Building Manager
Quantity of condensate depends on
1. Temp of chilled water @ inlet to AHU
2. Percentage of RH in fresh air
3. Percentage of RH in return air
4. Capacity of AHUs
5. Volume of chilled flow
6. Volume of air flow
In Hyderabad , More RH during monsoons (70 to
85%), in summer 50 to 70% and in winter 25 to
50%.
E Venkata Raju - Building Manager 5
Approximate Condensate quantity
@B7
• Based on our intermittent collection sample
reports at individual AHUs , floor AHUs ,
south wing AHUs and north wing AHUs in the
last 3 to 4 months , it is approximately 10 to
12 KL per day ( when 37 AHUs running).
• Assumed 15 to 18KL per day (When 62 AHUs
running)
E Venkata Raju - Building Manager 6
Quality of condensate water @B7
1.Hardness  0 to 2 ppm
2. TTDs  30 to 40 ppm
3. PH  6 to 7
4. Clear water
5. Temp 15 to 20 deg.C
E Venkata Raju - Building Manager 7
Usage of collected condensate water
1.As drinking water
2.As domestic water
3.As CT water
E Venkata Raju - Building Manager 8
For Drinking- Scheme
• Approximate cost : RS 2.50 lacs
• Savings/Earnings : 6000 (Ltrs) x 20 (days) x Rs.1.00
(per ltr)x 12(months) = 14.40 lacs /year
• Note :Every high purity of raw water , output is 80 to90% .
E Venkata Raju - Building Manager 9
Condensate
water
Nano
filtration/ RO
UV
dis infection Chlorination
Lab testing as per
drinking water standardsDrinking tank
For domestic purpose- Scheme
• Approximate cost : Rs 20000/-
• Savings/earnings: 12,000 (ltrs)x Rs0.30 x 26
days x 12 months= 11,23,200/- year
E Venkata Raju - Building Manager 10
Condensate
water
Multi grade
filter
Manual/auto
Chlorination
Domestic
tank
For CT water- Scheme
• Approximate cost : Rs 15000/-
• Savings : No chemicals required , no scale formation , no
bleed off , less power consumption in chillers :
Approximately Rs 75 to 80 lacs per year.
E Venkata Raju - Building Manager 11
Condensate
water Sand filter Collection
tank
B7Existing AHUs drain scheme
E Venkata Raju - Building Manager 12
B7 Proposed plan to collect condensate water from all AHUs
E Venkata Raju - Building Manager 13
Cost estimation
• 1. As per quote by Hiline : Rs 1.5 lacs
• 2. As per our estimate and as per standard
design : Rs 75,000/-
• 3. As per present available material : Rs
25000/- (May not be as per standard , but it is
good and suitable for our requirement)
E Venkata Raju - Building Manager 14
Thanks
E Venkata Raju - Building Manager 15

Contenu connexe

Tendances

Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)
Denish Jangid
 
Watershed delineation
Watershed delineationWatershed delineation
Watershed delineation
lizbasile
 

Tendances (12)

Irrigation engineering
Irrigation engineeringIrrigation engineering
Irrigation engineering
 
Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)
 
Siphon, Terjunan, Gorong-gorong
Siphon, Terjunan, Gorong-gorongSiphon, Terjunan, Gorong-gorong
Siphon, Terjunan, Gorong-gorong
 
Watershed delineation
Watershed delineationWatershed delineation
Watershed delineation
 
Project list water resource engineering
Project list water resource engineeringProject list water resource engineering
Project list water resource engineering
 
Conceptual design for water supply system
Conceptual design for water supply systemConceptual design for water supply system
Conceptual design for water supply system
 
India; Rain Water Harvesting and Artificial Recharge
India;  Rain Water Harvesting and Artificial RechargeIndia;  Rain Water Harvesting and Artificial Recharge
India; Rain Water Harvesting and Artificial Recharge
 
Runoff final
Runoff finalRunoff final
Runoff final
 
Role of various agencies in wrm
Role of various agencies in wrmRole of various agencies in wrm
Role of various agencies in wrm
 
Facsimile Contratto locazione commerciale transitorio
Facsimile Contratto locazione commerciale transitorioFacsimile Contratto locazione commerciale transitorio
Facsimile Contratto locazione commerciale transitorio
 
Importance and Techniques of Rain Water Harvesting in Lower Brahmaputra Valle...
Importance and Techniques of Rain Water Harvesting in Lower Brahmaputra Valle...Importance and Techniques of Rain Water Harvesting in Lower Brahmaputra Valle...
Importance and Techniques of Rain Water Harvesting in Lower Brahmaputra Valle...
 
Marina Barrage
Marina BarrageMarina Barrage
Marina Barrage
 

En vedette

National Bank of Canada Case Study
National Bank of Canada Case StudyNational Bank of Canada Case Study
National Bank of Canada Case Study
Bryan McCue
 

En vedette (16)

HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 
Ejercicios de Cinematica Para Pre-Ingenierias
Ejercicios de Cinematica Para Pre-IngenieriasEjercicios de Cinematica Para Pre-Ingenierias
Ejercicios de Cinematica Para Pre-Ingenierias
 
Rodillos vibratorios en Obra
Rodillos vibratorios en ObraRodillos vibratorios en Obra
Rodillos vibratorios en Obra
 
LoanSafe Risk Manager
LoanSafe Risk ManagerLoanSafe Risk Manager
LoanSafe Risk Manager
 
Tic
TicTic
Tic
 
Work,energyandpower
Work,energyandpowerWork,energyandpower
Work,energyandpower
 
Память
ПамятьПамять
Память
 
Яблокова Любовь Степановна
Яблокова Любовь СтепановнаЯблокова Любовь Степановна
Яблокова Любовь Степановна
 
National Bank of Canada Case Study
National Bank of Canada Case StudyNational Bank of Canada Case Study
National Bank of Canada Case Study
 
Chapter05
Chapter05Chapter05
Chapter05
 
Paula's resume
Paula's resumePaula's resume
Paula's resume
 
Nigeria's Media & Marketing in 2016
Nigeria's Media & Marketing in 2016Nigeria's Media & Marketing in 2016
Nigeria's Media & Marketing in 2016
 
Agentes de busqueda
Agentes de busquedaAgentes de busqueda
Agentes de busqueda
 
Innovative & Groundbreaking Automotive Startups
Innovative & Groundbreaking Automotive StartupsInnovative & Groundbreaking Automotive Startups
Innovative & Groundbreaking Automotive Startups
 
Χαράλαμπος Συργιάννης Τα ΚΠΕ και ο ρόλος τους στην ΠΕ Το ΚΠΕ Πεταλούδων Ρόδου
Χαράλαμπος Συργιάννης Τα ΚΠΕ και ο ρόλος τους στην ΠΕ Το ΚΠΕ Πεταλούδων ΡόδουΧαράλαμπος Συργιάννης Τα ΚΠΕ και ο ρόλος τους στην ΠΕ Το ΚΠΕ Πεταλούδων Ρόδου
Χαράλαμπος Συργιάννης Τα ΚΠΕ και ο ρόλος τους στην ΠΕ Το ΚΠΕ Πεταλούδων Ρόδου
 

Similaire à AHU condensate usage and appllication

05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and Energy
Jill Watkins
 
Big 5 Kuwait Provectus_WFP
Big 5 Kuwait Provectus_WFPBig 5 Kuwait Provectus_WFP
Big 5 Kuwait Provectus_WFP
Zack H. Abdi
 
water mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx ggwater mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx gg
Qasim Ali
 
Bangladesh water-pact---overview
Bangladesh water-pact---overviewBangladesh water-pact---overview
Bangladesh water-pact---overview
Faisal Rahman
 
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECTCONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
Mudassar Raut
 
Biomerwh in kristalvilla
Biomerwh in kristalvillaBiomerwh in kristalvilla
Biomerwh in kristalvilla
biomeshubha
 

Similaire à AHU condensate usage and appllication (20)

05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and Energy
 
Big 5 Kuwait Provectus_WFP
Big 5 Kuwait Provectus_WFPBig 5 Kuwait Provectus_WFP
Big 5 Kuwait Provectus_WFP
 
Circular Economy in Industrial Total Water Management.pptx
Circular Economy in Industrial Total Water Management.pptxCircular Economy in Industrial Total Water Management.pptx
Circular Economy in Industrial Total Water Management.pptx
 
Improvement in low water consumption(1).ppt
Improvement in low water consumption(1).pptImprovement in low water consumption(1).ppt
Improvement in low water consumption(1).ppt
 
Experimental analysis of dew drain water
Experimental analysis of dew drain waterExperimental analysis of dew drain water
Experimental analysis of dew drain water
 
water mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx ggwater mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx gg
 
Zero liquid discharge
Zero liquid dischargeZero liquid discharge
Zero liquid discharge
 
Saving water the right way! - Amal Padmanabhan & Ajith Panicker
Saving water the right way! - Amal Padmanabhan & Ajith PanickerSaving water the right way! - Amal Padmanabhan & Ajith Panicker
Saving water the right way! - Amal Padmanabhan & Ajith Panicker
 
Bangladesh water-pact---overview
Bangladesh water-pact---overviewBangladesh water-pact---overview
Bangladesh water-pact---overview
 
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECTCONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
 
Landscape architecture & water management_ Mohan Subramaniam_2013
Landscape architecture & water management_ Mohan Subramaniam_2013Landscape architecture & water management_ Mohan Subramaniam_2013
Landscape architecture & water management_ Mohan Subramaniam_2013
 
Biomerwh in kristalvilla
Biomerwh in kristalvillaBiomerwh in kristalvilla
Biomerwh in kristalvilla
 
Watercycle
WatercycleWatercycle
Watercycle
 
Water auditing
Water auditingWater auditing
Water auditing
 
Design Project EWB
Design Project EWBDesign Project EWB
Design Project EWB
 
En 528 urban water supply sewer system lecture no 9-10
En 528 urban water supply  sewer system lecture no 9-10En 528 urban water supply  sewer system lecture no 9-10
En 528 urban water supply sewer system lecture no 9-10
 
PT PIPA - contoh kisah sukses konservasi air di Jakarta
PT PIPA - contoh kisah sukses konservasi air di JakartaPT PIPA - contoh kisah sukses konservasi air di Jakarta
PT PIPA - contoh kisah sukses konservasi air di Jakarta
 
Transbay Presentation Sustainable Silicon Valley
Transbay Presentation Sustainable Silicon ValleyTransbay Presentation Sustainable Silicon Valley
Transbay Presentation Sustainable Silicon Valley
 
Lswtppt
LswtpptLswtppt
Lswtppt
 
Water Harvesting for Landscape Irrigation
Water Harvesting for Landscape IrrigationWater Harvesting for Landscape Irrigation
Water Harvesting for Landscape Irrigation
 

AHU condensate usage and appllication

  • 1. Condensation water that collects on a cool surface because the temperature of the surface is below the point at which moisture in the air forms as water droplets. 1E Venkata Raju - Building Manager
  • 2. Formation of condensation 2E Venkata Raju - Building Manager
  • 3. Condensate on glass of water 3E Venkata Raju - Building Manager
  • 4. Condensate water from AHU 4E Venkata Raju - Building Manager
  • 5. Quantity of condensate depends on 1. Temp of chilled water @ inlet to AHU 2. Percentage of RH in fresh air 3. Percentage of RH in return air 4. Capacity of AHUs 5. Volume of chilled flow 6. Volume of air flow In Hyderabad , More RH during monsoons (70 to 85%), in summer 50 to 70% and in winter 25 to 50%. E Venkata Raju - Building Manager 5
  • 6. Approximate Condensate quantity @B7 • Based on our intermittent collection sample reports at individual AHUs , floor AHUs , south wing AHUs and north wing AHUs in the last 3 to 4 months , it is approximately 10 to 12 KL per day ( when 37 AHUs running). • Assumed 15 to 18KL per day (When 62 AHUs running) E Venkata Raju - Building Manager 6
  • 7. Quality of condensate water @B7 1.Hardness  0 to 2 ppm 2. TTDs  30 to 40 ppm 3. PH  6 to 7 4. Clear water 5. Temp 15 to 20 deg.C E Venkata Raju - Building Manager 7
  • 8. Usage of collected condensate water 1.As drinking water 2.As domestic water 3.As CT water E Venkata Raju - Building Manager 8
  • 9. For Drinking- Scheme • Approximate cost : RS 2.50 lacs • Savings/Earnings : 6000 (Ltrs) x 20 (days) x Rs.1.00 (per ltr)x 12(months) = 14.40 lacs /year • Note :Every high purity of raw water , output is 80 to90% . E Venkata Raju - Building Manager 9 Condensate water Nano filtration/ RO UV dis infection Chlorination Lab testing as per drinking water standardsDrinking tank
  • 10. For domestic purpose- Scheme • Approximate cost : Rs 20000/- • Savings/earnings: 12,000 (ltrs)x Rs0.30 x 26 days x 12 months= 11,23,200/- year E Venkata Raju - Building Manager 10 Condensate water Multi grade filter Manual/auto Chlorination Domestic tank
  • 11. For CT water- Scheme • Approximate cost : Rs 15000/- • Savings : No chemicals required , no scale formation , no bleed off , less power consumption in chillers : Approximately Rs 75 to 80 lacs per year. E Venkata Raju - Building Manager 11 Condensate water Sand filter Collection tank
  • 12. B7Existing AHUs drain scheme E Venkata Raju - Building Manager 12
  • 13. B7 Proposed plan to collect condensate water from all AHUs E Venkata Raju - Building Manager 13
  • 14. Cost estimation • 1. As per quote by Hiline : Rs 1.5 lacs • 2. As per our estimate and as per standard design : Rs 75,000/- • 3. As per present available material : Rs 25000/- (May not be as per standard , but it is good and suitable for our requirement) E Venkata Raju - Building Manager 14
  • 15. Thanks E Venkata Raju - Building Manager 15