SlideShare une entreprise Scribd logo
1  sur  17
SEMINAR ON
MACHINE HOUR RATE
T.BOOMA
2ND M.COM
CONTENT
Introduction
Calculation Of Machine Hour Rate
Advantages
Disadvantages
Problems
Conclusion
References
INTRODUCTION
Machine hour rate is the cost of running a machine per hour.
It is one of the methods of absorbing factory expenses to production.
It is used in those industries or departments where machinery is
predominant and there is little or practically no manual labour.
In such industries or departments, overhead consists of indirect
expenses in running and operating the machine.
Therefore, it is desirable to allocate overhead to production on the
basis of working hours of the machines.
It is not desirable to calculate the machine hour rate for the entire
factory but different rates may be calculated according to their make,
type, size, capacity, wattage, horse power and other factors relating to
each machine or group of machines as a cost centre.
Machine hour rate is obtained by dividing the total running expenses of
a machine during a particular period by the number of hours the
machine is estimated to work during that period.
The formula used in computing the rate is:
 “Machine hour Rate is calculated by dividing the cost to be
apportioned or absorbed by the number of hours for which a
machine or machines are operated or expected to be operated”
 Machine Hour Rate = Total Factory Overheads(budgeted or actual)
Total Machine Hours (estimated or actual)
EXAMPLE:
 If factory overhead is Rs 3, 00,000 and total machine hours are
1,500, the machine hour rate is Rs--------- per machine hour
 (Rs 3, 00,000 ÷ 1500 hours-rs.200).
Calculation of Machine Hour
Rate:
The information required for calculation of machine hour rate is cost of
the machine; cost of installation of the machine; scrap value, if any; life
of the machine in hours; standing charges like rent etc. allocated to the
machine; repairs and maintenance of the machine; power
consumption; set up time; cost of lubricants applied on the machine
and insurance premium of the machine, if any.
Following steps are required to be taken for the calculation of machine
hour rate:
1. Each machine or a group of machines should be treated as a cost
centre so that all overheads relating to that machine or machines may
be identified.
2. Overheads relating to a machine are divided into two parts i.e., fixed
or standing charges and variable or machine expenses. Standing
charges are those expenses which remain constant irrespective of the
use or running of machine and examples of such expenses are rent
and rates, lighting and heating, insurance, supervising labour etc.
Cont..
3. Standing charges are estimated for a period for every machine and
amount so estimated is divided by the total number of normal
working hours of the machine during that period in order to calculate
an hourly rate for fixed charges. For machine expenses an hourly rate
is calculated for each item of expenses separately by dividing the
expenses by the normal working hours. While calculating the normal
working hours, the hours which are required for maintenance or for
setting- up or setting-off are to be deducted.
4. Total of standing charges rate and the machine expenses rate will
give the ordinary machine hour rate. If machine operator’s wages are
also added into the simple machine hour rate then it will be called
comprehensive machine hour rate.
5. Sometimes supplementary rate is used when the charge for all other
overhead cost is not included in the machine hour rate i.e., only
machine expenses are taken for the purpose of machine hour rate. It
is also used for correcting any error in the determination of machine
The bases which may be adopted for apportioning the different
expenses for the purpose of calculation of machine hour rate are
given below:
S.NO EXPENSES
STANDING OR FIXED CHARGES
1 RENT AND TAXES
2 FACTORY LIGHTING&HEATING
3 FACTORY SUPERVISION EXPENSES
4 LABOUR WELFARE EXPENSES
5 INSURANCE
6 LUBRICATING OIL & CONSUMABLE STORES
7 CLEANING MATERIAL
MACHINE OR VARIABLE EXPENSES
1 DEPRECIATION
2 POWER
3 STEAM WATER
4 REPAIRS AND MAINTENANCE
Advantages:
It helps to compare the relative efficiencies and cost of
operating different machines.
It brings to light the existence and extent of idle time of
machines.
It enables the management to decide how far the use of
machine work is preferable to manual work.
It is most scientific, practical and accurate method of
calculating manufacturing overheads.
Cost reports prepared with the help of such rate are
dependable and can help the management in decision-
making.
It provides useful data for estimating cost of production,
setting standards and for fixing selling prices for
quotations.
Disadvantages:
It involves additional work in assessing the
working hours of machines and thus it is a costly
method.
It gives inaccurate results if manual labour is
equally important.
It is difficult to estimate the machine hours
especially when production program is not
available in advance.
Blanket rate cannot be used and it makes the
method more costly.
PROBLEMS:
1. A machine is purchased for cash at rs.9,200. its working life is
estimated to be 18,000 hours after which its scrap value is estimated at
rs.200. it is assumed from past experience that:
The machine will work for 1,800 hours annually.
The repair charges will be rs.1,080 during the whole period of life of the
machine.
The power consumption will be 5 units per hour at 6 paise per unit.
Other annual standing charges are estimated to be:
Rs.
A)Rent of dept. (machine occupies 1/5 of the total space)
780
B)Light(12 points in the dept.-2 points engaged in the machine)
288
C)Foreman‘s salary(1/4 of his time is occupied in the machine)
6000
D)Insurance premium(fire) for machinery
36
CALCULATION OF MACHINE HOUR RATE
STANDING CHARGES PER ANNUM PER HOUR
Rent (rs.780/rs.5) 156
Light (2/12*rs.288) 48
Insurance charges 36
Cotton waste 60
Foreman‘s salary
(rs.6000/4)
1500
Total Standing Charges 1800
Hourly rate of standing
charges rs.1800/1800
1.00
MACHINE EXPENSES
Depreciation
(rs.9200-rs.200/18000)
0.50
Repairs and Maintenance
(rs.1080/18000)
0.06
Power (0.06*5) 0.30
2. Compute the machine hour rate so as to cover the
overhead expenses given below:
per hour:
Electric power 70 paise
Steam 35 paise
Water 10 paise
Repairs Rs.680
p.a
Rent Rs.350
p.a
Other information available were:
Original cost of machine
Rs.15000
Present book value Rs.3000
Replacement value
STANDING CHARGES PER ANNUM PER HOUR
Rent 350
Total standing charges 350
Hourly rate of standing charges
rs.350/2400
0.15
MACHINE EXPENSES
Electric power 0.70
Steam 0.35
Water 0.10
Repairs (680/2400) 0.28
Depreciation (1500/2400) 0.63
MACHINE HOUR RATE 2.21
CONCLUSION
 In factories or departments, where production is
largely by machinery, this method gives greater
accuracy than any of the other methods. In a highly
mechanized cost center, majority of the overhead
expenses are incurred on account of using the
machine, such as, depreciation, power, repairs and
maintenance, insurance,etc. Machine hour rate,
therefore, provides the most equitable basis for
absorption of overheads in machine intensive cost
centers
TIME TO ANSWER:
1. Formula For Machine Hour Rate------
2. Power Is ------------
3. Interest Of Hire Purchase Is---------
4. -----Cannot Be Used And It Makes The Method More
Costly
5. If Factory Overhead Is Rs 5, 00,000 And Total
Machine Hours Are 5,000, The Machine Hour Rate Is
Rs ------Per Hour
REFERENCES
1. COST ACCOUNTING-JAIN&NARANG
2. www.slideshare.net/yusufswt/machine-
hour-rate-method
3. www.yourarticlelibrary.com/accounting/.../
machine-hours-rate.../52583
17

Contenu connexe

Tendances

Cost Allocation powerpoint presentation
Cost Allocation powerpoint presentationCost Allocation powerpoint presentation
Cost Allocation powerpoint presentation
Shibani123
 

Tendances (20)

Elements of cost
Elements of costElements of cost
Elements of cost
 
Process costing
Process costingProcess costing
Process costing
 
Chapter 07 Marginal Costing
Chapter 07   Marginal CostingChapter 07   Marginal Costing
Chapter 07 Marginal Costing
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Cost sheet preparation.pptx
Cost sheet preparation.pptxCost sheet preparation.pptx
Cost sheet preparation.pptx
 
Absorption Costing Concept
Absorption Costing ConceptAbsorption Costing Concept
Absorption Costing Concept
 
Methods and techniques of Costing
Methods and techniques of CostingMethods and techniques of Costing
Methods and techniques of Costing
 
Accounts : Marginal Costing
Accounts : Marginal CostingAccounts : Marginal Costing
Accounts : Marginal Costing
 
Cost Allocation powerpoint presentation
Cost Allocation powerpoint presentationCost Allocation powerpoint presentation
Cost Allocation powerpoint presentation
 
A presentation on process costing
A presentation on process costingA presentation on process costing
A presentation on process costing
 
Job costing
Job costingJob costing
Job costing
 
Overhead rates of absorption
Overhead rates of absorptionOverhead rates of absorption
Overhead rates of absorption
 
Overheads and classifcation of overheads
Overheads and classifcation of overheads Overheads and classifcation of overheads
Overheads and classifcation of overheads
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Overheads
OverheadsOverheads
Overheads
 
Material in cost accounting
Material in cost accountingMaterial in cost accounting
Material in cost accounting
 
Overhead cost
Overhead costOverhead cost
Overhead cost
 
Elements of costs and classification of expenditure
Elements of costs and classification of expenditureElements of costs and classification of expenditure
Elements of costs and classification of expenditure
 
Cost centre and cost unit
Cost centre and cost unitCost centre and cost unit
Cost centre and cost unit
 

En vedette

Machine hour rate method
Machine hour rate methodMachine hour rate method
Machine hour rate method
Yusuf Khan
 
CNC Machine Maintenance
CNC Machine MaintenanceCNC Machine Maintenance
CNC Machine Maintenance
illpa
 
How To Prepare Cost Sheets And Analyse Costs
How To Prepare Cost Sheets And Analyse CostsHow To Prepare Cost Sheets And Analyse Costs
How To Prepare Cost Sheets And Analyse Costs
Dr. Trilok Kumar Jain
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
gk44
 
Topic 6 Non Current Asset
Topic 6 Non Current AssetTopic 6 Non Current Asset
Topic 6 Non Current Asset
mandalina landy
 

En vedette (20)

Machine hour rate method
Machine hour rate methodMachine hour rate method
Machine hour rate method
 
Cost calculation of cnc machining operation
Cost calculation of cnc machining operationCost calculation of cnc machining operation
Cost calculation of cnc machining operation
 
CNC Machine Maintenance
CNC Machine MaintenanceCNC Machine Maintenance
CNC Machine Maintenance
 
Process Costing
Process CostingProcess Costing
Process Costing
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
How To Prepare Cost Sheets And Analyse Costs
How To Prepare Cost Sheets And Analyse CostsHow To Prepare Cost Sheets And Analyse Costs
How To Prepare Cost Sheets And Analyse Costs
 
Mori Seiki Maintenance Guide
Mori Seiki Maintenance GuideMori Seiki Maintenance Guide
Mori Seiki Maintenance Guide
 
CNC Machines
CNC MachinesCNC Machines
CNC Machines
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explained
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
 
Depreciation
DepreciationDepreciation
Depreciation
 
Budget and budgetary control
Budget and budgetary controlBudget and budgetary control
Budget and budgetary control
 
Depreciation 2 (1)
Depreciation 2 (1)Depreciation 2 (1)
Depreciation 2 (1)
 
Topic 6 Non Current Asset
Topic 6 Non Current AssetTopic 6 Non Current Asset
Topic 6 Non Current Asset
 
Maintenance managemant
Maintenance managemantMaintenance managemant
Maintenance managemant
 
Preventive Maintenance: An Approach To Regulatory Compliance.
Preventive Maintenance: An Approach To Regulatory Compliance.Preventive Maintenance: An Approach To Regulatory Compliance.
Preventive Maintenance: An Approach To Regulatory Compliance.
 
The Experimental Approach of Manufacturing Hardened Barrel Screw on Tradition...
The Experimental Approach of Manufacturing Hardened Barrel Screw on Tradition...The Experimental Approach of Manufacturing Hardened Barrel Screw on Tradition...
The Experimental Approach of Manufacturing Hardened Barrel Screw on Tradition...
 
Cnc
CncCnc
Cnc
 
Guide to CNC Machine Maintenance and Calibration
Guide to CNC Machine Maintenance and CalibrationGuide to CNC Machine Maintenance and Calibration
Guide to CNC Machine Maintenance and Calibration
 
Accounting for Depreciation
Accounting for DepreciationAccounting for Depreciation
Accounting for Depreciation
 

Similaire à Machine hour rate

Avacs presentation by jun7
Avacs presentation by jun7Avacs presentation by jun7
Avacs presentation by jun7
Svend Andersen
 
Advanced manufacturing technology
Advanced manufacturing technologyAdvanced manufacturing technology
Advanced manufacturing technology
Nurul Arshad
 
Maintenance mgmt
Maintenance mgmtMaintenance mgmt
Maintenance mgmt
Ajit Adsul
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
Rahul Kumar
 

Similaire à Machine hour rate (20)

Prsentation 2 htibl bt case study uploaded
Prsentation 2 htibl bt case study uploadedPrsentation 2 htibl bt case study uploaded
Prsentation 2 htibl bt case study uploaded
 
COST AND MANAGMENT for accountancy for college students in basic level
COST AND MANAGMENT for accountancy for college students in basic levelCOST AND MANAGMENT for accountancy for college students in basic level
COST AND MANAGMENT for accountancy for college students in basic level
 
Sewing line setting
Sewing line settingSewing line setting
Sewing line setting
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Flexible Manufacturing System Design
Flexible Manufacturing System DesignFlexible Manufacturing System Design
Flexible Manufacturing System Design
 
Avacs presentation by jun7
Avacs presentation by jun7Avacs presentation by jun7
Avacs presentation by jun7
 
Chapter4.ppt
Chapter4.pptChapter4.ppt
Chapter4.ppt
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
 
Unit 5 mechanisation.pptx
Unit 5 mechanisation.pptxUnit 5 mechanisation.pptx
Unit 5 mechanisation.pptx
 
Advanced manufacturing technology
Advanced manufacturing technologyAdvanced manufacturing technology
Advanced manufacturing technology
 
Amt
AmtAmt
Amt
 
cost accoonting.pptx
cost accoonting.pptxcost accoonting.pptx
cost accoonting.pptx
 
Economic of power generation (1) h.pptx
Economic of power generation (1)       h.pptxEconomic of power generation (1)       h.pptx
Economic of power generation (1) h.pptx
 
Selection and economics of farm machines and equipments
Selection and economics of farm machines and equipmentsSelection and economics of farm machines and equipments
Selection and economics of farm machines and equipments
 
Maintenance mgmt
Maintenance mgmtMaintenance mgmt
Maintenance mgmt
 
Departmental Rate and Plantwide Rate
Departmental Rate and Plantwide RateDepartmental Rate and Plantwide Rate
Departmental Rate and Plantwide Rate
 
Chapter 7 Support Department Cost Allocation
Chapter 7 Support Department Cost AllocationChapter 7 Support Department Cost Allocation
Chapter 7 Support Department Cost Allocation
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Sneha
SnehaSneha
Sneha
 
Unit 5 or
Unit 5 orUnit 5 or
Unit 5 or
 

Plus de Booma Thayumanavar (10)

A study on customer satisfaction towards Indane LPG
A study on customer satisfaction towards Indane LPGA study on customer satisfaction towards Indane LPG
A study on customer satisfaction towards Indane LPG
 
Demographic environment
Demographic environmentDemographic environment
Demographic environment
 
concentric or related diversification
concentric or related diversificationconcentric or related diversification
concentric or related diversification
 
Finance
FinanceFinance
Finance
 
certificates related to shipment
certificates related to shipmentcertificates related to shipment
certificates related to shipment
 
new issue market
new issue marketnew issue market
new issue market
 
Product failure
Product failureProduct failure
Product failure
 
questionnaire preparation
questionnaire preparationquestionnaire preparation
questionnaire preparation
 
problems and prospects of leasing in india
problems and prospects of leasing in indiaproblems and prospects of leasing in india
problems and prospects of leasing in india
 
ROLE OF MONETARY POLICY IN INDIA
ROLE OF MONETARY POLICY IN INDIAROLE OF MONETARY POLICY IN INDIA
ROLE OF MONETARY POLICY IN INDIA
 

Dernier

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 

Dernier (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 

Machine hour rate

  • 1. SEMINAR ON MACHINE HOUR RATE T.BOOMA 2ND M.COM
  • 2. CONTENT Introduction Calculation Of Machine Hour Rate Advantages Disadvantages Problems Conclusion References
  • 3. INTRODUCTION Machine hour rate is the cost of running a machine per hour. It is one of the methods of absorbing factory expenses to production. It is used in those industries or departments where machinery is predominant and there is little or practically no manual labour. In such industries or departments, overhead consists of indirect expenses in running and operating the machine. Therefore, it is desirable to allocate overhead to production on the basis of working hours of the machines. It is not desirable to calculate the machine hour rate for the entire factory but different rates may be calculated according to their make, type, size, capacity, wattage, horse power and other factors relating to each machine or group of machines as a cost centre. Machine hour rate is obtained by dividing the total running expenses of a machine during a particular period by the number of hours the machine is estimated to work during that period.
  • 4. The formula used in computing the rate is:  “Machine hour Rate is calculated by dividing the cost to be apportioned or absorbed by the number of hours for which a machine or machines are operated or expected to be operated”  Machine Hour Rate = Total Factory Overheads(budgeted or actual) Total Machine Hours (estimated or actual) EXAMPLE:  If factory overhead is Rs 3, 00,000 and total machine hours are 1,500, the machine hour rate is Rs--------- per machine hour  (Rs 3, 00,000 ÷ 1500 hours-rs.200).
  • 5. Calculation of Machine Hour Rate: The information required for calculation of machine hour rate is cost of the machine; cost of installation of the machine; scrap value, if any; life of the machine in hours; standing charges like rent etc. allocated to the machine; repairs and maintenance of the machine; power consumption; set up time; cost of lubricants applied on the machine and insurance premium of the machine, if any. Following steps are required to be taken for the calculation of machine hour rate: 1. Each machine or a group of machines should be treated as a cost centre so that all overheads relating to that machine or machines may be identified. 2. Overheads relating to a machine are divided into two parts i.e., fixed or standing charges and variable or machine expenses. Standing charges are those expenses which remain constant irrespective of the use or running of machine and examples of such expenses are rent and rates, lighting and heating, insurance, supervising labour etc.
  • 6. Cont.. 3. Standing charges are estimated for a period for every machine and amount so estimated is divided by the total number of normal working hours of the machine during that period in order to calculate an hourly rate for fixed charges. For machine expenses an hourly rate is calculated for each item of expenses separately by dividing the expenses by the normal working hours. While calculating the normal working hours, the hours which are required for maintenance or for setting- up or setting-off are to be deducted. 4. Total of standing charges rate and the machine expenses rate will give the ordinary machine hour rate. If machine operator’s wages are also added into the simple machine hour rate then it will be called comprehensive machine hour rate. 5. Sometimes supplementary rate is used when the charge for all other overhead cost is not included in the machine hour rate i.e., only machine expenses are taken for the purpose of machine hour rate. It is also used for correcting any error in the determination of machine
  • 7. The bases which may be adopted for apportioning the different expenses for the purpose of calculation of machine hour rate are given below: S.NO EXPENSES STANDING OR FIXED CHARGES 1 RENT AND TAXES 2 FACTORY LIGHTING&HEATING 3 FACTORY SUPERVISION EXPENSES 4 LABOUR WELFARE EXPENSES 5 INSURANCE 6 LUBRICATING OIL & CONSUMABLE STORES 7 CLEANING MATERIAL MACHINE OR VARIABLE EXPENSES 1 DEPRECIATION 2 POWER 3 STEAM WATER 4 REPAIRS AND MAINTENANCE
  • 8. Advantages: It helps to compare the relative efficiencies and cost of operating different machines. It brings to light the existence and extent of idle time of machines. It enables the management to decide how far the use of machine work is preferable to manual work. It is most scientific, practical and accurate method of calculating manufacturing overheads. Cost reports prepared with the help of such rate are dependable and can help the management in decision- making. It provides useful data for estimating cost of production, setting standards and for fixing selling prices for quotations.
  • 9. Disadvantages: It involves additional work in assessing the working hours of machines and thus it is a costly method. It gives inaccurate results if manual labour is equally important. It is difficult to estimate the machine hours especially when production program is not available in advance. Blanket rate cannot be used and it makes the method more costly.
  • 10. PROBLEMS: 1. A machine is purchased for cash at rs.9,200. its working life is estimated to be 18,000 hours after which its scrap value is estimated at rs.200. it is assumed from past experience that: The machine will work for 1,800 hours annually. The repair charges will be rs.1,080 during the whole period of life of the machine. The power consumption will be 5 units per hour at 6 paise per unit. Other annual standing charges are estimated to be: Rs. A)Rent of dept. (machine occupies 1/5 of the total space) 780 B)Light(12 points in the dept.-2 points engaged in the machine) 288 C)Foreman‘s salary(1/4 of his time is occupied in the machine) 6000 D)Insurance premium(fire) for machinery 36
  • 11. CALCULATION OF MACHINE HOUR RATE STANDING CHARGES PER ANNUM PER HOUR Rent (rs.780/rs.5) 156 Light (2/12*rs.288) 48 Insurance charges 36 Cotton waste 60 Foreman‘s salary (rs.6000/4) 1500 Total Standing Charges 1800 Hourly rate of standing charges rs.1800/1800 1.00 MACHINE EXPENSES Depreciation (rs.9200-rs.200/18000) 0.50 Repairs and Maintenance (rs.1080/18000) 0.06 Power (0.06*5) 0.30
  • 12. 2. Compute the machine hour rate so as to cover the overhead expenses given below: per hour: Electric power 70 paise Steam 35 paise Water 10 paise Repairs Rs.680 p.a Rent Rs.350 p.a Other information available were: Original cost of machine Rs.15000 Present book value Rs.3000 Replacement value
  • 13. STANDING CHARGES PER ANNUM PER HOUR Rent 350 Total standing charges 350 Hourly rate of standing charges rs.350/2400 0.15 MACHINE EXPENSES Electric power 0.70 Steam 0.35 Water 0.10 Repairs (680/2400) 0.28 Depreciation (1500/2400) 0.63 MACHINE HOUR RATE 2.21
  • 14. CONCLUSION  In factories or departments, where production is largely by machinery, this method gives greater accuracy than any of the other methods. In a highly mechanized cost center, majority of the overhead expenses are incurred on account of using the machine, such as, depreciation, power, repairs and maintenance, insurance,etc. Machine hour rate, therefore, provides the most equitable basis for absorption of overheads in machine intensive cost centers
  • 15. TIME TO ANSWER: 1. Formula For Machine Hour Rate------ 2. Power Is ------------ 3. Interest Of Hire Purchase Is--------- 4. -----Cannot Be Used And It Makes The Method More Costly 5. If Factory Overhead Is Rs 5, 00,000 And Total Machine Hours Are 5,000, The Machine Hour Rate Is Rs ------Per Hour
  • 16. REFERENCES 1. COST ACCOUNTING-JAIN&NARANG 2. www.slideshare.net/yusufswt/machine- hour-rate-method 3. www.yourarticlelibrary.com/accounting/.../ machine-hours-rate.../52583
  • 17. 17