ELECTRICITY DISTRIBUTION LOSSES 
& ITS PREVENTION 
Presented By:- Abhishek Kumar, Geo Spatial Division, HCL 1
CONTENTS 
1. Drivers of AT&C LOSSES 
2. GIS MAP SAMPLE HAMIRPUR 
3. AT&C Calculation of DISTRIBUTION TRANSFORMER 
4. Pre-requisites for obtaining baseline AT&C LOSSES 
5. Ring Fencing Diagram 
2
Drivers for AT&C Losses 
TECHNICAL LOSSES COMMERCIAL LOSSES 
 Overloading of system elements like 
Feeders, Transformers & Conductors 
 Absence of up gradation of Old Lines 
and Equipment's 
 Non Installation of Capacitors 
 Low Metering/Billing/Collection Efficiency 
 Theft, Pilferage and tampering of meters 
 Inadequate Revenue Collection 
 Faulty Meter Reading
GIS MAP SMAPLE (HAMIRPUR) 
4 
33/11 KV 
SUBSTATION
REPRESENTATION OF SUSPECETED THEFT CASES 
5 
BILL NOT SHOWN/DOOR LOCK 
NO CONNECTIONS 
VALID CONNECTIONS
AT&C LOSS CALCULATION AT DTR LEVEL 
6 
DTR 
DTR, 25KVA 
DTR, 25 KVA 
(13 CONSUMERS 
CONNECTED) 
DT INPUT ENERGY: 3020 KWH 
BILLED UNIT: 3020 
DT INPUT ENERGY: 3020 KWH 
TOTAL ASSESMENT: 15793.77 
REALISATION: 11843 INR 
BILLED UNIT : 2868 KWH 
AT&C LOSS : 28.79% 
ASSESMENT: 15793.77 INR 
REALISATION : 11843 INR 
AT&C LOSS : 28.71%
CALCULATION of AT&C LOSS : BILLING EFFICIENCY 
7 
SI No. 
DT INPUT 
ENERGY (KWH) 
ACCOUNT ID 
METER 
STATUS 
BILL_BASIS CONSUMPTION 
1 6368004000 FAULTY ASSESMENT (METER DEFECTIVE) 80 
2 4485004000 ACTIVE METERED UNIT 400 
3 7884004000 ACTIVE METERED UNIT 740 
4 3872893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 
5 4414004000 FAULTY ASSESMENT (METER DEFECTIVE) 160 
6 6492993000 ACTIVE METERED UNIT 291 
7 872893000 ACTIVE METERED UNIT 160 
8 7712004000 FAULTY ASSESMENT (METER DEFECTIVE) 245 
9 2046993000 FAULTY ASSESMENT (METER DEFECTIVE) 80 
10 942893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 
11 5797004000 ACTIVE METERED UNIT 157 
12 2125993000 ACTIVE PROVISIONAL (HOUSE LOCKED) 104 
13 5715893000 ACTIVE METERED UNIT 131 
Total 2868 
3020 
Billing Efficiency= (Billed Unit/DT Energy) x 100 = 2868/3020 x 100 = 94.96 %
CALCULATION of AT&C LOSS : COLLECTION EFFICIENCY 
SI No. ACCOUNT ID CURRENT_ASSESSMENT LAST_PAY_AMT LAST_PAY_DATE 
1 6368004000 239.06 239 25-Aug-14 
2 4485004000 2156.8 2157 25-Aug-14 
3 7884004000 4042.76 4043 26-Aug-14 
4 3872893000 862.4 0 26-Jul-14 
5 4414004000 1421.71 0 30-Mar-85 
6 6492993000 1540.7 1541 25-Aug-14 
7 872893000 867 0 12-Apr-14 
8 7712004000 1161.98 1161 26-Aug-14 
9 2046993000 218.95 219 19-Aug-14 
10 942893000 853.59 854 19-Aug-14 
11 5797004000 828.37 829 25-Aug-14 
12 2125993000 1221.36 0 1-Jan-11 
13 5715893000 379.09 800 20-Aug-14 
TOTAL 15793.77 11843 
8 
 Collection Efficiency: (Collected Payment/Billed Amount) x 100 
= 11843/15793.77 x 100= 74.98%
CONCEPT OF AT&C LOSS 
COMMERCIAL LOSSES 
Factors causing Commercial Losses: 
 Meter tampering 
 Bypassing of meters 
 Usage of MAGNETS to slow down the meters 
 Tampering of PT circuits 
 CT/PT ratios (In case of HT meters) 
9
CONCEPT OF AT&C LOSS 
COMMERCIAL LOSSES :- COLLECTION EFFICIENCY 
 Utility is not being able to collect the complete amount billed by 
it. 
 Absence of Energy Accounting & Auditing 
 In case of unavailability of arrear figures, the collection efficiency 
figures can be more than 100%. 
 Revenue collected shall exclude the arrears. 
 In above cases efficiency needs to be restricted to 100% and shall 
be used for computation of AT&C losses. 
10
PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES 
 Metering of Energy Input Points of Project Area 
 On incoming lines of 33/11 kV sub-stations located within project area. 
 On 33 KV, 11 KV feeders emanating from sub-station located outside project 
area but supplying power to HT/LT consumers located within project area. 
11
PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES 
 Ring-fencing of Project area Electrical Network 
 Import/Export meters at the boundary of those lines that are feeding 
outside as well as inside project area so that import and export of 
energy can be measured for project area. These lines may emanate 
from the sub-stations located within or outside project area. 
 Import/Export meters on the dedicated feeder emanating from sub-stations 
located within project area but feeding outside project area. 
 Import/Export meters on 33/11 KV Sub-Stations 
12
RING FENCING DIAGRAM 
13
14

Contenu connexe

Tendances

ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
Waseem Hashmat
 
Design and Simulation of Power Factor Correction Boost Converter using Hyster...
Design and Simulation of Power Factor Correction Boost Converter using Hyster...Design and Simulation of Power Factor Correction Boost Converter using Hyster...
Design and Simulation of Power Factor Correction Boost Converter using Hyster...
ijtsrd
 

Tendances (20)

Fc tcr.newpptx
Fc tcr.newpptxFc tcr.newpptx
Fc tcr.newpptx
 
POWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxPOWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptx
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
Deviation Settlement Mechanism (DSM)
Deviation Settlement Mechanism (DSM)Deviation Settlement Mechanism (DSM)
Deviation Settlement Mechanism (DSM)
 
Power generation cost analysis.power generation_cost_analysis
Power generation cost analysis.power generation_cost_analysisPower generation cost analysis.power generation_cost_analysis
Power generation cost analysis.power generation_cost_analysis
 
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationThe power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentation
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Project management in thermal power plants
Project management in thermal power plantsProject management in thermal power plants
Project management in thermal power plants
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
 
Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchanges
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
 
Micro grid for a conventional developer
Micro grid for a conventional developerMicro grid for a conventional developer
Micro grid for a conventional developer
 
Statcom
StatcomStatcom
Statcom
 
Intership report PAK ELEKTRON LIMITED (PEL) , ENERGY METER PLANT SAAD IZHAR
Intership report PAK ELEKTRON LIMITED (PEL) , ENERGY METER PLANT SAAD IZHAR  Intership report PAK ELEKTRON LIMITED (PEL) , ENERGY METER PLANT SAAD IZHAR
Intership report PAK ELEKTRON LIMITED (PEL) , ENERGY METER PLANT SAAD IZHAR
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
Tariff determination for hydro power plant
Tariff determination for hydro power plantTariff determination for hydro power plant
Tariff determination for hydro power plant
 
Transmission congestion management in deregulated power system operations
Transmission congestion management in deregulated power system operationsTransmission congestion management in deregulated power system operations
Transmission congestion management in deregulated power system operations
 
Ic engine
Ic engineIc engine
Ic engine
 
Design and Simulation of Power Factor Correction Boost Converter using Hyster...
Design and Simulation of Power Factor Correction Boost Converter using Hyster...Design and Simulation of Power Factor Correction Boost Converter using Hyster...
Design and Simulation of Power Factor Correction Boost Converter using Hyster...
 

Similaire à AT&C LOSSES In RAPDRP

Microprocessor based autonomous control system
Microprocessor based autonomous control systemMicroprocessor based autonomous control system
Microprocessor based autonomous control system
Dr. Rajesh P Barnwal
 
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
jbpatel7290
 
Agricultural machinery telematics
Agricultural machinery telematicsAgricultural machinery telematics
Agricultural machinery telematics
Mik Kaplunski
 
Low power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifierLow power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifier
eSAT Journals
 

Similaire à AT&C LOSSES In RAPDRP (20)

Intelligent mcc Siemens
Intelligent mcc Siemens Intelligent mcc Siemens
Intelligent mcc Siemens
 
Intelligent mcc
Intelligent mccIntelligent mcc
Intelligent mcc
 
115 0115 joshi
115 0115 joshi115 0115 joshi
115 0115 joshi
 
Short circuit calculations
Short circuit calculationsShort circuit calculations
Short circuit calculations
 
water level monitor using gsm
water level monitor using gsmwater level monitor using gsm
water level monitor using gsm
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
Smart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptxSmart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptx
 
AVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.pptAVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.ppt
 
Microprocessor based autonomous control system
Microprocessor based autonomous control systemMicroprocessor based autonomous control system
Microprocessor based autonomous control system
 
Instruction manual
Instruction manualInstruction manual
Instruction manual
 
CESC Limited
CESC LimitedCESC Limited
CESC Limited
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National Highways
 
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Agricultural machinery telematics
Agricultural machinery telematicsAgricultural machinery telematics
Agricultural machinery telematics
 
Low power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifierLow power low voltage operation of operational amplifier
Low power low voltage operation of operational amplifier
 
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptxR01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using Arduino
 

Dernier

Dernier (20)

Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

AT&C LOSSES In RAPDRP

  • 1. Presentation on ELECTRICITY DISTRIBUTION LOSSES & ITS PREVENTION Presented By:- Abhishek Kumar, Geo Spatial Division, HCL 1
  • 2. CONTENTS 1. Drivers of AT&C LOSSES 2. GIS MAP SAMPLE HAMIRPUR 3. AT&C Calculation of DISTRIBUTION TRANSFORMER 4. Pre-requisites for obtaining baseline AT&C LOSSES 5. Ring Fencing Diagram 2
  • 3. Drivers for AT&C Losses TECHNICAL LOSSES COMMERCIAL LOSSES  Overloading of system elements like Feeders, Transformers & Conductors  Absence of up gradation of Old Lines and Equipment's  Non Installation of Capacitors  Low Metering/Billing/Collection Efficiency  Theft, Pilferage and tampering of meters  Inadequate Revenue Collection  Faulty Meter Reading
  • 4. GIS MAP SMAPLE (HAMIRPUR) 4 33/11 KV SUBSTATION
  • 5. REPRESENTATION OF SUSPECETED THEFT CASES 5 BILL NOT SHOWN/DOOR LOCK NO CONNECTIONS VALID CONNECTIONS
  • 6. AT&C LOSS CALCULATION AT DTR LEVEL 6 DTR DTR, 25KVA DTR, 25 KVA (13 CONSUMERS CONNECTED) DT INPUT ENERGY: 3020 KWH BILLED UNIT: 3020 DT INPUT ENERGY: 3020 KWH TOTAL ASSESMENT: 15793.77 REALISATION: 11843 INR BILLED UNIT : 2868 KWH AT&C LOSS : 28.79% ASSESMENT: 15793.77 INR REALISATION : 11843 INR AT&C LOSS : 28.71%
  • 7. CALCULATION of AT&C LOSS : BILLING EFFICIENCY 7 SI No. DT INPUT ENERGY (KWH) ACCOUNT ID METER STATUS BILL_BASIS CONSUMPTION 1 6368004000 FAULTY ASSESMENT (METER DEFECTIVE) 80 2 4485004000 ACTIVE METERED UNIT 400 3 7884004000 ACTIVE METERED UNIT 740 4 3872893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 5 4414004000 FAULTY ASSESMENT (METER DEFECTIVE) 160 6 6492993000 ACTIVE METERED UNIT 291 7 872893000 ACTIVE METERED UNIT 160 8 7712004000 FAULTY ASSESMENT (METER DEFECTIVE) 245 9 2046993000 FAULTY ASSESMENT (METER DEFECTIVE) 80 10 942893000 FAULTY ASSESMENT (METER DEFECTIVE) 160 11 5797004000 ACTIVE METERED UNIT 157 12 2125993000 ACTIVE PROVISIONAL (HOUSE LOCKED) 104 13 5715893000 ACTIVE METERED UNIT 131 Total 2868 3020 Billing Efficiency= (Billed Unit/DT Energy) x 100 = 2868/3020 x 100 = 94.96 %
  • 8. CALCULATION of AT&C LOSS : COLLECTION EFFICIENCY SI No. ACCOUNT ID CURRENT_ASSESSMENT LAST_PAY_AMT LAST_PAY_DATE 1 6368004000 239.06 239 25-Aug-14 2 4485004000 2156.8 2157 25-Aug-14 3 7884004000 4042.76 4043 26-Aug-14 4 3872893000 862.4 0 26-Jul-14 5 4414004000 1421.71 0 30-Mar-85 6 6492993000 1540.7 1541 25-Aug-14 7 872893000 867 0 12-Apr-14 8 7712004000 1161.98 1161 26-Aug-14 9 2046993000 218.95 219 19-Aug-14 10 942893000 853.59 854 19-Aug-14 11 5797004000 828.37 829 25-Aug-14 12 2125993000 1221.36 0 1-Jan-11 13 5715893000 379.09 800 20-Aug-14 TOTAL 15793.77 11843 8  Collection Efficiency: (Collected Payment/Billed Amount) x 100 = 11843/15793.77 x 100= 74.98%
  • 9. CONCEPT OF AT&C LOSS COMMERCIAL LOSSES Factors causing Commercial Losses:  Meter tampering  Bypassing of meters  Usage of MAGNETS to slow down the meters  Tampering of PT circuits  CT/PT ratios (In case of HT meters) 9
  • 10. CONCEPT OF AT&C LOSS COMMERCIAL LOSSES :- COLLECTION EFFICIENCY  Utility is not being able to collect the complete amount billed by it.  Absence of Energy Accounting & Auditing  In case of unavailability of arrear figures, the collection efficiency figures can be more than 100%.  Revenue collected shall exclude the arrears.  In above cases efficiency needs to be restricted to 100% and shall be used for computation of AT&C losses. 10
  • 11. PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES  Metering of Energy Input Points of Project Area  On incoming lines of 33/11 kV sub-stations located within project area.  On 33 KV, 11 KV feeders emanating from sub-station located outside project area but supplying power to HT/LT consumers located within project area. 11
  • 12. PRE-REQUISITES FOR OBTAINING BASELINE AT&C LOSSES  Ring-fencing of Project area Electrical Network  Import/Export meters at the boundary of those lines that are feeding outside as well as inside project area so that import and export of energy can be measured for project area. These lines may emanate from the sub-stations located within or outside project area.  Import/Export meters on the dedicated feeder emanating from sub-stations located within project area but feeding outside project area.  Import/Export meters on 33/11 KV Sub-Stations 12