1. Luke Adams Unit 10 Short Film Production
Production Schedule
Date Activity Timings
15/04/18 Walkthrough of whole short film to double check risk assessment,timings and
shooting positions
Shots 3,4,5 – similar set ups, same part of location. Multiple takes
Shots 6&9 – framed on legs and feet through bars – multiple takes and
contingency time as this will need to be shot from the street and may take more
time
7.30-8pm
8-9pm
9pm-10pm
16/04/18 Shot 7 – multiple takes
Shot 8 – multiple takes
Shot 10 – multiple takes
Shot 14 – multiple takes
All simple action, walking, walking away. All same part of location, similar setups.
Saving character interaction shots and close ups for final day. Plenty of contingency
time in this shoot if any issues from Day 1
7.30-8.00
8.30
8.30-9
9-9.30
17/04/18 Shot 11 – multiple takes
Shot 13 – multiple takes
Shot 12 – multiple takes ( differentcamera and light setup – close up)
There is again time here for contingencies like necessaryreshoots of today’s or
earlier shots.
In the event of bad weather mostof this plan can proceed as we are under the road
tunnel. There is plenty of time before deadline to reschedule and reshootin better
weather if its necessaryand there are only two actors involved to schedule so it
should not be a problem.
7.30.8pm
8-8.30pm
8.30-9pm