                1
AES Brasil Group
• Presence in Brazil since 1997
• Comprised of four companies in the sectors of
energy generation and distribution
• 7.4 thousand AES Brasil People
• Investments 1998-2011: R$ 8.1 billion
• Good corporate governance practices
• Sustainable practices in businesses
• Safety as a main value
• Strong cash generation capacity
• 25% of minimum pay-out according to bylaws
• Differentiated practice of dividend distribution
since 2006:
      –   AES Tietê: 100% of net income on quarterly
          basis
      –   AES Eletropaulo: distribution above the
          minimum required (25% of net income) on
          semi-annual basis


                                                   2
AES Brasil widely recognized in 2009-2011

       Management excellence                          Quality and safety                     Environmental
                                                                                                  concern




(AES Eletropaulo)      (AES Tietê)      (AES Tietê)

                                                      (AES Eletropaulo)     (AES Sul)
                                                                                                 (AES Brasil)

                    (AES Eletropaulo)



                                                              (AES Eletropaulo)
                                        (AES Tietê)
   (AES Brasil)
                       (AES Tietê)
                                                                                                 (AES Tietê)



                      (AES Tietê)                     (AES Eletropaulo)   (AES Eletropaulo)

                                                                                                                3
Shareholding Structure


                              AES Corp                       BNDES

                                 C 50.00% + 1 share   C 50.00% - 1 share
                                 P 0.00%              P 100%
                                 T 46.15%             T 53.85%


                                           Cia. Brasiliana
                                             de Energia




                                                      C 71.35%             C 76.45%
              C 99.99%          C 99.00%              P 32.34%             P 7.38%
T 99.70%      T 99.99%          T 99.00%              T 52.55%             T 34.87%

                    AES              AES                     AES                 AES
    AES Sul
                 Infoenergy       Uruguaiana                 Tietê           Eletropaulo



                                     C = Common Shares
                                     P = Preferred Shares
                                           T = Total
                                                                                           4
Listed Companies Shareholding Composition




                                                             ¹                         ¹ Free Float                 Others²             Market Cap³



                                                 16.1%                  19.2%                   56.2%                  8.5%                 R$ 4.8 bi




                                                 24.2%                  28.3%                   39.5%                  8.0%                 R$ 8.5 bi




1 - Parent companies, AES Corp and BNDES, have similar voting capital on each of the Companies: approx 38.2% on AES Eletropaulo and 35.7% on AES Tietê
2 - Includes Federal Government and Eletrobrás shares in AES Eletropaulo and AES Tietê, respectively
3 - Base: 09/30/2011. Considers preferred shares for AES Eletropaulo and preferred and common shares for AES Tietê
                                                                                                                                                         5
AES Brasil is the second largest group in
  Ebitda1 – 2010 (R$ Billion)
                                                                            electric sector
          4.5
                           4.2

                                     3.4
                                                 3.0
                                                               2.6
                                                                         2.0    1.6
                                                                                          1.6
                                                                                                        1.5

                                                                                                                     0.6


         CEMIG      AES BRASIL      CPFL      NEOENERGIA   TRACTEBEL    CESP    EDP      LIGHT        COPEL         DUKE

  Net   Income1   – 2010 (R$ Billion)
         2.3           2.2
                                    1.8
                                                1.6
                                                             1.2
                                                                        1.0
                                                                               0.6      0.6
                                                                                                     0.2
                                                                                                                   0.1


        CEMIG      AES BRASIL    NEOENERGIA     CPFL       TRACTEBEL   COPEL   EDP     LIGHT         DUKE         CESP
                                                                                                                             6
1 – excluding Eletrobrás                                                              Source: Companies’ financial reports
AES Tietê is an important player among private
Generation Installed Capacity (MW) - 2012          1
                                                            energy generators
            Main privately held Companies
                                                                                             AES Tietê is the 3rd largest among private
               AES TIETÊ   CPFL   DUKE
                 2,3%      2,4%   1,9%
                                         EDP
                                         1,6%
                                                                                               generation companies and 10th largest
       TRACTEBEL                           NEOENERGIA
          6,1%                                 1,2%                                            overall
                                                    ENDESA
                                                      0,8%
                                             LIGHT
                                             0,8%                                            Approximately             78%        of      country’s

                                                                                               generation installed capacity is state-

  DEMAIS                                           CHESF   ³                                   owned2
   27%                                              9%


                                                  FURNAS       ³                             There are three mega hydropower plants
                                                    8%

                                                                                               under construction in the North region of
                                                ELETRONORTE        ³
                                                     8%
                                                                                               Brazil with 18 GW in installed capacity
    COPEL                                           ITAIPU   ³
     4%                                               6%
                                                                                                  – Santo Antonio and Jirau (Madeira River): 7 GW
       PETROBRÁS                                ELETRONUCLEAR          ³
           5%      CEMIG   CESP                       3%
                    6%                                                                            – Belo Monte (Xingu River): 11 GW
                            6%                     CGTEE   ³
                                                    1%
                                                  ELETROSUL        ³
                                                     0,4%                  1- Sources: ANEEL – BIG (March, 2012) and Companies websites 2- Source: Merrill Lynch
 Total Installed Capacity: 117 GW                                                                                                                                  7
                                                                           3 – Eletrobrás, totaling 35%
AES Brasil is the largest distribution group
                                                                              in Brazil
Consumption (GWh) - 2010
                        13%
                                                            • 63     distribution     companies       in   Brazil
                                                              distributing 419 TWh
 40%                              12%
                                             A Brasil
                                             AES
                                                            • AES     Brasil    is    the   largest   electricity
                                                              distribution group in Brazil:
                                             CPFL Energia
                                  10%                              – AES Eletropaulo: 43 TWh distributed,
                                             Cemig                   representing 10.3% of the Brazilian
                             7%
            6%
                  6%
                       6%                                            market
                                             Neo Energia
Consumers – Dec/2010                                               – AES       Sul:    9    TWh       distributed,
                            12%              Copel                   representing 2.2% of the Brazilian
                                                                     market
    30%                                      Light
                                  12%                        Distribution companies’ operations are
                                             EDP
                                                              restricted to their concession areas

                                             Outros          Acquisitions must be only performed by
                                   12%
   5%                                                         the holdings of economic groups
       7%
             7%         16%                                                                                          8
Energy Sector in Brazil
Energy Sector in Brazil: business segments

        Free Clients                      Distribution                           Transmission                     Generation




   • Consumption of 113 TWh          • 63 companies                         • 68 companies                 • 13 groups controlling 76% of
   (26% of Brazilian total market)   • 430 TWh of energy                    • 68% private sector            total installed capacity

   • Conventional sources:            distributed in 2011                                                  • 22% private sector
                                                                            • High voltage transmission
     above 3000 kW                                                                                         • 1,862 power plants
                                     • 70 million consumers                   (>230 kV)
   • Alternative sources:                                                                                  • 117 GW of installed capacity
                                     • 67% private sector                   • 98.648 km in extension
     between 500 kW e 3000 kW                                                                                 • 73% hydroelectric
                                     • Annual tariff adjustment               lines (SIN¹)
   • Large consumers can                                                                                      • 17% thermoelectric
                                     • Tariff reset every four or           • Regulated public service
     purchase energy directly
                                      five years                              with free access                • 5% biomass
     from generators
                                     • Regulated public service             • Regulated tariff (annually      • 4% SHPP2
   • Free contracting
                                     • Regulated contracting                  adjusted by inflation)
     environment                                                                                              • 1% Wind
                                      environment
                                                                                                           • Contracting environment –
¹ Interconected National System
                                                                                                            free and regulated markets      10
² Small Hydro Power Plants                                  Sources: EPE, Aneel, ONS and Merrill Lynch
Energy sector in Brazil:
                                                                                  contracting environment
 Regulated Market                                                       Free Market


          Generators, Independent Power Producers                                  Generators and Independent
       (IPPs), Trading companies and Auto producers                                  Power Producers (IPPs)



                      Auctions: New Energy
                                                                                    Bilateral contracts (PPAs1)
                        and Existing Energy




                      Distribution companies                                                Free clients



                          •    Main auctions (reverse auctions):
                                 – New Energy (A-5): Delivery in 5 years, 15-30 years regulated PPA1
                                 – New Energy (A-3): Delivery in 3 years, 15-30 years regulated PPA1
                                 – Existing Energy (A-1): Delivery in 1 year, 5-15 years regulated PPA1

1 – Power Purchase Agreement                                                                                      11
Energy sector in Brazil:
                                                                                                        demand perspectives
    Macroeconomic Scenario

                            GDP - Annual growth (%)                                                            EPE’s1 Assumptions:
                2004-2008          2010           2011        2012-2015                         • Latest EPE’s estimates considers an
                    3.6            7.2             4.0              5.0                           economic activity slowdown in Brazil
                                                                                                  (industrial stagnation  and   higher
                                                                                                  inflation).
    Brazilian Consumption Evolution (TWh)

                                                            5.0% p.a.                           • For the next years, the good performance
                                                                                                  of domestic market and the perspectives
                                          3.6%                                 515
               4.0% p.a.                                                493                       of higher investments are factors
                                                              469                                 indicating that the Brazilian economy will
                                                     444
                                            423                                                   recover the growth path observed before
                                    408
             369
                     380    376                                                                   the global crisis.
     349

                                                                                                • Brazil will also benefit from the growth of
                                                                                                  emerging markets, with impact on
                                                                                                  exports of primary products.

     2006    2007   2008    2009    2010    2011     2012     2013      2014   2015
                                                                                                                                                12
1 - Source: EPE (Energetic Research Company) / ONS (National System Operator) – Second Review – september/11
Energy sector in Brazil:
                                                                                                  supply perspectives
Installed Energy Capacity in Brazil1

   Total installed capacity is expected to reach 171 GW by 2020
   Brazilian energy matrix will present higher diversification, but in the next 10 years hydropower plants will
    continue to prevail

                     2011: 115 GW                                                                     2020: 171 GW
                                                                                                  2
                                                                                            SHPP: 4%
                                                                                                           Natural gas: 7%
                       2
                  SHPP: 4%
                                                                                                                 Biomass: 5%
                             Natural gas: 8%

                                 Biomass: 5%                                                                                   Oil: 5%
                                                Oil: 3%                                                                        Nuclear: 2%
                                                Nuclear: 2%                                            Others: 17%             Coal: 2%
                                                                                   Hydro: 67%                                  Diesel: 1%
                      Others: 10%
    Hydro: 73%                                  Coal: 2%
                                                Diesel: 1%
                                                                                                                               Wind: 7%
                                                Wind: 1%
                                                Steam: 1%                                                                      Steam: 0%




1- Source: EPE (Energetic Research Company), Ten-year Energy Plan 2020, May/2011         2 - Small Hydro Power Plant
                                                                                                                                         13
Energy sector in Brazil:
                                                                                          regulatory methodology
Tariff Reset and Readjustment

• Tariff Reset is applied each 4 years for AES Eletropaulo
   − Base date: Jul/2011                                                                    • Parcel A Costs
   − Parcel A: costs are largely passed through to the tariff                Energy            − Non-manageable costs that are largely
                                                                            Purchase             passed through to the tariff
   − Parcel B: costs are set by ANEEL                                     Transmission
                                                                                               − Incentives to reduces costs
                                                                         Sector Charges
• Tariff Readjustment: annually
   − Parcel A : costs are largely passed through to the tariff
                                                                           Regulatory
   − Parcel B: cost are adjusted by IGPM +/- X(1) Factor                     Opex           • Regulatory Opex:
                                                                            (PMSO)
                                                                                               – Efficient operating cost determined by
                                                                                                 ANEEL (National Electricity Agency)

                                                        X WACC            Investment
                                                                         Remuneration
                                                                                            • Remuneration Asset Base:
                              Remuneration
                               Asset Base                                                      – Prudent investments used to calculate
                                                                                                 the investment remuneration (applying
                                                        X Depreciation                           WACC) and depreciation
                                                                          Depreciation



                                                                          Regulatory           Parcel A - Non-Manageable Costs
                                                                            Ebitda
                                                                                               Parcel B - Manageable Costs           14
 1 – X Factor: index that captures productivity gains
Energy sector in Brazil:
                                                                            regulatory methodology
3rd Cycle of Tariff Reset – X Factor


  X FACTOR                           Pd                            Q                                T
                       =                              +                             +



                                Distribution                                              Operational expenses
   DEFINITION                                              Quality of service
                                productivity                                                   trajectory



                                To capture                   To stimulate the           To implement operational
   OBJECTIVE                productivity gains             improvement of the           expenses trajectory during
                             with distribution                service quality                the tariff cycle


                           Defined at tariff reset,
                              considering the              Defined at each tariff         Defined at tariff reset,
                           average productivity of            readjustement,                 considering the
                           sector adjusted by the            according to the            expenses established by
   APPLICATION               market growth and            variation of SAIDI and         reference company and
                           variation of consumer          SAIFI and comparative               benchmarking
                           units of the distributor       performance of discos               methodologies          15
                              since last reset
AES Tietê Overview
Generation facilities



                                                           17 hydroelectric plants operating within the states of

                                                            São Paulo and Minas Gerais

                                                           30-year concession valid until 2029; renewable for

                                                            another 30 years

                                                           Installed capacity of 2,659 MW, with physical guarantee1

                                                            of 1,280 MW average

                                                           Almost all the amount of energy that AES Tietê can sell

                                                            in the long term is contracted to AES Eletropaulo until

                                                            the end of 2015

                                                           AES Tietê can invest in generation, its main activity, and

                                                            operate in energy trading

                                                           355 employees
                                                                                                                     17
1 - Amount of energy allowed to be long term contracted
Generated energy shows high
                                                                                 operational availability
Generated energy (MW avarage1)                                           Generated energy by power plant (MW avarage1)


                     130%
                                          125%
                                                                  124%
                                                                                           4%                         Água Vermelha
 118%                                                                             10%
                                                                                                                      Bariri
                                                                                                                      Barra Bonita
                                                                            8%
                                                                                                                      Euclides da Cunha
                                                                          6%                                    58%   Ibitinga
                     1,665
                                        1,599                              3%                                         Nova Avanhandava
                                                          1,582
                                                                            5%                                        Promissão
   1,512
                                                                                  6%                                  Other Power Plants*

   2008               2009               2010              2011

        Generation - Mw avg           Generation/Physical guarantee




            1 – Generated energy divided by the amount of hours           * Caconde, Limoeiro, Mogi and SHPPs                         18
A significant amount of billed energy and net
                                         revenues comes from the bilateral contract with
                                                                         AES Eletropaulo
Energy Billed (GWh)                                                                Net Revenues (%)




                                                                                                                 94%
                          14,706              14,729            15,122
       13,148                                                     554
                            117                 301
         331
                           1,150               1,340            1,519
        1,680              2,331               1,980             1,942




       11,138             11,108              11,108            11,108
                                                                                                      1%
                                                                                                                 2%          3%

                                                                                                           AES Eletropaulo

                                                                                                           Other bilateral contracts
        20081              2009               2010               2011

                                                                                                           Spot Market
      AES Eletropaulo       MRE2      Spot Market      Other bilateral contracts

   1 – Leap Year   2 – Energy Reallocation Mechanism                                                       MRE                         19
Investments in the modernization of Nova
                                                          Avanhandava, Ibitinga and Caconde
                                                                                power plants
    Investments (R$ million)                                       2011 Investments


                                               175


                                                19                                    85%


                                    82
          59            56                              174
                                    12         156

                        13                                                             4%      11%
          20
                                    70
          39            43


         2008         2009         2010        2011    2012(e)
                                                                                 Equipment and Modernization

                     Investments         New SHPPs*                              New SHPPs*

                                                                                 IT Projects
*Small Hydro Power Plants                                                                                      20
Growth opportunities
Perspectives


 • Project features
  -      Combined cycle using natural gas
  -      Estimated investment of R$ 1.1 billion
  -      Natural gas consumption: 2.5 million m3/day
  -      550 MW of installed capacity

 • Updates
 -       Environmental license obtained on October, 20th 2011
         (valid for 5 years)
 -       Gas unavailability for A-5 in 2011 and A-3 Energy
         Auction in 2012

• Next events
     -   Get the installation license
     -   Obtain gas supply in order to:
            -   Participate in the next auctions; or
            -   Evaluate energy offering in the free market
                                                                                   21
Financial highlights*

 Net Revenue (R$ million)                                 Ebitda (R$ million)




                                                                                1,255          1,320

                                                                                                       9


                                                  1,886
                                          1,754
          1,605            1,670                                1,254           1,309          1,311       1,466




                                                                                        (54)
         2008             2009            2010    2011          2008            2009           2010        2011
                                                                78%              75%           75%         78%

                                                                        Recurring          Non-recurring
                                                                                  Ebitda Margin
(*) 2009, 2010 and 2011 numbers in IFRS                                                                            22
Practice of total net income distribution on
                                                                               quarterly basis*
Net Income and Dividend Pay-out1 (R$ million)
                                                                               117%
                                                             110%                             109%
                                          100%

                                          12%                11%               11%            11%

                                                              706               737
                                                                                      31




                                           692                816               784            845




                                                                       (74)            (78)
                                                                       (36)

                                           2008               2009             2010            2011
                       Pay - out                Yield Pref         Recurring          Non- recurring   IFRS Effect
1 – Gross value
(*) 2009, 2010 and 2011 numbers in IFRS
                                                                                                                     23
Debt profile
 Net Debt (R$ billion)                                                              Amortization Schedule – Principal (R$ million)




    0.3x                   0.3x               0.3x                  0.3x


                                                                                               300           300            300

                                                                 0.5
         0.4                 0.4              0.4




        2008               2009               2010              2011                          2013           2014           2015

               Dívida Líquida                       Net Debt / EBITDA



                                   •    December, 2011:
                                          –    Average debt cost in 2011 was 115% of CDI1 p.a. or 15% p.a.
                                          –    Average debt maturity of 2.6 years

                                                                                                                                     24
1 – Brazilian Interbank Interest Rate
Capital Markets
    AES Tietê X Ibovespa X IEE                                                                     Daily Avg. Volume (R$ thousand)

                                          12 Months 1
140
130
                                                                                        + 22%
                                                                                                                                                   17,980
                                                                                        + 21%                           13,922        12,970
120
                                                                                        + 11%
110                                                                                                    10,187                                      4,344
                                                                                        + 4%
100                                                                                                                     4,239
                                                                                          -2%                                         3,397
    90                                                                                                  2,101
    80                                                                                                                                             13,635
                                                                                                        8,086           9,683         9,573
    70
    60
    Feb-11              May-11               Aug-11           Nov-11               Feb-12               2009            2010          2011     YTD Feb/12

             Ibovespa            IEE²           GETI4          TSR³            GETI3
                                                                                                                          Preferred       Common

•        Market Cap4: R$ 9.1 billion
•        BM&FBovespa: GETI3 (common shares) and GETI4 (preferred shares)
•        ADRs negotiated in US OTC Market: AESAY (common shares) and AESYY
         (preferred shares)


1 – Index: 02/28/2011 = 100       2 – Electric Energy Index   3 – Total Shareholders’ Return    4 – Index: 02/29/2012                                       25
AES Eletropaulo overview
Concession Area



                   Largest electricity distribution company in Latin America

                   Serving 24 municipalities in the São Paulo Metropolitan area

                   Concession contract valid until 2028; renewable for another 30

                    years

                   Concession area with the highest GDP in Brazil

                   45 thousand kilometers of lines and 6.3 million consumption

                    units in a concession area of 4,526 km2

                   Total distributed volume of 45 TWh in 2011

                   AES Eletropaulo, as a distribution company, can only invest in

                    assets within its concession area

                   5,668 employees

                                                                                     27
Consumption evolution

Total Market1 (GWh)                                  2011 Consumption by Class (%)



                                                                               6%            9
                                                                       14
                                                                    14%
                                            45,102
                                 43,345                                                36% 26
       41,243         41,269
                                             8,284
                                 7,911
        7,383          6,832                                      18% 43

                                                                                26%          28

                                                                          17
                      34,436     35,434     36,817
       33,860

                                                                                            36
                                                                          26



        2008          2009       2010       2011                     Brazil           AES Eletropaulo
                Captive Market     Free Clients
                                                            Residential        Commercial   Industrial   Others


                                                                                                                  28
1 – Net of own consumption
Industrial class
 Industrial class X industrial production in São Paulo State
  15%

  10%

   5%                                                                                •   Industrial    consumption         is
   0%                                                                                    influenced    by     manufacturing
  -5%                                                                                    industry performance in São Paulo
 -10%                   Economic crisis           Economic recovery                      State
 -15%
     jul/07         ago/08               set/09            out/10          Dec/11
                                                                           nov/11    •   Recent slowdown is influenced by
        Produção Industrial SP (% 12 meses)                Industrial (% 12 meses)       the     decrease     of   industrial
Consumption of industrial class by activity – AES Eletropaulo                            production in 2011

                                                                                     •   Moreover, the migration of clients
                                                                                         to other regions of São Paulo State
                                                                                         and of the country negatively
                                               Vehicles,
                                           Chemical, Rubber,                             impacts this class
                      Other industries
                                           Plastic and Metal
                            50%
                                               products
                                                  50%




                                                                                                                           29
Residential class
                                Residential class X Average income in São Paulo Metropolitan Area
                                1.800                                                                                4.800                        •    Residential class is influenced by
Average Income R$ - SP (q-2¹)




                                                                                                                                                       income in São Paulo Metropolitan




                                                                                                                             Residential (GWh)
                                1.600                                                                                4.300
                                                                                                                                                       Area
                                1.400                                                                                3.800                        •    Maintenance            of     the      income
                                                                                                                                                       expansion trend in São Paulo
                                1.200                                                                                3.300
                                                                                                                                                       Metropolitan         Area      will    sustain
                                                                                                                                                       growth of residential class
                                1.000                                                                   2.800
                                        1Q06 3Q06 1Q07 3Q07 1Q08 3Q08 1Q09 3Q09 1Q10 3Q10 1Q11 3Q11 4Q11
                                                                                                                                                  •    Average        annual       growth       (2003-
                                                Avg Real Income R$ - SP (q-2¹)                   Residential (GWh)                                     2011):
                                Consumption per consumer (in kWh)
                                                                                                                                                          – total residential market: 5.5%
                                                                                                                                                               y.y.
                                                                        - 9.4%
                                258                                                                                                                       – consumption            per     consumer:
                                                                                                                                                               2.1% y.y.
                                                                                                              229    234
                                                                                               223    228
                                                                                        219                                                           Consumption per consumer is
                                         220                                     213
                                                                 203    207
                                                         199                                                                                           still      9.4%       lower         than         in
                                                 192
                                                                                                                                                       the period before the rationing



                                                                                                                                                 1 - Two quarters of delay in relation to consumption    30
                                2000     2001    2002   2003    2004    2005     2006   2007   2008   2009    2010   2011
Investments amounted
                                                                    R$ 739 million in 2011
Investments Breakdown (R$ million)                    Investments 2011 (R$ million)




                                              841                                     227
                                     739      46
                         682          22                                                          172
                                                                      55
                         28
                                                                      22
              516                                                      39
    457                                                                     35
               37
                                                                                            189
    47
                                             794
                                      717
                         654
              478
    410                                                                          Maintenance
                                                                                 Client Service
                                                                                 System Expansion
                                                                                 Losses Recovery
   2008      2009       2010         2011   2012(e)
                                                                                 IT
             Capex    Paid by Customers                                          Paid by the Clients
                                                                                 Others



                                                                                                        31
SAIDI & SAIFI

 SAIDI - System Average Interruption Duration Index                       SAIFI - System Average Interruption Frequency Index

                                                                                                   7.87
                                                                                     8.41                        7.39
                                                                                                                             6.93
     10.92
                     10.09
                                     9.32
                                                   8.68


      9.20           11.86         10.60
                                                  10.36
                                                                                     5.20          6.17         5.43         5.45




      2008            2009          2010          2011                              2008          2009          2010         2011
       5th             8th           7th           6th                                1st          7th           3rd          4th

             SAIDI (hours)         SAIDI Aneel Reference                               SAIFI (times)          SAIFI Aneel Reference

                              ABRADEE ranking position among the 28 utilities with more than 500 thousand customers


          ►     2012 SAIDI ANEEL Reference: 8.67 hours                                 ►    2012 SAIFI ANEEL Reference: 6.87 times

Sources: ANEEL, AES Eletropaulo and ABRADEE
                                                                                                                                      32
Operational Indexes

 Losses (%)                                                                       Collection Rate (% over Gross Revenues)




             11.6              11.8
                                                 10.9            10.5                                          102.4        102.1
                                                                                                  101.1
                                                                                      98.5
              5.1               5.3               4.4            4.0



              6.5               6.5               6.5            6.5



             2008             2009              2010             2011                 2008        2009         2010         2011
                    Technical Losses¹           Commercial Losses


     ANEEL References:

   From Jul/09 to Jun/10: 12.32%                  From Jul/10 to Jun/11: 12.45%


                                                                                                                                    33
1 – Current technical losses used retroactively as a reference
“Creating Value” Project


          Internal process review:
(i) operating activities; (ii) support functions      Objective: to operate
  Target definition for productivity                  within the regulatory
              increase
                                                         framework for
 Reassess organization structure
                                                       operational costs,

   Review supply management                           and seek benchmark

                                                         position in the
Reassess and reinforce non-technical
         losses initiatives                                  sector


                                                                              34
Financial Highlights*

  Net Revenues (R$ million)                               Ebitda (R$ million)



                                                                                                                2,848
                                                                                                2,413
                                          9,697   9,836
                          8,786                                                                  426                933
                                                                                1,775
         7,530                                                  1,696                            339
                                                                                  87                                372
                                                                   -
                                                                  89             197



                                                                1,607           1,491           1,648           1,542




         2008             2009            2010    2011          2008            2009            2010            2011
                                                                                Recurring
                                                                                Regulatory assets and liabilities
                                                                                Non-recurring


(*) 2009, 2010 and 2011 numbers in IFRS
                                                                                                                          35
Practice of dividend distribution
                                                                                   on semi-annual basis*
 Net Income and Dividend Payout1 (R$ million)
                                          101,5%        93,4%           100,0%

                                                                                          54,4%


                                                          20,4%          28,6%
                                          20,3%                                           17,1%


                                                                         1.348            1.572
                                                         1.156
                                          1.027                           350             652
                                                          374
                                           329                            236
                                                                                          241
                                                          160

                                           698                            761             680
                                                          622



                                          2008           2009            2010             2011
                                                         Pay-out               Yield PN

                                           Net Income - Ex one-offs, regulatory assets and liabilities
                                           Regulatory assets and liabilities
                                           One-offs                                                                         36
(*) 2009, 2010 and 2011 numbers in IFRS                                                                  1 – Gross amount
Debt Profile
      Net Debt

                                                                       2.4x
                                                                                      2.0x
                                                                                                                                                              66%
                                                                              1.5x                  1.6x                               1%
                                                                                             1.4x                 1.3x
                        2.7                                                                                0.9x
                                                                                                                         0.8x
             2.5                    2.4
                                                 2.3                                                                                    33%


                                                                        2008           2009          2010          2011
         2008          2009        2010         2011
                                                                          Gross Debt/Ebitda Adjusted with Fcesp
                   Net Debt (R$ billion)                                                                                               CDI¹       IGP - DI²    Others
                                                                          Net Debt/Ebitda Adjusted with Fcesp
      Amortization Schedule – Principal (R$ million)
                                                                                                                                                                    941



         •     December, 2011:
                                                                                              574
                                                                                               46                                                                   762
       - Average debt cost was 110% of CDI¹                                                                                                 434
                                                                 375                                                     385
       or 12.1% p.a.                                                            342                                                         61
                                                                  94
                                                                                                            272          53     279
       - Average debt maturity of 6.7 years                                     43
                                                                                              527           50                   57
                                                                                                                         332                373
                                                                 281            299                                                                     65
                                                                                                           223                  222                                 179
                                                                                                                                                        65

                                                                 2012          2013          2014          2015      2016       2017     2018          2019     2020 -
                                                                                                                                                                2028 37
                                                                                                    Local Currency (ex FCesp)                 Fcesp³
1 – Brazilian Interbank Interest Rate      2 – Inflation Index     3 – Pension Fund
Capital Markets
AES Eletropaulo X Ibovespa X IEE                                                               Average Daily Volume (R$ thousand)

                                       12 Months 1
130           A                    B                                              + 30%                                        26,897         26,044
                                                                                  + 22%                           24,496
120
                                                                                  + 15%
110                                                                                                  21,960

100                                                                                -2%
90

80

70
 Feb-11               May-11            Aug-11            Nov-11            Feb-12
                                                                                                      2009         2010         2011 YTD Feb/12
      Ibovespa         IEE²      AES Eletropaulo PN         AES Eletropaulo TSR³

           A Ex dividends: 04/30/2011                B Ex dividends: 08/11/2011


 •     Market cap4: U$ 3.6 billion
 •     BM&FBOVESPA: ELPL3 (common shares) and ELPL4 (preferred shares)
 •     ADRs at US OTC Market: EPUMY (preferred shares)


1 – Index: 12/29/2011 = 100                                                 2 – Electric Energy Index                                                  38
3 – Total Shareholders’ Return                                              4 - Index: 02/29/12. Calculation includes only preferred shares
Sustainability and
Social Responsibility
Commitment with sustainability
Our Commitment with Sustainability


  We act as a transformer agent understanding, meeting and anticipating our customers electric power needs with safe and
  innovative solutions for the economic, environmental and social development of the communities in which we are present.




                                                                                                                            40
Commitment with sustainability

                              SUSTAINABLE ENERGY      INNOVATION IN PRODUCTS      EFFICIENCY IN THE USE OF   DEVELOPMENT & VALUATION
        SAFETY
                                  GENERATION                AND SERVICES                RESOURCES            OF COWORKERS, SUPPLIERS
                                                                                                                 AND COMMUNITIES



... means an attitude of        ... means using         ... means providing an       ... means allocating       ...means knowing,
    protection of our        economic, social and           environment and        them in such a manner           involving in a
 coworkers, suppliers           environmental              culture that inspire       that balanced and       transparent form and
and of the population.      resources in a balanced     solutions that improve      perennial results are      positively influencing
                            fashion, preserving the     people’s life, ensuring          ensured for all          our coworkers,
                               present time and         quality and excellence    stakeholders, abiding by         suppliers and
                              ensuring the future      in the services rendered    the values practiced by    communities to build a
                                                            to the customer.             the company          collective agenda that
                                                                                                                generates value for
                                                                                                                     everyone



                                                      TRANSVERSAL THEMES



                                                                                                     Communication
                                                      Stakeholders active
         Education for sustainability                                                                  Knowledge
                                                         participation
                   Transversal                                                                        Information
                      Themes
                                  To learn more access: www.aesbrasilsustentabilidade.com.br
                                                                                                                                        41
Social Responsibility: Main Projects

                     Development and transformation of communities
Education, culture                         “Casa de Cultura e Cidadania” Project
    and sport
                      Offers activities in culture and sports, courses, workshops and
                      lectures. Directly benefits approximately 5.6 thousand children
                        and teenagers and, indirectly, 290 thousand people in 7 units
                             located within AES Brazil companies’ area of operation.




                             Children education and development
                             “Centros Educacionais Luz e Lápis” Project
                             Two units in São Paulo attending 320 children from 1 to 6 years old, in social
                             vulnerability.




                                                                                                              42
Social Responsibility: Main Projects

                                                      Converting Consumers to Clients
                                                      A project developed to work on electrical network regularization.
                                                      Since 2004, more than 500 thousand families in low income
                                                      communities were benefited from better energy supply conditions
                                                      and social inclusion.




  Education about Safety and Efficiency in energy consumption
                                                    “AES Eletropaulo nas Escolas” Project
Education about safe and efficient use of energy to 4.5 thousand teachers and 404 thousand
 students from 900 public schools, between 2010 and 2011. The actions include recreational
                                                           activities offered in adapted trucks.




                                                                                                                          43
Attachments
Costs and Expenses

Costs and operational expenses1 (R$ million)




                                                                    415                     433                    420
                                              351

                                                                                            187                    174
                                              112                   201



                                             239                    214                     246                    245



                                            2008                   2009                    2010                   2011
                               Energy Purchase, Transmission and Connection Charges, and Water Resources

                               Other Costs and Expenses 2

1 – Do not include depreciation and amortization 2 - Personnel, Material, Third Party Services and Other Costs and Expenses   45
Costs and Expenses

Costs and operational expenses1 (R$ million)                                 PMS2 and Other Expenses (R$ million)



                                                                                                 1,306           1,255          1,272
                                                                  6,961           1,193
                                              6,745                                                                                 138
                           6,431                                                                  254             165
        5,893                                                     1,272
                                              1,255                                379
                           1,306
        1,193
                                                                                                  352             443               513

                                                                                   329

                                              5,490               5,689
        4,700              5,125
                                                                                                  700             647               622
                                                                                   485




        2008               2009               2010                2011            2008           2009             2010              2011
                 Energy Supply and Transmission Charges
                 PMS² and Others Expenses                                      Personnel and Payroll     Material and Third Party     Others


1 – Do not include depreciation and amortization
2 - Personnel, Material, Third Party Services and Other Costs and Expenses                                                                     46
Action Plan: R$ 242 million in 2011-2012


                 increase of 212 emergency teams, totalizing 353 teams trained to
                  perform attendances in powered grid
                 hiring and training of 580 maintanance and construction electricians
                 hiring of 30 additional prunning electricians
Concluded in
   2011          38% increase in call center positions (150 positions)
                 doubling of SMS receipt capacity to 100 thousand / day
                 increase of call center service capacity by 27 times from 2 thousand to
                 54 thousand calls / hour
                 300 additional stand-by positions in call center for emergency
                 situations



December/11
               increase of 120 emergency teams, totaling 473 teams
to March/12




                                                                                            47
AES Tiete's expansion obligation

  Privatization Notice                                     Judicial Notice:                    AES Tietê was
     established the           Aneel informed                                             summoned to answer a              São Paulo State
                                                      The Company was notified
obligation to expand the      that the issue is                                             Lawsuit filed by the             Supreme Court        Efforts being made
                                                       by the State of São Paulo
  installed capacity in         not related to                                              State of São Paulo,           rejected AES Tietê’s
                                                      Attorney's Office to present                                                                by the Company to
  15% (400 MW) until           the concession                                              which requested the                 appeal. The
                                                        its understanding on the
     2007, either in           agreement and                                                  fulfillment of the             grounds for the     meet the obligation :
                                                          matter, having filed its
   greenfield projects             must be                                                obligation in 24 months.            denial and the
                                                          response on time, the
  and/or through long          addressed with          proceedings were ended,              An injunction was                contents of the      • Long-term energy
     term purchase            the State of São         since no other action was         granted in order to have           decision have not
                                                                                                                                                  contracts (biomass)
 agreements with new                Paulo                taken by the Attorney's           a project submitted             yet been disclosed.
          plants                                                  Office                     within 60 days.                                     totaling an average of
                                                                                                                                                        10 MW

                                                                                                                                                 • SHPP São Joaquim
                                                                                                                                                 - started operating in
   1999          2007               Aug/08        Oct/08         Jul/09         Sep/10           Sep/11        Nov/11           Feb/12           July, 2011, with 3 MW
                                                                                                                                                  of installed capacity

                                                                                                                                                  • SHPP São José –
                                                                                                                                                  under construction,
   Company faces restrictions until
                                                                                   Popular Action:                                               with 4 MW of installed
            deadline:                        In response to a Popular                                                Lawsuit:
                                                                               Due to the plaintiffs failure
  • Insufficiency of hydro resources               Action (filed by           to specify the persons that        The Company                     capacity, expected to
     • Environmental restrictions              individuals against the           should be named as             appealed to the                  be operational in 1H12
                                                Federal Government,             Defendants, a favorable           State of Sao
 • Insufficiency of natural gas supply          Aneel, AES Tietê and           decision was rendered by        Paulo State Court                 • Thermo-SP - Project
• New Model of Electric Sector (Law #           Duke), the Company              the first Instance Court         of Appeals and
 10,848/2004), which forbids bilateral          presents its defense                                           the injunction was                of a 550MW gas fired
                                                                              (an appeal has been filed)
 agreements between generators and            before the first instance                                              stayed                          thermal plant
            distributors

                                                                                                                                                                     48
Eletrobras Lawsuit
                               State-owned
                            Eletropaulo was
                            spun-off into four             Eletrobras, after                                                                    On July 7, the      Next Steps:
                            companies and,                   winning the                                                                      judge determined
                                                                                         Eletrobras and                   Eletrobras                              1 - The auditing
  Stated-owned              according to our                    interest                                                                       Eletropaulo and
                                                                                        CTEEP appealed               requested the 1st                            procedure (AP)
   Eletropaulo               understanding                    calculation                                                                     CTEEP to present
                                                                                         to the Superior                level of court                             is expected to
borrowed money                based on the                 discussion, filed                                                                         their
                                                                                         Court of Justice             judge to appoint                            begin by the 1st
 from Eletrobras                 spin-off                 an Execution Suit                                                                    considerations,
                                                                                              (SCJ)                       an expert                                  half of 2012
                             agreement, the               to collect the due                                                                  which occurred in
                             discussion was                     amount                                                                              August           2 – AP is
                              transferred to                                                                                                                      expected to be
                                 CTEEP                                                                                                                            concluded in at
                                                                                                                                                                  least 6 months
                                                                                                                                                                   3 - After AP’s
                                                                                                                                                                   conclusion, a
                                                                                                                                                                   1st level court
                                                                                                                                                                  decision will be
   Nov/86          Dec/88        Jan/98          Apr/98       Sep/01           Sep/03       Oct/05          Jun/06       May/09          Dec/10    Jul/11             released
                                                                                                                                                                  4 - Appealing to
                                                                                                                                                                  the 2nd instance
                                                                                                                                                                        court
                                                                                                                                                                  5 - Foreclosure
                                                                                                                                                                       starts.
                                                                                                                                                                  Presentation of
               State-owned
                                                                         The 2nd level of                                              Eletrobras                     guaranty
             Eletropaulo and                Privatization                                                                            requested the
                                                                         court excluded              The SCJ decided
                Eletrobras                  event . State-                                                                                                        6 - Request to
                                                                        AES Eletropaulo                 to send the                 beginning of the
           disagreed on how                    owned                                                                                                               withdraw the
                                                                             from the                 Execution Suit                   appraisal
               to calculate                  Eletropaulo                                                                                                             guaranty
                                                                        discussion based              back to the 1st             procedure, which is
            interest over that              became AES                                                                            under 1st. instance              7 - Appeals to
                                                                          on the spin-off              level of court
           loan and a lawsuit                Eletropaulo                                                                             court analysis               the 3rd instance
                                                                           agreement
               was started                                                                                                                                             courts

                                                                                                                                                                            49
Shareholders Agreement
On Dec 2003 AES and BNDES signed a Shareholders’ Agreement to regulate their relationship as shareholders of
Brasiliana and its controlled companies. The Agreement is available at www.aeseletropaulo.com.br/ri

Shareholders can dispose its share at any time, considering the following terms:


Right of 1st     Any party with an intention to dispose its shares should first provide the other party the right to buy
refusal          that participation at the same price offered by a third party



Tag along        In the case of change in Brasiliana’s control, tag along rights are triggered for the following
rights             companies (only if AES is no longer controlling shareholder):
                     – AES Eletropaulo: Tag along of 100% in its common and preferred shares
                     – AES Tietê: Tag along of 80% in its common shares
                     – AES Elpa: Tag along of 80% in its common shares



Drag along       Once the offering party exercises the Drag Along clause, offered party is obligated to dispose of all
rights          its shares at the time, if the Right of 1st Refusal is not exercised by offered party


                                                                                                                       50
Brazilian Main Taxes


                      AES Tietê
                                                                        AES Eletropaulo
• Income Tax / Social Contribution:
                                                       • Income Tax / Social Contribution:
     – 34% over taxable income
                                                            – 34% over taxable income

• ICMS (VAT tax)                                       • ICMS: 22% over Revenue (average rate)
     – deferred tax                                         – Residential: 25%

• PIS/Cofins (sales tax):                                   – Industrial and Commercial: 18%

     – Eletropaulo´s PPA: 3.65% over Revenue                – Public Entities: free

     – Other bilateral contracts: 9.25% over Revenue   • PIS/Cofins:

     minus Costs                                            – 9.25% over Revenue minus Costs




                                                                                                 51
Contacts:
 ri.aeseletropaulo@aes.com
 ri.aestiete@aes.com
 + 55 11 2195 7048
The statements contained in this document with regard to the business prospects, projected operating and financial
results, and growth potential are merely forecasts based on the expectations of the Company’s Management in
relation to its future performance. Such estimates are highly dependent on market behavior and on the conditions
affecting Brazil’s macroeconomic performance as well as the electric sector and international market, and they are
therefore subject to changes.

Contenu connexe

Tendances

Apresentação institucional 3Q10
Apresentação institucional 3Q10Apresentação institucional 3Q10
Apresentação institucional 3Q10AES Eletropaulo
 
Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8AES Eletropaulo
 
Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11AES Eletropaulo
 
Santander Annual Conference
Santander Annual ConferenceSantander Annual Conference
Santander Annual ConferenceAES Eletropaulo
 
Santander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO ConferenceSantander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO ConferenceAES Tietê
 
Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010AES Eletropaulo
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse ConferenceAES Tietê
 
2011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q112011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q11Cteep
 
Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12Deutsche EuroShop AG
 
Corporate presentation november_2011_4
Corporate presentation november_2011_4Corporate presentation november_2011_4
Corporate presentation november_2011_4NALenergy
 
Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009AES Eletropaulo
 
Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12Deutsche EuroShop AG
 
IMPERIAL results presentation interim 2013
IMPERIAL results presentation interim 2013IMPERIAL results presentation interim 2013
IMPERIAL results presentation interim 2013IMPERIAL Logistics
 

Tendances (16)

Apresentação institucional 3Q10
Apresentação institucional 3Q10Apresentação institucional 3Q10
Apresentação institucional 3Q10
 
Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8
 
Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11
 
Apre 3 t06
Apre 3 t06Apre 3 t06
Apre 3 t06
 
Santander Annual Conference
Santander Annual ConferenceSantander Annual Conference
Santander Annual Conference
 
Santander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO ConferenceSantander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO Conference
 
Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse Conference
 
Apre 4 t06
Apre 4 t06Apre 4 t06
Apre 4 t06
 
2011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q112011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q11
 
Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12
 
Corporate presentation november_2011_4
Corporate presentation november_2011_4Corporate presentation november_2011_4
Corporate presentation november_2011_4
 
Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009
 
Tata motors update
Tata motors updateTata motors update
Tata motors update
 
Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12
 
IMPERIAL results presentation interim 2013
IMPERIAL results presentation interim 2013IMPERIAL results presentation interim 2013
IMPERIAL results presentation interim 2013
 

En vedette

Convergence Of Priority And Profitability-B.V.Raghunandan
Convergence Of Priority And Profitability-B.V.RaghunandanConvergence Of Priority And Profitability-B.V.Raghunandan
Convergence Of Priority And Profitability-B.V.RaghunandanSVS College
 
Как до открытия бизнеса собрать сообщество верных фанов на примере живого кейса
Как до открытия бизнеса собрать сообщество верных фанов на примере живого кейсаКак до открытия бизнеса собрать сообщество верных фанов на примере живого кейса
Как до открытия бизнеса собрать сообщество верных фанов на примере живого кейсаPromodo
 
Fdi in indian retailing industry b.v.raghunandan
Fdi in indian retailing industry  b.v.raghunandanFdi in indian retailing industry  b.v.raghunandan
Fdi in indian retailing industry b.v.raghunandanSVS College
 
Entrepreneurship b.v.raghunandan
Entrepreneurship b.v.raghunandanEntrepreneurship b.v.raghunandan
Entrepreneurship b.v.raghunandanSVS College
 
Case study for Class Room Teaching- B.V.Raghunandan
Case study for Class Room Teaching- B.V.Raghunandan Case study for Class Room Teaching- B.V.Raghunandan
Case study for Class Room Teaching- B.V.Raghunandan SVS College
 

En vedette (6)

Danube Odyssey2
Danube Odyssey2Danube Odyssey2
Danube Odyssey2
 
Convergence Of Priority And Profitability-B.V.Raghunandan
Convergence Of Priority And Profitability-B.V.RaghunandanConvergence Of Priority And Profitability-B.V.Raghunandan
Convergence Of Priority And Profitability-B.V.Raghunandan
 
Как до открытия бизнеса собрать сообщество верных фанов на примере живого кейса
Как до открытия бизнеса собрать сообщество верных фанов на примере живого кейсаКак до открытия бизнеса собрать сообщество верных фанов на примере живого кейса
Как до открытия бизнеса собрать сообщество верных фанов на примере живого кейса
 
Fdi in indian retailing industry b.v.raghunandan
Fdi in indian retailing industry  b.v.raghunandanFdi in indian retailing industry  b.v.raghunandan
Fdi in indian retailing industry b.v.raghunandan
 
Entrepreneurship b.v.raghunandan
Entrepreneurship b.v.raghunandanEntrepreneurship b.v.raghunandan
Entrepreneurship b.v.raghunandan
 
Case study for Class Room Teaching- B.V.Raghunandan
Case study for Class Room Teaching- B.V.Raghunandan Case study for Class Room Teaching- B.V.Raghunandan
Case study for Class Room Teaching- B.V.Raghunandan
 

Similaire à Apresentação institucional 4_q11_en_v3

Institutional presentation 3Q10
Institutional presentation 3Q10Institutional presentation 3Q10
Institutional presentation 3Q10AES Tietê
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007AES Tietê
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAES Tietê
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAES Tietê
 
Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010AES Tietê
 
Citi's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENGCiti's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENGAES Tietê
 
Citi's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity ConferenceCiti's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity ConferenceAES Tietê
 
Citi's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_EngCiti's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_EngAES Eletropaulo
 
Apresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdfApresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdfAES Tietê
 
Apresentação institucional 1T10_Eng
Apresentação institucional 1T10_EngApresentação institucional 1T10_Eng
Apresentação institucional 1T10_EngAES Eletropaulo
 
Apresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENGApresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENGAES Tietê
 
12/08/2005 - Merrill Lynch
12/08/2005  	-   	Merrill Lynch12/08/2005  	-   	Merrill Lynch
12/08/2005 - Merrill LynchAES Tietê
 
Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-AES Eletropaulo
 
Brasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conferenceBrasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conferenceAES Eletropaulo
 
CTEEP - Presentation 2007 Results - UBS
CTEEP - Presentation 2007 Results - UBSCTEEP - Presentation 2007 Results - UBS
CTEEP - Presentation 2007 Results - UBSCTEEP
 
6 transmissão paulista february 20 2008
6   transmissão paulista february 20 20086   transmissão paulista february 20 2008
6 transmissão paulista february 20 2008Cteep
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3AES Tietê
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3AES Tietê
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8AES Tietê
 

Similaire à Apresentação institucional 4_q11_en_v3 (20)

Institutional presentation 3Q10
Institutional presentation 3Q10Institutional presentation 3Q10
Institutional presentation 3Q10
 
Apre 2 t07
Apre 2 t07Apre 2 t07
Apre 2 t07
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
 
Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010
 
Citi's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENGCiti's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENG
 
Citi's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity ConferenceCiti's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity Conference
 
Citi's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_EngCiti's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_Eng
 
Apresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdfApresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdf
 
Apresentação institucional 1T10_Eng
Apresentação institucional 1T10_EngApresentação institucional 1T10_Eng
Apresentação institucional 1T10_Eng
 
Apresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENGApresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENG
 
12/08/2005 - Merrill Lynch
12/08/2005  	-   	Merrill Lynch12/08/2005  	-   	Merrill Lynch
12/08/2005 - Merrill Lynch
 
Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-
 
Brasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conferenceBrasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conference
 
CTEEP - Presentation 2007 Results - UBS
CTEEP - Presentation 2007 Results - UBSCTEEP - Presentation 2007 Results - UBS
CTEEP - Presentation 2007 Results - UBS
 
6 transmissão paulista february 20 2008
6   transmissão paulista february 20 20086   transmissão paulista february 20 2008
6 transmissão paulista february 20 2008
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8
 

Plus de AES Tietê

Apresentação bradesco ceo_forum2013_final (1)
Apresentação bradesco ceo_forum2013_final (1)Apresentação bradesco ceo_forum2013_final (1)
Apresentação bradesco ceo_forum2013_final (1)AES Tietê
 
Apresentação bradesco ceo_forum2013_final
Apresentação bradesco ceo_forum2013_finalApresentação bradesco ceo_forum2013_final
Apresentação bradesco ceo_forum2013_finalAES Tietê
 
Apresentação call tiete 3 q13_eng_final
Apresentação call tiete 3 q13_eng_finalApresentação call tiete 3 q13_eng_final
Apresentação call tiete 3 q13_eng_finalAES Tietê
 
Apresentação call tiete 1 t13_pt_final
Apresentação call tiete 1 t13_pt_finalApresentação call tiete 1 t13_pt_final
Apresentação call tiete 1 t13_pt_finalAES Tietê
 
Apimec presentation 03-31-2009
Apimec presentation   03-31-2009Apimec presentation   03-31-2009
Apimec presentation 03-31-2009AES Tietê
 
Apimec 31-03-2009
Apimec   31-03-2009Apimec   31-03-2009
Apimec 31-03-2009AES Tietê
 
12 03-2010 - apresentação da teleconferência 2009
12 03-2010  -   apresentação da teleconferência 200912 03-2010  -   apresentação da teleconferência 2009
12 03-2010 - apresentação da teleconferência 2009AES Tietê
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engAES Tietê
 
Apresentação call tiete 2 t12_final
Apresentação call tiete 2 t12_finalApresentação call tiete 2 t12_final
Apresentação call tiete 2 t12_finalAES Tietê
 
Apresentação call tiete 3 t12_eng
Apresentação call tiete 3 t12_engApresentação call tiete 3 t12_eng
Apresentação call tiete 3 t12_engAES Tietê
 
Apresentação call tiete 3 t12_sem discurso
Apresentação call tiete 3 t12_sem discursoApresentação call tiete 3 t12_sem discurso
Apresentação call tiete 3 t12_sem discursoAES Tietê
 
Presentation credit suisse - v brazil equity ideas conference
Presentation   credit suisse - v brazil equity ideas conferencePresentation   credit suisse - v brazil equity ideas conference
Presentation credit suisse - v brazil equity ideas conferenceAES Tietê
 
Apresentação credit suisse - v brazil equity ideas conference
Apresentação   credit suisse - v brazil equity ideas conferenceApresentação   credit suisse - v brazil equity ideas conference
Apresentação credit suisse - v brazil equity ideas conferenceAES Tietê
 
Presentation barclays capital latin america regulated industries conference
Presentation   barclays capital latin america regulated industries conferencePresentation   barclays capital latin america regulated industries conference
Presentation barclays capital latin america regulated industries conferenceAES Tietê
 
Apresentação barclays capital latin america regulated industries conference
Apresentação   barclays capital latin america regulated industries conferenceApresentação   barclays capital latin america regulated industries conference
Apresentação barclays capital latin america regulated industries conferenceAES Tietê
 
Apresentação expo money apimec 2012
Apresentação expo money   apimec 2012Apresentação expo money   apimec 2012
Apresentação expo money apimec 2012AES Tietê
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8AES Tietê
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11AES Tietê
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11AES Tietê
 
Apresentação call tiete 4 q12_en
Apresentação call tiete 4 q12_enApresentação call tiete 4 q12_en
Apresentação call tiete 4 q12_enAES Tietê
 

Plus de AES Tietê (20)

Apresentação bradesco ceo_forum2013_final (1)
Apresentação bradesco ceo_forum2013_final (1)Apresentação bradesco ceo_forum2013_final (1)
Apresentação bradesco ceo_forum2013_final (1)
 
Apresentação bradesco ceo_forum2013_final
Apresentação bradesco ceo_forum2013_finalApresentação bradesco ceo_forum2013_final
Apresentação bradesco ceo_forum2013_final
 
Apresentação call tiete 3 q13_eng_final
Apresentação call tiete 3 q13_eng_finalApresentação call tiete 3 q13_eng_final
Apresentação call tiete 3 q13_eng_final
 
Apresentação call tiete 1 t13_pt_final
Apresentação call tiete 1 t13_pt_finalApresentação call tiete 1 t13_pt_final
Apresentação call tiete 1 t13_pt_final
 
Apimec presentation 03-31-2009
Apimec presentation   03-31-2009Apimec presentation   03-31-2009
Apimec presentation 03-31-2009
 
Apimec 31-03-2009
Apimec   31-03-2009Apimec   31-03-2009
Apimec 31-03-2009
 
12 03-2010 - apresentação da teleconferência 2009
12 03-2010  -   apresentação da teleconferência 200912 03-2010  -   apresentação da teleconferência 2009
12 03-2010 - apresentação da teleconferência 2009
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_eng
 
Apresentação call tiete 2 t12_final
Apresentação call tiete 2 t12_finalApresentação call tiete 2 t12_final
Apresentação call tiete 2 t12_final
 
Apresentação call tiete 3 t12_eng
Apresentação call tiete 3 t12_engApresentação call tiete 3 t12_eng
Apresentação call tiete 3 t12_eng
 
Apresentação call tiete 3 t12_sem discurso
Apresentação call tiete 3 t12_sem discursoApresentação call tiete 3 t12_sem discurso
Apresentação call tiete 3 t12_sem discurso
 
Presentation credit suisse - v brazil equity ideas conference
Presentation   credit suisse - v brazil equity ideas conferencePresentation   credit suisse - v brazil equity ideas conference
Presentation credit suisse - v brazil equity ideas conference
 
Apresentação credit suisse - v brazil equity ideas conference
Apresentação   credit suisse - v brazil equity ideas conferenceApresentação   credit suisse - v brazil equity ideas conference
Apresentação credit suisse - v brazil equity ideas conference
 
Presentation barclays capital latin america regulated industries conference
Presentation   barclays capital latin america regulated industries conferencePresentation   barclays capital latin america regulated industries conference
Presentation barclays capital latin america regulated industries conference
 
Apresentação barclays capital latin america regulated industries conference
Apresentação   barclays capital latin america regulated industries conferenceApresentação   barclays capital latin america regulated industries conference
Apresentação barclays capital latin america regulated industries conference
 
Apresentação expo money apimec 2012
Apresentação expo money   apimec 2012Apresentação expo money   apimec 2012
Apresentação expo money apimec 2012
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11
 
Apresentação call tiete 4 q12_en
Apresentação call tiete 4 q12_enApresentação call tiete 4 q12_en
Apresentação call tiete 4 q12_en
 

Dernier

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 

Dernier (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 

Apresentação institucional 4_q11_en_v3

  • 2. AES Brasil Group • Presence in Brazil since 1997 • Comprised of four companies in the sectors of energy generation and distribution • 7.4 thousand AES Brasil People • Investments 1998-2011: R$ 8.1 billion • Good corporate governance practices • Sustainable practices in businesses • Safety as a main value • Strong cash generation capacity • 25% of minimum pay-out according to bylaws • Differentiated practice of dividend distribution since 2006: – AES Tietê: 100% of net income on quarterly basis – AES Eletropaulo: distribution above the minimum required (25% of net income) on semi-annual basis 2
  • 3. AES Brasil widely recognized in 2009-2011  Management excellence  Quality and safety  Environmental concern (AES Eletropaulo) (AES Tietê) (AES Tietê) (AES Eletropaulo) (AES Sul) (AES Brasil) (AES Eletropaulo) (AES Eletropaulo) (AES Tietê) (AES Brasil) (AES Tietê) (AES Tietê) (AES Tietê) (AES Eletropaulo) (AES Eletropaulo) 3
  • 4. Shareholding Structure AES Corp BNDES C 50.00% + 1 share C 50.00% - 1 share P 0.00% P 100% T 46.15% T 53.85% Cia. Brasiliana de Energia C 71.35% C 76.45% C 99.99% C 99.00% P 32.34% P 7.38% T 99.70% T 99.99% T 99.00% T 52.55% T 34.87% AES AES AES AES AES Sul Infoenergy Uruguaiana Tietê Eletropaulo C = Common Shares P = Preferred Shares T = Total 4
  • 5. Listed Companies Shareholding Composition ¹ ¹ Free Float Others² Market Cap³ 16.1% 19.2% 56.2% 8.5% R$ 4.8 bi 24.2% 28.3% 39.5% 8.0% R$ 8.5 bi 1 - Parent companies, AES Corp and BNDES, have similar voting capital on each of the Companies: approx 38.2% on AES Eletropaulo and 35.7% on AES Tietê 2 - Includes Federal Government and Eletrobrás shares in AES Eletropaulo and AES Tietê, respectively 3 - Base: 09/30/2011. Considers preferred shares for AES Eletropaulo and preferred and common shares for AES Tietê 5
  • 6. AES Brasil is the second largest group in Ebitda1 – 2010 (R$ Billion) electric sector 4.5 4.2 3.4 3.0 2.6 2.0 1.6 1.6 1.5 0.6 CEMIG AES BRASIL CPFL NEOENERGIA TRACTEBEL CESP EDP LIGHT COPEL DUKE Net Income1 – 2010 (R$ Billion) 2.3 2.2 1.8 1.6 1.2 1.0 0.6 0.6 0.2 0.1 CEMIG AES BRASIL NEOENERGIA CPFL TRACTEBEL COPEL EDP LIGHT DUKE CESP 6 1 – excluding Eletrobrás Source: Companies’ financial reports
  • 7. AES Tietê is an important player among private Generation Installed Capacity (MW) - 2012 1 energy generators Main privately held Companies  AES Tietê is the 3rd largest among private AES TIETÊ CPFL DUKE 2,3% 2,4% 1,9% EDP 1,6% generation companies and 10th largest TRACTEBEL NEOENERGIA 6,1% 1,2% overall ENDESA 0,8% LIGHT 0,8%  Approximately 78% of country’s generation installed capacity is state- DEMAIS CHESF ³ owned2 27% 9% FURNAS ³  There are three mega hydropower plants 8% under construction in the North region of ELETRONORTE ³ 8% Brazil with 18 GW in installed capacity COPEL ITAIPU ³ 4% 6% – Santo Antonio and Jirau (Madeira River): 7 GW PETROBRÁS ELETRONUCLEAR ³ 5% CEMIG CESP 3% 6% – Belo Monte (Xingu River): 11 GW 6% CGTEE ³ 1% ELETROSUL ³ 0,4% 1- Sources: ANEEL – BIG (March, 2012) and Companies websites 2- Source: Merrill Lynch Total Installed Capacity: 117 GW 7 3 – Eletrobrás, totaling 35%
  • 8. AES Brasil is the largest distribution group in Brazil Consumption (GWh) - 2010 13% • 63 distribution companies in Brazil distributing 419 TWh 40% 12% A Brasil AES • AES Brasil is the largest electricity distribution group in Brazil: CPFL Energia 10% – AES Eletropaulo: 43 TWh distributed, Cemig representing 10.3% of the Brazilian 7% 6% 6% 6% market Neo Energia Consumers – Dec/2010 – AES Sul: 9 TWh distributed, 12% Copel representing 2.2% of the Brazilian market 30% Light 12%  Distribution companies’ operations are EDP restricted to their concession areas Outros  Acquisitions must be only performed by 12% 5% the holdings of economic groups 7% 7% 16% 8
  • 10. Energy Sector in Brazil: business segments Free Clients Distribution Transmission Generation • Consumption of 113 TWh • 63 companies • 68 companies • 13 groups controlling 76% of (26% of Brazilian total market) • 430 TWh of energy • 68% private sector total installed capacity • Conventional sources: distributed in 2011 • 22% private sector • High voltage transmission above 3000 kW • 1,862 power plants • 70 million consumers (>230 kV) • Alternative sources: • 117 GW of installed capacity • 67% private sector • 98.648 km in extension between 500 kW e 3000 kW • 73% hydroelectric • Annual tariff adjustment lines (SIN¹) • Large consumers can • 17% thermoelectric • Tariff reset every four or • Regulated public service purchase energy directly five years with free access • 5% biomass from generators • Regulated public service • Regulated tariff (annually • 4% SHPP2 • Free contracting • Regulated contracting adjusted by inflation) environment • 1% Wind environment • Contracting environment – ¹ Interconected National System free and regulated markets 10 ² Small Hydro Power Plants Sources: EPE, Aneel, ONS and Merrill Lynch
  • 11. Energy sector in Brazil: contracting environment Regulated Market Free Market Generators, Independent Power Producers Generators and Independent (IPPs), Trading companies and Auto producers Power Producers (IPPs) Auctions: New Energy Bilateral contracts (PPAs1) and Existing Energy Distribution companies Free clients • Main auctions (reverse auctions): – New Energy (A-5): Delivery in 5 years, 15-30 years regulated PPA1 – New Energy (A-3): Delivery in 3 years, 15-30 years regulated PPA1 – Existing Energy (A-1): Delivery in 1 year, 5-15 years regulated PPA1 1 – Power Purchase Agreement 11
  • 12. Energy sector in Brazil: demand perspectives Macroeconomic Scenario GDP - Annual growth (%) EPE’s1 Assumptions: 2004-2008 2010 2011 2012-2015 • Latest EPE’s estimates considers an 3.6 7.2 4.0 5.0 economic activity slowdown in Brazil (industrial stagnation and higher inflation). Brazilian Consumption Evolution (TWh) 5.0% p.a. • For the next years, the good performance of domestic market and the perspectives 3.6% 515 4.0% p.a. 493 of higher investments are factors 469 indicating that the Brazilian economy will 444 423 recover the growth path observed before 408 369 380 376 the global crisis. 349 • Brazil will also benefit from the growth of emerging markets, with impact on exports of primary products. 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 12 1 - Source: EPE (Energetic Research Company) / ONS (National System Operator) – Second Review – september/11
  • 13. Energy sector in Brazil: supply perspectives Installed Energy Capacity in Brazil1  Total installed capacity is expected to reach 171 GW by 2020  Brazilian energy matrix will present higher diversification, but in the next 10 years hydropower plants will continue to prevail 2011: 115 GW 2020: 171 GW 2 SHPP: 4% Natural gas: 7% 2 SHPP: 4% Biomass: 5% Natural gas: 8% Biomass: 5% Oil: 5% Oil: 3% Nuclear: 2% Nuclear: 2% Others: 17% Coal: 2% Hydro: 67% Diesel: 1% Others: 10% Hydro: 73% Coal: 2% Diesel: 1% Wind: 7% Wind: 1% Steam: 1% Steam: 0% 1- Source: EPE (Energetic Research Company), Ten-year Energy Plan 2020, May/2011 2 - Small Hydro Power Plant 13
  • 14. Energy sector in Brazil: regulatory methodology Tariff Reset and Readjustment • Tariff Reset is applied each 4 years for AES Eletropaulo − Base date: Jul/2011 • Parcel A Costs − Parcel A: costs are largely passed through to the tariff Energy − Non-manageable costs that are largely Purchase passed through to the tariff − Parcel B: costs are set by ANEEL Transmission − Incentives to reduces costs Sector Charges • Tariff Readjustment: annually − Parcel A : costs are largely passed through to the tariff Regulatory − Parcel B: cost are adjusted by IGPM +/- X(1) Factor Opex • Regulatory Opex: (PMSO) – Efficient operating cost determined by ANEEL (National Electricity Agency) X WACC Investment Remuneration • Remuneration Asset Base: Remuneration Asset Base – Prudent investments used to calculate the investment remuneration (applying X Depreciation WACC) and depreciation Depreciation Regulatory Parcel A - Non-Manageable Costs Ebitda Parcel B - Manageable Costs 14 1 – X Factor: index that captures productivity gains
  • 15. Energy sector in Brazil: regulatory methodology 3rd Cycle of Tariff Reset – X Factor X FACTOR Pd Q T = + + Distribution Operational expenses DEFINITION Quality of service productivity trajectory To capture To stimulate the To implement operational OBJECTIVE productivity gains improvement of the expenses trajectory during with distribution service quality the tariff cycle Defined at tariff reset, considering the Defined at each tariff Defined at tariff reset, average productivity of readjustement, considering the sector adjusted by the according to the expenses established by APPLICATION market growth and variation of SAIDI and reference company and variation of consumer SAIFI and comparative benchmarking units of the distributor performance of discos methodologies 15 since last reset
  • 16.
  • 17. AES Tietê Overview Generation facilities  17 hydroelectric plants operating within the states of São Paulo and Minas Gerais  30-year concession valid until 2029; renewable for another 30 years  Installed capacity of 2,659 MW, with physical guarantee1 of 1,280 MW average  Almost all the amount of energy that AES Tietê can sell in the long term is contracted to AES Eletropaulo until the end of 2015  AES Tietê can invest in generation, its main activity, and operate in energy trading  355 employees 17 1 - Amount of energy allowed to be long term contracted
  • 18. Generated energy shows high operational availability Generated energy (MW avarage1) Generated energy by power plant (MW avarage1) 130% 125% 124% 4% Água Vermelha 118% 10% Bariri Barra Bonita 8% Euclides da Cunha 6% 58% Ibitinga 1,665 1,599 3% Nova Avanhandava 1,582 5% Promissão 1,512 6% Other Power Plants* 2008 2009 2010 2011 Generation - Mw avg Generation/Physical guarantee 1 – Generated energy divided by the amount of hours * Caconde, Limoeiro, Mogi and SHPPs 18
  • 19. A significant amount of billed energy and net revenues comes from the bilateral contract with AES Eletropaulo Energy Billed (GWh) Net Revenues (%) 94% 14,706 14,729 15,122 13,148 554 117 301 331 1,150 1,340 1,519 1,680 2,331 1,980 1,942 11,138 11,108 11,108 11,108 1% 2% 3% AES Eletropaulo Other bilateral contracts 20081 2009 2010 2011 Spot Market AES Eletropaulo MRE2 Spot Market Other bilateral contracts 1 – Leap Year 2 – Energy Reallocation Mechanism MRE 19
  • 20. Investments in the modernization of Nova Avanhandava, Ibitinga and Caconde power plants Investments (R$ million) 2011 Investments 175 19 85% 82 59 56 174 12 156 13 4% 11% 20 70 39 43 2008 2009 2010 2011 2012(e) Equipment and Modernization Investments New SHPPs* New SHPPs* IT Projects *Small Hydro Power Plants 20
  • 21. Growth opportunities Perspectives • Project features - Combined cycle using natural gas - Estimated investment of R$ 1.1 billion - Natural gas consumption: 2.5 million m3/day - 550 MW of installed capacity • Updates - Environmental license obtained on October, 20th 2011 (valid for 5 years) - Gas unavailability for A-5 in 2011 and A-3 Energy Auction in 2012 • Next events - Get the installation license - Obtain gas supply in order to: - Participate in the next auctions; or - Evaluate energy offering in the free market 21
  • 22. Financial highlights* Net Revenue (R$ million) Ebitda (R$ million) 1,255 1,320 9 1,886 1,754 1,605 1,670 1,254 1,309 1,311 1,466 (54) 2008 2009 2010 2011 2008 2009 2010 2011 78% 75% 75% 78% Recurring Non-recurring Ebitda Margin (*) 2009, 2010 and 2011 numbers in IFRS 22
  • 23. Practice of total net income distribution on quarterly basis* Net Income and Dividend Pay-out1 (R$ million) 117% 110% 109% 100% 12% 11% 11% 11% 706 737 31 692 816 784 845 (74) (78) (36) 2008 2009 2010 2011 Pay - out Yield Pref Recurring Non- recurring IFRS Effect 1 – Gross value (*) 2009, 2010 and 2011 numbers in IFRS 23
  • 24. Debt profile Net Debt (R$ billion) Amortization Schedule – Principal (R$ million) 0.3x 0.3x 0.3x 0.3x 300 300 300 0.5 0.4 0.4 0.4 2008 2009 2010 2011 2013 2014 2015 Dívida Líquida Net Debt / EBITDA • December, 2011: – Average debt cost in 2011 was 115% of CDI1 p.a. or 15% p.a. – Average debt maturity of 2.6 years 24 1 – Brazilian Interbank Interest Rate
  • 25. Capital Markets AES Tietê X Ibovespa X IEE Daily Avg. Volume (R$ thousand) 12 Months 1 140 130 + 22% 17,980 + 21% 13,922 12,970 120 + 11% 110 10,187 4,344 + 4% 100 4,239 -2% 3,397 90 2,101 80 13,635 8,086 9,683 9,573 70 60 Feb-11 May-11 Aug-11 Nov-11 Feb-12 2009 2010 2011 YTD Feb/12 Ibovespa IEE² GETI4 TSR³ GETI3 Preferred Common • Market Cap4: R$ 9.1 billion • BM&FBovespa: GETI3 (common shares) and GETI4 (preferred shares) • ADRs negotiated in US OTC Market: AESAY (common shares) and AESYY (preferred shares) 1 – Index: 02/28/2011 = 100 2 – Electric Energy Index 3 – Total Shareholders’ Return 4 – Index: 02/29/2012 25
  • 26.
  • 27. AES Eletropaulo overview Concession Area  Largest electricity distribution company in Latin America  Serving 24 municipalities in the São Paulo Metropolitan area  Concession contract valid until 2028; renewable for another 30 years  Concession area with the highest GDP in Brazil  45 thousand kilometers of lines and 6.3 million consumption units in a concession area of 4,526 km2  Total distributed volume of 45 TWh in 2011  AES Eletropaulo, as a distribution company, can only invest in assets within its concession area  5,668 employees 27
  • 28. Consumption evolution Total Market1 (GWh) 2011 Consumption by Class (%) 6% 9 14 14% 45,102 43,345 36% 26 41,243 41,269 8,284 7,911 7,383 6,832 18% 43 26% 28 17 34,436 35,434 36,817 33,860 36 26 2008 2009 2010 2011 Brazil AES Eletropaulo Captive Market Free Clients Residential Commercial Industrial Others 28 1 – Net of own consumption
  • 29. Industrial class Industrial class X industrial production in São Paulo State 15% 10% 5% • Industrial consumption is 0% influenced by manufacturing -5% industry performance in São Paulo -10% Economic crisis Economic recovery State -15% jul/07 ago/08 set/09 out/10 Dec/11 nov/11 • Recent slowdown is influenced by Produção Industrial SP (% 12 meses) Industrial (% 12 meses) the decrease of industrial Consumption of industrial class by activity – AES Eletropaulo production in 2011 • Moreover, the migration of clients to other regions of São Paulo State and of the country negatively Vehicles, Chemical, Rubber, impacts this class Other industries Plastic and Metal 50% products 50% 29
  • 30. Residential class Residential class X Average income in São Paulo Metropolitan Area 1.800 4.800 • Residential class is influenced by Average Income R$ - SP (q-2¹) income in São Paulo Metropolitan Residential (GWh) 1.600 4.300 Area 1.400 3.800 • Maintenance of the income expansion trend in São Paulo 1.200 3.300 Metropolitan Area will sustain growth of residential class 1.000 2.800 1Q06 3Q06 1Q07 3Q07 1Q08 3Q08 1Q09 3Q09 1Q10 3Q10 1Q11 3Q11 4Q11 • Average annual growth (2003- Avg Real Income R$ - SP (q-2¹) Residential (GWh) 2011): Consumption per consumer (in kWh) – total residential market: 5.5% y.y. - 9.4% 258 – consumption per consumer: 2.1% y.y. 229 234 223 228 219  Consumption per consumer is 220 213 203 207 199 still 9.4% lower than in 192 the period before the rationing 1 - Two quarters of delay in relation to consumption 30 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
  • 31. Investments amounted R$ 739 million in 2011 Investments Breakdown (R$ million) Investments 2011 (R$ million) 841 227 739 46 682 22 172 55 28 22 516 39 457 35 37 189 47 794 717 654 478 410 Maintenance Client Service System Expansion Losses Recovery 2008 2009 2010 2011 2012(e) IT Capex Paid by Customers Paid by the Clients Others 31
  • 32. SAIDI & SAIFI SAIDI - System Average Interruption Duration Index SAIFI - System Average Interruption Frequency Index 7.87 8.41 7.39 6.93 10.92 10.09 9.32 8.68 9.20 11.86 10.60 10.36 5.20 6.17 5.43 5.45 2008 2009 2010 2011 2008 2009 2010 2011 5th 8th 7th 6th 1st 7th 3rd 4th SAIDI (hours) SAIDI Aneel Reference SAIFI (times) SAIFI Aneel Reference ABRADEE ranking position among the 28 utilities with more than 500 thousand customers ► 2012 SAIDI ANEEL Reference: 8.67 hours ► 2012 SAIFI ANEEL Reference: 6.87 times Sources: ANEEL, AES Eletropaulo and ABRADEE 32
  • 33. Operational Indexes Losses (%) Collection Rate (% over Gross Revenues) 11.6 11.8 10.9 10.5 102.4 102.1 101.1 98.5 5.1 5.3 4.4 4.0 6.5 6.5 6.5 6.5 2008 2009 2010 2011 2008 2009 2010 2011 Technical Losses¹ Commercial Losses ANEEL References: From Jul/09 to Jun/10: 12.32% From Jul/10 to Jun/11: 12.45% 33 1 – Current technical losses used retroactively as a reference
  • 34. “Creating Value” Project Internal process review: (i) operating activities; (ii) support functions Objective: to operate Target definition for productivity within the regulatory increase framework for Reassess organization structure operational costs, Review supply management and seek benchmark position in the Reassess and reinforce non-technical losses initiatives sector 34
  • 35. Financial Highlights* Net Revenues (R$ million) Ebitda (R$ million) 2,848 2,413 9,697 9,836 8,786 426 933 1,775 7,530 1,696 339 87 372 - 89 197 1,607 1,491 1,648 1,542 2008 2009 2010 2011 2008 2009 2010 2011 Recurring Regulatory assets and liabilities Non-recurring (*) 2009, 2010 and 2011 numbers in IFRS 35
  • 36. Practice of dividend distribution on semi-annual basis* Net Income and Dividend Payout1 (R$ million) 101,5% 93,4% 100,0% 54,4% 20,4% 28,6% 20,3% 17,1% 1.348 1.572 1.156 1.027 350 652 374 329 236 241 160 698 761 680 622 2008 2009 2010 2011 Pay-out Yield PN Net Income - Ex one-offs, regulatory assets and liabilities Regulatory assets and liabilities One-offs 36 (*) 2009, 2010 and 2011 numbers in IFRS 1 – Gross amount
  • 37. Debt Profile Net Debt 2.4x 2.0x 66% 1.5x 1.6x 1% 1.4x 1.3x 2.7 0.9x 0.8x 2.5 2.4 2.3 33% 2008 2009 2010 2011 2008 2009 2010 2011 Gross Debt/Ebitda Adjusted with Fcesp Net Debt (R$ billion) CDI¹ IGP - DI² Others Net Debt/Ebitda Adjusted with Fcesp Amortization Schedule – Principal (R$ million) 941 • December, 2011: 574 46 762 - Average debt cost was 110% of CDI¹ 434 375 385 or 12.1% p.a. 342 61 94 272 53 279 - Average debt maturity of 6.7 years 43 527 50 57 332 373 281 299 65 223 222 179 65 2012 2013 2014 2015 2016 2017 2018 2019 2020 - 2028 37 Local Currency (ex FCesp) Fcesp³ 1 – Brazilian Interbank Interest Rate 2 – Inflation Index 3 – Pension Fund
  • 38. Capital Markets AES Eletropaulo X Ibovespa X IEE Average Daily Volume (R$ thousand) 12 Months 1 130 A B + 30% 26,897 26,044 + 22% 24,496 120 + 15% 110 21,960 100 -2% 90 80 70 Feb-11 May-11 Aug-11 Nov-11 Feb-12 2009 2010 2011 YTD Feb/12 Ibovespa IEE² AES Eletropaulo PN AES Eletropaulo TSR³ A Ex dividends: 04/30/2011 B Ex dividends: 08/11/2011 • Market cap4: U$ 3.6 billion • BM&FBOVESPA: ELPL3 (common shares) and ELPL4 (preferred shares) • ADRs at US OTC Market: EPUMY (preferred shares) 1 – Index: 12/29/2011 = 100 2 – Electric Energy Index 38 3 – Total Shareholders’ Return 4 - Index: 02/29/12. Calculation includes only preferred shares
  • 40. Commitment with sustainability Our Commitment with Sustainability We act as a transformer agent understanding, meeting and anticipating our customers electric power needs with safe and innovative solutions for the economic, environmental and social development of the communities in which we are present. 40
  • 41. Commitment with sustainability SUSTAINABLE ENERGY INNOVATION IN PRODUCTS EFFICIENCY IN THE USE OF DEVELOPMENT & VALUATION SAFETY GENERATION AND SERVICES RESOURCES OF COWORKERS, SUPPLIERS AND COMMUNITIES ... means an attitude of ... means using ... means providing an ... means allocating ...means knowing, protection of our economic, social and environment and them in such a manner involving in a coworkers, suppliers environmental culture that inspire that balanced and transparent form and and of the population. resources in a balanced solutions that improve perennial results are positively influencing fashion, preserving the people’s life, ensuring ensured for all our coworkers, present time and quality and excellence stakeholders, abiding by suppliers and ensuring the future in the services rendered the values practiced by communities to build a to the customer. the company collective agenda that generates value for everyone TRANSVERSAL THEMES Communication Stakeholders active Education for sustainability Knowledge participation Transversal Information Themes To learn more access: www.aesbrasilsustentabilidade.com.br 41
  • 42. Social Responsibility: Main Projects Development and transformation of communities Education, culture “Casa de Cultura e Cidadania” Project and sport Offers activities in culture and sports, courses, workshops and lectures. Directly benefits approximately 5.6 thousand children and teenagers and, indirectly, 290 thousand people in 7 units located within AES Brazil companies’ area of operation. Children education and development “Centros Educacionais Luz e Lápis” Project Two units in São Paulo attending 320 children from 1 to 6 years old, in social vulnerability. 42
  • 43. Social Responsibility: Main Projects Converting Consumers to Clients A project developed to work on electrical network regularization. Since 2004, more than 500 thousand families in low income communities were benefited from better energy supply conditions and social inclusion. Education about Safety and Efficiency in energy consumption “AES Eletropaulo nas Escolas” Project Education about safe and efficient use of energy to 4.5 thousand teachers and 404 thousand students from 900 public schools, between 2010 and 2011. The actions include recreational activities offered in adapted trucks. 43
  • 45. Costs and Expenses Costs and operational expenses1 (R$ million) 415 433 420 351 187 174 112 201 239 214 246 245 2008 2009 2010 2011 Energy Purchase, Transmission and Connection Charges, and Water Resources Other Costs and Expenses 2 1 – Do not include depreciation and amortization 2 - Personnel, Material, Third Party Services and Other Costs and Expenses 45
  • 46. Costs and Expenses Costs and operational expenses1 (R$ million) PMS2 and Other Expenses (R$ million) 1,306 1,255 1,272 6,961 1,193 6,745 138 6,431 254 165 5,893 1,272 1,255 379 1,306 1,193 352 443 513 329 5,490 5,689 4,700 5,125 700 647 622 485 2008 2009 2010 2011 2008 2009 2010 2011 Energy Supply and Transmission Charges PMS² and Others Expenses Personnel and Payroll Material and Third Party Others 1 – Do not include depreciation and amortization 2 - Personnel, Material, Third Party Services and Other Costs and Expenses 46
  • 47. Action Plan: R$ 242 million in 2011-2012  increase of 212 emergency teams, totalizing 353 teams trained to perform attendances in powered grid  hiring and training of 580 maintanance and construction electricians  hiring of 30 additional prunning electricians Concluded in 2011  38% increase in call center positions (150 positions)  doubling of SMS receipt capacity to 100 thousand / day  increase of call center service capacity by 27 times from 2 thousand to 54 thousand calls / hour  300 additional stand-by positions in call center for emergency situations December/11 increase of 120 emergency teams, totaling 473 teams to March/12 47
  • 48. AES Tiete's expansion obligation Privatization Notice Judicial Notice: AES Tietê was established the Aneel informed summoned to answer a São Paulo State The Company was notified obligation to expand the that the issue is Lawsuit filed by the Supreme Court Efforts being made by the State of São Paulo installed capacity in not related to State of São Paulo, rejected AES Tietê’s Attorney's Office to present by the Company to 15% (400 MW) until the concession which requested the appeal. The its understanding on the 2007, either in agreement and fulfillment of the grounds for the meet the obligation : matter, having filed its greenfield projects must be obligation in 24 months. denial and the response on time, the and/or through long addressed with proceedings were ended, An injunction was contents of the • Long-term energy term purchase the State of São since no other action was granted in order to have decision have not contracts (biomass) agreements with new Paulo taken by the Attorney's a project submitted yet been disclosed. plants Office within 60 days. totaling an average of 10 MW • SHPP São Joaquim - started operating in 1999 2007 Aug/08 Oct/08 Jul/09 Sep/10 Sep/11 Nov/11 Feb/12 July, 2011, with 3 MW of installed capacity • SHPP São José – under construction, Company faces restrictions until Popular Action: with 4 MW of installed deadline: In response to a Popular Lawsuit: Due to the plaintiffs failure • Insufficiency of hydro resources Action (filed by to specify the persons that The Company capacity, expected to • Environmental restrictions individuals against the should be named as appealed to the be operational in 1H12 Federal Government, Defendants, a favorable State of Sao • Insufficiency of natural gas supply Aneel, AES Tietê and decision was rendered by Paulo State Court • Thermo-SP - Project • New Model of Electric Sector (Law # Duke), the Company the first Instance Court of Appeals and 10,848/2004), which forbids bilateral presents its defense the injunction was of a 550MW gas fired (an appeal has been filed) agreements between generators and before the first instance stayed thermal plant distributors 48
  • 49. Eletrobras Lawsuit State-owned Eletropaulo was spun-off into four Eletrobras, after On July 7, the Next Steps: companies and, winning the judge determined Eletrobras and Eletrobras 1 - The auditing Stated-owned according to our interest Eletropaulo and CTEEP appealed requested the 1st procedure (AP) Eletropaulo understanding calculation CTEEP to present to the Superior level of court is expected to borrowed money based on the discussion, filed their Court of Justice judge to appoint begin by the 1st from Eletrobras spin-off an Execution Suit considerations, (SCJ) an expert half of 2012 agreement, the to collect the due which occurred in discussion was amount August 2 – AP is transferred to expected to be CTEEP concluded in at least 6 months 3 - After AP’s conclusion, a 1st level court decision will be Nov/86 Dec/88 Jan/98 Apr/98 Sep/01 Sep/03 Oct/05 Jun/06 May/09 Dec/10 Jul/11 released 4 - Appealing to the 2nd instance court 5 - Foreclosure starts. Presentation of State-owned The 2nd level of Eletrobras guaranty Eletropaulo and Privatization requested the court excluded The SCJ decided Eletrobras event . State- 6 - Request to AES Eletropaulo to send the beginning of the disagreed on how owned withdraw the from the Execution Suit appraisal to calculate Eletropaulo guaranty discussion based back to the 1st procedure, which is interest over that became AES under 1st. instance 7 - Appeals to on the spin-off level of court loan and a lawsuit Eletropaulo court analysis the 3rd instance agreement was started courts 49
  • 50. Shareholders Agreement On Dec 2003 AES and BNDES signed a Shareholders’ Agreement to regulate their relationship as shareholders of Brasiliana and its controlled companies. The Agreement is available at www.aeseletropaulo.com.br/ri Shareholders can dispose its share at any time, considering the following terms: Right of 1st  Any party with an intention to dispose its shares should first provide the other party the right to buy refusal that participation at the same price offered by a third party Tag along  In the case of change in Brasiliana’s control, tag along rights are triggered for the following rights companies (only if AES is no longer controlling shareholder): – AES Eletropaulo: Tag along of 100% in its common and preferred shares – AES Tietê: Tag along of 80% in its common shares – AES Elpa: Tag along of 80% in its common shares Drag along  Once the offering party exercises the Drag Along clause, offered party is obligated to dispose of all rights its shares at the time, if the Right of 1st Refusal is not exercised by offered party 50
  • 51. Brazilian Main Taxes AES Tietê AES Eletropaulo • Income Tax / Social Contribution: • Income Tax / Social Contribution: – 34% over taxable income – 34% over taxable income • ICMS (VAT tax) • ICMS: 22% over Revenue (average rate) – deferred tax – Residential: 25% • PIS/Cofins (sales tax): – Industrial and Commercial: 18% – Eletropaulo´s PPA: 3.65% over Revenue – Public Entities: free – Other bilateral contracts: 9.25% over Revenue • PIS/Cofins: minus Costs – 9.25% over Revenue minus Costs 51
  • 52. Contacts: ri.aeseletropaulo@aes.com ri.aestiete@aes.com + 55 11 2195 7048 The statements contained in this document with regard to the business prospects, projected operating and financial results, and growth potential are merely forecasts based on the expectations of the Company’s Management in relation to its future performance. Such estimates are highly dependent on market behavior and on the conditions affecting Brazil’s macroeconomic performance as well as the electric sector and international market, and they are therefore subject to changes.