SlideShare une entreprise Scribd logo
1  sur  27
By
  PADIGA AKHILESH GO6155
    SACHIN PATIL GO6157
PEKETI PADMAKANTH GO6159
 KAIZEN means continuous improvement
 Focus on gradual and continuous
  improvement
 Never ending efforts for improvement
  involving everyone in the organization
KAIZEN FACTORS
        •  Great attention paid to customer
         •Efficient stock control
           requirements and needs
         methods help reduce costs
          •Flexible working practices
         and improve cash-flow
          and empowerment – help
          increase efficiency, reduce
        •Leadership seen as vital.
          costs and improve
        Ability to communicate a
          motivation
        clear vision, take people
        •Fundamental principles –
        often with the vision and
        alongcharacterised as ‘lean
        production’ – reducing waste,
        to think about where the
        •Punctuality in high qualitydelivery,
        zero defects, all aspects –in
        company needs to be
        supply, manufacture, etc. stages
        control measures at all
        5, 10, 15 and 20 years
TOP MANAGEMENT

    MIDDLE MANAGEMENT

                 SUPERVISOR

                        WORKER
• Get rid of all old assumptions.
• Don't look for excuses, look for ways to make things
  happen.
• Say "NO" to the status quo.
• Don't worry about being perfect - even if you only get it
  half right " start NOW!
• It does not cost money to do KAIZEN.
• If something is wrong "Fix it NOW.
• Good ideas flow when the going gets tough.
• Ask "WHY" five times - get to the root cause.
• Look for wisdom from Ten people rather than one.
• Never stop doing KAIZEN.
CONDITIONS FOR SUCCESSFUL
    IMPLEMENTATION OF KAIZEN
• Top management commitment
• Top management commitment
• Top management commitment
• Setting up an organization
  dedicated to promote it
• Appointing the best available
  personnel to manage the kaizen
  process
• Conducting training and education
• Establishing A step by step process
• 3M’S CONSIDERED WITH
  4M’S
3M’S              METHODOLOGY
• MURA-UNEVENESS
• MURI-OVERBURDEN
• MUDA-WASTEFUL
4M’S
• MAN,MONEY,METHOD,
     MACHINERY
• Its reduces waste
• Immediate results
• Kaizen improves
  –   Space utilization
  –   Product quality
  –   Use of capita
  –   Communications
  –   Production capacity
  –   Employee retention
CASE STUDY
• A national bank uses a five day kaizen approach to attack process speed and
  efficiency problems
• A cross functional team is selected for the event.
• Project is well defined in the beginning itself

                                  KAIZEN




     DAY 1 FULL OF PROBLEMS                  DAY 5 SOLUTIONS FOR PROBLEMS
KAIZEN SCHEDULE
DAY 1:(discussion on goals to be
achieved)
• Training participants on topics
  that cover basic concepts
  related to the GOAL
• Teaching relevant lean or six
  sigma concepts and reviewing
  relevant data
KAIZEN SCHEDULE
DAY 2: (unit walk)
• Discussion on the problems
  and situations being
  studied
• Group visits each portion
  of process-cross functional
  representation may find
  insights of the area.
KAIZEN SCHEDULE
DAY 2: VALUE STREAM MAP:
It captures the basic process steps such as
• Cycle time
• Number of steps
• Rework loops
• Queuing delays
• Work in progress
• Transportation time
KAIZEN SCHEDULE
DAY 3: identifying solutions
• Designed for clarifying
  problems and brainstorming
  solutions.
• The team reorganized and
  create a SHOULD map to solve
  the identified problems
• Developing action plans for
  implementing solution
KAIZEN SCHEDULE
DAY 4(applying the
solutions)
• Used to test the solutions
• The group quantifies the
  improvement if the
  proposed changes are
  implemented to reduce
  the specified problems
KAIZEN SCHEDULE
DAY 5:(prepare findings in
formal report)
The participants prepare
and present their findings to
the sponsor in a formal
report out session.
 Internal consultant will    MAKING IT WORK
  assist the team
 Group are expected only
  to get through the
  simulation and piloting
  of solution
 Problems are solved
  based on priority for the
  business as a whole
• Cycle time – 30% faster to 95% faster    RESULTS
• One administrative process-20 min to
  12 min
• Complaint resolution-30days to 8days
• Fiscal indicators +ve
• New revenue-USD 6million to USD
  9million
• Other projects led to cost reduction
  saving hundreds of thousand of dollars
•
                                CONCLUSION
    Power full improvement tool as
  people are isolated from their
  day to day activity and allowed
  to concentrate all their
  creativity and time on problem
  solving and improvement.
• Gains immediate productivity
  and quality.
DISCUSSION
1. What are the characteristics of the bank kaizen event

2. Discuss the kaizen model followed by the bank

3. What are the Results achieved by the bank by this Kaizen
   event?

4. Why do you consider the kaizen event to be powerful?
CHARACTERISTICS
• Permanent change in method
• Continuous idea generation
• Easy process
• Immediate application
• Huge benefits and wealth generation
• TOTOAL QUALITY in terms of Working
  procedure
• Improving cycle times, process, wealth,
  resolution solvation
• Cross functional representation.
• Coordination
Type of KEIZEN-CUBE
• As the given model is a cross functional
  KEIZEN type of CASE it needs
  improvements form all the sides and all
  the people from different groups.

• A cube kaizen would be to make
  improvements “up and down” from the
  plane, or upstream and downstream by
  including each and every aspects

• Other types are point, line, plane
• Cycle time – 30% faster to 95% faster    RESULTS
• One administrative process-20 min to
  12 min
• Complaint resolution-30days to 8days
• Fiscal indicators +ve
• New revenue-USD 6million to USD
  9million
• Other projects led to cost reduction
  saving hundreds of thousand of dollars
KAIZEN EVENT TO BE POWERFUL
• Immediate effect and results
• Fast problem resolution
• Very cheap tool yet, the most powerful for
  wealth creation
• Quick and continuous improvement in the
  process
• People allowed to concentrate all their
  creativity and time on problem solving and
  improvement.
• Generate energy among those who work
  in area being improved and produce
  immediate gains.
Kaizen

Contenu connexe

Tendances (20)

Kaizen
KaizenKaizen
Kaizen
 
Kaizen study material
Kaizen study materialKaizen study material
Kaizen study material
 
Kaizen
KaizenKaizen
Kaizen
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
Kaizen (Continual Improvement)
Kaizen (Continual Improvement)Kaizen (Continual Improvement)
Kaizen (Continual Improvement)
 
Kaizen_ presentation
Kaizen_ presentationKaizen_ presentation
Kaizen_ presentation
 
Kaizen
KaizenKaizen
Kaizen
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Kaizen
KaizenKaizen
Kaizen
 
KAIZEN
KAIZENKAIZEN
KAIZEN
 
Kizen
KizenKizen
Kizen
 
Kaizenpresentation
KaizenpresentationKaizenpresentation
Kaizenpresentation
 
Kaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewKaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_preview
 
Kaizen presentation
Kaizen presentationKaizen presentation
Kaizen presentation
 
20130619 kaizen final
20130619 kaizen final20130619 kaizen final
20130619 kaizen final
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvement
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)new
 

En vedette

Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementAnand Subramaniam
 
JUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASINGJUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASINGZamri Yahya
 
Purchasing and Procurement management
Purchasing and Procurement managementPurchasing and Procurement management
Purchasing and Procurement managementFarouk Nasser
 
What Is The Difference Between Procurement and Purchasing?
What Is The Difference Between Procurement and Purchasing?What Is The Difference Between Procurement and Purchasing?
What Is The Difference Between Procurement and Purchasing?Procurify.com
 
10 Ways To Improve Your Purchasing Department
10 Ways To Improve Your Purchasing Department10 Ways To Improve Your Purchasing Department
10 Ways To Improve Your Purchasing DepartmentKeith Taylor
 
purchasing process
purchasing processpurchasing process
purchasing processonearbaein
 
Purchasing management
Purchasing managementPurchasing management
Purchasing managementMandeep Raj
 

En vedette (12)

Kaizen
Kaizen Kaizen
Kaizen
 
Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E Procurement
 
JUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASINGJUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASING
 
Purchasing ~Sourcing
Purchasing ~SourcingPurchasing ~Sourcing
Purchasing ~Sourcing
 
Purchasing and Procurement management
Purchasing and Procurement managementPurchasing and Procurement management
Purchasing and Procurement management
 
What Is The Difference Between Procurement and Purchasing?
What Is The Difference Between Procurement and Purchasing?What Is The Difference Between Procurement and Purchasing?
What Is The Difference Between Procurement and Purchasing?
 
10 Ways To Improve Your Purchasing Department
10 Ways To Improve Your Purchasing Department10 Ways To Improve Your Purchasing Department
10 Ways To Improve Your Purchasing Department
 
Kaizen Examples
Kaizen ExamplesKaizen Examples
Kaizen Examples
 
5s and kaizen
5s and kaizen5s and kaizen
5s and kaizen
 
purchasing process
purchasing processpurchasing process
purchasing process
 
Vendor Management
Vendor ManagementVendor Management
Vendor Management
 
Purchasing management
Purchasing managementPurchasing management
Purchasing management
 

Similaire à Kaizen

Lean tool- Kaizen
Lean tool- KaizenLean tool- Kaizen
Lean tool- KaizenAntara Paul
 
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques prathiekraj1
 
การบริหารเชิงคุณภาพ ชุดที่ 6
การบริหารเชิงคุณภาพ ชุดที่ 6การบริหารเชิงคุณภาพ ชุดที่ 6
การบริหารเชิงคุณภาพ ชุดที่ 6Atit Patumvan
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxFaith Youngsville, NC
 
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicThe Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicDave Litwiller
 
Kaizen college brochure 2016 en
Kaizen college brochure 2016 enKaizen college brochure 2016 en
Kaizen college brochure 2016 enSalim Louadj
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality managementAnitha Velusamy
 
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...KaiNexus
 
Marketing Busuness Art 2012
Marketing Busuness Art 2012Marketing Busuness Art 2012
Marketing Busuness Art 2012Arif Mahmood
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringShillu Blue
 
CFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesCFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesRae Davies
 

Similaire à Kaizen (20)

Lean tool- Kaizen
Lean tool- KaizenLean tool- Kaizen
Lean tool- Kaizen
 
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques
 
การบริหารเชิงคุณภาพ ชุดที่ 6
การบริหารเชิงคุณภาพ ชุดที่ 6การบริหารเชิงคุณภาพ ชุดที่ 6
การบริหารเชิงคุณภาพ ชุดที่ 6
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptx
 
Tqm
TqmTqm
Tqm
 
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicThe Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
 
Day 4 part 3
Day  4 part 3Day  4 part 3
Day 4 part 3
 
MBA TQM 5s.pdf
MBA TQM 5s.pdfMBA TQM 5s.pdf
MBA TQM 5s.pdf
 
M ogun jit-lss-sample2015
M ogun jit-lss-sample2015M ogun jit-lss-sample2015
M ogun jit-lss-sample2015
 
Kaizen.pptx
Kaizen.pptxKaizen.pptx
Kaizen.pptx
 
Kaizen college brochure 2016 en
Kaizen college brochure 2016 enKaizen college brochure 2016 en
Kaizen college brochure 2016 en
 
Finlay Miller - Daily Kaizen
Finlay Miller - Daily KaizenFinlay Miller - Daily Kaizen
Finlay Miller - Daily Kaizen
 
Scrum Training
Scrum TrainingScrum Training
Scrum Training
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
 
Kaizen
KaizenKaizen
Kaizen
 
Marketing Busuness Art 2012
Marketing Busuness Art 2012Marketing Busuness Art 2012
Marketing Busuness Art 2012
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
CFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesCFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean Techniques
 
Leanprjctmgmt2
Leanprjctmgmt2Leanprjctmgmt2
Leanprjctmgmt2
 

Plus de Akhil Padiga

How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQMAkhil Padiga
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring roadAkhil Padiga
 
Elevated express highway pvnr
Elevated express highway pvnrElevated express highway pvnr
Elevated express highway pvnrAkhil Padiga
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concreteAkhil Padiga
 
sales vs marketing
sales vs marketingsales vs marketing
sales vs marketingAkhil Padiga
 
Earth quake resistant structures
Earth quake resistant structuresEarth quake resistant structures
Earth quake resistant structuresAkhil Padiga
 
rain water harvesting business plan
rain water harvesting business planrain water harvesting business plan
rain water harvesting business planAkhil Padiga
 

Plus de Akhil Padiga (8)

How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQM
 
Stress management
Stress managementStress management
Stress management
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Elevated express highway pvnr
Elevated express highway pvnrElevated express highway pvnr
Elevated express highway pvnr
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concrete
 
sales vs marketing
sales vs marketingsales vs marketing
sales vs marketing
 
Earth quake resistant structures
Earth quake resistant structuresEarth quake resistant structures
Earth quake resistant structures
 
rain water harvesting business plan
rain water harvesting business planrain water harvesting business plan
rain water harvesting business plan
 

Dernier

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Dernier (20)

Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

Kaizen

  • 1. By PADIGA AKHILESH GO6155 SACHIN PATIL GO6157 PEKETI PADMAKANTH GO6159
  • 2.  KAIZEN means continuous improvement  Focus on gradual and continuous improvement  Never ending efforts for improvement involving everyone in the organization
  • 3.
  • 4.
  • 5. KAIZEN FACTORS • Great attention paid to customer •Efficient stock control requirements and needs methods help reduce costs •Flexible working practices and improve cash-flow and empowerment – help increase efficiency, reduce •Leadership seen as vital. costs and improve Ability to communicate a motivation clear vision, take people •Fundamental principles – often with the vision and alongcharacterised as ‘lean production’ – reducing waste, to think about where the •Punctuality in high qualitydelivery, zero defects, all aspects –in company needs to be supply, manufacture, etc. stages control measures at all 5, 10, 15 and 20 years
  • 6. TOP MANAGEMENT MIDDLE MANAGEMENT SUPERVISOR WORKER
  • 7. • Get rid of all old assumptions. • Don't look for excuses, look for ways to make things happen. • Say "NO" to the status quo. • Don't worry about being perfect - even if you only get it half right " start NOW! • It does not cost money to do KAIZEN. • If something is wrong "Fix it NOW. • Good ideas flow when the going gets tough. • Ask "WHY" five times - get to the root cause. • Look for wisdom from Ten people rather than one. • Never stop doing KAIZEN.
  • 8. CONDITIONS FOR SUCCESSFUL IMPLEMENTATION OF KAIZEN • Top management commitment • Top management commitment • Top management commitment • Setting up an organization dedicated to promote it • Appointing the best available personnel to manage the kaizen process • Conducting training and education • Establishing A step by step process
  • 9. • 3M’S CONSIDERED WITH 4M’S 3M’S METHODOLOGY • MURA-UNEVENESS • MURI-OVERBURDEN • MUDA-WASTEFUL 4M’S • MAN,MONEY,METHOD, MACHINERY
  • 10. • Its reduces waste • Immediate results • Kaizen improves – Space utilization – Product quality – Use of capita – Communications – Production capacity – Employee retention
  • 12. • A national bank uses a five day kaizen approach to attack process speed and efficiency problems • A cross functional team is selected for the event. • Project is well defined in the beginning itself KAIZEN DAY 1 FULL OF PROBLEMS DAY 5 SOLUTIONS FOR PROBLEMS
  • 13. KAIZEN SCHEDULE DAY 1:(discussion on goals to be achieved) • Training participants on topics that cover basic concepts related to the GOAL • Teaching relevant lean or six sigma concepts and reviewing relevant data
  • 14. KAIZEN SCHEDULE DAY 2: (unit walk) • Discussion on the problems and situations being studied • Group visits each portion of process-cross functional representation may find insights of the area.
  • 15. KAIZEN SCHEDULE DAY 2: VALUE STREAM MAP: It captures the basic process steps such as • Cycle time • Number of steps • Rework loops • Queuing delays • Work in progress • Transportation time
  • 16. KAIZEN SCHEDULE DAY 3: identifying solutions • Designed for clarifying problems and brainstorming solutions. • The team reorganized and create a SHOULD map to solve the identified problems • Developing action plans for implementing solution
  • 17. KAIZEN SCHEDULE DAY 4(applying the solutions) • Used to test the solutions • The group quantifies the improvement if the proposed changes are implemented to reduce the specified problems
  • 18. KAIZEN SCHEDULE DAY 5:(prepare findings in formal report) The participants prepare and present their findings to the sponsor in a formal report out session.
  • 19.  Internal consultant will MAKING IT WORK assist the team  Group are expected only to get through the simulation and piloting of solution  Problems are solved based on priority for the business as a whole
  • 20. • Cycle time – 30% faster to 95% faster RESULTS • One administrative process-20 min to 12 min • Complaint resolution-30days to 8days • Fiscal indicators +ve • New revenue-USD 6million to USD 9million • Other projects led to cost reduction saving hundreds of thousand of dollars
  • 21. CONCLUSION Power full improvement tool as people are isolated from their day to day activity and allowed to concentrate all their creativity and time on problem solving and improvement. • Gains immediate productivity and quality.
  • 22. DISCUSSION 1. What are the characteristics of the bank kaizen event 2. Discuss the kaizen model followed by the bank 3. What are the Results achieved by the bank by this Kaizen event? 4. Why do you consider the kaizen event to be powerful?
  • 23. CHARACTERISTICS • Permanent change in method • Continuous idea generation • Easy process • Immediate application • Huge benefits and wealth generation • TOTOAL QUALITY in terms of Working procedure • Improving cycle times, process, wealth, resolution solvation • Cross functional representation. • Coordination
  • 24. Type of KEIZEN-CUBE • As the given model is a cross functional KEIZEN type of CASE it needs improvements form all the sides and all the people from different groups. • A cube kaizen would be to make improvements “up and down” from the plane, or upstream and downstream by including each and every aspects • Other types are point, line, plane
  • 25. • Cycle time – 30% faster to 95% faster RESULTS • One administrative process-20 min to 12 min • Complaint resolution-30days to 8days • Fiscal indicators +ve • New revenue-USD 6million to USD 9million • Other projects led to cost reduction saving hundreds of thousand of dollars
  • 26. KAIZEN EVENT TO BE POWERFUL • Immediate effect and results • Fast problem resolution • Very cheap tool yet, the most powerful for wealth creation • Quick and continuous improvement in the process • People allowed to concentrate all their creativity and time on problem solving and improvement. • Generate energy among those who work in area being improved and produce immediate gains.