Answer the following questions (with short, iustification, No Partial Marking for wrong/invalid justification) b. Between aperiodic and sporadic jobs, whose timing constraints are harder and why? c. The frame size of a cyclic scheduler is 2ms and the hyper period of all the tasks in the system is 20ms. How many entres wil be presert in the off-line schedule calculated for the cyclic scheduler? d. Can we use RM algorithm in a round-robin scheduling approach? e. While designing a clock driven schedule for 3 periodic tasks (10,2),(15,4) and (20,5), a designer selected the frame size as ' 4 . Do you agree with the designer's choice regarding the frame size? Please provide one line justification for your answer. f. Can improving reliability of a system affect the RT performance of the same system negatively? Provide the justification for yoir answer Answer the following questions (with short, iustification, No Partial Marking for wrong/invalid justification) b. Between aperiodic and sporadic jobs, whose timing constraints are harder and why? c. The frame size of a cyclic scheduler is 2ms and the hyper period of all the tasks in the system is 20ms. How many entres wil be presert in the off-line schedule calculated for the cyclic scheduler? d. Can we use RM algorithm in a round-robin scheduling approach? e. While designing a clock driven schedule for 3 periodic tasks (10,2),(15,4) and (20,5), a designer selected the frame size as ' 4 . Do you agree with the designer's choice regarding the frame size? Please provide one line justification for your answer. f. Can improving reliability of a system affect the RT performance of the same system negatively? Provide the justification for yoir answer.