Engage with stakeholders to provide improvement advice and support, to achieve business outcomes.
Situation
The boogies change over setups were consuming between 3 and 7 hours (5 hours on average) of production
downtime.
Solution
I conducted a detailed time and motion study for 5 days on the Boogie Change operation. I analysed the setup. I
created Spaghetti Diagrams and recorded the time it took for each task, understood “why” a specific tool was being
used and documented every waste in the process. I decided to use S.M.E.D. (Single Minute Exchange of Die) as this
would assist in minimising the down-time due to setup.
Outcome
After implementing the new procedures, all setups and changeovers were completed in 50 minutes. There was a 25%
decrease in raw material waste and quality defects decreased.
Establish systems to ensure business assets are providing maximum benefits.
Situation
There were inefficiencies and non-existent Accounts Payable processes. Late fees were being applied to late
payments from Suppliers. The goal was to reduce department overtime by 75%.
Solution
I assisted the team and conducted a 5-day Kaizen event. Calculated total Value-Added Time = 304 minutes and the
Non-Value-Added Time = 35, 200 minutes or 84 days (35,200 / 420 minutes). Out of the 119 steps, only 9 were value-
added. Created the future state and at the end of the week, an action list was created for the remaining activities.
Outcome
Over the next 30 days the compliance reached 100% for all internal groups creating a total reduction of tracking days
by 92.3%. Overall, the event did more than improve the bottom line. It helped to kick off new Lean initiatives across
the business.
Drive improvement support services to ensure promotion of a commercially efficient culture.
Situation
The Executive Management were keen to “Lean” out the support processes.
Solution
I analysed the front-end processes with the objective of streamlining activities throughout the business. I mapped
current front-end processes from receiving an enquiry through to project initiation. This led to identification of
‘disconnects’ and the visibility of timings for sub-elements of the process. I documented waste which could be
reduced once the team digested and documented the impact on the business. I developed the ‘future-state map’
along with the counter measures that reduced the overall cycle time from 17 weeks to 8 weeks.
Outcome
The improvement freed up time for Executive Management to work on the strategic growth of the business. This led
to an increased win rate of projects with the potential to increase sales by 10% - high utilisation of existing Sales
resources and reduced average time by 40% per enquiry.
Anand Subramaniam Dossier Commercial in Confidence
3
Deployment of best practice improvement management strategies.
Situation
I concentrated in the “Freight Receiving” area. On an average 5,000+ boxes of varying sizes were received during non-
peak time rising to 75,000 boxes during peak activity. With 35 workstations throughout the process the business
operates to an average of 150 boxes per person per hour. In line with best practice, the objective was to analyse all
process steps and identify specific areas for improvement, improve the flow visibility and reduce waste.
Solution
I photographed the current state and measured non-value add activity. From the analysis I identified the layout and
flow through the conveyor loop were not ideal resulting in stop/start at the 35 workstations. The analysis showed that
there was poor use of the grid system for stock once received which resulted in excessive walking by operators 12,000
~ 18,000 steps per day. The flow of work was making it difficult for Operators to effectively use their resources. I
prepared a detailed no cost / low cost implementation plan with the objective to increase overall productivity by 15%
within the next 10, 20, 30, 45 and 60 days in the 6 areas.
Outcome
There was reduction in labour time of 11 hours per week. With the improved layout walk time was reduced by 60%
and the conveyor system belt length was shortened leading to 11% monthly energy saving. Since the Lean initiate, the
business further reduced their carbon footprint.
Execute safety responsibilities, authorities and accountabilities consistent with safety management systems.
Situation
The field techs were not following the safety standards laid out in the OH&S guide and this led to on-site injuries. The
management wanted a field audit and review.
Solution
The safety standard operating procedures were too detailed and difficult to comprehend by the field technicians. They
were 350+ sheets. I developed 1~2-page job breakdown sheet along with standard work for modular construction,
cabling, ducting, cavity drops, DIALs, tool calibration, working at height, confined space, vehicle & safety audits
checklist. I had the input from the field team and was well received as the staff could relate to it with photos and
points of safety failure.
Outcome
By standardising, and simplifying tasks done by technicians (blue collar) the safety incident reduced by 80%. All field
staff promoted a safe workplace with zero harm and complied with all OHS and other regulatory standards.
Seek and develop business improvement opportunities in collaboration with the stakeholders.
Situation
The Hybrid Fibre Coaxial end-to-end (E2E) activation process, had a 41% defect rate and was creating customer
satisfaction challenges. The E2E activation process showed 11 tasks that were creating 83% of these defects.
Solution
I performed a 2-day Kaizen event to implement Mistake Proofing methods. I mapped the process to determine the
specific steps which were causing these errors and why. This allowed us to focus on areas that were impacting the
flow, waste and were prone to defects.
Outcome
This removed 80% of the defects within 5 months. From the above exercise we were able to apply Mistake Proofing to
other product / technologies like Fibre to Curb, Node and Basement.

Contenu connexe

Tendances

White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTRIrfan Rasheed Rana
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)Anand Subramaniam
 
DMAIC, DMADV & AGILE
DMAIC, DMADV & AGILEDMAIC, DMADV & AGILE
DMAIC, DMADV & AGILEAyo Apampa
 
Principles Of Lean And Value Stream Mapping Overview
Principles Of Lean And Value Stream Mapping OverviewPrinciples Of Lean And Value Stream Mapping Overview
Principles Of Lean And Value Stream Mapping Overviewjheaton418
 
Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
How to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DHow to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DStefan Kovacs
 
Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metricskaskerrigan
 
Process audit by Sougata Pal
Process audit by Sougata PalProcess audit by Sougata Pal
Process audit by Sougata PalSougata Pal
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophyDr. Chandan Vichoray
 

Tendances (20)

Six Sigma Overview
Six Sigma OverviewSix Sigma Overview
Six Sigma Overview
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 
Lean Management System Assessment
Lean Management System AssessmentLean Management System Assessment
Lean Management System Assessment
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
DMAIC, DMADV & AGILE
DMAIC, DMADV & AGILEDMAIC, DMADV & AGILE
DMAIC, DMADV & AGILE
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) PosterTPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
 
Principles Of Lean And Value Stream Mapping Overview
Principles Of Lean And Value Stream Mapping OverviewPrinciples Of Lean And Value Stream Mapping Overview
Principles Of Lean And Value Stream Mapping Overview
 
Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
How to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DHow to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8D
 
KPI SMRP Presentation
KPI SMRP PresentationKPI SMRP Presentation
KPI SMRP Presentation
 
Process Flow Mapping
Process Flow MappingProcess Flow Mapping
Process Flow Mapping
 
Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metrics
 
Process audit by Sougata Pal
Process audit by Sougata PalProcess audit by Sougata Pal
Process audit by Sougata Pal
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy
 

Similaire à Anand short dossier

Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Gurmeet Singh Guliani
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryJaideep Chandrasekharan
 
Alexander Proudfoot - Meat processing process improvement
Alexander Proudfoot - Meat processing process improvementAlexander Proudfoot - Meat processing process improvement
Alexander Proudfoot - Meat processing process improvementAlexander Proudfoot
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance ExcellenceDavid McDonald
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industryAmberSaleem8
 
Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...Argo, Inc.
 
Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...Tara Bilby
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2
CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2
CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2David Hazell
 
Kaizen Costing – A Management Technique
Kaizen Costing – A Management TechniqueKaizen Costing – A Management Technique
Kaizen Costing – A Management Techniqueinventionjournals
 
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Wally Wilson
 
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxChaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxcravennichole326
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integrationEdward Jones
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement SimulationBisher Yousfi
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newindi7257
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017indi7257
 
Case Studies2
Case Studies2Case Studies2
Case Studies2dtrumpy
 

Similaire à Anand short dossier (20)

Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside Story
 
Alexander Proudfoot - Meat processing process improvement
Alexander Proudfoot - Meat processing process improvementAlexander Proudfoot - Meat processing process improvement
Alexander Proudfoot - Meat processing process improvement
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industry
 
Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...
 
Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...Upstream optimization: How continuous improvement methods are having a positi...
Upstream optimization: How continuous improvement methods are having a positi...
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2
CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2
CaseStudy-DigitalChecklistsinManufacturing-April-2016-v2
 
Kaizen Costing – A Management Technique
Kaizen Costing – A Management TechniqueKaizen Costing – A Management Technique
Kaizen Costing – A Management Technique
 
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
 
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxChaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integration
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement Simulation
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
KEVIN_Resume LSS
KEVIN_Resume LSSKEVIN_Resume LSS
KEVIN_Resume LSS
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017
 
Case Studies2
Case Studies2Case Studies2
Case Studies2
 

Plus de Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Material Handling
Material Handling Material Handling
Material Handling
 

Dernier

Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 

Dernier (15)

Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 

Anand short dossier

  • 1. Anand Subramaniam Dossier Commercial in Confidence 2 Engage with stakeholders to provide improvement advice and support, to achieve business outcomes. Situation The boogies change over setups were consuming between 3 and 7 hours (5 hours on average) of production downtime. Solution I conducted a detailed time and motion study for 5 days on the Boogie Change operation. I analysed the setup. I created Spaghetti Diagrams and recorded the time it took for each task, understood “why” a specific tool was being used and documented every waste in the process. I decided to use S.M.E.D. (Single Minute Exchange of Die) as this would assist in minimising the down-time due to setup. Outcome After implementing the new procedures, all setups and changeovers were completed in 50 minutes. There was a 25% decrease in raw material waste and quality defects decreased. Establish systems to ensure business assets are providing maximum benefits. Situation There were inefficiencies and non-existent Accounts Payable processes. Late fees were being applied to late payments from Suppliers. The goal was to reduce department overtime by 75%. Solution I assisted the team and conducted a 5-day Kaizen event. Calculated total Value-Added Time = 304 minutes and the Non-Value-Added Time = 35, 200 minutes or 84 days (35,200 / 420 minutes). Out of the 119 steps, only 9 were value- added. Created the future state and at the end of the week, an action list was created for the remaining activities. Outcome Over the next 30 days the compliance reached 100% for all internal groups creating a total reduction of tracking days by 92.3%. Overall, the event did more than improve the bottom line. It helped to kick off new Lean initiatives across the business. Drive improvement support services to ensure promotion of a commercially efficient culture. Situation The Executive Management were keen to “Lean” out the support processes. Solution I analysed the front-end processes with the objective of streamlining activities throughout the business. I mapped current front-end processes from receiving an enquiry through to project initiation. This led to identification of ‘disconnects’ and the visibility of timings for sub-elements of the process. I documented waste which could be reduced once the team digested and documented the impact on the business. I developed the ‘future-state map’ along with the counter measures that reduced the overall cycle time from 17 weeks to 8 weeks. Outcome The improvement freed up time for Executive Management to work on the strategic growth of the business. This led to an increased win rate of projects with the potential to increase sales by 10% - high utilisation of existing Sales resources and reduced average time by 40% per enquiry.
  • 2. Anand Subramaniam Dossier Commercial in Confidence 3 Deployment of best practice improvement management strategies. Situation I concentrated in the “Freight Receiving” area. On an average 5,000+ boxes of varying sizes were received during non- peak time rising to 75,000 boxes during peak activity. With 35 workstations throughout the process the business operates to an average of 150 boxes per person per hour. In line with best practice, the objective was to analyse all process steps and identify specific areas for improvement, improve the flow visibility and reduce waste. Solution I photographed the current state and measured non-value add activity. From the analysis I identified the layout and flow through the conveyor loop were not ideal resulting in stop/start at the 35 workstations. The analysis showed that there was poor use of the grid system for stock once received which resulted in excessive walking by operators 12,000 ~ 18,000 steps per day. The flow of work was making it difficult for Operators to effectively use their resources. I prepared a detailed no cost / low cost implementation plan with the objective to increase overall productivity by 15% within the next 10, 20, 30, 45 and 60 days in the 6 areas. Outcome There was reduction in labour time of 11 hours per week. With the improved layout walk time was reduced by 60% and the conveyor system belt length was shortened leading to 11% monthly energy saving. Since the Lean initiate, the business further reduced their carbon footprint. Execute safety responsibilities, authorities and accountabilities consistent with safety management systems. Situation The field techs were not following the safety standards laid out in the OH&S guide and this led to on-site injuries. The management wanted a field audit and review. Solution The safety standard operating procedures were too detailed and difficult to comprehend by the field technicians. They were 350+ sheets. I developed 1~2-page job breakdown sheet along with standard work for modular construction, cabling, ducting, cavity drops, DIALs, tool calibration, working at height, confined space, vehicle & safety audits checklist. I had the input from the field team and was well received as the staff could relate to it with photos and points of safety failure. Outcome By standardising, and simplifying tasks done by technicians (blue collar) the safety incident reduced by 80%. All field staff promoted a safe workplace with zero harm and complied with all OHS and other regulatory standards. Seek and develop business improvement opportunities in collaboration with the stakeholders. Situation The Hybrid Fibre Coaxial end-to-end (E2E) activation process, had a 41% defect rate and was creating customer satisfaction challenges. The E2E activation process showed 11 tasks that were creating 83% of these defects. Solution I performed a 2-day Kaizen event to implement Mistake Proofing methods. I mapped the process to determine the specific steps which were causing these errors and why. This allowed us to focus on areas that were impacting the flow, waste and were prone to defects. Outcome This removed 80% of the defects within 5 months. From the above exercise we were able to apply Mistake Proofing to other product / technologies like Fibre to Curb, Node and Basement.