1) Explain ERP
Enterprise Resource Planning is the latest high end solution, information technology has lent
to business application. The ERP solutions seek to streamline and integrate operation
processes and information flows in the company to synergise the resources of an organisation
namely men, material, money and machine through information. Initially implementation of
an ERP package was possible only for very large Multi National Companies and
Infrastructure Companies due to high cost involved. Today many companies in India have
gone in for implementation of ERP and it is expected in the near future that 60% of the
companies will be implementing one or the other ERP packages since this will become a
must for gaining competitive advantage.
In the present business environment, role of a Chartered Accountant is considered to be very
important and inevitable. Chartered Accountants as managers, consultants, advisors or
auditors play an important role in controlling, managing, and supporting the business.
As the business needs are very complex in nature, the implementation of an ERP package
needs Chartered Accountants with functional skills for evaluation, Business Process
Reengineering (BPR), Mapping of Business requirements, Report designing, ensuring
Business controls, customization of the package for the specific requirements, Documentation
etc.,
Sooner or later a Chartered Accountant without the knowledge of ERP may feel as if he is a
fish out of the bowl. By this article it is attempted to highlight various aspects of ERP and
specific areas of ERP that are relevant for Chartered Accountants.
Evolution of ERP
In the ever growing business environment the following demands are placed on the industry :
o Aggressive Cost control initiatives
o Need to analyze costs / revenues on a product or customer basis
o Flexibility to respond to changing business requirements
o More informed management decision making
o Changes in ways of doing business
Difficulty in getting accurate data, timely information and improper interface of the complex
natured business functions have been identified as the hurdles in the growth of any business.
Time and again depending upon the velocity of the growing business needs, one or the other
applications and planning systems have been introduced into the business world for crossing
these hurdles and for achieving the required growth. They are:
o Management Information Systems (MIS)
o Integrated Information Systems (IIS)
o Executive Information Systems (EIS)
o Corporate Information Systems (CIS)
o Enterprise Wide Systems (EWS)
o Material Resource Planning (MRP)
o Manufacturing Resource Planning (MRP II)
o Money Resource Planning (MRP III)
The latest planning tool added to the above list is Enterprise Resource Planning.
Need for ERP
Most organizations across the world have realized that in a rapidly changing environment, it
is impossible to create and maintain a custom designed software package which will cater to
all their requirements and also be completely up-to-date. Realizing the requirement of user
organizations some of the leading software companies have designed Enterprise Resource
Planning software which will offer an integrated software solution to all the functions of an
organisation.
Features of ERP
Some of the major features of ERP and what ERP can do for the business system are as
below:
o ERP facilitates company-wide Integrated Information System covering all
functional areas like Manufacturing, Selling and distribution, Payables,
Receivables, Inventory, Accounts, Human resources, Purchases etc.,
o ERP performs core Corporate activities and increases customer service and
thereby augmenting the Corporate Image.
o ERP bridges the information gap across the organisation.
o ERP provides for complete integration of Systems not only across the
departments in a company but also across the companies under the same
management.
o ERP is the only solution for better Project Management.
o ERP allows automatic introduction of latest technologies like Electronic Fund
Transfer (EFT), Electronic Data Interchange (EDI), Internet, Intranet, Video
conferencing, E-Commerce etc.
o ERP eliminates the most of the business problems like Material shortages,
Productivity enhancements, Customer service, Cash Management, Inventory
problems, Quality problems, Prompt delivery etc.,
o ERP not only addresses the current requirements of the company but also
provides the opportunity of continually improving and refining business
processes.
o ERP provides business intelligence tools like Decision Support Systems
(DSS), Executive Information System (EIS), Reporting, Data Mining and
Early Warning Systems (Robots) for enabling people to make better decisions
and thus improve their business processes
Components of ERP
To enable the easy handling of the system the ERP has been divided into the following Core
subsystems:
o Sales and Marketing
o Master Scheduling
o Material Requirement Planning
o Capacity Requirement Planning
o Bill of Materials
o Purchasing
o Shop floor control
o Accounts Payable/Receivable
o Logistics
o Asset Management
o Financial Accounting
Suppliers of ERP
There are many numbers of ERP suppliers who are very active in the market. Some of the
companies offering renowned international ERP products include:
o Baan
o CODA
o D&B
o IBM
o JD Edwards
o Marcarn
o Oracle
o Peoplesoft
o Platinum
o Ramco
o SAP
o SMI
o Software 2000
Selection of ERP
Once the BPR is completed the next task is to evaluate and select a suitable package for
implementation. Evaluation of the right ERP package is considered as more crucial step.
Evaluation and selection involves:
o checking whether all functional aspects of the Business are duly covered
o checking whether all the business functions and processes are fully integrated
o checking whether all the latest IT trends are covered
o checking whether the vendor has customizing and implementing capabilities
o checking whether the business can absorb the cost
o checking whether the ROI is optimum
2) How an ERP implementation can help in integrating an organisation operation?
Implementation of ERP
Implementing an ERP package has to be done on a phased manner. Step by step method of
implementing will yield a better result than big-bang introduction. The total time required for
successfully implementing an ERP package will be anything between 18 and 24 months. The
normal steps involved in implementation of an ERP are as below:
o Project Planning
o Business & Operational analysis including Gap analysis
o Business Process Reengineering
o Installation and configuration
o Project team training
o Business Requirement mapping
o Module configuration
o System interfaces
o Data conversion
o Custom Documentation
o End user training
o Acceptance testing
o Post implementation/Audit support
Benefits of ERP
The benefits accruing to any business enterprise on account of implementing are unlimited.
According to the companies like NIKE, DHL, Tektronix, Fujitsu, Millipore, Sun
Microsystems, following are some of the benefits they achieved by implementing ERP
packages:
o Gives Accounts Payable personnel increased control of invoicing and payment
processing and thereby boosting their productivity and eliminating their
reliance on computer personnel for these operations.
o Reduce paper documents by providing on-line formats for quickly entering
and retrieving information.
o Improves timeliness of information by permitting, posting daily instead of
monthly.
o Greater accuracy of information with detailed content, better presentation,
fully satisfactory for the Auditors.
o Improved Cost Control
o Faster response and follow up on customers
o More efficient cash collection, say, material reduction in delay in payments by
customers.
o Better monitoring and quicker resolution of queries.
o Enables quick response to change in business operations and market
conditions.
o Helps to achieve competitive advantage by improving its business process.
o Improves supply-demand linkage with remote locations and branches in
different countries.
o Provides a unified customer database usable by all applications.
o Improves International operations by supporting a variety of tax structures,
invoicing schemes, multiple currencies, multiple period accounting and
languages.
o Improves information access and management throughout the enterprise.
o Provides solution for problems like Y2K and Single Monitory Unit (SMU) or
Euro Currency.
3) Discuss about approach in decision making in acquisiting of information system?
Information system Acquisition Process
The acquisition process should involve the identification and analysis of alternative
solutions that are each compared with the established business requirements. The decision
making to acquire a typical IT application primarily consists of the following stages: (see
Appendix)
STAGE 1: IDENTIFYING, PLANNING, AND JUSTIFYING THE INFORMATION
AND SYSTEM REQUIREMENTS
One of the most essential assessments in decision making process is identifying the
business objective after first knowing the problems being solved. The management should
primarily identify the business processes involved in the organization. Information systems
are usually developed as enablers of the business processes. The first phase of the acquisition
process should align the business process with the company objectives and the business plan.
Note that specific process may need to be prioritized to fully obtain the benefits of IT
implementation. Moreover, each process should be carefully analyzed to ensure that it will
have the certain functionality to meet the requirements of the business process and the users,
as well as the benefits which can be justified with its cost.5
Another big challenge in the procuring information systems is to define the system
requirements. System requirements describe the objectives of the system. They define the
problem to be solved, business, and system goals, system process to be accomplished, user
expectations, and the deliverables for the system. Furthermore, the requirements should
incorporate information about system inputs, information being processed in the system, and
the information expected out the system. Each of this information should be clearly defined
so that later gaps in requirements and expectations are avoided. Information system
requirements can be gathered through interviews, questionnaires, existing system derivation,
benchmarking with related system, prototyping, and Rapid Application Development (RAD).
[7]
The output of this step is a decision to go with specific application, timetable, budget,
and system expectations. As Small Business Television (SBTV) Network Chief Operating
Officer, Michael Kelley, explains, "Before we went and purchased anything, we developed a
business plan with a three-year outlook on what we thought we needed for the business.
During the planning process, we knew that we were going to have to make a change within a
three-year period. So that was an 'x' on the side of 'reasons not to buy, lease, or build in-
house' because we new we might have to change our technology — probably in less than two
years. As it turned out, it was about 14 months, and we had to make a lot of changes and
reconfigurations."[5]
STAGE 2: RESTRUCTURING INFORMATION SYSTEM ARCHITECTURE
With the regards of system analysis approach, an organization which is still in the
progress of acquiring IT should remodel its information system (IS) architecture. IS
architecture is the conceptualization of how the organization’s information objectives are met
by the capabilities of the specific applications.[7]
This structural design however describes the
flow of the information, data hierarchy, application functionality, technical feasibility, and
organization architecture in the organization. The output from this phase should be a strategic
planning level on how to develop specific application that meets the constrained defined by
the IS architecture. Therefore, the application portfolio may be changed corresponding to this
structure.
STAGE 3: IDENTIFYING A DEVELOPMENT ALTERNATIVE
There are several options in procuring software solutions. Some available alternatives
are: (1) Developing the system in-house, (2) Off-the self solutions (Purchasing commercially
available solution),
(3)Buying a custom made system for a vendor, (4) Leasing software from an application
service provider (ASP) or lease through utility computing (contracted development), (5)
Outsourcing a system from other companies (6) Participating in auction, e-marketplace, or a
public exchange (consortium) ,(7)Use a combination of these listed options.
The consideration criteria and some critical factors upon various options will be
discussed thoroughly later in the next section. While an organization is in the phase of
deciding which alternative being selected, the management should carefully examine not only
the advantages and disadvantages of each procuring option, but more importantly, the option
must be best-fit with the organization business plan that has been documented in the previous
steps. Any system development project, whether the system is built in-house or purchased
elsewhere, should support the company’s business and IT strategy. The solution being sought
associated with business requirements should align the business goals with IT strategy.
STAGE 4: CONDUCTING A FEASIBILITY ANALYSIS
As a part of the assessment in acquiring the solutions, a feasibility analysis is important
to identify the constraints for each alternative from both technical and business perspective.
Feasibility analysis incorporates the following categories:
· Economic feasibility analysis provides cost-benefit justification with being regard to the
expenses of a system, which include procurement, project-specific, start-up, and
operational costs. Some cost examples are one-time and recurring cost, consultants,
support staff, infrastructure, maintenance, training, and application software cost. This
examination ensures that the solution won’t exceed the budget limit as well as it increase
the efficiency and better resource utilization.
· Technical feasibility assessment analyzes the technical reasonableness of the proposed
solution. Technical feasibility evaluates whether the company has the infrastructure and
resources including hardware, software, and network capability to support the application.
Meanwhile, it also assesses the consistency of the proposed system in terms of the
technical requirements with the company technical resource. Therefore, this assessment
guarantees the reliability and capacity for the future growth.
· Operational feasibility evaluation reviews the extent of organizational changes
required to accommodate the proposed system. The proposed system should solve the
business problems and provide better opportunity for the business since the business
process might be changed. Some alignments that may occur include business process,
human resource management, and products or service offered.
· Legal and contractual feasibility. The proposed solution must pass any related legal or
contractual obligations associated with. Corporate legal counsel should ensure that there
are no illegal practices corresponding to the new system related with any preexisting
regulations. Organization also may work with some experts from Computer Law
Association to make sure this analysis strictly enforced. Thus, the underlying theme will
protect the company and the establishment of the remedy process should the vendor or
contractor fail to perform as promised.
· Political feasibility. The nature of the organization most likely will be affected by the
presence of the new system. Therefore, this feasibility analysis evaluates how the internal
organization will accept the new system. It also incorporates the user expectancy
regarding the new system and the corporate culture response toward the proposed
solution.
Upon completion of the series of feasibility analyses, the risk analysis review most likely
will be conducted. Risk analysis evaluate the security of proposed system, potential threats,
vulnerabilities, impacts, as well as the feasibility of other controls can be used to minimize
the identified threats.[6]
Finally, the company may perform some ergonomic requirements review to provide a
work environment that is safe and efficient for the employee. Ergonomic check will make
sure the design of the human interface components (i.e: monitor, keyboard, etc) is user
friendly enough to accommodate all the requirements that make the users feel comfortable to
work with.
STAGE 5: PERFORMING THE SELECTION PROCEDURE
Selection procedure is the process of identifying the best match between the available
options and the identified requirements. In this process, the company requests for a proposal
from prospective providers, evaluates the proposal, and selects the best available alternative.
There are various ways to solicit responses from providers. Some of the common methods
comprise request for information (RFI), request for bid (RFB), and request for proposal
(RFP). An RFI is used to seek information from vendors for a specific intention. RFI should
act as a tool for determining the alternatives or associated alternatives for meeting the
organization’s needs. An RFB is designed to procure specific items or services and used
where either multiple vendors are equally competent of meeting all of the technical and
functional specifications or only one provider can meet them. Furthermore, an RFP specifies
the minimal acceptable requirements, including functional, technical, and contractual aspects.
This document offers flexibility to respondents to further define the requested requirements.
RFPs can be a lead to a purchase or continued negotiation.
All of these processes should be structurally proceeded to ensure the process would be
completed neatly in a timely fashion. If done properly, this process turns out to be a
purchasing decision for the selected application. Note that the entire process must be
documented in a written letter before moving to the next step. This is an important issue to
avoid a bid protest that may be filled from any other potential vendors. Management, IT
auditor and also legal counsel must review every point in detail before the proposal
evaluation process begins.
STAGE 6: PROPOSAL EVALUATION PROCESS
Proposal evaluation is a crucial process in the software acquisition since one of more
key stakeholders reviews submitted proposals using a list of objective selection criteria and
decide the best match between the product features and functionality with the identified
requirements.
Martin, et al (2000) identified six steps in selecting a software vendor with its
application package:[8]
1. Examining potential vendors’ background. Potential software application providers can
be identified from software catalogs, lists provided by hardware vendors, technical and trade
journals, or consultants experienced in the other companies, and Web searches. These
preliminary evaluation criteria can be used to pre-eliminate the unqualified potential vendors
based on the vendor track record, reputation, and some previous feedback.
2. Determining the evaluation criteria. One of the most difficult tasks in evaluating the
vendor and a software package is to determine a set of detailed criteria for choosing the best
vendor and package. These criteria can be identified from the RFP feedback sent by the
vendors. Some areas that should be considered: characteristics, of the vendor, functional
requirements of the system, technical requirements, total project costs, scalability of the
solution, project time frame, quality of documentation provided, and vendor support package.
3. Evaluating providers and their applications. The objective of this evaluation is to
determine the gaps between the company’s needs and the capabilities of the vendors and their
application packages. Ranking the vendors on each weighted criteria and then multiply the
ranks by the associated weight can be one method to evaluate the vendors and their solution
packages.
4. Selecting the provider and its solution. Choosing the vendor and its software depends on
the nature of the application. Negotiation can begin with vendors to determine how their
packages might be modified to remove any discrepancies with the company’s IT needs.
Furthermore, feedbacks from the users who will work with the system and the IT staff who
will support the system have to be considered. In general, defined list of criteria for selecting
a software application package are following:
TABLE 1. Criteria for Selecting a Software Application Package to use
· Usability and functionality
· Cost-benefit analysis
· Upgrade policy and cost
· Vendor reputation
· System flexibility and scalability
· Manageability
· Quality of documentation
· Hardware and networking resources
· Upgradeability
· Required training
· System security
· Maintenance and operational requirements
· User easiness to learn
· Performance measurement
· Interoperability and data handling
· Ease of integration
· Reliability measurement
· Compatibility with other applications
5. Negotiate a contract. Once the vendor and its package selected, then the company can
move to the contract negotiation, in which the company can specify the price of the software
and the type of the support to be provided by the vendor. The contract must describe the
detailed specifications, all the included services provided by the vendor, and other detail
terms of the system. Contract is a legal document so the company should involve the
experienced software purchasing specialists and legal assistance. Since the contract can be
very tricky so these legal counsel should be involved from the beginning of selection process.
6. Establishing a service level agreement (SLA). SLA is formal agreement regarding the
distribution of work between the organization and its vendor. Such agreement is created
according to a set of agreed-upon objective, quality tests, and some what-if situations.
Overall, SLA defines: (1) company and vendor responsibilities, (2) framework for designing
support services, (3) company privilege to have most of the control over their system.
STAGE 7: IMPLEMENTING THE SELECTED SOLUTION
Upon completion of the contract negotiation, an acceptance plan should be agreed by
both the company and the vendor so the new application can be ready to be installed or
developed. No matter what options the company chooses, even when they decide to build
their software in house, the company will most likely have to deal with some vendor (s)
and/or certain software that has to be purchased from some supplier(s). During this process,
the application is also tested and user reactions are evaluated. After the application or
prototype of the application has passed user requirements, they can be deployed. Under this
circumstance, the company management may deal with organizational issues such as
conversion strategies, training, and resistant to change [9]
STAGE 8: REVIEWING AND MONITORING THE ACQUISITION PROCESS
Software acquisition process is a continuing process that must be reviewed in ongoing
basis. A purchased software solution should effectively and efficiently satisfy user
requirements. Software maintenance and operation can be an issue due to rapid changes in IT
technology. However, this process can involve external evaluation to make sure the
procedures and processes in place and whether the acquisition was in compliance with
institutional processes and operating procedures.
Standard project management techniques and tools are useful for this task. Operation,
maintenance, and evaluation can be done in-house or outsourced. For medium-large
applications, a company may create a project team to manage the process. Company also may
collaborate with other business partners to monitor the development process; however, it may
have some critical issue with IT failure, such as: application incompatibility between two
entities, communication breakdown, etc. IT can be a place where these acquisition procedures
are lacking; therefore, the development process must be managed properly. Ultimately,
investing an IT project may require streamlining of one or more business processes and
excellent coordination between all the related entities.
4) Explain difficulties in implementation of ERP?
 Implementation effort will be bigger then ever talked about or even imagined. We are
yet to hear from an organisation who have implemented ahead of schedule and under
budget.
 Because of the richness of functionality, the "toy box effect" can take over. Users see
all the functionality available and suddenly they want it now. The scope can grow out
of control.
 The existing environmental mix between what is done manually and what is done by
the system will swing dramatically after implementation. Many more tasks will be
automated. Automation will significantly reduce the flexibility of how you operate as
a business.
 Users need to become more computer literate. Many see this as personally
challenging - even beyond their ability - and will not cope, or leave the company.
 The word "Enterprise" in ERP means that whatever happens in one area has a ripple
effect in other areas. Understanding the implications of actions of one area, on other
areas of the company, is not something that happens overnight. Training tends to
focus on how do I do my job. It should also focus on what are the impacts of my job,
in other areas.
 Near enough is no longer good enough. Data integrity becomes critical. The computer
cannot make human judgments. If stock is moved, it is no good somebody
remembering where they put it. The information needs to be put into the system or
there will be a domino effect. E.g. Stock is moved from location A to location B and
the information is not put into the system. The system will tell someone to get the
material from A and when it is not there, they have to go looking. At the same time it
is telling someone else to put new material in B, but B is full. The first person finds
the original material in B and logs it into the system. We now have double the
quantity in the system again and it doesn't reorder. And so it goes on and everyone is
blaming the system.
 ERP systems tend to replace old systems. As such it is a quantum leap for all areas of
the company. It is replacing the trusty Ford with a high performance Ferrari. This
happens at a Technical level as well as a Business Level. New ways need to be learnt
in a very short space of time.
 Things have to be done consistently. No longer are we able to do something one way
in one branch and another way in another branch. The system is going to determine
how we do things in all locations. Even within one location, special treatment may not
be possible any more without changing the configuration of the system. If the system
says you can either have 0, 15, 30 or 60 day credit terms, you can no longer offer 45
day terms without changing configuration. If consistency can be implemented, there is
good potential for cost savings as well as getting rid of special arrangements that
reduce profit.
A survey of organisations that have implemented ERP's was carried out recently. It
identified "10 Common Causes of Disaster".
 Change Management and Training.
This was mentioned as the major problem with implementations. Changing work
practices to fit the system is a major difficulty. Also mentioned were training across
modules and starting training sooner.
 To BPR or not to BPR
It is difficult to draw the line between changing Business Processes to suit the system
or retaining Business Processes and paying the cost, in dollars and time, to change the
system. As time and cost squeeze the implementation, the usual path is to not modify
the system, but to change the way people work. This feeds back into Change
Management and Training.
 Poor Planning
Planning covers several areas such as having a strong Business Case, to the
availability of Users to make decisions on configuration, to the investing in a plan that
captures all the issues associated with implementing it.
 Underestimating IT skills
As most people are upgrading from old technology, the skills of the staff need to be
upgraded as well. The upgrade is also going to place significant demands on a team
who are geared to maintain an old but stable environment. Usually this effort is
underestimated.
 Poor Project Management
Very few organisations have the experience in house to run such a complex project as
implementing a large-scale integrated solution. It usually requires outside contractors
to come in and manage such a major exercise. It can be a fine line between abdicating
responsibility and sharing responsibility. Many consulting firms do a disservice to
their clients by not sharing the responsibility.
 Technology Trials
The effort to build interfaces, change reports, customize the software and convert the
data is normally underestimated. To collect new data, and clean the data being
converted, will also require an effort that is beyond what is normally expected.
 Low Executive Buy-in
Implementation projects need Senior Executive involvement to ensure the right
participation mix of Business and IT, and to resolve conflicts.
 Underestimating Resources
Most common budget blow outs are change management and user training,
integration testing, process rework, report customisation and consulting fees.
 Insufficient Software Evaluation
This involves the surprises that come out after the software is purchased.
Organisations usually do not do enough to understand what, and how the product
works before they sign on the bottom line. The Bleeding Edge ERP is so massive and
integrated that reporting and linking to other systems (either your own or your
customers and suppliers) can be much more difficult than you expect. Companies
looking at ERP need to examine how they accept online feeds from a customer, or a
customers' customer, and examine the technological enablers as well as the
implications of these technologies inside of the Business.

Contenu connexe

Tendances

Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planningsandeeptiwari
 
The role of erp for global businesses
The role of erp for global businessesThe role of erp for global businesses
The role of erp for global businessesasmamaw
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource PlanningAnkesh Gorkhali
 
Erp system for college automation using rfid tags
Erp system for college automation using rfid tagsErp system for college automation using rfid tags
Erp system for college automation using rfid tagseSAT Journals
 
Retail Management by devesh bagga v1.0
Retail Management by devesh bagga v1.0Retail Management by devesh bagga v1.0
Retail Management by devesh bagga v1.0Devesh Bagga
 
ERP Module Finance
ERP Module FinanceERP Module Finance
ERP Module FinanceAshok Sinch
 
Erp notes-by-hemant sir-readonly
Erp notes-by-hemant sir-readonlyErp notes-by-hemant sir-readonly
Erp notes-by-hemant sir-readonlyEzhil Vendhaan
 
industry_insight
industry_insightindustry_insight
industry_insightJunya Punkt
 
Modules in Enterprise Resource Planning
Modules in Enterprise Resource PlanningModules in Enterprise Resource Planning
Modules in Enterprise Resource Planningsaksheebhaiswar
 
Erp & e commerce
Erp & e commerceErp & e commerce
Erp & e commerceAli Mcc
 
erp and related technologies
erp and related technologieserp and related technologies
erp and related technologiesMadan Kumawat
 
Enterprise resource planning ppt
Enterprise resource planning pptEnterprise resource planning ppt
Enterprise resource planning pptBabasab Patil
 
A Whitepaper on ERP in Retail Industry
A Whitepaper on ERP in Retail IndustryA Whitepaper on ERP in Retail Industry
A Whitepaper on ERP in Retail IndustryAbhishek Kaushal
 
The overwhelming challenges of IT infrastructure management
The overwhelming challenges of IT infrastructure managementThe overwhelming challenges of IT infrastructure management
The overwhelming challenges of IT infrastructure managementNIIT Technologies
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource PlanningSumant Diwakar
 

Tendances (20)

Erp enterprise resource planning sap oracle by ijaz haider malik
Erp enterprise resource planning sap oracle by ijaz haider malikErp enterprise resource planning sap oracle by ijaz haider malik
Erp enterprise resource planning sap oracle by ijaz haider malik
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
The role of erp for global businesses
The role of erp for global businessesThe role of erp for global businesses
The role of erp for global businesses
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
Erp system for college automation using rfid tags
Erp system for college automation using rfid tagsErp system for college automation using rfid tags
Erp system for college automation using rfid tags
 
ERP systems
ERP systemsERP systems
ERP systems
 
Retail Management by devesh bagga v1.0
Retail Management by devesh bagga v1.0Retail Management by devesh bagga v1.0
Retail Management by devesh bagga v1.0
 
ERP Module Finance
ERP Module FinanceERP Module Finance
ERP Module Finance
 
Erp notes-by-hemant sir-readonly
Erp notes-by-hemant sir-readonlyErp notes-by-hemant sir-readonly
Erp notes-by-hemant sir-readonly
 
industry_insight
industry_insightindustry_insight
industry_insight
 
Modules in Enterprise Resource Planning
Modules in Enterprise Resource PlanningModules in Enterprise Resource Planning
Modules in Enterprise Resource Planning
 
Erp & e commerce
Erp & e commerceErp & e commerce
Erp & e commerce
 
erp and related technologies
erp and related technologieserp and related technologies
erp and related technologies
 
Enterprise resource planning ppt
Enterprise resource planning pptEnterprise resource planning ppt
Enterprise resource planning ppt
 
A Whitepaper on ERP in Retail Industry
A Whitepaper on ERP in Retail IndustryA Whitepaper on ERP in Retail Industry
A Whitepaper on ERP in Retail Industry
 
ERP
ERPERP
ERP
 
Top five future trends in erp
Top five future trends in erpTop five future trends in erp
Top five future trends in erp
 
The overwhelming challenges of IT infrastructure management
The overwhelming challenges of IT infrastructure managementThe overwhelming challenges of IT infrastructure management
The overwhelming challenges of IT infrastructure management
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
Erp pptx
Erp pptxErp pptx
Erp pptx
 

En vedette

prakash agrawal crp presentation
prakash agrawal   crp presentationprakash agrawal   crp presentation
prakash agrawal crp presentationAkash Maurya
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecastingTwinkle Constantino
 

En vedette (7)

prakash agrawal crp presentation
prakash agrawal   crp presentationprakash agrawal   crp presentation
prakash agrawal crp presentation
 
Erp presentation
Erp presentationErp presentation
Erp presentation
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecasting
 

Similaire à Unit V with Answers

Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Makan Singh
 
ERP( enterprise resource planning)
ERP( enterprise resource planning)ERP( enterprise resource planning)
ERP( enterprise resource planning)Omer Maroof
 
Enterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesEnterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesGanesha Pandian
 
an-overview-enterprise-resource-planning erp-
 an-overview-enterprise-resource-planning  erp- an-overview-enterprise-resource-planning  erp-
an-overview-enterprise-resource-planning erp-Er Deepak Sharma
 
ERP_Follow_The_Money_Trail[1]
ERP_Follow_The_Money_Trail[1]ERP_Follow_The_Money_Trail[1]
ERP_Follow_The_Money_Trail[1]Jacob Vaidyan
 
Entreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.pptEntreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.pptRAJESH S
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planningTran Thuy Duong
 
ERP strategy and digital finance transformation
ERP strategy and digital finance transformationERP strategy and digital finance transformation
ERP strategy and digital finance transformationjayjani123
 
Inroduction to ERP system core functions and challenages.pptx
Inroduction to ERP system core functions and challenages.pptxInroduction to ERP system core functions and challenages.pptx
Inroduction to ERP system core functions and challenages.pptxnagarajan740445
 

Similaire à Unit V with Answers (20)

Erp
ErpErp
Erp
 
Erp notes
Erp notesErp notes
Erp notes
 
testing
testingtesting
testing
 
Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)
 
Lecture 6 recording
Lecture 6 recordingLecture 6 recording
Lecture 6 recording
 
Erp1
Erp1Erp1
Erp1
 
ERP( enterprise resource planning)
ERP( enterprise resource planning)ERP( enterprise resource planning)
ERP( enterprise resource planning)
 
Erp
ErpErp
Erp
 
Sap 1
Sap 1Sap 1
Sap 1
 
ERP
ERPERP
ERP
 
SAP
SAP SAP
SAP
 
Enterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesEnterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modules
 
an-overview-enterprise-resource-planning erp-
 an-overview-enterprise-resource-planning  erp- an-overview-enterprise-resource-planning  erp-
an-overview-enterprise-resource-planning erp-
 
Sap 2
Sap 2Sap 2
Sap 2
 
ERP_Follow_The_Money_Trail[1]
ERP_Follow_The_Money_Trail[1]ERP_Follow_The_Money_Trail[1]
ERP_Follow_The_Money_Trail[1]
 
Erp
ErpErp
Erp
 
Entreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.pptEntreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.ppt
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planning
 
ERP strategy and digital finance transformation
ERP strategy and digital finance transformationERP strategy and digital finance transformation
ERP strategy and digital finance transformation
 
Inroduction to ERP system core functions and challenages.pptx
Inroduction to ERP system core functions and challenages.pptxInroduction to ERP system core functions and challenages.pptx
Inroduction to ERP system core functions and challenages.pptx
 

Plus de Dr. C.V. Suresh Babu (20)

Data analytics with R
Data analytics with RData analytics with R
Data analytics with R
 
Association rules
Association rulesAssociation rules
Association rules
 
Clustering
ClusteringClustering
Clustering
 
Classification
ClassificationClassification
Classification
 
Blue property assumptions.
Blue property assumptions.Blue property assumptions.
Blue property assumptions.
 
Introduction to regression
Introduction to regressionIntroduction to regression
Introduction to regression
 
DART
DARTDART
DART
 
Mycin
MycinMycin
Mycin
 
Expert systems
Expert systemsExpert systems
Expert systems
 
Dempster shafer theory
Dempster shafer theoryDempster shafer theory
Dempster shafer theory
 
Bayes network
Bayes networkBayes network
Bayes network
 
Bayes' theorem
Bayes' theoremBayes' theorem
Bayes' theorem
 
Knowledge based agents
Knowledge based agentsKnowledge based agents
Knowledge based agents
 
Rule based system
Rule based systemRule based system
Rule based system
 
Formal Logic in AI
Formal Logic in AIFormal Logic in AI
Formal Logic in AI
 
Production based system
Production based systemProduction based system
Production based system
 
Game playing in AI
Game playing in AIGame playing in AI
Game playing in AI
 
Diagnosis test of diabetics and hypertension by AI
Diagnosis test of diabetics and hypertension by AIDiagnosis test of diabetics and hypertension by AI
Diagnosis test of diabetics and hypertension by AI
 
A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”
 
A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”
 

Dernier

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 

Dernier (20)

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 

Unit V with Answers

  • 1. 1) Explain ERP Enterprise Resource Planning is the latest high end solution, information technology has lent to business application. The ERP solutions seek to streamline and integrate operation processes and information flows in the company to synergise the resources of an organisation namely men, material, money and machine through information. Initially implementation of an ERP package was possible only for very large Multi National Companies and Infrastructure Companies due to high cost involved. Today many companies in India have gone in for implementation of ERP and it is expected in the near future that 60% of the companies will be implementing one or the other ERP packages since this will become a must for gaining competitive advantage. In the present business environment, role of a Chartered Accountant is considered to be very important and inevitable. Chartered Accountants as managers, consultants, advisors or auditors play an important role in controlling, managing, and supporting the business. As the business needs are very complex in nature, the implementation of an ERP package needs Chartered Accountants with functional skills for evaluation, Business Process Reengineering (BPR), Mapping of Business requirements, Report designing, ensuring Business controls, customization of the package for the specific requirements, Documentation etc., Sooner or later a Chartered Accountant without the knowledge of ERP may feel as if he is a fish out of the bowl. By this article it is attempted to highlight various aspects of ERP and specific areas of ERP that are relevant for Chartered Accountants. Evolution of ERP In the ever growing business environment the following demands are placed on the industry : o Aggressive Cost control initiatives o Need to analyze costs / revenues on a product or customer basis o Flexibility to respond to changing business requirements o More informed management decision making o Changes in ways of doing business Difficulty in getting accurate data, timely information and improper interface of the complex natured business functions have been identified as the hurdles in the growth of any business. Time and again depending upon the velocity of the growing business needs, one or the other applications and planning systems have been introduced into the business world for crossing these hurdles and for achieving the required growth. They are: o Management Information Systems (MIS) o Integrated Information Systems (IIS) o Executive Information Systems (EIS) o Corporate Information Systems (CIS)
  • 2. o Enterprise Wide Systems (EWS) o Material Resource Planning (MRP) o Manufacturing Resource Planning (MRP II) o Money Resource Planning (MRP III) The latest planning tool added to the above list is Enterprise Resource Planning. Need for ERP Most organizations across the world have realized that in a rapidly changing environment, it is impossible to create and maintain a custom designed software package which will cater to all their requirements and also be completely up-to-date. Realizing the requirement of user organizations some of the leading software companies have designed Enterprise Resource Planning software which will offer an integrated software solution to all the functions of an organisation. Features of ERP Some of the major features of ERP and what ERP can do for the business system are as below: o ERP facilitates company-wide Integrated Information System covering all functional areas like Manufacturing, Selling and distribution, Payables, Receivables, Inventory, Accounts, Human resources, Purchases etc., o ERP performs core Corporate activities and increases customer service and thereby augmenting the Corporate Image. o ERP bridges the information gap across the organisation. o ERP provides for complete integration of Systems not only across the departments in a company but also across the companies under the same management. o ERP is the only solution for better Project Management. o ERP allows automatic introduction of latest technologies like Electronic Fund Transfer (EFT), Electronic Data Interchange (EDI), Internet, Intranet, Video conferencing, E-Commerce etc. o ERP eliminates the most of the business problems like Material shortages, Productivity enhancements, Customer service, Cash Management, Inventory problems, Quality problems, Prompt delivery etc., o ERP not only addresses the current requirements of the company but also provides the opportunity of continually improving and refining business processes.
  • 3. o ERP provides business intelligence tools like Decision Support Systems (DSS), Executive Information System (EIS), Reporting, Data Mining and Early Warning Systems (Robots) for enabling people to make better decisions and thus improve their business processes Components of ERP To enable the easy handling of the system the ERP has been divided into the following Core subsystems: o Sales and Marketing o Master Scheduling o Material Requirement Planning o Capacity Requirement Planning o Bill of Materials o Purchasing o Shop floor control o Accounts Payable/Receivable o Logistics o Asset Management o Financial Accounting Suppliers of ERP There are many numbers of ERP suppliers who are very active in the market. Some of the companies offering renowned international ERP products include: o Baan o CODA o D&B o IBM o JD Edwards o Marcarn o Oracle o Peoplesoft o Platinum
  • 4. o Ramco o SAP o SMI o Software 2000 Selection of ERP Once the BPR is completed the next task is to evaluate and select a suitable package for implementation. Evaluation of the right ERP package is considered as more crucial step. Evaluation and selection involves: o checking whether all functional aspects of the Business are duly covered o checking whether all the business functions and processes are fully integrated o checking whether all the latest IT trends are covered o checking whether the vendor has customizing and implementing capabilities o checking whether the business can absorb the cost o checking whether the ROI is optimum 2) How an ERP implementation can help in integrating an organisation operation?
  • 6. Implementing an ERP package has to be done on a phased manner. Step by step method of implementing will yield a better result than big-bang introduction. The total time required for successfully implementing an ERP package will be anything between 18 and 24 months. The normal steps involved in implementation of an ERP are as below: o Project Planning o Business & Operational analysis including Gap analysis o Business Process Reengineering o Installation and configuration o Project team training o Business Requirement mapping o Module configuration o System interfaces o Data conversion o Custom Documentation o End user training o Acceptance testing o Post implementation/Audit support Benefits of ERP The benefits accruing to any business enterprise on account of implementing are unlimited. According to the companies like NIKE, DHL, Tektronix, Fujitsu, Millipore, Sun Microsystems, following are some of the benefits they achieved by implementing ERP packages: o Gives Accounts Payable personnel increased control of invoicing and payment processing and thereby boosting their productivity and eliminating their reliance on computer personnel for these operations. o Reduce paper documents by providing on-line formats for quickly entering and retrieving information. o Improves timeliness of information by permitting, posting daily instead of monthly. o Greater accuracy of information with detailed content, better presentation, fully satisfactory for the Auditors. o Improved Cost Control o Faster response and follow up on customers
  • 7. o More efficient cash collection, say, material reduction in delay in payments by customers. o Better monitoring and quicker resolution of queries. o Enables quick response to change in business operations and market conditions. o Helps to achieve competitive advantage by improving its business process. o Improves supply-demand linkage with remote locations and branches in different countries. o Provides a unified customer database usable by all applications. o Improves International operations by supporting a variety of tax structures, invoicing schemes, multiple currencies, multiple period accounting and languages. o Improves information access and management throughout the enterprise. o Provides solution for problems like Y2K and Single Monitory Unit (SMU) or Euro Currency. 3) Discuss about approach in decision making in acquisiting of information system? Information system Acquisition Process The acquisition process should involve the identification and analysis of alternative solutions that are each compared with the established business requirements. The decision making to acquire a typical IT application primarily consists of the following stages: (see Appendix) STAGE 1: IDENTIFYING, PLANNING, AND JUSTIFYING THE INFORMATION AND SYSTEM REQUIREMENTS One of the most essential assessments in decision making process is identifying the business objective after first knowing the problems being solved. The management should primarily identify the business processes involved in the organization. Information systems are usually developed as enablers of the business processes. The first phase of the acquisition process should align the business process with the company objectives and the business plan. Note that specific process may need to be prioritized to fully obtain the benefits of IT implementation. Moreover, each process should be carefully analyzed to ensure that it will
  • 8. have the certain functionality to meet the requirements of the business process and the users, as well as the benefits which can be justified with its cost.5 Another big challenge in the procuring information systems is to define the system requirements. System requirements describe the objectives of the system. They define the problem to be solved, business, and system goals, system process to be accomplished, user expectations, and the deliverables for the system. Furthermore, the requirements should incorporate information about system inputs, information being processed in the system, and the information expected out the system. Each of this information should be clearly defined so that later gaps in requirements and expectations are avoided. Information system requirements can be gathered through interviews, questionnaires, existing system derivation, benchmarking with related system, prototyping, and Rapid Application Development (RAD). [7] The output of this step is a decision to go with specific application, timetable, budget, and system expectations. As Small Business Television (SBTV) Network Chief Operating Officer, Michael Kelley, explains, "Before we went and purchased anything, we developed a business plan with a three-year outlook on what we thought we needed for the business. During the planning process, we knew that we were going to have to make a change within a three-year period. So that was an 'x' on the side of 'reasons not to buy, lease, or build in- house' because we new we might have to change our technology — probably in less than two years. As it turned out, it was about 14 months, and we had to make a lot of changes and reconfigurations."[5] STAGE 2: RESTRUCTURING INFORMATION SYSTEM ARCHITECTURE With the regards of system analysis approach, an organization which is still in the progress of acquiring IT should remodel its information system (IS) architecture. IS architecture is the conceptualization of how the organization’s information objectives are met by the capabilities of the specific applications.[7] This structural design however describes the flow of the information, data hierarchy, application functionality, technical feasibility, and organization architecture in the organization. The output from this phase should be a strategic planning level on how to develop specific application that meets the constrained defined by
  • 9. the IS architecture. Therefore, the application portfolio may be changed corresponding to this structure. STAGE 3: IDENTIFYING A DEVELOPMENT ALTERNATIVE There are several options in procuring software solutions. Some available alternatives are: (1) Developing the system in-house, (2) Off-the self solutions (Purchasing commercially available solution), (3)Buying a custom made system for a vendor, (4) Leasing software from an application service provider (ASP) or lease through utility computing (contracted development), (5) Outsourcing a system from other companies (6) Participating in auction, e-marketplace, or a public exchange (consortium) ,(7)Use a combination of these listed options. The consideration criteria and some critical factors upon various options will be discussed thoroughly later in the next section. While an organization is in the phase of deciding which alternative being selected, the management should carefully examine not only the advantages and disadvantages of each procuring option, but more importantly, the option must be best-fit with the organization business plan that has been documented in the previous steps. Any system development project, whether the system is built in-house or purchased elsewhere, should support the company’s business and IT strategy. The solution being sought associated with business requirements should align the business goals with IT strategy. STAGE 4: CONDUCTING A FEASIBILITY ANALYSIS As a part of the assessment in acquiring the solutions, a feasibility analysis is important to identify the constraints for each alternative from both technical and business perspective. Feasibility analysis incorporates the following categories: · Economic feasibility analysis provides cost-benefit justification with being regard to the expenses of a system, which include procurement, project-specific, start-up, and operational costs. Some cost examples are one-time and recurring cost, consultants, support staff, infrastructure, maintenance, training, and application software cost. This examination ensures that the solution won’t exceed the budget limit as well as it increase the efficiency and better resource utilization.
  • 10. · Technical feasibility assessment analyzes the technical reasonableness of the proposed solution. Technical feasibility evaluates whether the company has the infrastructure and resources including hardware, software, and network capability to support the application. Meanwhile, it also assesses the consistency of the proposed system in terms of the technical requirements with the company technical resource. Therefore, this assessment guarantees the reliability and capacity for the future growth. · Operational feasibility evaluation reviews the extent of organizational changes required to accommodate the proposed system. The proposed system should solve the business problems and provide better opportunity for the business since the business process might be changed. Some alignments that may occur include business process, human resource management, and products or service offered. · Legal and contractual feasibility. The proposed solution must pass any related legal or contractual obligations associated with. Corporate legal counsel should ensure that there are no illegal practices corresponding to the new system related with any preexisting regulations. Organization also may work with some experts from Computer Law Association to make sure this analysis strictly enforced. Thus, the underlying theme will protect the company and the establishment of the remedy process should the vendor or contractor fail to perform as promised. · Political feasibility. The nature of the organization most likely will be affected by the presence of the new system. Therefore, this feasibility analysis evaluates how the internal organization will accept the new system. It also incorporates the user expectancy regarding the new system and the corporate culture response toward the proposed solution. Upon completion of the series of feasibility analyses, the risk analysis review most likely will be conducted. Risk analysis evaluate the security of proposed system, potential threats, vulnerabilities, impacts, as well as the feasibility of other controls can be used to minimize the identified threats.[6] Finally, the company may perform some ergonomic requirements review to provide a work environment that is safe and efficient for the employee. Ergonomic check will make
  • 11. sure the design of the human interface components (i.e: monitor, keyboard, etc) is user friendly enough to accommodate all the requirements that make the users feel comfortable to work with. STAGE 5: PERFORMING THE SELECTION PROCEDURE Selection procedure is the process of identifying the best match between the available options and the identified requirements. In this process, the company requests for a proposal from prospective providers, evaluates the proposal, and selects the best available alternative. There are various ways to solicit responses from providers. Some of the common methods comprise request for information (RFI), request for bid (RFB), and request for proposal (RFP). An RFI is used to seek information from vendors for a specific intention. RFI should act as a tool for determining the alternatives or associated alternatives for meeting the organization’s needs. An RFB is designed to procure specific items or services and used where either multiple vendors are equally competent of meeting all of the technical and functional specifications or only one provider can meet them. Furthermore, an RFP specifies the minimal acceptable requirements, including functional, technical, and contractual aspects. This document offers flexibility to respondents to further define the requested requirements. RFPs can be a lead to a purchase or continued negotiation. All of these processes should be structurally proceeded to ensure the process would be completed neatly in a timely fashion. If done properly, this process turns out to be a purchasing decision for the selected application. Note that the entire process must be documented in a written letter before moving to the next step. This is an important issue to avoid a bid protest that may be filled from any other potential vendors. Management, IT auditor and also legal counsel must review every point in detail before the proposal evaluation process begins. STAGE 6: PROPOSAL EVALUATION PROCESS Proposal evaluation is a crucial process in the software acquisition since one of more key stakeholders reviews submitted proposals using a list of objective selection criteria and decide the best match between the product features and functionality with the identified requirements.
  • 12. Martin, et al (2000) identified six steps in selecting a software vendor with its application package:[8] 1. Examining potential vendors’ background. Potential software application providers can be identified from software catalogs, lists provided by hardware vendors, technical and trade journals, or consultants experienced in the other companies, and Web searches. These preliminary evaluation criteria can be used to pre-eliminate the unqualified potential vendors based on the vendor track record, reputation, and some previous feedback. 2. Determining the evaluation criteria. One of the most difficult tasks in evaluating the vendor and a software package is to determine a set of detailed criteria for choosing the best vendor and package. These criteria can be identified from the RFP feedback sent by the vendors. Some areas that should be considered: characteristics, of the vendor, functional requirements of the system, technical requirements, total project costs, scalability of the solution, project time frame, quality of documentation provided, and vendor support package. 3. Evaluating providers and their applications. The objective of this evaluation is to determine the gaps between the company’s needs and the capabilities of the vendors and their application packages. Ranking the vendors on each weighted criteria and then multiply the ranks by the associated weight can be one method to evaluate the vendors and their solution packages. 4. Selecting the provider and its solution. Choosing the vendor and its software depends on the nature of the application. Negotiation can begin with vendors to determine how their packages might be modified to remove any discrepancies with the company’s IT needs. Furthermore, feedbacks from the users who will work with the system and the IT staff who will support the system have to be considered. In general, defined list of criteria for selecting a software application package are following: TABLE 1. Criteria for Selecting a Software Application Package to use
  • 13. · Usability and functionality · Cost-benefit analysis · Upgrade policy and cost · Vendor reputation · System flexibility and scalability · Manageability · Quality of documentation · Hardware and networking resources · Upgradeability · Required training · System security · Maintenance and operational requirements · User easiness to learn · Performance measurement · Interoperability and data handling · Ease of integration · Reliability measurement · Compatibility with other applications 5. Negotiate a contract. Once the vendor and its package selected, then the company can move to the contract negotiation, in which the company can specify the price of the software and the type of the support to be provided by the vendor. The contract must describe the detailed specifications, all the included services provided by the vendor, and other detail terms of the system. Contract is a legal document so the company should involve the experienced software purchasing specialists and legal assistance. Since the contract can be very tricky so these legal counsel should be involved from the beginning of selection process. 6. Establishing a service level agreement (SLA). SLA is formal agreement regarding the distribution of work between the organization and its vendor. Such agreement is created according to a set of agreed-upon objective, quality tests, and some what-if situations. Overall, SLA defines: (1) company and vendor responsibilities, (2) framework for designing support services, (3) company privilege to have most of the control over their system. STAGE 7: IMPLEMENTING THE SELECTED SOLUTION Upon completion of the contract negotiation, an acceptance plan should be agreed by both the company and the vendor so the new application can be ready to be installed or developed. No matter what options the company chooses, even when they decide to build their software in house, the company will most likely have to deal with some vendor (s) and/or certain software that has to be purchased from some supplier(s). During this process, the application is also tested and user reactions are evaluated. After the application or prototype of the application has passed user requirements, they can be deployed. Under this circumstance, the company management may deal with organizational issues such as conversion strategies, training, and resistant to change [9]
  • 14. STAGE 8: REVIEWING AND MONITORING THE ACQUISITION PROCESS Software acquisition process is a continuing process that must be reviewed in ongoing basis. A purchased software solution should effectively and efficiently satisfy user requirements. Software maintenance and operation can be an issue due to rapid changes in IT technology. However, this process can involve external evaluation to make sure the procedures and processes in place and whether the acquisition was in compliance with institutional processes and operating procedures. Standard project management techniques and tools are useful for this task. Operation, maintenance, and evaluation can be done in-house or outsourced. For medium-large applications, a company may create a project team to manage the process. Company also may collaborate with other business partners to monitor the development process; however, it may have some critical issue with IT failure, such as: application incompatibility between two entities, communication breakdown, etc. IT can be a place where these acquisition procedures are lacking; therefore, the development process must be managed properly. Ultimately, investing an IT project may require streamlining of one or more business processes and excellent coordination between all the related entities. 4) Explain difficulties in implementation of ERP?  Implementation effort will be bigger then ever talked about or even imagined. We are yet to hear from an organisation who have implemented ahead of schedule and under budget.  Because of the richness of functionality, the "toy box effect" can take over. Users see all the functionality available and suddenly they want it now. The scope can grow out of control.  The existing environmental mix between what is done manually and what is done by the system will swing dramatically after implementation. Many more tasks will be automated. Automation will significantly reduce the flexibility of how you operate as a business.  Users need to become more computer literate. Many see this as personally challenging - even beyond their ability - and will not cope, or leave the company.  The word "Enterprise" in ERP means that whatever happens in one area has a ripple effect in other areas. Understanding the implications of actions of one area, on other areas of the company, is not something that happens overnight. Training tends to
  • 15. focus on how do I do my job. It should also focus on what are the impacts of my job, in other areas.  Near enough is no longer good enough. Data integrity becomes critical. The computer cannot make human judgments. If stock is moved, it is no good somebody remembering where they put it. The information needs to be put into the system or there will be a domino effect. E.g. Stock is moved from location A to location B and the information is not put into the system. The system will tell someone to get the material from A and when it is not there, they have to go looking. At the same time it is telling someone else to put new material in B, but B is full. The first person finds the original material in B and logs it into the system. We now have double the quantity in the system again and it doesn't reorder. And so it goes on and everyone is blaming the system.  ERP systems tend to replace old systems. As such it is a quantum leap for all areas of the company. It is replacing the trusty Ford with a high performance Ferrari. This happens at a Technical level as well as a Business Level. New ways need to be learnt in a very short space of time.  Things have to be done consistently. No longer are we able to do something one way in one branch and another way in another branch. The system is going to determine how we do things in all locations. Even within one location, special treatment may not be possible any more without changing the configuration of the system. If the system says you can either have 0, 15, 30 or 60 day credit terms, you can no longer offer 45 day terms without changing configuration. If consistency can be implemented, there is good potential for cost savings as well as getting rid of special arrangements that reduce profit. A survey of organisations that have implemented ERP's was carried out recently. It identified "10 Common Causes of Disaster".  Change Management and Training. This was mentioned as the major problem with implementations. Changing work practices to fit the system is a major difficulty. Also mentioned were training across modules and starting training sooner.  To BPR or not to BPR It is difficult to draw the line between changing Business Processes to suit the system or retaining Business Processes and paying the cost, in dollars and time, to change the system. As time and cost squeeze the implementation, the usual path is to not modify the system, but to change the way people work. This feeds back into Change Management and Training.  Poor Planning
  • 16. Planning covers several areas such as having a strong Business Case, to the availability of Users to make decisions on configuration, to the investing in a plan that captures all the issues associated with implementing it.  Underestimating IT skills As most people are upgrading from old technology, the skills of the staff need to be upgraded as well. The upgrade is also going to place significant demands on a team who are geared to maintain an old but stable environment. Usually this effort is underestimated.  Poor Project Management Very few organisations have the experience in house to run such a complex project as implementing a large-scale integrated solution. It usually requires outside contractors to come in and manage such a major exercise. It can be a fine line between abdicating responsibility and sharing responsibility. Many consulting firms do a disservice to their clients by not sharing the responsibility.  Technology Trials The effort to build interfaces, change reports, customize the software and convert the data is normally underestimated. To collect new data, and clean the data being converted, will also require an effort that is beyond what is normally expected.  Low Executive Buy-in Implementation projects need Senior Executive involvement to ensure the right participation mix of Business and IT, and to resolve conflicts.  Underestimating Resources Most common budget blow outs are change management and user training, integration testing, process rework, report customisation and consulting fees.  Insufficient Software Evaluation This involves the surprises that come out after the software is purchased. Organisations usually do not do enough to understand what, and how the product works before they sign on the bottom line. The Bleeding Edge ERP is so massive and integrated that reporting and linking to other systems (either your own or your customers and suppliers) can be much more difficult than you expect. Companies looking at ERP need to examine how they accept online feeds from a customer, or a
  • 17. customers' customer, and examine the technological enablers as well as the implications of these technologies inside of the Business.