W H I T E PA P E R




Combining ITIL and Six Sigma to Improve
                       ®




Information Technology Service Management
at General Electric
CONTENTS




Combining ITIL and Six Sigma to Improve Information
                                  ®




Technology Service Management at General Electric

EXECUTIVE SUMMARY

There are two approaches that can be used to improve information technology service management (ITSM): the Information
Technology Infrastructure Library (ITIL) and Six Sigma.


Many followers of these seemingly mutually exclusive approaches exhibit a nearly religious zeal in defending their way as being
the only way to go. Rather than being opposing approaches, however, Six Sigma and ITIL are complementary.


ITIL defines a framework for IT Service Management. It consists of a set of guidelines that specify what an IT organization
should do based on industry best practices. It does not, however, define how to do it. For example, ITIL specifies that IT
should allocate a priority for each incident that comes into the service desk, but it does not specify how to allocate those
priorities. With ITIL, it’s up to the IT staff to flesh out the details of process flow and create detailed work instructions, all in a
way that makes sense for their organization.


Six Sigma, on the other hand, defines a process improvement approach that is based on statistical measurement, drives quality
improvement, and reduces operational costs. It helps in developing detailed work instructions, and it defines a methodology
for continually mapping, measuring, and improving the quality process. Six Sigma tells how, but it doesn’t tell what to do nor
does it specify any best practices specifically for ITSM.


In summary, ITIL defines the “what” of service management and Six Sigma defines the “how” of quality improvement.
Together, they make a great combination for improving the quality of IT service delivery and support. This paper presents a
description of ITIL and Six Sigma, and discusses how they can be used together to improve IT service through best practices.
The paper illustrates the power of the combination of ITIL and Six Sigma, with a real-world example of an ITSM improvement
program implemented at General Electric. This program uses the Remedy IT Service Management Suite for the Enterprise
                                                                                ®



(Remedy ITSM), a product line of BMC Software, to automate service management.


Section 1:           ITIL
                     > ITIL Library
Section 2:           Six Sigma
Section 3:           Combining Six Sigma and ITIL
                     > Project Objectives
                     > Implementing the methodology
Section 4:           Conclusions
Section 5:           About the Authors
ITIL




ITIL                                                                   2. Service Delivery. This set describes:
                                                                         > Service Level Management. Deals with customers’ needs.
                                                                         > Availability Management. Helps ensure high service

ITIL is a public domain set of best practice books that outline             availability.

a comprehensive, consistent, and coherent process-based                  > Capacity Management. Describes maintaining

framework for IT Service Management. The U.K. govern-                       performance at the levels that customers require.

ment’s Central Computer and Telecommunication Agency                     > Financial Management. Covers IT services costs.

(CCTA) developed it in the late 1980s. The UK’s Office of                > IT Service Continuity Management. Describes

Government Commerce (OGC) now controls its content.                         minimizing service disruptions due to natural or man-
                                                                            made disasters.

ITIL is a framework of best practices that can be used to                > Security Management. Explains how to organize and

assist organizations in developing their ITSM process-driven                maintain the management of security of the IT

approaches. It is a guide for establishing common processes,                Infrastructure from the IT manager’s point of view.

roles, and activities, with appropriate reference to each other
and how the communication lines should exist between                   3. Planning to Implement Service Management.

them. It is not a methodology. Organizations can use ITIL              Explains the steps necessary to identify how an organization

either in whole or in part, depending on their preferences.            might expect to benefit from ITIL and how to set about
                                                                       reaping those benefits. It helps organizations identify their

ITIL provides guidance on how to link existing processes and           strengths and weaknesses, enabling them to develop the

activities across IT departments in a structured context, and          former and overcome the latter.

this linkage is key to quality service delivery. The models
provided in ITIL show the goals, general activities, inputs,           4. ICT (Information and Communications Technology)-

and outputs of the various processes that can be tailored to           Infrastructure Management.

the organization’s needs. The intent is to establish a common          Covers Network Service Management, Operations

language across functional areas. ITIL complies with                   Management, Management of Local Processors, Computer

requirements for ISO9001 quality standards and is referenced           Installations and Acceptance, and Systems Management.

by ISO9000 for IT standards.
                                                                       5. Applications Management.

ITIL LIBRARY                                                           Deals with software life cycle support, testing of IT services
                                                                       and business change with emphasis placed on clear require-
The ITIL library consists of seven sets of books:                      ments, definition, and implementation of solutions to meet
1. Service Support. This set describes:                                business user needs.
  > Configuration Management. Shows how assets
     interrelate.                                                      6. The Business Perspective.
  > Incident Management. Deals with getting services                   Helps business managers understand IT service provision.
     restored as quickly as possible.                                  Issues covered include Business Relationship Management,
  > Problem Management. Describes root cause analysis                  partnerships and outsourcing, and continuous improvement
     of problems.                                                      and exploitation of ICT for business advantage.
  > Change Management. Shows how to implement
     changes that eliminate problems.                                  7. Security Management.
  > Release Management. Deals with releasing versions of               Helps the IT Security Officer provide the level of security
     hardware and software.                                            necessary for the provision of the total service to the
  > Service Desk Function. Explores how to manage call                 organization. The guide focuses on the process of imple-
     types and service requests.                                       menting security requirements identified in the IT Service
                                                                       Level Agreement, rather than considering business issues
                                                                       of security policy.

                                                                   1
SIX SIGMA




Six Sigma                                                                Six Sigma methodology includes a proven tool set for driving
                                                                         and achieving transformational change within an organization.
                                                                         The tool set provides a variety of templates for measuring,

Six Sigma was created by Motorola and is based on the                    collecting, and summarizing data, as well as for creating

work of quality guru W. Edwards Deming. Professor Deming                 process maps. The methodology and tools can be used for

observed that 85 percent of the reasons for failure to meet              mapping, measuring, improving, and managing processes.

customer expectations are related to deficiencies in systems
and process. The Six Sigma process uses data and rigorous                Using a universal measurement scale, Six Sigma defines and

statistical analysis to identify defects in a process or product,        estimates the opportunities for error and calculates defects in

reduce variability, and achieve as close to zero defects                 the same way every time, thus offering a means for measuring

as possible.                                                             improvement. The Six Sigma methodology incorporates this
                                                                         data and statistical analysis into a project-based workflow that

Six Sigma is a process improvement methodology that focuses              allows businesses to make intelligent decisions about where

an organization on customer requirements, process alignment,             and how to incorporate improvements.

analytical rigor, and timely execution. It is a highly disciplined
methodology and practice that provides the tools required to             At the heart of Six Sigma is a five-phase process

achieve consistent, high-performance results from products               improvement methodology—called DMAIC—for analyzing

and processes. By increasing performance and decreasing                  and improving business process. DMAIC is an acronym for

variation, Six Sigma allows organizations to make customer-              the five phases of the model: Define opportunities, Measure

focused, data-driven decisions that ultimately yield a reduction         performance, Analyze factors impacting performance,

in product defects, increased profits and employee morale,               Improve performance, and Control performance.

and high-quality products. Six Sigma, according to
www.isixsigma.com, “simply means a measure of quality
that strives for near perfection.” (www.iSixSigma.com)




                                                                     2
COMBINING SIX SIGMA AND ITIL




Combining Six Sigma                                                     Objective 2: Leverage ITIL best practices
                                                                        Because ISO references ITIL for IT standards, the team
and ITIL                                                                selected ITIL to define best practices for ITSM.


                                                                        Objective 3: Determine the current state of IT service
The IT Solutions Enterprise Planning & Strategy consulting              The objective is to determine the current state of IT service
group at GE was enlisted to help improve IT service manage-             by base-lining current process maturity and capability, and
ment practices internally at GE. The group has developed                comparing them to ITIL. This would give the team not only
a methodology for process improvement that combines                     an indication of where the greatest problems are, but also
Six Sigma and ITIL.                                                     a baseline to use in determining performance against
                                                                        those problems.
The goal of the methodology is to transition from the current
state to an ITIL-compatible state. Six Sigma provides the               To achieve this objective, the team used two tools: the
engine to help achieve this goal. The approach is to analyze            Capability Maturity Model (CMM) to determine whether the
risk, compare current processes to the goal state, and then             current processes are maturing in the right direction, and the
determine the solution, using a business case to migrate                Capability Assessment Tool (CAT), an interview/ questionnaire-
current processes toward usable, measurable, ITIL-compatible            based process used to determine the level of maturity and
processes. The group is using the Remedy ITSM Suite to                  capabilities of current processes.
automate and improve ITSM processes.
                                                                        Objective 4: Continually improve
The methodology is based on the DMAIC model and has                     IT service management processes
five phases that map directly into the five DMAIC phases.               This objective is based on Six Sigma and Deming’s Total
The group applied the methodology to the ITSM process                   Quality Management (TQM) approach. Meeting it requires
improvement project.                                                    continual improvement of the processes that make up IT
                                                                        Service Management. The team used ITIL standards as a
PROJECT OBJECTIVES                                                      yardstick to measure improvement of IT service management

The team first set the objectives of the project. Following is a        processes.

description of each of the objectives, including an indication
of how ITIL and Six Sigma are used as enablers in achieving             Objective 5: Establish ongoing measurements

each objective:                                                         to ensure improvement/control
                                                                        In addressing this objective, the team used Six Sigma to help

Objective 1: Achieve ISO compliance                                     define the metrics to be established, ensuring that the metrics

The team set out to achieve ISO compliance. ISO references              are process-centered, practical, and useable.

ITIL for IT standards, and therefore ITIL defines ISO
compliance for ITSM.                                                    IMPLEMENTING THE METHODOLOGY

                                                                        The team then executed DMAIC, the five-phase process
ISO requires that processes have documented work                        improvement methodology of Six Sigma, to meet the
instructions, an essential ingredient to augment the best               objectives set for the ITSM improvement project.
practices defined by ITIL. As noted earlier, an ITIL process            > Phase 1: Define opportunities
may indicate to allocate a priority at a particular point, but it       > Phase 2: Measure performance
does not indicate how to allocate the priority. The work                > Phase 3: Analyze factors impacting performance
instructions would indicate how to allocate priority at that            > Phase 4: Improve performance
point. To achieve objective 2, then, requires not only                  > Phase 5: Control performance
compliance with ITIL processes, but also documented work
instructions for those processes.



                                                                    3
PHASE 1




PHASE 1 - DEFINE OPPORTUNITIES                                             The team produced six deliverables in the Define phase:
                                                                           > Team charter that describes the purpose, goals, and
The Define phase sets the expectations of the improvement
                                                                               resources for the project.
project and directs the focus of Six Sigma strategy to the
                                                                           > Data collection plan that includes such items as interview
customers’ requirements. It identifies the product and/or
                                                                               schedules and questions.
process to be improved and ensures that resources are in
                                                                           > Critical to Quality (CTQ) outline that identifies the critical
place for the improvement project.
                                                                               success factors.
                                                                           > Current situation analysis that was created using the
The goal is to align ITSM strategy with the business,
                                                                               CAT tool.
organizational, and technological strategies. The desired
                                                                           > Customers/Output—Process—Input/Suppliers (COPIS)
result is to set a definitive vision, scope, and strategic
                                                                               “as-is” process map outline that provides an under-
approach for ITSM operations.
                                                                               standing of the current processes to which the solution
                                                                               has to be aligned.



                                                                           Figure 1 shows the COPIS outline produced by the team.



                                               Service Request Process
                                                COPIS Service Request

        Customers/Outputs                                    Process                                                      Inputs/Suppliers

         Customers                                                                                                       Inputs
         Service users                                                                                                   Service Requests
                                                                                                                         Authorizations
                                                                                                                         Approvals
                                                                                                                         Asset Information
                                                                   Process                                               Service Catalog
                                                                                                                         People Information
                                                                                                                         Change Management
                                                                                                                         Information
                                     1.0            2.0               3.0                4.0           5.0
                                   Create       Review and        Assign and          Evaluate        Fulfill
                                  Service        Approve             Route             Service       Service
                                  Request         Service           Service           Request        Request
           Outputs                                                                                                       Suppliers
             Fulfilled                           Request           Request                                               Requester (Initiator)
              Service                                                                                                    Reviewer
             Request                                                                                                     Approvers
                                                                                                                         Service Providers
                                                                                                                         SR Manager




Figure 1. COPIS Outline




                                                                       4
PHASE 2




PHASE 2 - MEASURE PERFORMANCE                                                             The team produced three deliverables in the Measure phase:
                                                                                          > An accurate assessment of current process performance.
The Measure phase assesses the current condition of the
                                                                                          > Detailed “as-is” process maps derived from the COPIS
process before attempting to identify improvements. It
                                                                                            outline created in Phase 1
defines the defect(s), gathers baseline information about the
                                                                                          > Critical Success Factors (CTQ) summary chart
process, validates the measurement system(s), and establishes
more specific improvement goals. Because the Measure
                                                                                          Figure 2 shows the detailed “as-is” current service request
phase is based on data, it eliminates assumptions about how
                                                                                          process map produced by the team. The map provides a
well a process is currently working.
                                                                                          detailed look at the Review and Approve Services Request
                                                                                          process, which is a component of the overall Service Request
The goal of the Measure Phase is to create a current-state
                                                                                          Process shown in Figure 1, and shows functional roles and
assessment of how well the current environment supports
                                                                                          responsibilities. (Typically, most of the opportunities for
the ITSM strategy. The desired result is to determine current
                                                                                          improvement lie in the handoffs among functions.) The map
processes, issues, and the critical success factors—or Critical
                                                                                          is accompanied by work instructions that indicate how the
To Quality factors (CTQs)—of the desired future state
                                                                                          processes are performed.
environment.



                                                                Service Request Process
                                                         2.0 Review & Approve Service Request

                             2.0
     Requester




                             2.13                                                                                            2.5
                          Receive SR                                                                                 Provide Additional
                         Notification                                                                                   Information
 Reviewer/
  Assessor




                             2.0

                              2.1             2.2                               2.3                                        2.4
                                                         Correctly   No                            Missing
                          Receive SR     Review SR and                       Request                                 Manually Collect        3.0
                                                         Assigned?                              Information?
                         Notification   make comments                     Re-assignment                              Information and
                                                                                                                     Update Request
     Approver/s




                                                                          Yes                                               No
                                                                                                                                                            Automatic
                                                                                                                                                             Rejection
                             2.0                                                                                                                           Notification To
                                                                                                                                                            Requestor
                             2.6              2.7                               2.8                                        2.4                        No
                                                         Correctly   No                            Missing
                          Receive SR     Review SR and                       Request                           Yes   Manually Collect     Approved?
                                                         Assigned?                              Information?
                         Notification   make comments                     Re-assignment                              Information and
                                                                                                                                                            Automatic
     Service Providers




                                                                                                                     Update Request
                                                                                                                                                             Rejection
                                                                                                                                                   Yes     Notification To
                                                                          Yes                                            No
                                                                                                                                                            Requestor

                             2.0

                             2.10             2.11                             2.12
                                                         Correctly   No                         3.0
                          Receive SR     Review SR and                       Request                                                                            3.0
                         Notification                    Assigned?
                                        make comments                     Re-assignment


                                                                          Yes




Figure 2. Example Detailed “As-Is” Process Map




                                                                                    5
PHASE 3




P H A S E 3 - A N A LY Z E F A C T O R S                                                      Figure 3 shows a portion of the Opportunities table that the
I M PA C T I N G P E R F O R M A N C E                                                        team generated. The chart shows how current processes
                                                                                              compare to ITIL and enables the team to identify the pro-
The Analyze phase examines the data collected in the
                                                                                              cesses with the greatest opportunities for improvement (the
Measure phase to generate a prioritized list of the sources of
                                                                                              “low-hanging fruit”), so the team can prioritize their improve-
variation. The Analyze phase focuses improvement efforts by
                                                                                              ment actions. This particular example shows a sample of a
separating the “vital few” variables (those most likely respon-
                                                                                              high-level root cause analysis produced in this phase. The
sible for the variation) from the “trivial many” (those least
                                                                                              chart is used in creating proposed problem solutions. As the
likely responsible for variation).
                                                                                              project progresses, root causes and the associated solution
                                                                                              options are described in greater detail.
The team produced four deliverables in the Analyze phase:
> Opportunities Table: Solutions mapped to process gap
> Critical Success Factors (CTQs) benchmarked against ITIL
   best practices to identify opportunities for improvement
> Cause and Effect Diagram
> Pareto Chart of Opportunities


 Impact       Process         People,         Gap Description        Business Impact               Underlying          Control, Influence,    High Level      Potential
              Gap Type        Process,                                                             Root Cause          Out of Control         CTQs            Solutions/
                              or Tool                                                                                                                         Initiatives

 SRC01 -High Level Root Cause: Inefficient Approval Process
  MED         ITIL Gap       Process/      Initial service        Potential for non-          Lack of process          In our control        Improve       Re-define and
                             People        request vetting        compliancy with the         definition and                                 Operational   validate process,
                                           “feasibility”          process to ensure           adherence due to                               Efficiency    and implement
                                           authorization is a     that proper                 being a manual                                               the process within
                                           manual process         authorization and           process and not                                              the new tool
                                           performed outside      approval is granted         tracked with a tool.                                         following ITIL
                                           the tool.              prior to SR                                                                              RFC guidelines.
                                                                  implementation and
                                                                  approval. No audit
                                                                  trail of initial
                                                                  authorization.

  MED       Inefficiency       Tool        Lack of automation     Risk of not receiving       Tool is only currently   In our sphere of      Improve       Ensure that the
                                           around approvals       the proper                  designed to track        influence             Operational   tool will support
                                           at the business and    authorization in a          IT approval.                                   Efficiency    approval
                                           financial level with   timely fashion or not                                                                    automation
                                           Capital Acquisition    at all. This could                                                                       beyond IT
                                           Process.               impact SLAs.                                                                             approvals to
                                                                                                                                                           business and
                                                                                                                                                           financial.



Figure 3. Opportunities Table




                                                                                          6
PHASE 4




PHASE 4 - IMPROVE PERFORMANCE                                          Figure 4 shows the FMEA chart. The analysis shows the effect
                                                                       of improvements made when the full solution was
The Improve phase confirms that the solution proposed in
                                                                       implemented.
Phase 3 will meet or exceed the quality improvement goals
of the project. In this phase, the team tests the solution on a
                                                                       This is the graphical output that is automatically generated
small scale in a real business environment to help ensure that
                                                                       once the risk assessment is complete, at least in draft form.
the causes of variation have been fixed and the solution will
                                                                       Risk Priority Number (RPN) is the product of the numerical
work when fully implemented.
                                                                       severity, occurrence and detection ratings that are assigned
                                                                       to each risk. The highest Risk Priority Number is representing
The goal of the Improve phase is to define and refine
                                                                       the greatest risk. In the event that time or resource
recommended tactical solutions based on information
                                                                       limitations prevent the team from addressing all risks that
determined in phases 1-3. The desired result is a documented
                                                                       have been identified, the RPN can be used to prioritize
recommendation based on strategic fit, cost, and benefits.
                                                                       mitigation activities and resources. In some cases, only risks
                                                                       over a certain RPN threshold may be addressed.
The team produced four deliverables in the Improve phase:
> Risk Assessment/Failure Modes and Effect Analysis
                                                                       Figure 5 shows the “To Be” process map that illustrates the
  (FMEA)/Contingency Plan.
                                                                       process as it is to be when the improvements have been
> Prioritized potential solutions
                                                                       implemented.
> Solution Pilot
> “To Be” process maps
                                                                       This new process is designed to address the top risks identi-
                                                                       fied in the risk assessment. It includes the solution selected
                                                                       for implementation, and is verified in the solution pilot.



                                                         Risk Reduction
300

250

200

150

100

50

 0
        Scan File      Status       WO Not          Data          Validation     Location      Location        User             User
         Move         Updating      Closed        Collection      Occuring       Change        Change         Change           Change
                                                  Occuring

      = Eliminated     = Original    = Improvement         Failure Modes

Figure 4. FEMA Chart




                                                                   7
PHASE 5




PHASE 5 – CONTROL PERFORMANCE                                                                                          The team produced five deliverables in the Control phase:
                                                                                                                       > Multi-Generational Product Plan (MGPP)
The Control phase implements the piloted solution and ensures
                                                                                                                       > Process metrics defined
that the improvements to the process, once implemented, will
                                                                                                                       > Full solution implemented
be sustained to prevent the process from reverting to its prior
                                                                                                                       > Control/Response Plan implemented
state. In this phase, the team shares, throughout the organiza-
                                                                                                                       > Risk mitigation actions complete
tion, the lessons learned in the improvement project to help
accelerate improvements in other areas.


The goal of the Control phase is to propose a plan for
designing and implementing the ITSM process improvement
solution. The desired result is a true life cycle ITSM solution
that allows for continuous improvement.



                                                                              3.0 Assessment and Approval of RFC
         Requester




                                3.15                                                                                                                               3.13                  3.28
                            RFC Rejected                                                         Stop                                                           Rejected              Approved            6A
                            Notification                                                                                                                    Change Notification   Change Notification


                                  3A                      4A                           5A                         7A

                                                        Yes                       Yes
                                                                                                                 3.4                         3.5
                                   3.1                                               3.3                                                                                          3.26
 Manager




                                                         3.2            No                           No                                   Financial
 Change




                          Initial Assessment                                      Standard                   Determine                    Approval                           Assign Change
                                                       URGENT?
                              and Review                                          Change?                 Resources, Impact,              Required?                           Implementer
                                                                         5B                                 and Schedule
                                                                                        Yes

                                3.6                  Financial
                          Request Financial          Approval                                                          No                             Yes                        3.25.5
                             Approval                                                                                                                                       Approve Change
                                                                                                                                                                               Request
                                               Yes                                                   3.9                                               3.11
                                                                         3.8           Low                                       3.10        No
                                                                       Impact?                  Approve/Obtain                Approved?           Reject Change
                                                       Yes                                         Approval                                          Request
                                  3.7
                               Financial
                               Approval
                               Obtained                          Med/High


                                                                         3.16                       3.17                     3.18
                                                                   Technical Impact           Business Impact          Submit to CAB
                                                                     Assessment                 Assessment               for review
 Change Advisory




                                                           3.20
                                  3.19               Plan, Schedule                       3.21
                                                        Back-out             No
                               Review the                                             Recommend
     Board




                              Schedule &              Satisfactory?
                                                                                         Reject?
                     No     Impact of Change
                                                             Yes                                                            Yes
                                                            3.24                       No
                                                       Recommend
                                                     Chage be Approved

                                3.14                        3.25                       3.22                           3.23                               3.12
                             Review the                Notify Change              Notify Change                  Notify Change                    Notify Requester                                      3.27
                            Schedule &                  Manager to                 Manager to                     Manager to                          Rejected                                    Notify Requester
                          Impact of Change            approve change                 rework                      Reject change                                                                       Approved




Figure 5. “To-Be” Process Map




                                                                                                                 8
CONCLUSIONS




Figure 6 shows the MGPP. Six Sigma is a continuous                                                    CONCLUSIONS
improvement program. In the first pass through the
                                                                                                      At first glance, ITIL and Six Sigma appear to be mutually
methodology, the team addressed the opportunities with the
                                                                                                      exclusive. However, as this paper discusses and the GE ITSM
highest potential gain. After the first pass, the team planned
                                                                                                      improvement project validates, these two approaches are
to reapply the methodology to address the other opportun-
                                                                                                      highly complementary and can be used in combination
ities that were identified in the analysis done in the first pass.
                                                                                                      effectively to continually improve business processes. The
The MGPP lays out the steps to be performed to continually
                                                                                                      benefits are compelling:
improve ITSM using the five-phase process improvement
                                                                                                      > Reduce costs by helping to minimize potential downtime
methodology iteratively. The MGPP also may illustrate oppor-
                                                                                                           and the adverse effects of system, network, and applica-
tunities for translating the proven improvement to other areas
                                                                                                           tion failures and install, move, adds, change and
of the business or other business units within the organization.
                                                                                                           decommission implementations.
                                                                                                      > Enhance decision-making ability by facilitating access to
                                                                                                           information throughout the organization, and by enabling
                                                                                                           the enterprise wide use of outputs from an integrated
                                                                                                           framework of processes and tools through such devices as
                                                                                                           cross functional IT service dashboards.
                                                                                                      > Improve IT service levels by creating operational efficien-
                                                                                                           cies and enabling a linked IT Service Management process
                                                                                                           loop for defining, measuring, analyzing, improving, and
                                                                                                           controlling service performance.


                                                                                                      For more information contact us at ServicesMKTG@gecits.ge.com


                                                               2003                                                                                                2004

                                    APR   MAY    JUN     JUL      AUG       SEP      OCT      NOV       DEC      JAN       FEB        MAR     APR      MAY      JUN      JUL      AUG       SEP     OCT      NOV         DEC


                                                Development                                         Pilot Change Request
                                                                                    • Roll out Change Process replacing the Current Change Request
        Solution Development                                                        • Evaluate pilot results
                                                                                                                                                         Deployment Change Request
                           Pilot                                                                                                              • Full deployment to replace the remaining quot;Change Requestquot;
                 Change Request                                                                                                               • Initiate integration with Asset Management

                        Phase I
      Change Request Deployment
                                          • System configuration
                                          • Interface development
                                                                                                                                       Development
                        Phase II          • Data conversion
 Core Service Request Development         • Process design
                                          • Training program creation
                                          • Testing and QA
                        Phase II          • Release management planning
  Core Service Request Deployment
                                                                                                                                                                               Development
                        Phase II                                 Deployment Change ‘‘Service Request’’
     Service Request Development
                                                               • Rollout Change Process replacing the Current Service Request
                                                               • Phased approach
                        Phase II                                                   • Phase II: Core in Phase II
      Service Request Deployment                                                   • Phase III: Self Service, and TBD Functionality




                                                                                                Development                                   Pilot
            Incident/Problem                                                                                                           • Introduce to TBD localized Help Desk and associated Level 2 support personnel
                    Development                                                                                                        • Complete integration with Asset Management

            Incident/Problem
                            Pilot                                                                                                                                                           Deployment
                                                                                                                                                                                        • Roll-out to all departments
                                                                                                                                                                                          simultaneously
            Incident/Problem                                                                                                                                                            • Use mulitple teams in all
                     Deployment                                                                                                                                                           geographic locations




Figure 6. Multi-Generational Product Plan



                                                                                                9
ABOUT THE AUTHORS




ABOUT THE AUTHORS                                                                                    ABOUT REMEDY SOLUTIONS

Malcolm Fry is a recognized IT industry luminary with over 35                                        Remedy delivers Service Management software solutions that
years experience in Information Technology in a number of                                            enable organizations to align internal and external service
industries, including retail, production, oil and pharmaceuti-                                       and support processes to business goals. More than 10,000
cals, and consulting. This experience, coupled with his                                              customers worldwide, from small and mid-sized businesses
impressive technical background, gives Malcolm an unparal-                                           to global enterprises, have chosen Remedy’s IT Service
leled breadth of knowledge and experience. Malcolm is the                                            Management and Customer Service and Support software
author of four best-selling books on IT service and support,                                         to automate their support processes, improve service levels,
has had many other articles and papers published, and is                                             manage assets, and lower costs. As part of BMC Software,
regularly used as a source of information by technology                                              Remedy’s highly flexible, best-practice applications enable
journalists. He is also the solo performer in a highly successful                                    enterprise-wide Business Service Management, and allow
best-selling video series made for the Help Desk Institute. He                                       customers to easily adapt to unique and changing
has Masters level ITIL certification.                                                                requirements. Learn more at www.remedy.com.


Molly Bott has specialized in delivering global network and                                          ABOUT BMC SOFTWARE
systems management solutions for more than 15 years. In
                                                                                                     BMC Software, Inc. (NYSE:BMC) is a leading provider of
recent years as a GE IT Solutions Enterprise Consultant and
                                                                                                     enterprise management solutions that empower companies
Six Sigma Green Belt, her emphasis has been placed on IT
                                                                                                     to manage their IT infrastructure from a business perspective.
Service Management (ITIL standards coupled with proven
                                                                                                     Delivering Business Service Management, BMC Software
best practices like Six Sigma). This allows her to take the next
                                                                                                     solutions span enterprise systems, applications, databases
step in process improvement, using statistical tools to break
                                                                                                     and service management. Founded in 1980, BMC Software
down processes and drive to clear measurable outcomes.
                                                                                                     has offices worldwide and fiscal 2004 revenues of more than
                                                                                                     $1.4 billion. For more information about BMC Software,
                                                                                                     visit www.bmc.com.


                                                                                                     ABOUT GE

                                                                                                     GE IT Solutions, Inc. is an industry leader in the planning,
                                                                                                     design, implementation, and management of complete IT
                                                                                                     infrastructure solutions for businesses throughout North
                                                                                                     America. Focused on IT Service Management consulting
                                                                                                     and optimization, as well as infrastructure solutions in the
                                                                                                     client, network, server, storage, and security environments,
                                                                                                     IT Solutions utilizes world-class best practices and Six Sigma
                                                                                                     methodology coupled with the ITIL framework to ensure
                                                                                                     reliability, cost effectiveness, and quality of each solution.
                                                                                                     The company’s strong financial position ensures that they
                                                                                                     will continue to provide ongoing services year after year. IT
                                                                                                     Solutions is a GE business wholly owned by General Electric
                                                                                                     Company. Tel: 877-443-2487. www.geitsolutions.com




BMC Software, the BMC Software logos and all other BMC Software product or service names are registered trademarks or trademarks of BMC Software, Inc. All other registered trademarks or trademarks
belong to their respective companies. ©2004 BMC Software, Inc. All rights reserved. WP_ITSM_SIXSIGMAITIL_US02 46760

Contenu connexe

Tendances

Itil v3 foundation study guide itil core concepts
Itil v3 foundation study guide   itil core conceptsItil v3 foundation study guide   itil core concepts
Itil v3 foundation study guide itil core conceptsMuhammad Zamzani
 
Integrated Service Management (IBM Tivoli)
Integrated Service Management (IBM Tivoli)Integrated Service Management (IBM Tivoli)
Integrated Service Management (IBM Tivoli)IBM Danmark
 
Cobit, itil and cmmi - a tutorial
Cobit, itil and cmmi  - a tutorialCobit, itil and cmmi  - a tutorial
Cobit, itil and cmmi - a tutorialseveman
 
Estudo Gartner - IT360 ManageEngine
Estudo Gartner -  IT360 ManageEngineEstudo Gartner -  IT360 ManageEngine
Estudo Gartner - IT360 ManageEngineINSPIRIT BRASIL
 
ITIL v3 vs v4
ITIL v3 vs v4ITIL v3 vs v4
ITIL v3 vs v4BITIL.COM
 
Introduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementIntroduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementChristian F. Nissen
 
Structured Approach To It Business System Availability And Continuity Plannin...
Structured Approach To It Business System Availability And Continuity Plannin...Structured Approach To It Business System Availability And Continuity Plannin...
Structured Approach To It Business System Availability And Continuity Plannin...guest1c9378
 
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarIntegrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarITSM Academy, Inc.
 
Business IT Management - Intro to CobiT & ITIL
Business IT Management - Intro to CobiT & ITILBusiness IT Management - Intro to CobiT & ITIL
Business IT Management - Intro to CobiT & ITILAhmad Hafeezi
 
201306 CIO NET The Value of IT Frameworks
201306 CIO NET The Value of IT Frameworks201306 CIO NET The Value of IT Frameworks
201306 CIO NET The Value of IT FrameworksFrancisco Calzado
 
2012 04 16 Iso38500 Governance V1
2012 04 16 Iso38500 Governance V12012 04 16 Iso38500 Governance V1
2012 04 16 Iso38500 Governance V1Michael Boyle
 
ThinkFaculty ITIL Training Course IBM
ThinkFaculty ITIL Training Course IBMThinkFaculty ITIL Training Course IBM
ThinkFaculty ITIL Training Course IBMZyma Arsalan
 
Itil V3 Quick Reference Quide
Itil V3   Quick Reference QuideItil V3   Quick Reference Quide
Itil V3 Quick Reference QuideJamil Faraj , PMP
 
Itil v3 foundation study guide service design
Itil v3 foundation study guide   service designItil v3 foundation study guide   service design
Itil v3 foundation study guide service designMuhammad Zamzani
 

Tendances (20)

Tan catersteel toleman_50_2
Tan catersteel toleman_50_2Tan catersteel toleman_50_2
Tan catersteel toleman_50_2
 
COBIT 5 & 4.1 Comparison
COBIT 5 & 4.1 ComparisonCOBIT 5 & 4.1 Comparison
COBIT 5 & 4.1 Comparison
 
Itil v3 foundation study guide itil core concepts
Itil v3 foundation study guide   itil core conceptsItil v3 foundation study guide   itil core concepts
Itil v3 foundation study guide itil core concepts
 
It service management
It service managementIt service management
It service management
 
Integrated Service Management (IBM Tivoli)
Integrated Service Management (IBM Tivoli)Integrated Service Management (IBM Tivoli)
Integrated Service Management (IBM Tivoli)
 
Cobit, itil and cmmi - a tutorial
Cobit, itil and cmmi  - a tutorialCobit, itil and cmmi  - a tutorial
Cobit, itil and cmmi - a tutorial
 
Estudo Gartner - IT360 ManageEngine
Estudo Gartner -  IT360 ManageEngineEstudo Gartner -  IT360 ManageEngine
Estudo Gartner - IT360 ManageEngine
 
ITIL 2011 Foundation Overview
ITIL 2011 Foundation OverviewITIL 2011 Foundation Overview
ITIL 2011 Foundation Overview
 
ITIL v3 vs v4
ITIL v3 vs v4ITIL v3 vs v4
ITIL v3 vs v4
 
Introduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service managementIntroduction to ITIL 4 and IT service management
Introduction to ITIL 4 and IT service management
 
Structured Approach To It Business System Availability And Continuity Plannin...
Structured Approach To It Business System Availability And Continuity Plannin...Structured Approach To It Business System Availability And Continuity Plannin...
Structured Approach To It Business System Availability And Continuity Plannin...
 
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarIntegrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
 
Business IT Management - Intro to CobiT & ITIL
Business IT Management - Intro to CobiT & ITILBusiness IT Management - Intro to CobiT & ITIL
Business IT Management - Intro to CobiT & ITIL
 
201306 CIO NET The Value of IT Frameworks
201306 CIO NET The Value of IT Frameworks201306 CIO NET The Value of IT Frameworks
201306 CIO NET The Value of IT Frameworks
 
2012 04 16 Iso38500 Governance V1
2012 04 16 Iso38500 Governance V12012 04 16 Iso38500 Governance V1
2012 04 16 Iso38500 Governance V1
 
itil v3 for dummies
 itil v3 for dummies itil v3 for dummies
itil v3 for dummies
 
Itil Mind Maps
Itil Mind MapsItil Mind Maps
Itil Mind Maps
 
ThinkFaculty ITIL Training Course IBM
ThinkFaculty ITIL Training Course IBMThinkFaculty ITIL Training Course IBM
ThinkFaculty ITIL Training Course IBM
 
Itil V3 Quick Reference Quide
Itil V3   Quick Reference QuideItil V3   Quick Reference Quide
Itil V3 Quick Reference Quide
 
Itil v3 foundation study guide service design
Itil v3 foundation study guide   service designItil v3 foundation study guide   service design
Itil v3 foundation study guide service design
 

En vedette

Heavy-Duty Tie Downs
Heavy-Duty Tie DownsHeavy-Duty Tie Downs
Heavy-Duty Tie DownsGary Yue
 
Fotos Adicionales Boda
Fotos Adicionales BodaFotos Adicionales Boda
Fotos Adicionales BodaDiego Salas
 
ARMS 2009: BMPT from Russia
ARMS 2009: BMPT from RussiaARMS 2009: BMPT from Russia
ARMS 2009: BMPT from RussiaGary Yue
 
Social Space 2010 - Civil Society and Political Change
Social Space 2010 - Civil Society and Political ChangeSocial Space 2010 - Civil Society and Political Change
Social Space 2010 - Civil Society and Political ChangeGary Yue
 

En vedette (8)

Cooperative Freedom
Cooperative FreedomCooperative Freedom
Cooperative Freedom
 
Heavy-Duty Tie Downs
Heavy-Duty Tie DownsHeavy-Duty Tie Downs
Heavy-Duty Tie Downs
 
Minor Scales
Minor ScalesMinor Scales
Minor Scales
 
La Tavolozza
La TavolozzaLa Tavolozza
La Tavolozza
 
Fotos Adicionales Boda
Fotos Adicionales BodaFotos Adicionales Boda
Fotos Adicionales Boda
 
Using Google groups in education.
Using Google groups in education.Using Google groups in education.
Using Google groups in education.
 
ARMS 2009: BMPT from Russia
ARMS 2009: BMPT from RussiaARMS 2009: BMPT from Russia
ARMS 2009: BMPT from Russia
 
Social Space 2010 - Civil Society and Political Change
Social Space 2010 - Civil Society and Political ChangeSocial Space 2010 - Civil Society and Political Change
Social Space 2010 - Civil Society and Political Change
 

Similaire à Combining Itil And Six Sigma To Improve

A Case Study On Implementing ITIL In Business Organization Considering Busi...
A Case Study On Implementing ITIL In Business Organization   Considering Busi...A Case Study On Implementing ITIL In Business Organization   Considering Busi...
A Case Study On Implementing ITIL In Business Organization Considering Busi...Carrie Cox
 
Itil the basics
Itil the basicsItil the basics
Itil the basicsdarshan185
 
IT Management Toolkit - ITIL Is Not Enough
IT Management Toolkit - ITIL Is Not EnoughIT Management Toolkit - ITIL Is Not Enough
IT Management Toolkit - ITIL Is Not EnoughAhmed Al-Hadidi
 
Information Technology Infrastructure Library
Information Technology Infrastructure LibraryInformation Technology Infrastructure Library
Information Technology Infrastructure LibraryCOEPD HR
 
Scott_article_120307
Scott_article_120307Scott_article_120307
Scott_article_120307John Scott
 
ICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdfICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdfAbdetaImi
 
ICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdfICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdfAbdetaImi
 
ITIL Service Desk
ITIL Service DeskITIL Service Desk
ITIL Service Deskjmansur1
 
ITIL With Information Security
ITIL With Information SecurityITIL With Information Security
ITIL With Information Securityvikasraina
 
IT Governance Framework
IT Governance FrameworkIT Governance Framework
IT Governance FrameworkSherri Booher
 
Using ITIL 4 and IT4IT together
Using ITIL 4 and IT4IT togetherUsing ITIL 4 and IT4IT together
Using ITIL 4 and IT4IT togetherRob Akershoek
 
Msp It Goverance And Service Delivery Process
Msp It Goverance And Service Delivery ProcessMsp It Goverance And Service Delivery Process
Msp It Goverance And Service Delivery Processkadhar_masthan
 
Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...
Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...
Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...LucyAntheny
 

Similaire à Combining Itil And Six Sigma To Improve (20)

A Case Study On Implementing ITIL In Business Organization Considering Busi...
A Case Study On Implementing ITIL In Business Organization   Considering Busi...A Case Study On Implementing ITIL In Business Organization   Considering Busi...
A Case Study On Implementing ITIL In Business Organization Considering Busi...
 
ITIL basics
ITIL basicsITIL basics
ITIL basics
 
Itil the basics
Itil the basicsItil the basics
Itil the basics
 
IT Management Toolkit - ITIL Is Not Enough
IT Management Toolkit - ITIL Is Not EnoughIT Management Toolkit - ITIL Is Not Enough
IT Management Toolkit - ITIL Is Not Enough
 
Information Technology Infrastructure Library
Information Technology Infrastructure LibraryInformation Technology Infrastructure Library
Information Technology Infrastructure Library
 
Scott_article_120307
Scott_article_120307Scott_article_120307
Scott_article_120307
 
ICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdfICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdf
 
ICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdfICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdf
 
ITIL Service Desk
ITIL Service DeskITIL Service Desk
ITIL Service Desk
 
CobiT And ITIL Breakfast Seminar
CobiT And ITIL Breakfast SeminarCobiT And ITIL Breakfast Seminar
CobiT And ITIL Breakfast Seminar
 
Dit yvol4iss01
Dit yvol4iss01Dit yvol4iss01
Dit yvol4iss01
 
Itil 2
Itil 2Itil 2
Itil 2
 
ITIL With Information Security
ITIL With Information SecurityITIL With Information Security
ITIL With Information Security
 
Dit yvol4iss28
Dit yvol4iss28Dit yvol4iss28
Dit yvol4iss28
 
Itil the basics
Itil the basicsItil the basics
Itil the basics
 
IT Governance Framework
IT Governance FrameworkIT Governance Framework
IT Governance Framework
 
Using ITIL 4 and IT4IT together
Using ITIL 4 and IT4IT togetherUsing ITIL 4 and IT4IT together
Using ITIL 4 and IT4IT together
 
Msp It Goverance And Service Delivery Process
Msp It Goverance And Service Delivery ProcessMsp It Goverance And Service Delivery Process
Msp It Goverance And Service Delivery Process
 
Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...
Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...
Top 10 ITIL Service Management Templates with Samples and Examples (Free PDF ...
 
1 itil v3 overview ver1.8
1 itil v3 overview ver1.81 itil v3 overview ver1.8
1 itil v3 overview ver1.8
 

Dernier

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Dernier (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Combining Itil And Six Sigma To Improve

  • 1. W H I T E PA P E R Combining ITIL and Six Sigma to Improve ® Information Technology Service Management at General Electric
  • 2. CONTENTS Combining ITIL and Six Sigma to Improve Information ® Technology Service Management at General Electric EXECUTIVE SUMMARY There are two approaches that can be used to improve information technology service management (ITSM): the Information Technology Infrastructure Library (ITIL) and Six Sigma. Many followers of these seemingly mutually exclusive approaches exhibit a nearly religious zeal in defending their way as being the only way to go. Rather than being opposing approaches, however, Six Sigma and ITIL are complementary. ITIL defines a framework for IT Service Management. It consists of a set of guidelines that specify what an IT organization should do based on industry best practices. It does not, however, define how to do it. For example, ITIL specifies that IT should allocate a priority for each incident that comes into the service desk, but it does not specify how to allocate those priorities. With ITIL, it’s up to the IT staff to flesh out the details of process flow and create detailed work instructions, all in a way that makes sense for their organization. Six Sigma, on the other hand, defines a process improvement approach that is based on statistical measurement, drives quality improvement, and reduces operational costs. It helps in developing detailed work instructions, and it defines a methodology for continually mapping, measuring, and improving the quality process. Six Sigma tells how, but it doesn’t tell what to do nor does it specify any best practices specifically for ITSM. In summary, ITIL defines the “what” of service management and Six Sigma defines the “how” of quality improvement. Together, they make a great combination for improving the quality of IT service delivery and support. This paper presents a description of ITIL and Six Sigma, and discusses how they can be used together to improve IT service through best practices. The paper illustrates the power of the combination of ITIL and Six Sigma, with a real-world example of an ITSM improvement program implemented at General Electric. This program uses the Remedy IT Service Management Suite for the Enterprise ® (Remedy ITSM), a product line of BMC Software, to automate service management. Section 1: ITIL > ITIL Library Section 2: Six Sigma Section 3: Combining Six Sigma and ITIL > Project Objectives > Implementing the methodology Section 4: Conclusions Section 5: About the Authors
  • 3. ITIL ITIL 2. Service Delivery. This set describes: > Service Level Management. Deals with customers’ needs. > Availability Management. Helps ensure high service ITIL is a public domain set of best practice books that outline availability. a comprehensive, consistent, and coherent process-based > Capacity Management. Describes maintaining framework for IT Service Management. The U.K. govern- performance at the levels that customers require. ment’s Central Computer and Telecommunication Agency > Financial Management. Covers IT services costs. (CCTA) developed it in the late 1980s. The UK’s Office of > IT Service Continuity Management. Describes Government Commerce (OGC) now controls its content. minimizing service disruptions due to natural or man- made disasters. ITIL is a framework of best practices that can be used to > Security Management. Explains how to organize and assist organizations in developing their ITSM process-driven maintain the management of security of the IT approaches. It is a guide for establishing common processes, Infrastructure from the IT manager’s point of view. roles, and activities, with appropriate reference to each other and how the communication lines should exist between 3. Planning to Implement Service Management. them. It is not a methodology. Organizations can use ITIL Explains the steps necessary to identify how an organization either in whole or in part, depending on their preferences. might expect to benefit from ITIL and how to set about reaping those benefits. It helps organizations identify their ITIL provides guidance on how to link existing processes and strengths and weaknesses, enabling them to develop the activities across IT departments in a structured context, and former and overcome the latter. this linkage is key to quality service delivery. The models provided in ITIL show the goals, general activities, inputs, 4. ICT (Information and Communications Technology)- and outputs of the various processes that can be tailored to Infrastructure Management. the organization’s needs. The intent is to establish a common Covers Network Service Management, Operations language across functional areas. ITIL complies with Management, Management of Local Processors, Computer requirements for ISO9001 quality standards and is referenced Installations and Acceptance, and Systems Management. by ISO9000 for IT standards. 5. Applications Management. ITIL LIBRARY Deals with software life cycle support, testing of IT services and business change with emphasis placed on clear require- The ITIL library consists of seven sets of books: ments, definition, and implementation of solutions to meet 1. Service Support. This set describes: business user needs. > Configuration Management. Shows how assets interrelate. 6. The Business Perspective. > Incident Management. Deals with getting services Helps business managers understand IT service provision. restored as quickly as possible. Issues covered include Business Relationship Management, > Problem Management. Describes root cause analysis partnerships and outsourcing, and continuous improvement of problems. and exploitation of ICT for business advantage. > Change Management. Shows how to implement changes that eliminate problems. 7. Security Management. > Release Management. Deals with releasing versions of Helps the IT Security Officer provide the level of security hardware and software. necessary for the provision of the total service to the > Service Desk Function. Explores how to manage call organization. The guide focuses on the process of imple- types and service requests. menting security requirements identified in the IT Service Level Agreement, rather than considering business issues of security policy. 1
  • 4. SIX SIGMA Six Sigma Six Sigma methodology includes a proven tool set for driving and achieving transformational change within an organization. The tool set provides a variety of templates for measuring, Six Sigma was created by Motorola and is based on the collecting, and summarizing data, as well as for creating work of quality guru W. Edwards Deming. Professor Deming process maps. The methodology and tools can be used for observed that 85 percent of the reasons for failure to meet mapping, measuring, improving, and managing processes. customer expectations are related to deficiencies in systems and process. The Six Sigma process uses data and rigorous Using a universal measurement scale, Six Sigma defines and statistical analysis to identify defects in a process or product, estimates the opportunities for error and calculates defects in reduce variability, and achieve as close to zero defects the same way every time, thus offering a means for measuring as possible. improvement. The Six Sigma methodology incorporates this data and statistical analysis into a project-based workflow that Six Sigma is a process improvement methodology that focuses allows businesses to make intelligent decisions about where an organization on customer requirements, process alignment, and how to incorporate improvements. analytical rigor, and timely execution. It is a highly disciplined methodology and practice that provides the tools required to At the heart of Six Sigma is a five-phase process achieve consistent, high-performance results from products improvement methodology—called DMAIC—for analyzing and processes. By increasing performance and decreasing and improving business process. DMAIC is an acronym for variation, Six Sigma allows organizations to make customer- the five phases of the model: Define opportunities, Measure focused, data-driven decisions that ultimately yield a reduction performance, Analyze factors impacting performance, in product defects, increased profits and employee morale, Improve performance, and Control performance. and high-quality products. Six Sigma, according to www.isixsigma.com, “simply means a measure of quality that strives for near perfection.” (www.iSixSigma.com) 2
  • 5. COMBINING SIX SIGMA AND ITIL Combining Six Sigma Objective 2: Leverage ITIL best practices Because ISO references ITIL for IT standards, the team and ITIL selected ITIL to define best practices for ITSM. Objective 3: Determine the current state of IT service The IT Solutions Enterprise Planning & Strategy consulting The objective is to determine the current state of IT service group at GE was enlisted to help improve IT service manage- by base-lining current process maturity and capability, and ment practices internally at GE. The group has developed comparing them to ITIL. This would give the team not only a methodology for process improvement that combines an indication of where the greatest problems are, but also Six Sigma and ITIL. a baseline to use in determining performance against those problems. The goal of the methodology is to transition from the current state to an ITIL-compatible state. Six Sigma provides the To achieve this objective, the team used two tools: the engine to help achieve this goal. The approach is to analyze Capability Maturity Model (CMM) to determine whether the risk, compare current processes to the goal state, and then current processes are maturing in the right direction, and the determine the solution, using a business case to migrate Capability Assessment Tool (CAT), an interview/ questionnaire- current processes toward usable, measurable, ITIL-compatible based process used to determine the level of maturity and processes. The group is using the Remedy ITSM Suite to capabilities of current processes. automate and improve ITSM processes. Objective 4: Continually improve The methodology is based on the DMAIC model and has IT service management processes five phases that map directly into the five DMAIC phases. This objective is based on Six Sigma and Deming’s Total The group applied the methodology to the ITSM process Quality Management (TQM) approach. Meeting it requires improvement project. continual improvement of the processes that make up IT Service Management. The team used ITIL standards as a PROJECT OBJECTIVES yardstick to measure improvement of IT service management The team first set the objectives of the project. Following is a processes. description of each of the objectives, including an indication of how ITIL and Six Sigma are used as enablers in achieving Objective 5: Establish ongoing measurements each objective: to ensure improvement/control In addressing this objective, the team used Six Sigma to help Objective 1: Achieve ISO compliance define the metrics to be established, ensuring that the metrics The team set out to achieve ISO compliance. ISO references are process-centered, practical, and useable. ITIL for IT standards, and therefore ITIL defines ISO compliance for ITSM. IMPLEMENTING THE METHODOLOGY The team then executed DMAIC, the five-phase process ISO requires that processes have documented work improvement methodology of Six Sigma, to meet the instructions, an essential ingredient to augment the best objectives set for the ITSM improvement project. practices defined by ITIL. As noted earlier, an ITIL process > Phase 1: Define opportunities may indicate to allocate a priority at a particular point, but it > Phase 2: Measure performance does not indicate how to allocate the priority. The work > Phase 3: Analyze factors impacting performance instructions would indicate how to allocate priority at that > Phase 4: Improve performance point. To achieve objective 2, then, requires not only > Phase 5: Control performance compliance with ITIL processes, but also documented work instructions for those processes. 3
  • 6. PHASE 1 PHASE 1 - DEFINE OPPORTUNITIES The team produced six deliverables in the Define phase: > Team charter that describes the purpose, goals, and The Define phase sets the expectations of the improvement resources for the project. project and directs the focus of Six Sigma strategy to the > Data collection plan that includes such items as interview customers’ requirements. It identifies the product and/or schedules and questions. process to be improved and ensures that resources are in > Critical to Quality (CTQ) outline that identifies the critical place for the improvement project. success factors. > Current situation analysis that was created using the The goal is to align ITSM strategy with the business, CAT tool. organizational, and technological strategies. The desired > Customers/Output—Process—Input/Suppliers (COPIS) result is to set a definitive vision, scope, and strategic “as-is” process map outline that provides an under- approach for ITSM operations. standing of the current processes to which the solution has to be aligned. Figure 1 shows the COPIS outline produced by the team. Service Request Process COPIS Service Request Customers/Outputs Process Inputs/Suppliers Customers Inputs Service users Service Requests Authorizations Approvals Asset Information Process Service Catalog People Information Change Management Information 1.0 2.0 3.0 4.0 5.0 Create Review and Assign and Evaluate Fulfill Service Approve Route Service Service Request Service Service Request Request Outputs Suppliers Fulfilled Request Request Requester (Initiator) Service Reviewer Request Approvers Service Providers SR Manager Figure 1. COPIS Outline 4
  • 7. PHASE 2 PHASE 2 - MEASURE PERFORMANCE The team produced three deliverables in the Measure phase: > An accurate assessment of current process performance. The Measure phase assesses the current condition of the > Detailed “as-is” process maps derived from the COPIS process before attempting to identify improvements. It outline created in Phase 1 defines the defect(s), gathers baseline information about the > Critical Success Factors (CTQ) summary chart process, validates the measurement system(s), and establishes more specific improvement goals. Because the Measure Figure 2 shows the detailed “as-is” current service request phase is based on data, it eliminates assumptions about how process map produced by the team. The map provides a well a process is currently working. detailed look at the Review and Approve Services Request process, which is a component of the overall Service Request The goal of the Measure Phase is to create a current-state Process shown in Figure 1, and shows functional roles and assessment of how well the current environment supports responsibilities. (Typically, most of the opportunities for the ITSM strategy. The desired result is to determine current improvement lie in the handoffs among functions.) The map processes, issues, and the critical success factors—or Critical is accompanied by work instructions that indicate how the To Quality factors (CTQs)—of the desired future state processes are performed. environment. Service Request Process 2.0 Review & Approve Service Request 2.0 Requester 2.13 2.5 Receive SR Provide Additional Notification Information Reviewer/ Assessor 2.0 2.1 2.2 2.3 2.4 Correctly No Missing Receive SR Review SR and Request Manually Collect 3.0 Assigned? Information? Notification make comments Re-assignment Information and Update Request Approver/s Yes No Automatic Rejection 2.0 Notification To Requestor 2.6 2.7 2.8 2.4 No Correctly No Missing Receive SR Review SR and Request Yes Manually Collect Approved? Assigned? Information? Notification make comments Re-assignment Information and Automatic Service Providers Update Request Rejection Yes Notification To Yes No Requestor 2.0 2.10 2.11 2.12 Correctly No 3.0 Receive SR Review SR and Request 3.0 Notification Assigned? make comments Re-assignment Yes Figure 2. Example Detailed “As-Is” Process Map 5
  • 8. PHASE 3 P H A S E 3 - A N A LY Z E F A C T O R S Figure 3 shows a portion of the Opportunities table that the I M PA C T I N G P E R F O R M A N C E team generated. The chart shows how current processes compare to ITIL and enables the team to identify the pro- The Analyze phase examines the data collected in the cesses with the greatest opportunities for improvement (the Measure phase to generate a prioritized list of the sources of “low-hanging fruit”), so the team can prioritize their improve- variation. The Analyze phase focuses improvement efforts by ment actions. This particular example shows a sample of a separating the “vital few” variables (those most likely respon- high-level root cause analysis produced in this phase. The sible for the variation) from the “trivial many” (those least chart is used in creating proposed problem solutions. As the likely responsible for variation). project progresses, root causes and the associated solution options are described in greater detail. The team produced four deliverables in the Analyze phase: > Opportunities Table: Solutions mapped to process gap > Critical Success Factors (CTQs) benchmarked against ITIL best practices to identify opportunities for improvement > Cause and Effect Diagram > Pareto Chart of Opportunities Impact Process People, Gap Description Business Impact Underlying Control, Influence, High Level Potential Gap Type Process, Root Cause Out of Control CTQs Solutions/ or Tool Initiatives SRC01 -High Level Root Cause: Inefficient Approval Process MED ITIL Gap Process/ Initial service Potential for non- Lack of process In our control Improve Re-define and People request vetting compliancy with the definition and Operational validate process, “feasibility” process to ensure adherence due to Efficiency and implement authorization is a that proper being a manual the process within manual process authorization and process and not the new tool performed outside approval is granted tracked with a tool. following ITIL the tool. prior to SR RFC guidelines. implementation and approval. No audit trail of initial authorization. MED Inefficiency Tool Lack of automation Risk of not receiving Tool is only currently In our sphere of Improve Ensure that the around approvals the proper designed to track influence Operational tool will support at the business and authorization in a IT approval. Efficiency approval financial level with timely fashion or not automation Capital Acquisition at all. This could beyond IT Process. impact SLAs. approvals to business and financial. Figure 3. Opportunities Table 6
  • 9. PHASE 4 PHASE 4 - IMPROVE PERFORMANCE Figure 4 shows the FMEA chart. The analysis shows the effect of improvements made when the full solution was The Improve phase confirms that the solution proposed in implemented. Phase 3 will meet or exceed the quality improvement goals of the project. In this phase, the team tests the solution on a This is the graphical output that is automatically generated small scale in a real business environment to help ensure that once the risk assessment is complete, at least in draft form. the causes of variation have been fixed and the solution will Risk Priority Number (RPN) is the product of the numerical work when fully implemented. severity, occurrence and detection ratings that are assigned to each risk. The highest Risk Priority Number is representing The goal of the Improve phase is to define and refine the greatest risk. In the event that time or resource recommended tactical solutions based on information limitations prevent the team from addressing all risks that determined in phases 1-3. The desired result is a documented have been identified, the RPN can be used to prioritize recommendation based on strategic fit, cost, and benefits. mitigation activities and resources. In some cases, only risks over a certain RPN threshold may be addressed. The team produced four deliverables in the Improve phase: > Risk Assessment/Failure Modes and Effect Analysis Figure 5 shows the “To Be” process map that illustrates the (FMEA)/Contingency Plan. process as it is to be when the improvements have been > Prioritized potential solutions implemented. > Solution Pilot > “To Be” process maps This new process is designed to address the top risks identi- fied in the risk assessment. It includes the solution selected for implementation, and is verified in the solution pilot. Risk Reduction 300 250 200 150 100 50 0 Scan File Status WO Not Data Validation Location Location User User Move Updating Closed Collection Occuring Change Change Change Change Occuring = Eliminated = Original = Improvement Failure Modes Figure 4. FEMA Chart 7
  • 10. PHASE 5 PHASE 5 – CONTROL PERFORMANCE The team produced five deliverables in the Control phase: > Multi-Generational Product Plan (MGPP) The Control phase implements the piloted solution and ensures > Process metrics defined that the improvements to the process, once implemented, will > Full solution implemented be sustained to prevent the process from reverting to its prior > Control/Response Plan implemented state. In this phase, the team shares, throughout the organiza- > Risk mitigation actions complete tion, the lessons learned in the improvement project to help accelerate improvements in other areas. The goal of the Control phase is to propose a plan for designing and implementing the ITSM process improvement solution. The desired result is a true life cycle ITSM solution that allows for continuous improvement. 3.0 Assessment and Approval of RFC Requester 3.15 3.13 3.28 RFC Rejected Stop Rejected Approved 6A Notification Change Notification Change Notification 3A 4A 5A 7A Yes Yes 3.4 3.5 3.1 3.3 3.26 Manager 3.2 No No Financial Change Initial Assessment Standard Determine Approval Assign Change URGENT? and Review Change? Resources, Impact, Required? Implementer 5B and Schedule Yes 3.6 Financial Request Financial Approval No Yes 3.25.5 Approval Approve Change Request Yes 3.9 3.11 3.8 Low 3.10 No Impact? Approve/Obtain Approved? Reject Change Yes Approval Request 3.7 Financial Approval Obtained Med/High 3.16 3.17 3.18 Technical Impact Business Impact Submit to CAB Assessment Assessment for review Change Advisory 3.20 3.19 Plan, Schedule 3.21 Back-out No Review the Recommend Board Schedule & Satisfactory? Reject? No Impact of Change Yes Yes 3.24 No Recommend Chage be Approved 3.14 3.25 3.22 3.23 3.12 Review the Notify Change Notify Change Notify Change Notify Requester 3.27 Schedule & Manager to Manager to Manager to Rejected Notify Requester Impact of Change approve change rework Reject change Approved Figure 5. “To-Be” Process Map 8
  • 11. CONCLUSIONS Figure 6 shows the MGPP. Six Sigma is a continuous CONCLUSIONS improvement program. In the first pass through the At first glance, ITIL and Six Sigma appear to be mutually methodology, the team addressed the opportunities with the exclusive. However, as this paper discusses and the GE ITSM highest potential gain. After the first pass, the team planned improvement project validates, these two approaches are to reapply the methodology to address the other opportun- highly complementary and can be used in combination ities that were identified in the analysis done in the first pass. effectively to continually improve business processes. The The MGPP lays out the steps to be performed to continually benefits are compelling: improve ITSM using the five-phase process improvement > Reduce costs by helping to minimize potential downtime methodology iteratively. The MGPP also may illustrate oppor- and the adverse effects of system, network, and applica- tunities for translating the proven improvement to other areas tion failures and install, move, adds, change and of the business or other business units within the organization. decommission implementations. > Enhance decision-making ability by facilitating access to information throughout the organization, and by enabling the enterprise wide use of outputs from an integrated framework of processes and tools through such devices as cross functional IT service dashboards. > Improve IT service levels by creating operational efficien- cies and enabling a linked IT Service Management process loop for defining, measuring, analyzing, improving, and controlling service performance. For more information contact us at ServicesMKTG@gecits.ge.com 2003 2004 APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Development Pilot Change Request • Roll out Change Process replacing the Current Change Request Solution Development • Evaluate pilot results Deployment Change Request Pilot • Full deployment to replace the remaining quot;Change Requestquot; Change Request • Initiate integration with Asset Management Phase I Change Request Deployment • System configuration • Interface development Development Phase II • Data conversion Core Service Request Development • Process design • Training program creation • Testing and QA Phase II • Release management planning Core Service Request Deployment Development Phase II Deployment Change ‘‘Service Request’’ Service Request Development • Rollout Change Process replacing the Current Service Request • Phased approach Phase II • Phase II: Core in Phase II Service Request Deployment • Phase III: Self Service, and TBD Functionality Development Pilot Incident/Problem • Introduce to TBD localized Help Desk and associated Level 2 support personnel Development • Complete integration with Asset Management Incident/Problem Pilot Deployment • Roll-out to all departments simultaneously Incident/Problem • Use mulitple teams in all Deployment geographic locations Figure 6. Multi-Generational Product Plan 9
  • 12. ABOUT THE AUTHORS ABOUT THE AUTHORS ABOUT REMEDY SOLUTIONS Malcolm Fry is a recognized IT industry luminary with over 35 Remedy delivers Service Management software solutions that years experience in Information Technology in a number of enable organizations to align internal and external service industries, including retail, production, oil and pharmaceuti- and support processes to business goals. More than 10,000 cals, and consulting. This experience, coupled with his customers worldwide, from small and mid-sized businesses impressive technical background, gives Malcolm an unparal- to global enterprises, have chosen Remedy’s IT Service leled breadth of knowledge and experience. Malcolm is the Management and Customer Service and Support software author of four best-selling books on IT service and support, to automate their support processes, improve service levels, has had many other articles and papers published, and is manage assets, and lower costs. As part of BMC Software, regularly used as a source of information by technology Remedy’s highly flexible, best-practice applications enable journalists. He is also the solo performer in a highly successful enterprise-wide Business Service Management, and allow best-selling video series made for the Help Desk Institute. He customers to easily adapt to unique and changing has Masters level ITIL certification. requirements. Learn more at www.remedy.com. Molly Bott has specialized in delivering global network and ABOUT BMC SOFTWARE systems management solutions for more than 15 years. In BMC Software, Inc. (NYSE:BMC) is a leading provider of recent years as a GE IT Solutions Enterprise Consultant and enterprise management solutions that empower companies Six Sigma Green Belt, her emphasis has been placed on IT to manage their IT infrastructure from a business perspective. Service Management (ITIL standards coupled with proven Delivering Business Service Management, BMC Software best practices like Six Sigma). This allows her to take the next solutions span enterprise systems, applications, databases step in process improvement, using statistical tools to break and service management. Founded in 1980, BMC Software down processes and drive to clear measurable outcomes. has offices worldwide and fiscal 2004 revenues of more than $1.4 billion. For more information about BMC Software, visit www.bmc.com. ABOUT GE GE IT Solutions, Inc. is an industry leader in the planning, design, implementation, and management of complete IT infrastructure solutions for businesses throughout North America. Focused on IT Service Management consulting and optimization, as well as infrastructure solutions in the client, network, server, storage, and security environments, IT Solutions utilizes world-class best practices and Six Sigma methodology coupled with the ITIL framework to ensure reliability, cost effectiveness, and quality of each solution. The company’s strong financial position ensures that they will continue to provide ongoing services year after year. IT Solutions is a GE business wholly owned by General Electric Company. Tel: 877-443-2487. www.geitsolutions.com BMC Software, the BMC Software logos and all other BMC Software product or service names are registered trademarks or trademarks of BMC Software, Inc. All other registered trademarks or trademarks belong to their respective companies. ©2004 BMC Software, Inc. All rights reserved. WP_ITSM_SIXSIGMAITIL_US02 46760