SlideShare une entreprise Scribd logo
1  sur  17
TataAutoComp GY Batteries Pvt. Ltd.
Project report on Dross Generation in the Casting Section
Project by-
Abhishek Roy
Project Head-
Mr. Suvrajit Banerjee
Under the supervision of
Mr. Mohit Bhakal
TataAutoComp GY Batteries Pvt. Ltd.
Acknowledgement
I have taken efforts in this project. However, it would not
have been possible without the kind support and help of
many individuals and organizations. I would like to extend
my sincere thanks to all of them. I am highly indebted to Mr.
Suvrajit Banerjee, Mr. Mohit Bhakal for their guidance and
constant supervision as well as for providing necessary
information regarding the project & also for their support in
completing the project. I would like to express my gratitude
towards operators of Casting section of TATA AutoComp
GY Batteries Pvt. Ltd for their kind co-operation and
encouragement which help me in completion of this project
and for giving me such attention and time.
TataAutoComp GY Batteries Pvt. Ltd.
Company Profile
Tata AutoComp Systems Limited, promoted by the
Tata Group, provides products and services in the
automotive industry to Indian and global customers,
including Ashok Leyland, BMW India, Mercedes-Benz
India, EicherMotors, Fiat, Force Motors, Ford India,
General Motors India, Hero Honda, Hindustan Motors,
Honda Scooters, Honda Siel Cars India Ltd,
International Tractors John Deere India, Mahindra and
Mahindra, Mahindra Renault, Man-Force Trucks, New
Holland, Piaggio, Punjab Tractors, Royal Enfield,
Skoda, Swaraj Mazda, Tata Motors, Toyota Kirloskar
Motor Pvt. Ltd., Tractors and Farm Equipment Limited.
TataAutoComp GY Batteries Pvt. Ltd.
Company Profile (TATA AutoComp GY Batteries)
TATA Green Batteries are a product of
TATA AutoComp GY Batteries Pvt.
Ltd. (TGY), a joint venture between
TATA AutoComp Systems Ltd,
India's leading auto component
manufacturer and GS Yuasa
International, Japan, one of the
world's largest automotive battery
manufacturers. These batteries are
a combination of TATA AutoComp’s
extensive experience in the
Automotive Industry and GS Yuasa
International’s superior
technological know-how. With a low
top-up requirement and being 90%
recyclable, Tata Green Batteries
allow a hassle free battery running
experience
TataAutoComp GY Batteries Pvt. Ltd.
Different Sections In the Plant
CASTING
Pasting
Assembly
Charging
Dispatch
*The project is undergone under this section
TataAutoComp GY Batteries Pvt. Ltd.
Way to the
PASTING
section
Raw Material Section
Calcium –ve Alloy
Antimony Alloy
Calcium +ve Alloy
Sb+ve
Emergency
Exit
Ca+ve
Ca-ve
CASTING SECTION
Ca+ve
CorkPreparation
Area
CASTING
SectionEntry
Office
Dross
dumping
area
B1 B2 B3 B4 B5 B6 B7 B8
A1 A2 C6 C5 C4 C3 C2 C1C10 C9 C8 C7
Ca-ve
Ca-ve
Ca-ve
Ca-ve
Ca-ve
Ca-ve
Ca-ve
Ca-ve
Ca-ve
Sb+ve
Sb+ve
Sb+ve
Sb+ve
Sb+ve
Sb+ve
Sb+ve
TataAutoComp GY Batteries Pvt. Ltd.
Gravity Casting Machine
TataAutoComp GY Batteries Pvt. Ltd.
Working Of the machine
1
2
6
5
4
3
7
TataAutoComp GY Batteries Pvt. Ltd.
Process
POT (Where
The molten
lead is present)
FEEDLINE(which
transfer the
molten lead)
LADDLE
TRIM DIE
SECTION
(to cut excess
part of the panel)
COLLECTING
AREA (The final
product is kept
here )
MOULD(which
give shape to the
molten lead)
ROLLER
1 2
6
5
4
3
7
The excess part is send back
to the Pot
TataAutoComp GY Batteries Pvt. Ltd.
Type Pot Temp. Ladle Temp. Moving mould Temp. Fixed Mould Temp. Feed Line Temp.
Sb +ve 420±30 600±30 200±30 200±30 490±30
Ca -ve 420±30 600±30 200±30 200±30 490±30
Ca +ve 420±30 600±30 200±30 200±30 490±30
Grid information
TataAutoComp GY Batteries Pvt. Ltd.
Grid Nomenclature
Y M 83A
Plate thickness (100-83)/10=1.7±0.1mm
Grid thickness ((100-83)/10)-0.2=1.7±0.1mm
Small
Calcium
OTHER NOTATIONS:-
C Antimony
G Big
In case of
Plate thickness
=(100- )/10=2.1±0.1mm
Grid thickness
=((100- )/10)-
0.2=1.8±0.1mm
C G 80A 79
79
80
TataAutoComp GY Batteries Pvt. Ltd.
Dross
Dross is a mass of solid impurities floating
on a molten metal or dispersed in the metal,
such as in wrought iron. It forms on the
surface of low-melting-point metals such as
tin lead zinc or aluminium or alloys by
oxidation of metals
as tin, lead, zinc or aluminium or alloys by ox
idation of the metal(s). Dross, as a solid, is
distinguished from slag, which is a liquid.
Dross product is not entirely waste material;
for example, aluminium dross can be
recycled and is used in
secondary steelmaking for slag deoxidation.
Dross
TataAutoComp GY Batteries Pvt. Ltd.
16 Major Losses In a Company
8 Availability
Losses
Machine Loss
Setup & adjusting
Tool change
Start-up losses
Minor stoppage
Speed loss
Defect and
rework
Shutdown
5 Productivity
losses
Management
losses
Operating Motion
Line organisation
Logistics
Adjustments
3 Production
losses
•Loss of energy
•Die-tool losses
•Yield loss
TataAutoComp GY Batteries Pvt. Ltd.
Time Study of the Machine (B3-B4)
Total sample time for the production- 180 minutes
No of panels to be produced– 3690 panels
Actual Time taken for production- 144 minutes
No of grids produced- 3168 panels
Major losses occurred during the process-
• Shut Down Loss/Defect and rework- 20 min
• Setup Loss-5 min
• Die/Tool Loss- 5 min
• Line organisational loss-6 min
TataAutoComp GY Batteries Pvt. Ltd.
Date April'16 May'16
1st 237 0
2nd 432 409
3rd 385 341
4th 427 285
5th 426 321
6th 471 323
7th 373 407
8th 0 394
9th 457 412
10th 379 342
11th 431 425
12th 292 557
13th 341 444
14th 397 497
15th 324 299
16th 431 493
17th 418 266
18th 300 464
19th 206 428
20th 289 511
21st 436 515
22nd 300 442
23rd 430 459
24th 304 451
25th 366 363
26th 417 0
27th 455 0
28th 398 0
29th 367 89
30th 323 452
31st n/a 470
possible reasons-
- temperature variations
-manpower variation
-Impurities in the ingot
highest
amount of
dross
generated
TataAutoComp GY Batteries Pvt. Ltd.
Dross Generation Data
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st
April'16 237 432 385 427 426 471 373 0 457 379 431 292 341 397 324 431 418 300 206 289 436 300 430 304 366 417 455 398 367 323 0
May'16 0 409 341 285 321 323 407 394 412 342 425 557 444 497 299 493 266 464 428 511 515 442 459 451 363 0 0 0 89 452 470
0
100
200
300
400
500
600
Dross(inkg)
highest
amount of
dross
generated
TataAutoComp GY Batteries Pvt. Ltd.
Action Plan
There are ways by which we can reduce the
generation of dross-
• By induction heating- induction heating helps in
reducing dross generation and also helps in energy
saving. The idea is being proposed and is in a
prototype position.
• By minimising the surface area of the opening of
the pot- The opening present in the pot is the
reason for the generation of dross as more amount
of air can enter through it to oxidise with the lead. If
the conveyor length is increased so that it ends at
the inside the opening and the opening is made
small enough so as to make the dross removal
easier for the operator and putting a cover on it, the
dross generation can be reduced by 5%.

Contenu connexe

Tendances

Bibliografia, gabaritos das perguntas e exercícios
Bibliografia, gabaritos das perguntas e exercíciosBibliografia, gabaritos das perguntas e exercícios
Bibliografia, gabaritos das perguntas e exercíciosRenaldo Adriano
 
Cálculos e recomendações para correias de transmissão de potência em v good...
Cálculos e recomendações para correias de transmissão de potência em v   good...Cálculos e recomendações para correias de transmissão de potência em v   good...
Cálculos e recomendações para correias de transmissão de potência em v good...Diogo Bellé
 
PÁ CARREGADEIRA CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!
PÁ CARREGADEIRA  CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!PÁ CARREGADEIRA  CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!
PÁ CARREGADEIRA CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!Daniel Andrade
 
Guia de aplicacao_de_inversores_de_frequencia
Guia de aplicacao_de_inversores_de_frequenciaGuia de aplicacao_de_inversores_de_frequencia
Guia de aplicacao_de_inversores_de_frequenciaEdilton Neres dos Santos
 
Profile measurement webinar
Profile measurement webinarProfile measurement webinar
Profile measurement webinarAlfa Egypt
 
Apostila valvulas-industriais-visao-geral
Apostila valvulas-industriais-visao-geralApostila valvulas-industriais-visao-geral
Apostila valvulas-industriais-visao-geralRosivaldo Bandeira
 
Catalogo correias-goodyear
Catalogo correias-goodyearCatalogo correias-goodyear
Catalogo correias-goodyearLuedes Viana
 
Process Plant Start Up and Commissioning
Process Plant Start Up and CommissioningProcess Plant Start Up and Commissioning
Process Plant Start Up and CommissioningpetroEDGE
 
Nbr 7165 sb 121 simbolos graficos de solda para construcao naval e ferroviario
Nbr 7165 sb 121   simbolos graficos de solda para construcao naval e ferroviarioNbr 7165 sb 121   simbolos graficos de solda para construcao naval e ferroviario
Nbr 7165 sb 121 simbolos graficos de solda para construcao naval e ferroviarioBmarques Bruno
 
Curso de tubulações industriais aula6
Curso de tubulações industriais aula6Curso de tubulações industriais aula6
Curso de tubulações industriais aula6Antonio Gomes
 
Tabela diametro-furo-para-fazer-rosca
Tabela diametro-furo-para-fazer-roscaTabela diametro-furo-para-fazer-rosca
Tabela diametro-furo-para-fazer-roscaBraga2013
 

Tendances (20)

Chanfros
ChanfrosChanfros
Chanfros
 
Bibliografia, gabaritos das perguntas e exercícios
Bibliografia, gabaritos das perguntas e exercíciosBibliografia, gabaritos das perguntas e exercícios
Bibliografia, gabaritos das perguntas e exercícios
 
Cálculos e recomendações para correias de transmissão de potência em v good...
Cálculos e recomendações para correias de transmissão de potência em v   good...Cálculos e recomendações para correias de transmissão de potência em v   good...
Cálculos e recomendações para correias de transmissão de potência em v good...
 
PÁ CARREGADEIRA CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!
PÁ CARREGADEIRA  CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!PÁ CARREGADEIRA  CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!
PÁ CARREGADEIRA CATERPILLAR 924H - MANUAL DE ESPECIFICAÇÕES DA MÁQUINA!
 
Guia de aplicacao_de_inversores_de_frequencia
Guia de aplicacao_de_inversores_de_frequenciaGuia de aplicacao_de_inversores_de_frequencia
Guia de aplicacao_de_inversores_de_frequencia
 
Tabela de cabos Celesc
Tabela de cabos CelescTabela de cabos Celesc
Tabela de cabos Celesc
 
Aula unid 3_4
Aula unid 3_4Aula unid 3_4
Aula unid 3_4
 
Profile measurement webinar
Profile measurement webinarProfile measurement webinar
Profile measurement webinar
 
73333575 cames
73333575 cames73333575 cames
73333575 cames
 
Apostila valvulas-industriais-visao-geral
Apostila valvulas-industriais-visao-geralApostila valvulas-industriais-visao-geral
Apostila valvulas-industriais-visao-geral
 
Catalogo correias-goodyear
Catalogo correias-goodyearCatalogo correias-goodyear
Catalogo correias-goodyear
 
1.Risk Based Inspection API 580.PDF
1.Risk Based Inspection API 580.PDF1.Risk Based Inspection API 580.PDF
1.Risk Based Inspection API 580.PDF
 
Process Plant Start Up and Commissioning
Process Plant Start Up and CommissioningProcess Plant Start Up and Commissioning
Process Plant Start Up and Commissioning
 
Westermann tables
Westermann tablesWestermann tables
Westermann tables
 
Filtro
FiltroFiltro
Filtro
 
216 b, 226b, 236b, 242b e 252b
216 b, 226b, 236b, 242b e 252b216 b, 226b, 236b, 242b e 252b
216 b, 226b, 236b, 242b e 252b
 
793 f m03_engine_en_txt
793 f m03_engine_en_txt793 f m03_engine_en_txt
793 f m03_engine_en_txt
 
Nbr 7165 sb 121 simbolos graficos de solda para construcao naval e ferroviario
Nbr 7165 sb 121   simbolos graficos de solda para construcao naval e ferroviarioNbr 7165 sb 121   simbolos graficos de solda para construcao naval e ferroviario
Nbr 7165 sb 121 simbolos graficos de solda para construcao naval e ferroviario
 
Curso de tubulações industriais aula6
Curso de tubulações industriais aula6Curso de tubulações industriais aula6
Curso de tubulações industriais aula6
 
Tabela diametro-furo-para-fazer-rosca
Tabela diametro-furo-para-fazer-roscaTabela diametro-furo-para-fazer-rosca
Tabela diametro-furo-para-fazer-rosca
 

En vedette

Presentation on dross treatment
Presentation on dross treatmentPresentation on dross treatment
Presentation on dross treatmentSrihari Chodagiri
 
Aluminum fluxes and degassing methode
Aluminum fluxes and degassing methodeAluminum fluxes and degassing methode
Aluminum fluxes and degassing methodeAbdul Rahman
 
weldability and defects in weldments
weldability and defects in weldmentsweldability and defects in weldments
weldability and defects in weldmentsBahri Fetahi
 
Metal Casting processes including pattern making and mold making,Patterns,Cas...
Metal Casting processes including pattern making and mold making,Patterns,Cas...Metal Casting processes including pattern making and mold making,Patterns,Cas...
Metal Casting processes including pattern making and mold making,Patterns,Cas...Azlan
 

En vedette (7)

Presentation on dross treatment
Presentation on dross treatmentPresentation on dross treatment
Presentation on dross treatment
 
Aluminum fluxes and degassing methode
Aluminum fluxes and degassing methodeAluminum fluxes and degassing methode
Aluminum fluxes and degassing methode
 
weldability and defects in weldments
weldability and defects in weldmentsweldability and defects in weldments
weldability and defects in weldments
 
Casting defects
Casting defectsCasting defects
Casting defects
 
Metal Casting processes including pattern making and mold making,Patterns,Cas...
Metal Casting processes including pattern making and mold making,Patterns,Cas...Metal Casting processes including pattern making and mold making,Patterns,Cas...
Metal Casting processes including pattern making and mold making,Patterns,Cas...
 
Casting defects
Casting defectsCasting defects
Casting defects
 
Casting
CastingCasting
Casting
 

Similaire à To study The dross generation

Case study final presentation ashish
Case study final presentation ashishCase study final presentation ashish
Case study final presentation ashishashish sinha
 
Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...guestb741cc
 
Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...guestb741cc
 
GFRP Reinforcement Bar Manufacturing
GFRP Reinforcement Bar Manufacturing GFRP Reinforcement Bar Manufacturing
GFRP Reinforcement Bar Manufacturing Chi Nini
 
Neel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship ReportNeel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship ReportPradeep Yadav
 
Summer Training presentation
Summer Training presentationSummer Training presentation
Summer Training presentationMukul kashiwal
 
Future Manufacturing - Metal Casting Industry
Future Manufacturing - Metal Casting IndustryFuture Manufacturing - Metal Casting Industry
Future Manufacturing - Metal Casting IndustryAdriaan van der Walt
 
Additive manufacturing in the automotive industry
 Additive manufacturing in the automotive industry Additive manufacturing in the automotive industry
Additive manufacturing in the automotive industryRahulkhandelwal120
 
Traditional manufacturing processes vs Advanced manufacturing processes
Traditional manufacturing processes vs Advanced manufacturing processesTraditional manufacturing processes vs Advanced manufacturing processes
Traditional manufacturing processes vs Advanced manufacturing processesSisubalan Selvan
 
Automatic packing machine - Samwon machinery catalogue
Automatic packing machine - Samwon machinery catalogueAutomatic packing machine - Samwon machinery catalogue
Automatic packing machine - Samwon machinery catalogueOnplus
 
Sustainability case tata power
Sustainability case  tata powerSustainability case  tata power
Sustainability case tata powerShruti Railkar
 
Tata Nano Case Study
Tata Nano Case StudyTata Nano Case Study
Tata Nano Case StudyMunish Kumar
 
jacob-peled - Rubber Machinery Selection
jacob-peled - Rubber Machinery Selectionjacob-peled - Rubber Machinery Selection
jacob-peled - Rubber Machinery SelectionPelmarGroup
 

Similaire à To study The dross generation (20)

Case study final presentation ashish
Case study final presentation ashishCase study final presentation ashish
Case study final presentation ashish
 
Tata NANO
Tata NANOTata NANO
Tata NANO
 
Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...
 
Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...Global solution for the overall fleet consumption reduction inside the Autmot...
Global solution for the overall fleet consumption reduction inside the Autmot...
 
SGI. PROFILE
SGI. PROFILESGI. PROFILE
SGI. PROFILE
 
GFRP Reinforcement Bar Manufacturing
GFRP Reinforcement Bar Manufacturing GFRP Reinforcement Bar Manufacturing
GFRP Reinforcement Bar Manufacturing
 
Neel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship ReportNeel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship Report
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Summer Training presentation
Summer Training presentationSummer Training presentation
Summer Training presentation
 
STP REPORT (final)
STP REPORT (final)STP REPORT (final)
STP REPORT (final)
 
Future Manufacturing - Metal Casting Industry
Future Manufacturing - Metal Casting IndustryFuture Manufacturing - Metal Casting Industry
Future Manufacturing - Metal Casting Industry
 
Techinical report
Techinical reportTechinical report
Techinical report
 
Additive manufacturing in the automotive industry
 Additive manufacturing in the automotive industry Additive manufacturing in the automotive industry
Additive manufacturing in the automotive industry
 
Traditional manufacturing processes vs Advanced manufacturing processes
Traditional manufacturing processes vs Advanced manufacturing processesTraditional manufacturing processes vs Advanced manufacturing processes
Traditional manufacturing processes vs Advanced manufacturing processes
 
Go kart design project presentation
Go kart design project presentationGo kart design project presentation
Go kart design project presentation
 
Automatic packing machine - Samwon machinery catalogue
Automatic packing machine - Samwon machinery catalogueAutomatic packing machine - Samwon machinery catalogue
Automatic packing machine - Samwon machinery catalogue
 
Sustainability case tata power
Sustainability case  tata powerSustainability case  tata power
Sustainability case tata power
 
Tata Nano Case Study
Tata Nano Case StudyTata Nano Case Study
Tata Nano Case Study
 
jacob-peled - Rubber Machinery Selection
jacob-peled - Rubber Machinery Selectionjacob-peled - Rubber Machinery Selection
jacob-peled - Rubber Machinery Selection
 
TAYO PROJECT FINAL
TAYO PROJECT FINALTAYO PROJECT FINAL
TAYO PROJECT FINAL
 

To study The dross generation

  • 1. TataAutoComp GY Batteries Pvt. Ltd. Project report on Dross Generation in the Casting Section Project by- Abhishek Roy Project Head- Mr. Suvrajit Banerjee Under the supervision of Mr. Mohit Bhakal
  • 2. TataAutoComp GY Batteries Pvt. Ltd. Acknowledgement I have taken efforts in this project. However, it would not have been possible without the kind support and help of many individuals and organizations. I would like to extend my sincere thanks to all of them. I am highly indebted to Mr. Suvrajit Banerjee, Mr. Mohit Bhakal for their guidance and constant supervision as well as for providing necessary information regarding the project & also for their support in completing the project. I would like to express my gratitude towards operators of Casting section of TATA AutoComp GY Batteries Pvt. Ltd for their kind co-operation and encouragement which help me in completion of this project and for giving me such attention and time.
  • 3. TataAutoComp GY Batteries Pvt. Ltd. Company Profile Tata AutoComp Systems Limited, promoted by the Tata Group, provides products and services in the automotive industry to Indian and global customers, including Ashok Leyland, BMW India, Mercedes-Benz India, EicherMotors, Fiat, Force Motors, Ford India, General Motors India, Hero Honda, Hindustan Motors, Honda Scooters, Honda Siel Cars India Ltd, International Tractors John Deere India, Mahindra and Mahindra, Mahindra Renault, Man-Force Trucks, New Holland, Piaggio, Punjab Tractors, Royal Enfield, Skoda, Swaraj Mazda, Tata Motors, Toyota Kirloskar Motor Pvt. Ltd., Tractors and Farm Equipment Limited.
  • 4. TataAutoComp GY Batteries Pvt. Ltd. Company Profile (TATA AutoComp GY Batteries) TATA Green Batteries are a product of TATA AutoComp GY Batteries Pvt. Ltd. (TGY), a joint venture between TATA AutoComp Systems Ltd, India's leading auto component manufacturer and GS Yuasa International, Japan, one of the world's largest automotive battery manufacturers. These batteries are a combination of TATA AutoComp’s extensive experience in the Automotive Industry and GS Yuasa International’s superior technological know-how. With a low top-up requirement and being 90% recyclable, Tata Green Batteries allow a hassle free battery running experience
  • 5. TataAutoComp GY Batteries Pvt. Ltd. Different Sections In the Plant CASTING Pasting Assembly Charging Dispatch *The project is undergone under this section
  • 6. TataAutoComp GY Batteries Pvt. Ltd. Way to the PASTING section Raw Material Section Calcium –ve Alloy Antimony Alloy Calcium +ve Alloy Sb+ve Emergency Exit Ca+ve Ca-ve CASTING SECTION Ca+ve CorkPreparation Area CASTING SectionEntry Office Dross dumping area B1 B2 B3 B4 B5 B6 B7 B8 A1 A2 C6 C5 C4 C3 C2 C1C10 C9 C8 C7 Ca-ve Ca-ve Ca-ve Ca-ve Ca-ve Ca-ve Ca-ve Ca-ve Ca-ve Sb+ve Sb+ve Sb+ve Sb+ve Sb+ve Sb+ve Sb+ve
  • 7. TataAutoComp GY Batteries Pvt. Ltd. Gravity Casting Machine
  • 8. TataAutoComp GY Batteries Pvt. Ltd. Working Of the machine 1 2 6 5 4 3 7
  • 9. TataAutoComp GY Batteries Pvt. Ltd. Process POT (Where The molten lead is present) FEEDLINE(which transfer the molten lead) LADDLE TRIM DIE SECTION (to cut excess part of the panel) COLLECTING AREA (The final product is kept here ) MOULD(which give shape to the molten lead) ROLLER 1 2 6 5 4 3 7 The excess part is send back to the Pot
  • 10. TataAutoComp GY Batteries Pvt. Ltd. Type Pot Temp. Ladle Temp. Moving mould Temp. Fixed Mould Temp. Feed Line Temp. Sb +ve 420±30 600±30 200±30 200±30 490±30 Ca -ve 420±30 600±30 200±30 200±30 490±30 Ca +ve 420±30 600±30 200±30 200±30 490±30 Grid information
  • 11. TataAutoComp GY Batteries Pvt. Ltd. Grid Nomenclature Y M 83A Plate thickness (100-83)/10=1.7±0.1mm Grid thickness ((100-83)/10)-0.2=1.7±0.1mm Small Calcium OTHER NOTATIONS:- C Antimony G Big In case of Plate thickness =(100- )/10=2.1±0.1mm Grid thickness =((100- )/10)- 0.2=1.8±0.1mm C G 80A 79 79 80
  • 12. TataAutoComp GY Batteries Pvt. Ltd. Dross Dross is a mass of solid impurities floating on a molten metal or dispersed in the metal, such as in wrought iron. It forms on the surface of low-melting-point metals such as tin lead zinc or aluminium or alloys by oxidation of metals as tin, lead, zinc or aluminium or alloys by ox idation of the metal(s). Dross, as a solid, is distinguished from slag, which is a liquid. Dross product is not entirely waste material; for example, aluminium dross can be recycled and is used in secondary steelmaking for slag deoxidation. Dross
  • 13. TataAutoComp GY Batteries Pvt. Ltd. 16 Major Losses In a Company 8 Availability Losses Machine Loss Setup & adjusting Tool change Start-up losses Minor stoppage Speed loss Defect and rework Shutdown 5 Productivity losses Management losses Operating Motion Line organisation Logistics Adjustments 3 Production losses •Loss of energy •Die-tool losses •Yield loss
  • 14. TataAutoComp GY Batteries Pvt. Ltd. Time Study of the Machine (B3-B4) Total sample time for the production- 180 minutes No of panels to be produced– 3690 panels Actual Time taken for production- 144 minutes No of grids produced- 3168 panels Major losses occurred during the process- • Shut Down Loss/Defect and rework- 20 min • Setup Loss-5 min • Die/Tool Loss- 5 min • Line organisational loss-6 min
  • 15. TataAutoComp GY Batteries Pvt. Ltd. Date April'16 May'16 1st 237 0 2nd 432 409 3rd 385 341 4th 427 285 5th 426 321 6th 471 323 7th 373 407 8th 0 394 9th 457 412 10th 379 342 11th 431 425 12th 292 557 13th 341 444 14th 397 497 15th 324 299 16th 431 493 17th 418 266 18th 300 464 19th 206 428 20th 289 511 21st 436 515 22nd 300 442 23rd 430 459 24th 304 451 25th 366 363 26th 417 0 27th 455 0 28th 398 0 29th 367 89 30th 323 452 31st n/a 470 possible reasons- - temperature variations -manpower variation -Impurities in the ingot highest amount of dross generated
  • 16. TataAutoComp GY Batteries Pvt. Ltd. Dross Generation Data 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st April'16 237 432 385 427 426 471 373 0 457 379 431 292 341 397 324 431 418 300 206 289 436 300 430 304 366 417 455 398 367 323 0 May'16 0 409 341 285 321 323 407 394 412 342 425 557 444 497 299 493 266 464 428 511 515 442 459 451 363 0 0 0 89 452 470 0 100 200 300 400 500 600 Dross(inkg) highest amount of dross generated
  • 17. TataAutoComp GY Batteries Pvt. Ltd. Action Plan There are ways by which we can reduce the generation of dross- • By induction heating- induction heating helps in reducing dross generation and also helps in energy saving. The idea is being proposed and is in a prototype position. • By minimising the surface area of the opening of the pot- The opening present in the pot is the reason for the generation of dross as more amount of air can enter through it to oxidise with the lead. If the conveyor length is increased so that it ends at the inside the opening and the opening is made small enough so as to make the dross removal easier for the operator and putting a cover on it, the dross generation can be reduced by 5%.