High Pressure and efficient Boilers forHigh Pressure and efficient Boilers for
Cogeneration applicationsCogeneration applications
•
What is CO-GENERATION?
• This is a combined / integrated System of
production of Electrical power and useful heat by
sequential use of energy from a common fuel source
generally bagasse).
• To generate surplus power
For Best Utilization of resources
. To have Independency in power and steam
The Major advantage of Co- GenThe Major advantage of Co- Gen
power is ;-power is ;-
• A-Most techno- commercial viable Projects with short pay back.
• B-Cost of power production is very cheap compare to that of
• purchase power.
• C-Dependability and reliability with quality of power.
• D-Quick return on investments.
• E-Restore ecological imbalance.
• F-Ability to use Bio-Mass and organic matters like wood, grass and
agro wastes and also municipal wastes.
• G-Availability of power between Nov. to May when Hydel power availability
less.
• H-provides ecmomical and timely solution of Power problems.
CO-GENERATION in SUGAR MILLS
How Cogeneration Saves Energy
BOILER
ALTERNATORTURBINE
TO
PROCESS
TO PROCESS
Fuel
Air
TO
POWER
SUPPLY
CONDENSER
TO COOLING
TOWER
COGENERATION PLANT LAYOUT
Feed water
PRDS
• Better Power Quality
• Improved Reliability and run ability
• Lower Energy Costs
• Reduction CO2 in the environment
• Conserve Natural Resources
• Support Grid Infrastructure
– Fewer T&D Constraints
– Defer Costly Grid Upgrades
– Price Stability
Benefits of cogeneration
Steps for conservationSteps for conservation
1.Government of India enforced the1.Government of India enforced the
energy conservation act 2001 with effectenergy conservation act 2001 with effect
from 1.3.2002.from 1.3.2002.
2.The initial phase of 5 years would be2.The initial phase of 5 years would be
implementation of the act .implementation of the act .
3.The act provides mainly for efficient use3.The act provides mainly for efficient use
of energy and its conservation.of energy and its conservation.
4.Industry using4.Industry using
Mandatory Requirement of ActMandatory Requirement of Act
• Those unit having connected load of 5000 KWh
are called as ‘ Designated Energy Consumer’.
• As per the act it is mandatory for all designated
Energy Consumers to get Energy Audit
conducted by an Accredited Energy Auditor. And
to designate or appoint an Energy Manager.
Energy Saving potential areas in sugar industries
1.Convertion from low Pressure to HP
Boilers
2.Steam Boilers (Reducing moisture percentage
in Bagasse)
3.Crushing section
4.Evaporator section
FEASIBILITY STUDY (TYPICAL STEPS)
Energy auditing
Technical Analysis
Inception
Implementation Planning
Financing
Operation and maintenance
CASE STUDIESCASE STUDIES
• A-IMPROVEMENT PROJECT By
• I-BY RETROFITTING
• II- -RENOVATION &TECHNOLOGICAL
UPGRADATION
• B-INITIATING NEW PROJECTS
RETROFITTINGRETROFITTING
• Replacement of old 18/21Kgs/cm to HP >100bars
boilers
• A-Provision of Better control system.
• B-Efficiency improvement by Automation
• C-Reduction of unaccountable losses by
• providing dust extraction system
• D-Reduction of Boiler & TG down time &
• efficiency improvement by water & steam
• quality control
Case StudiesCase Studies
• Introducing New HP Boiler without affecting
Present Existing System
2002-03 2001-02 2000-01 1999-00 1998-99 Max Min Diff
%
Saving
scope
SL
NO. PARTICULARS UOM Actual Actual Actual Actual Actual
1 Cane Crushed MT 729598 736838 646051 700916 736663
2 No. of Crop Days 173 191 159 165 188
3 Crushing Rate/22 hours MT 4162.95 3951 4194.98 4385.11 4230.29
4 Crushing Rate/24 hours MT 4541.39 4311.12 4576.34 4783.32 4614.77
5 Crop Day Average MT 4217.33 3857 4063.22 4247.98 3918.42
6 Recovery % 9.51 9.11 9.758 9.23 8.187
7 Bagasse Moisture % 50.66 50.56 50.11 50.4 51.3 51.3 50.11 1.19 2.32
8 Steam % Cane % 48.76 50.71 48.75 49.45 49.74
9 Power / Ton of Cane KWH 24.68 25.46 25.18 25.8 24.68 1.08 4.19
DOWN TIME ANALYSIS
Rs
51.57
lakhs
per
season
10 No Cane Hrs-Mts 6.-00 57-50 142-15 154-55 204-10
11 Mechanical Hrs-Mts 64-35 59-30 4.-30 24-55 180-45 181 4.5 176 97.5
12 Electrical Hrs-Mts 11.-10 53-55 4.-00 24-25 70-00 70 4 66 94.3
13 General Cleaning Hrs-Mts 97-10 97-15 109-25 110-25 51-05 110 51.08 59.3 53.7
14 Lost % on Available Hours % 7.06 10.3 11.23 8.96 11.9 11.9 7.06 4.84 40.7
Comparison of performance during various seasns from 1998 to 2002
SL
NO PARTICULAR UOM 2002-03 2000-01 1994-95 Max Min %saving scope
Plant Sanctioned Capacity MT 5000 5000 2500
1 Cane Crushed MT 729598 646051.4 721475.5
2 No. of Crop Days 173 159 258
3 Crushing Rate / 22 hours MT 4162.9 4149.982 2819.806
4 Crushing Rate / 24 hours MT 4541.4 4576.344 3076.152
5 Crop Day Average MT 4217.3 4063.216 2796.416
6 Recovery % 9.51 9.758 9.357
7 Pol in Cane % 11.5 11.618 10.963
8 Total Losses % 2 1.871 1.617
a)Bagasse % 0.55 0.541 0.54
b)Filter Cake % 0.08 0.07 0.05
c)Final Molasses % 1.27 1.211 0.99
d)Unknown Loss % 0.1 0.049 0.037
9 Molasses % Cane % 4.52 4.449 4.415
10 Bagasse % Cane % 29.56 30.32 31.22
11 Cane Preparatory Index % 78.18
12 Bagasse Moisture % 50.66 50.11 50.52
13 Pol % Bagasse % 1.86 1.78 1.73
14 Sugar quality ICUMSA % 90to130 80-120
15 Total Available Hours HRS 4148-39 3816-33 6173-40
Coomparison of performance with best two seasons
16 Down Time Hours HRS 292-55 428-25 544-45
17 Imbibition% Fiber % 259.14 293.58 295.62
18 Milling Loss 4.12 3.78 3.69
19 Reduced Mill Extraction % 95.73 96.02 95.89
20 Reduced B.House Extraction % 91.27 91.66 93.43
21 Steam % Cane % 48.76 48.75 47.41 48.76 47.41 2.77
22 Power / Ton of Cane KWH 24.68 25.18
Rs 21.62
lakhs/seaso
n
23 Peak Period Recovery % 9.68 9.923 9.83
DOWN TIME ANALYSIS
24 No Cane HRS 6.-00 142-15 54-15
25 Mechanical HRS 64-35 4.-30 152-15 64.58 4.5 93
26 Electrical HRS 11.-10 4.-00 5.-30
27 General Cleaning HRS 97-10 109-25 164-00 109.416 97.16 11.2
28 Others HRS 112-10 167-50 168-45 167.83 112.166 33.17
29 Lost % on Avaible Hours % 7.06 11.23 8.82
30 Process Stock-Brown Sugar Qtls 2325 1477.49 694.65
341.8 213.8 128 hours
Remarks:Possible saving of running hours =128 hours
Possible increased in crushing of cane per season= 24220 MT/season
ANALYSIS OF PERFORMANCE FOR THE SEASON 2002-2003(MONTH WISE)
S
L
N
O PARTICULARS UOM DEC.02 JAN.03 FEB.03 MAR.03 APL.03 MAY.03 JUNE.03 TOTAL Max Min
%savi
ng
1 Cane Crushed MT 48558.3 128742 134980 140288 127097 128072.4 21860 729598
2 Recovery % 8.05 8.84 10.06 10.66 10.14 8.75 6.68 9.61
3 Sugar Production Qtls 3100 113875 13227.5 14747 13123.3 114975 25397 696220
4 Season Days-Crop Day Days 14 31 28 31 30 31 8 173
5 Season Days-Crushing Day Days 14 27 27 31 29 31 8 167
6 Total Available Hours HRs 332-36 744-00 672-00 744-00 720-00 744-00 192-03 4148-39
7 Total Working Hours HRs 330-51 641-40 636-35 705-45 676-15 692-10 172-28 3855-44
8 Stoppage Hours HRs 1.-45 102-20 35-25 38-15 43-45 51-50 19-35 292-55
a)Want of Cane HRs 0-00 6.-00 0-00 0-00 0-00 0-00 0-00 6.-00
b)Engineering(Mech&Elec) HRs 0-00 5.-00 5.-55 20-45 12.-40 21-35 10.-20 75-45
c)Proces
s HRs 0-00 0-50 0-00 0-30 0-00 0-00 0-00 1.-20
d)General Cleaning HRs 0-00 41-40 26-15 0-00 29-15 0-00 0-00 97-10
e)Others HRs 1.-45 48-50 3.-15 17-00 1.-50 30.15 9.-15 112-10
9 Down Time % Available % 0.53 13.75 5.27 5.14 6.08 6.97 10.-20 7.06
10 Crushing Rate / 22 hours MTs 3228.9 4414 4664.88 4373.12 4134.77 4617.712 2504.2 4162.95
11 Crushing Rate / 24 hours MTs 3522.43 4815.3 5088.96 4771 4510.66 5037.504 2731.8 4541.39
12 Crop Day Average MTs 3468.45 4153 4820.73 4525.41 4236.57 4131.368 2732.5 4217.33
13 Crushing Day Average MTs 3468.45 4768.2 4999.27 4525.41 4382.66 4131.368 2732.5 4368.85
14 Pol % Cane % 9.844 10.656 11.947 12.627 12.14 11.025 9.11 11.5
15 Total Losses % 1.8 1.828 1.898 1.993 2.01 2.284 2.443 2
a)Final Molasses % 1.13 1.143 1.218 1.306 1.31 1.369 1.45 1.27
b)Bagasse % 0.521 0.543 0.54 0.545 0.56 0.57 0.6 0.55
c)Filter Cake % 0.08 0.081 0.083 0.084 0.08 0.087 0.105 0.08
d)Unknown % 0.069 0.062 0.057 0.058 0.06 0.263 0.288 0.1
16 Reduced Mill Extraction % 94.79 95.31 95.88 96.12 96.02 95.64 94.48 95.73
17 Reduced BH. Extraction % 91.66 91.49 91.39 91.15 91.19 91.14 90.46 91.27
18 Pol % Bagasse % 1.89 1.88 1.86 1.85 1.84 1.84 1.9 1.86
19 Bagasse % Cane % 27.53 28.82 29.06 29.42 30.19 30.75 31.63 29.56
20 Final Molasses Purity % 29.6 30.45 30.99 31.71 31.51 31.55 34.15 31.35
21 Molasses % Cane % 4.26 4.17 4.37 4.61 4.66 4.85 4.93 4.52
22 Steam % Cane % 49.47 47.69 47.62 48.37 47.96 48.18 70.91 48.76
23 Power per Ton of Cane Units 23.61 23.61 23.27 24.69 25.13 25.57 34.3 24.63 34.3 23.27 32.2
Remarks: Saving of power in terms of money will be Rs 77.15 lakhs /month. @Rs 5.00/KWH
% Recovery during 2002-03
8.05 8.84
10.06 10.65 10.14
8.75
6.68
0
2
4
6
8
10
12
Dec Jan Feb Mar Apl May Jun
Recovery
%bagasse moisture
27.53 28.82 29.06 29.42 30.19 30.75 31.63
0
5
10
15
20
25
30
35
Dec Jan Feb Mar Apl May Jun
Dec Jan Feb Mar Apl May Jun
%bagassemoisture
Column 7
29
28.6
28.2
27.8
27.4
power consumption per ton of cane
crushed
23.61 23.61 23.27 24.69 25.13 25.57
34.3
0
5
10
15
20
25
30
35
40
Dec Jan Feb Mar Apl May Jun
powerconsumedpertonofcane
BY Technological Up gradationBY Technological Up gradation
• A-Replacement of old low pressure Boilers to
High pressure to get the benefits
improved cycle efficiency.
• B-Providing Topping up TG Set to optimize
expenses on Electrical system.
• C-Better environments by Providing
• Emission monitoring.
Acquire Best Available Technology inAcquire Best Available Technology in
New ProjectsNew Projects
• A-Select Most modern and reliable
• equipments
• B-Design Tailor make System.
• C-Select Flexible System for Better
utilization of resources and Better economy.
KCP Boiler
70 TPH, 43.4ata &
400ºC
TBW Boiler
70 TPH, 67ata & 485ºC
9.74
MW,
70tph
TG
ComparisonComparison
Prevailing SystemPrevailing System Proposed SystemProposed System
Multi fuel Boiler
105ata, 525º C, 88%
Topping
upTG
set
18.6
MW,
61tph
TG
GEC Turbine
SIEMENS Turbine
C
C
11 KV BUS
9.74
MW,
70tph
TG
18.6
MW,
61tph
TG
C C
GEC Turbine SIEMENS Turbine
67ata&485ºC
42ata&400ºC
Actual Thermal Efficiency of existing power plantActual Thermal Efficiency of existing power plant
on dateon date
Heat value of KPC boiler ≈ 767 Kcal/kg (from steam table)
(at 43.4 ata and 400ºC)
Then net heat value of KPC boiler ≈ 767 – 105 ≈ 662 Kcal/kg.
Thermal efficiency of KPC boiler = ηth = (Net heat value * Total Steam generation) / (CV of
the bagasse * total bagasse consumption)
ηth = (662 * 122759) / (2277 * 61672)
= 57.99% ≈ 58% ( against 69% of design)
Heat value of TBW boiler = 807.7 Kcal/kg (From steam table)
(at 67 ata and 485ºC)
Then net heat value of TBW boiler ≈ 807.7 – 105 ≈ 702.7 Kcal/kg
GCV of coal = (CV of coal * total coal consumption) / Total fuel consumption
= (5500 * 4622) / 56213 = 452.22 Kcal/kg
GCV of Bagasse = (CV of bagasse * total bagasse consumption) / Total fuel consumption
= (2277 * 51591) / 56213 = 2089.77 Kcal/kg
Then net GCV = 452.22 + 2089.77 = 2542 Kcal/kg
Then net heat gain = heat gain * steam required for cane * efficiency of Topping TG set
= 13.8 * 125*103
* 0.9
= 1552.5 Kcal/kg
Total power generation = 1552.5/860 = 1.8 MW
Transfer rate = 1800 * 24 * 330 * 1.96 = 2.79 crore.
Thermal efficiency of TBW boiler = ηth = (Net heat value * Total Steam generation) /
(Net GCV * total fuel consumption)
= (702.7 * 129399) * 100 / (2542 * 56213)
ηth = 63% (against 71.75% of design)
Average thermal efficiency of KPC & TBW boiler = (58+63) / 2 = 60.5%
Expected direct efficiency of multifuel boiler = 84%
Then fuel saving = 84 – 60.5 = 23.5%
Cost of fuel saving = Actual cane crushed * % of fuel caned * % fuel save
for 02-03 = 729598 * 0.3 * 0.235
= Rs. 51436.65
Then total saving of bagasse = 51437 * 500
= Rs. 2,57,815
= 2.57 crore
Net gain in power = 2.79 crore
Net gain in fuel save = 2.57 crore
Then total gain = 2.79+2.57 = 5.36 crore
Heat value of AFBC boiler = 821.5 Kcal/kg (from steam table)
(at 515º C and 105 kg/cm2
)
Then net heat gain = 821.5 – 807.7
= 13.8 Kcal/kg
From data
Budgeted cane crushed/year = 775000 M.T
Actual cane crushed/year = 72598.401 M.T
No. of crop days = 170 days
% Steam required for cane = 48%
% of bagasse in cane = 30%
Then steam required for cane/hr. = (budgeted cane crushed * %steam reqd. for cane) /
(No. of days * 24)
= (775000 * 0.48) / (170*24)
= 91.176 tph
≈ 100 tph
For maximum efficiency
steam required for cane/hr = 100/0.80 = 125 tph
The Major advantage of Co- GenThe Major advantage of Co- Gen
power is ;-power is ;-
• A-Most techno- commercial viable Projects with short pay back.
• B-Cost of power production is very cheap compare to that of purchase
power.
• C-Dependability and reliability with quality of power.
• D-Quick return on investments.
• E-Restore ecological imbalance.
• F-Ability to use Bio-Mass and organic matters like wood, grass and agro
and
• municipal wastes.
• G-Availability of power between Nov. to May when Hydel power availability
• less.
•
Continue---
• H-provides ecmomical and timeluy solution of Power problems.
STEPS FOR SAVINGSSTEPS FOR SAVINGS
• !-Saving of Bagasse by adopting high technology HP Boilers
• 2-Reduction of moisture in bagasse 50 to 45% by improving Milling
Technique.
• 3-Reduction in Process steam consumptions in evaporator and Prime
movers
• BLTFF evaporators
• 4- Reduction in live s team consumption by using multi stage reaction
Turbines.
• 5- Reduction in over consumptions of power TCH using new technique of
•
• Variable drives and high efficient auxiliaries.
• 6-improve crushing rate by having quality power

Contenu connexe

Tendances

vocational training report on CSPGCL korba, chhattisgarh
vocational training report on CSPGCL korba, chhattisgarhvocational training report on CSPGCL korba, chhattisgarh
vocational training report on CSPGCL korba, chhattisgarhsahilthakur03
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plantra m
 
Combined heat power plant (chp)
Combined heat power plant (chp)Combined heat power plant (chp)
Combined heat power plant (chp)numanahmed88
 
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGCOAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGBalamurugan Subburaj
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station workingRonak Thakare
 
27. COGENERATION.ppt
27. COGENERATION.ppt27. COGENERATION.ppt
27. COGENERATION.pptRENERGISTICS
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 
Candu reactor ppt
Candu reactor pptCandu reactor ppt
Candu reactor pptASHWIN A
 
Ash handling system
Ash handling systemAsh handling system
Ash handling systemVvs Pradeep
 
Cogeneration
CogenerationCogeneration
Cogenerationskdass23
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plantTaral Soliya
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT Amit Gupta
 
Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Aman Gupta
 

Tendances (20)

vocational training report on CSPGCL korba, chhattisgarh
vocational training report on CSPGCL korba, chhattisgarhvocational training report on CSPGCL korba, chhattisgarh
vocational training report on CSPGCL korba, chhattisgarh
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Power plant economics
Power plant economicsPower plant economics
Power plant economics
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Combined heat power plant (chp)
Combined heat power plant (chp)Combined heat power plant (chp)
Combined heat power plant (chp)
 
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGCOAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 
27. COGENERATION.ppt
27. COGENERATION.ppt27. COGENERATION.ppt
27. COGENERATION.ppt
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
Candu reactor ppt
Candu reactor pptCandu reactor ppt
Candu reactor ppt
 
Ash handling system
Ash handling systemAsh handling system
Ash handling system
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plant
 
Topic cogeneration
Topic cogeneration Topic cogeneration
Topic cogeneration
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant
 

Similaire à Cogeneration power plant

Cea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_ceaCea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_ceaProbodh Mallick
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-BokhariAssad Bokhari
 
Computer aided evaluation of steam power plants performance based on energy a...
Computer aided evaluation of steam power plants performance based on energy a...Computer aided evaluation of steam power plants performance based on energy a...
Computer aided evaluation of steam power plants performance based on energy a...Ahmed Noaman
 
Analysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility SystemAnalysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility SystemDeeptej Kolambkar
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfBlentBulut5
 
Flywheel Energy Storage
Flywheel Energy StorageFlywheel Energy Storage
Flywheel Energy Storagemichaeljmack
 
Industrial energy-saving
Industrial energy-savingIndustrial energy-saving
Industrial energy-savingsachindesai055
 
PM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptxPM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptxsantosh509014
 
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...Rohan Raibagkar
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundationguest17a0764
 
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdfBest-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdfprabhakarjha82
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
 
Boiler ea case study 16 jan 2012 varanasi
Boiler ea case study  16 jan 2012 varanasiBoiler ea case study  16 jan 2012 varanasi
Boiler ea case study 16 jan 2012 varanasiD.Pawan Kumar
 
Improving steam boiler operating efficiency
Improving steam boiler operating efficiencyImproving steam boiler operating efficiency
Improving steam boiler operating efficiencymatsoh
 
Improving steam boiler operating efficiency
Improving steam boiler operating efficiencyImproving steam boiler operating efficiency
Improving steam boiler operating efficiencyNaqqash Sajid
 
PLD-FINAL-REPORT
PLD-FINAL-REPORTPLD-FINAL-REPORT
PLD-FINAL-REPORTadnan malak
 

Similaire à Cogeneration power plant (20)

13 b shukla
13 b shukla13 b shukla
13 b shukla
 
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_ceaCea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-Bokhari
 
Computer aided evaluation of steam power plants performance based on energy a...
Computer aided evaluation of steam power plants performance based on energy a...Computer aided evaluation of steam power plants performance based on energy a...
Computer aided evaluation of steam power plants performance based on energy a...
 
Analysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility SystemAnalysis and Optimization of Mechanical Utility System
Analysis and Optimization of Mechanical Utility System
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
 
Flywheel Energy Storage
Flywheel Energy StorageFlywheel Energy Storage
Flywheel Energy Storage
 
Industrial energy-saving
Industrial energy-savingIndustrial energy-saving
Industrial energy-saving
 
PM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptxPM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptx
 
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundation
 
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdfBest-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
Boiler ea case study 16 jan 2012 varanasi
Boiler ea case study  16 jan 2012 varanasiBoiler ea case study  16 jan 2012 varanasi
Boiler ea case study 16 jan 2012 varanasi
 
Improving steam boiler operating efficiency
Improving steam boiler operating efficiencyImproving steam boiler operating efficiency
Improving steam boiler operating efficiency
 
Improving steam boiler operating efficiency
Improving steam boiler operating efficiencyImproving steam boiler operating efficiency
Improving steam boiler operating efficiency
 
COAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdfCOAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdf
 
Air cooled condensers
Air cooled condensersAir cooled condensers
Air cooled condensers
 
PLD-FINAL-REPORT
PLD-FINAL-REPORTPLD-FINAL-REPORT
PLD-FINAL-REPORT
 
MAR,23.pptx
MAR,23.pptxMAR,23.pptx
MAR,23.pptx
 

Plus de Ashish Kumar Jain

Proximate & ultimate analysis of coal
Proximate & ultimate analysis of coalProximate & ultimate analysis of coal
Proximate & ultimate analysis of coalAshish Kumar Jain
 
Assessment of boiler performance
Assessment of boiler performanceAssessment of boiler performance
Assessment of boiler performanceAshish Kumar Jain
 
Belt conveyor-manufacturing & utilization
Belt conveyor-manufacturing & utilizationBelt conveyor-manufacturing & utilization
Belt conveyor-manufacturing & utilizationAshish Kumar Jain
 
Permacare RO membrane expertise
Permacare RO membrane expertisePermacare RO membrane expertise
Permacare RO membrane expertiseAshish Kumar Jain
 
Hydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheetHydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheetAshish Kumar Jain
 
Bhel STEAM safety valve_1700_series
Bhel STEAM safety valve_1700_seriesBhel STEAM safety valve_1700_series
Bhel STEAM safety valve_1700_seriesAshish Kumar Jain
 
Deaerator -thermal power plants
Deaerator  -thermal power plantsDeaerator  -thermal power plants
Deaerator -thermal power plantsAshish Kumar Jain
 
Chiller absorption machine working principle
Chiller absorption machine  working principleChiller absorption machine  working principle
Chiller absorption machine working principleAshish Kumar Jain
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
High speed balancing of turbine rotors
High speed balancing of turbine rotorsHigh speed balancing of turbine rotors
High speed balancing of turbine rotorsAshish Kumar Jain
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations Ashish Kumar Jain
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPEAshish Kumar Jain
 

Plus de Ashish Kumar Jain (20)

Proximate & ultimate analysis of coal
Proximate & ultimate analysis of coalProximate & ultimate analysis of coal
Proximate & ultimate analysis of coal
 
Assessment of boiler performance
Assessment of boiler performanceAssessment of boiler performance
Assessment of boiler performance
 
Condensate
Condensate Condensate
Condensate
 
Belt conveyor-manufacturing & utilization
Belt conveyor-manufacturing & utilizationBelt conveyor-manufacturing & utilization
Belt conveyor-manufacturing & utilization
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Permacare RO membrane expertise
Permacare RO membrane expertisePermacare RO membrane expertise
Permacare RO membrane expertise
 
Governing system
Governing systemGoverning system
Governing system
 
Generator capability curve
Generator capability curve Generator capability curve
Generator capability curve
 
Hydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheetHydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheet
 
Bhel STEAM safety valve_1700_series
Bhel STEAM safety valve_1700_seriesBhel STEAM safety valve_1700_series
Bhel STEAM safety valve_1700_series
 
Deaerator -thermal power plants
Deaerator  -thermal power plantsDeaerator  -thermal power plants
Deaerator -thermal power plants
 
Chiller absorption machine working principle
Chiller absorption machine  working principleChiller absorption machine  working principle
Chiller absorption machine working principle
 
Belt Conveyor System
Belt Conveyor SystemBelt Conveyor System
Belt Conveyor System
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
High speed balancing of turbine rotors
High speed balancing of turbine rotorsHigh speed balancing of turbine rotors
High speed balancing of turbine rotors
 
Excel Tips in computers
Excel Tips in computersExcel Tips in computers
Excel Tips in computers
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Boiler -Emergency Handling
 Boiler -Emergency Handling Boiler -Emergency Handling
Boiler -Emergency Handling
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycle
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPE
 

Dernier

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 

Dernier (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 

Cogeneration power plant

  • 1. High Pressure and efficient Boilers forHigh Pressure and efficient Boilers for Cogeneration applicationsCogeneration applications •
  • 2. What is CO-GENERATION? • This is a combined / integrated System of production of Electrical power and useful heat by sequential use of energy from a common fuel source generally bagasse). • To generate surplus power For Best Utilization of resources . To have Independency in power and steam
  • 3. The Major advantage of Co- GenThe Major advantage of Co- Gen power is ;-power is ;- • A-Most techno- commercial viable Projects with short pay back. • B-Cost of power production is very cheap compare to that of • purchase power. • C-Dependability and reliability with quality of power. • D-Quick return on investments. • E-Restore ecological imbalance. • F-Ability to use Bio-Mass and organic matters like wood, grass and agro wastes and also municipal wastes. • G-Availability of power between Nov. to May when Hydel power availability less. • H-provides ecmomical and timely solution of Power problems.
  • 7. • Better Power Quality • Improved Reliability and run ability • Lower Energy Costs • Reduction CO2 in the environment • Conserve Natural Resources • Support Grid Infrastructure – Fewer T&D Constraints – Defer Costly Grid Upgrades – Price Stability Benefits of cogeneration
  • 8. Steps for conservationSteps for conservation 1.Government of India enforced the1.Government of India enforced the energy conservation act 2001 with effectenergy conservation act 2001 with effect from 1.3.2002.from 1.3.2002. 2.The initial phase of 5 years would be2.The initial phase of 5 years would be implementation of the act .implementation of the act . 3.The act provides mainly for efficient use3.The act provides mainly for efficient use of energy and its conservation.of energy and its conservation. 4.Industry using4.Industry using
  • 9. Mandatory Requirement of ActMandatory Requirement of Act • Those unit having connected load of 5000 KWh are called as ‘ Designated Energy Consumer’. • As per the act it is mandatory for all designated Energy Consumers to get Energy Audit conducted by an Accredited Energy Auditor. And to designate or appoint an Energy Manager.
  • 10. Energy Saving potential areas in sugar industries 1.Convertion from low Pressure to HP Boilers 2.Steam Boilers (Reducing moisture percentage in Bagasse) 3.Crushing section 4.Evaporator section
  • 11. FEASIBILITY STUDY (TYPICAL STEPS) Energy auditing Technical Analysis Inception Implementation Planning Financing Operation and maintenance
  • 12. CASE STUDIESCASE STUDIES • A-IMPROVEMENT PROJECT By • I-BY RETROFITTING • II- -RENOVATION &TECHNOLOGICAL UPGRADATION • B-INITIATING NEW PROJECTS
  • 13. RETROFITTINGRETROFITTING • Replacement of old 18/21Kgs/cm to HP >100bars boilers • A-Provision of Better control system. • B-Efficiency improvement by Automation • C-Reduction of unaccountable losses by • providing dust extraction system • D-Reduction of Boiler & TG down time & • efficiency improvement by water & steam • quality control
  • 14. Case StudiesCase Studies • Introducing New HP Boiler without affecting Present Existing System
  • 15. 2002-03 2001-02 2000-01 1999-00 1998-99 Max Min Diff % Saving scope SL NO. PARTICULARS UOM Actual Actual Actual Actual Actual 1 Cane Crushed MT 729598 736838 646051 700916 736663 2 No. of Crop Days 173 191 159 165 188 3 Crushing Rate/22 hours MT 4162.95 3951 4194.98 4385.11 4230.29 4 Crushing Rate/24 hours MT 4541.39 4311.12 4576.34 4783.32 4614.77 5 Crop Day Average MT 4217.33 3857 4063.22 4247.98 3918.42 6 Recovery % 9.51 9.11 9.758 9.23 8.187 7 Bagasse Moisture % 50.66 50.56 50.11 50.4 51.3 51.3 50.11 1.19 2.32 8 Steam % Cane % 48.76 50.71 48.75 49.45 49.74 9 Power / Ton of Cane KWH 24.68 25.46 25.18 25.8 24.68 1.08 4.19 DOWN TIME ANALYSIS Rs 51.57 lakhs per season 10 No Cane Hrs-Mts 6.-00 57-50 142-15 154-55 204-10 11 Mechanical Hrs-Mts 64-35 59-30 4.-30 24-55 180-45 181 4.5 176 97.5 12 Electrical Hrs-Mts 11.-10 53-55 4.-00 24-25 70-00 70 4 66 94.3 13 General Cleaning Hrs-Mts 97-10 97-15 109-25 110-25 51-05 110 51.08 59.3 53.7 14 Lost % on Available Hours % 7.06 10.3 11.23 8.96 11.9 11.9 7.06 4.84 40.7 Comparison of performance during various seasns from 1998 to 2002
  • 16. SL NO PARTICULAR UOM 2002-03 2000-01 1994-95 Max Min %saving scope Plant Sanctioned Capacity MT 5000 5000 2500 1 Cane Crushed MT 729598 646051.4 721475.5 2 No. of Crop Days 173 159 258 3 Crushing Rate / 22 hours MT 4162.9 4149.982 2819.806 4 Crushing Rate / 24 hours MT 4541.4 4576.344 3076.152 5 Crop Day Average MT 4217.3 4063.216 2796.416 6 Recovery % 9.51 9.758 9.357 7 Pol in Cane % 11.5 11.618 10.963 8 Total Losses % 2 1.871 1.617 a)Bagasse % 0.55 0.541 0.54 b)Filter Cake % 0.08 0.07 0.05 c)Final Molasses % 1.27 1.211 0.99 d)Unknown Loss % 0.1 0.049 0.037 9 Molasses % Cane % 4.52 4.449 4.415 10 Bagasse % Cane % 29.56 30.32 31.22 11 Cane Preparatory Index % 78.18 12 Bagasse Moisture % 50.66 50.11 50.52 13 Pol % Bagasse % 1.86 1.78 1.73 14 Sugar quality ICUMSA % 90to130 80-120 15 Total Available Hours HRS 4148-39 3816-33 6173-40 Coomparison of performance with best two seasons
  • 17. 16 Down Time Hours HRS 292-55 428-25 544-45 17 Imbibition% Fiber % 259.14 293.58 295.62 18 Milling Loss 4.12 3.78 3.69 19 Reduced Mill Extraction % 95.73 96.02 95.89 20 Reduced B.House Extraction % 91.27 91.66 93.43 21 Steam % Cane % 48.76 48.75 47.41 48.76 47.41 2.77 22 Power / Ton of Cane KWH 24.68 25.18 Rs 21.62 lakhs/seaso n 23 Peak Period Recovery % 9.68 9.923 9.83 DOWN TIME ANALYSIS 24 No Cane HRS 6.-00 142-15 54-15 25 Mechanical HRS 64-35 4.-30 152-15 64.58 4.5 93 26 Electrical HRS 11.-10 4.-00 5.-30 27 General Cleaning HRS 97-10 109-25 164-00 109.416 97.16 11.2 28 Others HRS 112-10 167-50 168-45 167.83 112.166 33.17 29 Lost % on Avaible Hours % 7.06 11.23 8.82 30 Process Stock-Brown Sugar Qtls 2325 1477.49 694.65 341.8 213.8 128 hours Remarks:Possible saving of running hours =128 hours Possible increased in crushing of cane per season= 24220 MT/season
  • 18. ANALYSIS OF PERFORMANCE FOR THE SEASON 2002-2003(MONTH WISE) S L N O PARTICULARS UOM DEC.02 JAN.03 FEB.03 MAR.03 APL.03 MAY.03 JUNE.03 TOTAL Max Min %savi ng 1 Cane Crushed MT 48558.3 128742 134980 140288 127097 128072.4 21860 729598 2 Recovery % 8.05 8.84 10.06 10.66 10.14 8.75 6.68 9.61 3 Sugar Production Qtls 3100 113875 13227.5 14747 13123.3 114975 25397 696220 4 Season Days-Crop Day Days 14 31 28 31 30 31 8 173 5 Season Days-Crushing Day Days 14 27 27 31 29 31 8 167 6 Total Available Hours HRs 332-36 744-00 672-00 744-00 720-00 744-00 192-03 4148-39 7 Total Working Hours HRs 330-51 641-40 636-35 705-45 676-15 692-10 172-28 3855-44 8 Stoppage Hours HRs 1.-45 102-20 35-25 38-15 43-45 51-50 19-35 292-55 a)Want of Cane HRs 0-00 6.-00 0-00 0-00 0-00 0-00 0-00 6.-00 b)Engineering(Mech&Elec) HRs 0-00 5.-00 5.-55 20-45 12.-40 21-35 10.-20 75-45
  • 19. c)Proces s HRs 0-00 0-50 0-00 0-30 0-00 0-00 0-00 1.-20 d)General Cleaning HRs 0-00 41-40 26-15 0-00 29-15 0-00 0-00 97-10 e)Others HRs 1.-45 48-50 3.-15 17-00 1.-50 30.15 9.-15 112-10 9 Down Time % Available % 0.53 13.75 5.27 5.14 6.08 6.97 10.-20 7.06 10 Crushing Rate / 22 hours MTs 3228.9 4414 4664.88 4373.12 4134.77 4617.712 2504.2 4162.95 11 Crushing Rate / 24 hours MTs 3522.43 4815.3 5088.96 4771 4510.66 5037.504 2731.8 4541.39 12 Crop Day Average MTs 3468.45 4153 4820.73 4525.41 4236.57 4131.368 2732.5 4217.33 13 Crushing Day Average MTs 3468.45 4768.2 4999.27 4525.41 4382.66 4131.368 2732.5 4368.85 14 Pol % Cane % 9.844 10.656 11.947 12.627 12.14 11.025 9.11 11.5 15 Total Losses % 1.8 1.828 1.898 1.993 2.01 2.284 2.443 2 a)Final Molasses % 1.13 1.143 1.218 1.306 1.31 1.369 1.45 1.27 b)Bagasse % 0.521 0.543 0.54 0.545 0.56 0.57 0.6 0.55 c)Filter Cake % 0.08 0.081 0.083 0.084 0.08 0.087 0.105 0.08 d)Unknown % 0.069 0.062 0.057 0.058 0.06 0.263 0.288 0.1 16 Reduced Mill Extraction % 94.79 95.31 95.88 96.12 96.02 95.64 94.48 95.73 17 Reduced BH. Extraction % 91.66 91.49 91.39 91.15 91.19 91.14 90.46 91.27 18 Pol % Bagasse % 1.89 1.88 1.86 1.85 1.84 1.84 1.9 1.86 19 Bagasse % Cane % 27.53 28.82 29.06 29.42 30.19 30.75 31.63 29.56 20 Final Molasses Purity % 29.6 30.45 30.99 31.71 31.51 31.55 34.15 31.35 21 Molasses % Cane % 4.26 4.17 4.37 4.61 4.66 4.85 4.93 4.52 22 Steam % Cane % 49.47 47.69 47.62 48.37 47.96 48.18 70.91 48.76 23 Power per Ton of Cane Units 23.61 23.61 23.27 24.69 25.13 25.57 34.3 24.63 34.3 23.27 32.2 Remarks: Saving of power in terms of money will be Rs 77.15 lakhs /month. @Rs 5.00/KWH
  • 20. % Recovery during 2002-03 8.05 8.84 10.06 10.65 10.14 8.75 6.68 0 2 4 6 8 10 12 Dec Jan Feb Mar Apl May Jun Recovery
  • 21. %bagasse moisture 27.53 28.82 29.06 29.42 30.19 30.75 31.63 0 5 10 15 20 25 30 35 Dec Jan Feb Mar Apl May Jun Dec Jan Feb Mar Apl May Jun %bagassemoisture Column 7 29 28.6 28.2 27.8 27.4
  • 22. power consumption per ton of cane crushed 23.61 23.61 23.27 24.69 25.13 25.57 34.3 0 5 10 15 20 25 30 35 40 Dec Jan Feb Mar Apl May Jun powerconsumedpertonofcane
  • 23. BY Technological Up gradationBY Technological Up gradation • A-Replacement of old low pressure Boilers to High pressure to get the benefits improved cycle efficiency. • B-Providing Topping up TG Set to optimize expenses on Electrical system. • C-Better environments by Providing • Emission monitoring.
  • 24. Acquire Best Available Technology inAcquire Best Available Technology in New ProjectsNew Projects • A-Select Most modern and reliable • equipments • B-Design Tailor make System. • C-Select Flexible System for Better utilization of resources and Better economy.
  • 25. KCP Boiler 70 TPH, 43.4ata & 400ºC TBW Boiler 70 TPH, 67ata & 485ºC 9.74 MW, 70tph TG ComparisonComparison Prevailing SystemPrevailing System Proposed SystemProposed System Multi fuel Boiler 105ata, 525º C, 88% Topping upTG set 18.6 MW, 61tph TG GEC Turbine SIEMENS Turbine C C 11 KV BUS 9.74 MW, 70tph TG 18.6 MW, 61tph TG C C GEC Turbine SIEMENS Turbine 67ata&485ºC 42ata&400ºC
  • 26. Actual Thermal Efficiency of existing power plantActual Thermal Efficiency of existing power plant on dateon date Heat value of KPC boiler ≈ 767 Kcal/kg (from steam table) (at 43.4 ata and 400ºC) Then net heat value of KPC boiler ≈ 767 – 105 ≈ 662 Kcal/kg. Thermal efficiency of KPC boiler = ηth = (Net heat value * Total Steam generation) / (CV of the bagasse * total bagasse consumption) ηth = (662 * 122759) / (2277 * 61672) = 57.99% ≈ 58% ( against 69% of design) Heat value of TBW boiler = 807.7 Kcal/kg (From steam table) (at 67 ata and 485ºC) Then net heat value of TBW boiler ≈ 807.7 – 105 ≈ 702.7 Kcal/kg GCV of coal = (CV of coal * total coal consumption) / Total fuel consumption = (5500 * 4622) / 56213 = 452.22 Kcal/kg GCV of Bagasse = (CV of bagasse * total bagasse consumption) / Total fuel consumption = (2277 * 51591) / 56213 = 2089.77 Kcal/kg Then net GCV = 452.22 + 2089.77 = 2542 Kcal/kg
  • 27. Then net heat gain = heat gain * steam required for cane * efficiency of Topping TG set = 13.8 * 125*103 * 0.9 = 1552.5 Kcal/kg Total power generation = 1552.5/860 = 1.8 MW Transfer rate = 1800 * 24 * 330 * 1.96 = 2.79 crore.
  • 28. Thermal efficiency of TBW boiler = ηth = (Net heat value * Total Steam generation) / (Net GCV * total fuel consumption) = (702.7 * 129399) * 100 / (2542 * 56213) ηth = 63% (against 71.75% of design) Average thermal efficiency of KPC & TBW boiler = (58+63) / 2 = 60.5%
  • 29. Expected direct efficiency of multifuel boiler = 84% Then fuel saving = 84 – 60.5 = 23.5% Cost of fuel saving = Actual cane crushed * % of fuel caned * % fuel save for 02-03 = 729598 * 0.3 * 0.235 = Rs. 51436.65 Then total saving of bagasse = 51437 * 500 = Rs. 2,57,815 = 2.57 crore Net gain in power = 2.79 crore Net gain in fuel save = 2.57 crore Then total gain = 2.79+2.57 = 5.36 crore
  • 30. Heat value of AFBC boiler = 821.5 Kcal/kg (from steam table) (at 515º C and 105 kg/cm2 ) Then net heat gain = 821.5 – 807.7 = 13.8 Kcal/kg From data Budgeted cane crushed/year = 775000 M.T Actual cane crushed/year = 72598.401 M.T No. of crop days = 170 days % Steam required for cane = 48% % of bagasse in cane = 30% Then steam required for cane/hr. = (budgeted cane crushed * %steam reqd. for cane) / (No. of days * 24) = (775000 * 0.48) / (170*24) = 91.176 tph ≈ 100 tph For maximum efficiency steam required for cane/hr = 100/0.80 = 125 tph
  • 31. The Major advantage of Co- GenThe Major advantage of Co- Gen power is ;-power is ;- • A-Most techno- commercial viable Projects with short pay back. • B-Cost of power production is very cheap compare to that of purchase power. • C-Dependability and reliability with quality of power. • D-Quick return on investments. • E-Restore ecological imbalance. • F-Ability to use Bio-Mass and organic matters like wood, grass and agro and • municipal wastes. • G-Availability of power between Nov. to May when Hydel power availability • less. • Continue--- • H-provides ecmomical and timeluy solution of Power problems.
  • 32. STEPS FOR SAVINGSSTEPS FOR SAVINGS • !-Saving of Bagasse by adopting high technology HP Boilers • 2-Reduction of moisture in bagasse 50 to 45% by improving Milling Technique. • 3-Reduction in Process steam consumptions in evaporator and Prime movers • BLTFF evaporators • 4- Reduction in live s team consumption by using multi stage reaction Turbines. • 5- Reduction in over consumptions of power TCH using new technique of • • Variable drives and high efficient auxiliaries. • 6-improve crushing rate by having quality power