NEDUET
 SITE ENGINEERING SURVEYS
 PRELIMINARY DESIGN
 DETAILED ENGINEERING DRAWINGS
 FEASIBILITY DOCUMENTS
SOIL TEST REPORTS
BUILDING EVALUATION REPORT
STRUCTURE STABILITY CERTIFICATE
SURVEY
ROOF TOP SITES
1) Columns Verification
2) Slab thickness
Building Structural
Conditions
GREEN FIELD SITES
1) Acquire Area
2) Site Levels
ROOF SLAB WITHOUT STOREY MARGIN
ROOF SLAB WITH STOREY MARGIN
ACQUIRED AREA
SITE LEVELS MARKING
Roof Top Layout Designing Based On :
•Column size ,should not be > 6”
•Site (commercial ,residential building) structural condition
•Slab thickness should not be >150mm
•Other structural perspective to ensure building is safe for further
construction /implementation work
• Design proposal furnished as per client requirements
Green Field Layout Designing Based On :
• Plot size or area that need to acquired
•Area that need to be acquire must be sufficient enough to design raft
foundation as per edb standards.
LIMITATION
•DG pads cannot be proposed at Raft foundation.
ARCHITECTURAL AND STRUCTURAL DRAWINGS
• Detail drawings designed over approved layouts by client
•Detailing of Reinforcement in structural members designing
•Reinforcement shall be grade 60 in accordance with ASTMA615
•Foundation designing
FOUNDATION DETAIL BEAMS DETAIL BAR BENDING SCHEDULE
ROOF TOP SITES DESIGN
GREEN FIELD SITES DESIGN
•Raft size design according to bearing capacity ,that would be provided
after soil test .
•All reinforced concrete design is according to ACI318-05
•Structural steel design is according to AISC.
RAFT PLAN
RAFT ELEVATION
BAR BENDING SCHEDULE
Detailed drawings also include:
•Electrical and earthling drawings
•Tower section drawings
Tower arrangement
EARTHING PIT DETAIL
POWER DETAIL
SOIL REPORT:
For green field sites soil test perform in order to evaluate
• Bearing capacity of soil
•Water ground level
•Soil type
•Accurate site level w.r.t road level
BUILDING EVALUATION REPORT:
•BER merge the information of exiting structure to ensure weather
building columns /beams and foundation feasible to take the additional
load imposed due to telecommunication tower and further construction
STRUCTURE STABILITY CERTIFICATE:
•SSC’S issued to ensure that design structure is safe and designed in
accordance with latest standard specification including wind
pressure and earthquake effects.
•SSC’S certified after completely checking the area, where the
further construction required.
•Check additional stresses in columns and pressure on footings due to
dead load.
•Check additional stresses in columns and pressure on footings due to
wind load.
•Calculate the reactions on the columns and footings.

Contenu connexe

Tendances

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Fred Teichman
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumarankumaraguru paran
 
IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...
IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...
IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...IRJET Journal
 
Microwave Tower Presentation.ppt
Microwave Tower Presentation.pptMicrowave Tower Presentation.ppt
Microwave Tower Presentation.pptRuturajJadhav25
 
Part 4 Mods - Tower and Foundation Modifications on vertical structures
Part 4 Mods  - Tower and Foundation Modifications on vertical structures Part 4 Mods  - Tower and Foundation Modifications on vertical structures
Part 4 Mods - Tower and Foundation Modifications on vertical structures Fred Teichman
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission TowerAbhijit Kumar
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guideibrahimnabil17
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...van den Dool Dick
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 

Tendances (20)

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...
IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...
IRJET- Analysis of Four Legged Steel Telecommunication Tower-Equivalent Stati...
 
In Building Solution
In Building SolutionIn Building Solution
In Building Solution
 
Microwave Tower Presentation.ppt
Microwave Tower Presentation.pptMicrowave Tower Presentation.ppt
Microwave Tower Presentation.ppt
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
IBS Training
IBS TrainingIBS Training
IBS Training
 
Part 4 Mods - Tower and Foundation Modifications on vertical structures
Part 4 Mods  - Tower and Foundation Modifications on vertical structures Part 4 Mods  - Tower and Foundation Modifications on vertical structures
Part 4 Mods - Tower and Foundation Modifications on vertical structures
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission Tower
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guide
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
resume
resumeresume
resume
 
Resume
ResumeResume
Resume
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 

Similaire à Telecommunication Tower

Hafiz A Waheed Portfolio
Hafiz A Waheed Portfolio Hafiz A Waheed Portfolio
Hafiz A Waheed Portfolio Hafiz Waheed
 
Structural Design of Residential Buildings - Introduction
Structural Design of Residential Buildings - IntroductionStructural Design of Residential Buildings - Introduction
Structural Design of Residential Buildings - IntroductionPrakashRavindran5
 
Chapter 10 structure construction
Chapter 10  structure constructionChapter 10  structure construction
Chapter 10 structure constructionmohdasrimohdhasim
 
Design steps of structure.
Design steps of structure.Design steps of structure.
Design steps of structure.Hatindera Singh
 
Foundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptxFoundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptxyeah43
 
presentation on flat plate
 presentation on flat plate presentation on flat plate
presentation on flat platesharifulaust
 
shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )sharifulaust
 
Structure analysis and design
Structure analysis and designStructure analysis and design
Structure analysis and designKiran Birdi
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of buildingKrishnagnr
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptxdharmveersingh60
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
Brochure contractor registration_guidelines
Brochure contractor registration_guidelinesBrochure contractor registration_guidelines
Brochure contractor registration_guidelinesmuhammad Taupik
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R Newneerajtri
 
joblayoutmobequipcoord-jan-2014.ppt
joblayoutmobequipcoord-jan-2014.pptjoblayoutmobequipcoord-jan-2014.ppt
joblayoutmobequipcoord-jan-2014.pptyokeceg852
 

Similaire à Telecommunication Tower (20)

muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
 
Hafiz A Waheed Portfolio
Hafiz A Waheed Portfolio Hafiz A Waheed Portfolio
Hafiz A Waheed Portfolio
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
 
Structural Design of Residential Buildings - Introduction
Structural Design of Residential Buildings - IntroductionStructural Design of Residential Buildings - Introduction
Structural Design of Residential Buildings - Introduction
 
Chapter 10 structure construction
Chapter 10  structure constructionChapter 10  structure construction
Chapter 10 structure construction
 
Design steps of structure.
Design steps of structure.Design steps of structure.
Design steps of structure.
 
Foundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptxFoundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptx
 
presentation on flat plate
 presentation on flat plate presentation on flat plate
presentation on flat plate
 
shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )
 
Structure analysis and design
Structure analysis and designStructure analysis and design
Structure analysis and design
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of building
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptx
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Brochure contractor registration_guidelines
Brochure contractor registration_guidelinesBrochure contractor registration_guidelines
Brochure contractor registration_guidelines
 
Company profile
Company profileCompany profile
Company profile
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
joblayoutmobequipcoord-jan-2014.ppt
joblayoutmobequipcoord-jan-2014.pptjoblayoutmobequipcoord-jan-2014.ppt
joblayoutmobequipcoord-jan-2014.ppt
 

Plus de ayishairshad

Trip rate calculations
Trip rate calculationsTrip rate calculations
Trip rate calculationsayishairshad
 
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...ayishairshad
 
Prediction of traveller information and route choice
Prediction of traveller information and route choicePrediction of traveller information and route choice
Prediction of traveller information and route choiceayishairshad
 
Organizational culture
Organizational culture Organizational culture
Organizational culture ayishairshad
 
Vertical alignment by Ayisha Irshad
Vertical alignment by Ayisha IrshadVertical alignment by Ayisha Irshad
Vertical alignment by Ayisha Irshadayishairshad
 
Heathrow airport Presentation by Ayisha Irshad
Heathrow airport Presentation by Ayisha IrshadHeathrow airport Presentation by Ayisha Irshad
Heathrow airport Presentation by Ayisha Irshadayishairshad
 

Plus de ayishairshad (8)

Trip rate calculations
Trip rate calculationsTrip rate calculations
Trip rate calculations
 
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
 
Telenor 4G
Telenor 4GTelenor 4G
Telenor 4G
 
Geometric design
Geometric designGeometric design
Geometric design
 
Prediction of traveller information and route choice
Prediction of traveller information and route choicePrediction of traveller information and route choice
Prediction of traveller information and route choice
 
Organizational culture
Organizational culture Organizational culture
Organizational culture
 
Vertical alignment by Ayisha Irshad
Vertical alignment by Ayisha IrshadVertical alignment by Ayisha Irshad
Vertical alignment by Ayisha Irshad
 
Heathrow airport Presentation by Ayisha Irshad
Heathrow airport Presentation by Ayisha IrshadHeathrow airport Presentation by Ayisha Irshad
Heathrow airport Presentation by Ayisha Irshad
 

Dernier

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Dernier (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Telecommunication Tower

  • 1. DESIGNING OF TELECOMMUNICATION TOWER PRESENTED Y: AYISHA IRSHAD BE.CIVIL ENGINEER NEDUET MS.URAN AND INFRASTRUCTURE ENGINEERING NEDUET
  • 2.  SITE ENGINEERING SURVEYS  PRELIMINARY DESIGN  DETAILED ENGINEERING DRAWINGS  FEASIBILITY DOCUMENTS SOIL TEST REPORTS BUILDING EVALUATION REPORT STRUCTURE STABILITY CERTIFICATE
  • 3. SURVEY ROOF TOP SITES 1) Columns Verification 2) Slab thickness Building Structural Conditions GREEN FIELD SITES 1) Acquire Area 2) Site Levels
  • 4. ROOF SLAB WITHOUT STOREY MARGIN ROOF SLAB WITH STOREY MARGIN
  • 6. Roof Top Layout Designing Based On : •Column size ,should not be > 6” •Site (commercial ,residential building) structural condition •Slab thickness should not be >150mm •Other structural perspective to ensure building is safe for further construction /implementation work • Design proposal furnished as per client requirements
  • 7. Green Field Layout Designing Based On : • Plot size or area that need to acquired •Area that need to be acquire must be sufficient enough to design raft foundation as per edb standards. LIMITATION •DG pads cannot be proposed at Raft foundation.
  • 8. ARCHITECTURAL AND STRUCTURAL DRAWINGS • Detail drawings designed over approved layouts by client •Detailing of Reinforcement in structural members designing •Reinforcement shall be grade 60 in accordance with ASTMA615 •Foundation designing FOUNDATION DETAIL BEAMS DETAIL BAR BENDING SCHEDULE ROOF TOP SITES DESIGN
  • 9. GREEN FIELD SITES DESIGN •Raft size design according to bearing capacity ,that would be provided after soil test . •All reinforced concrete design is according to ACI318-05 •Structural steel design is according to AISC. RAFT PLAN RAFT ELEVATION BAR BENDING SCHEDULE
  • 10. Detailed drawings also include: •Electrical and earthling drawings •Tower section drawings Tower arrangement EARTHING PIT DETAIL POWER DETAIL
  • 11. SOIL REPORT: For green field sites soil test perform in order to evaluate • Bearing capacity of soil •Water ground level •Soil type •Accurate site level w.r.t road level BUILDING EVALUATION REPORT: •BER merge the information of exiting structure to ensure weather building columns /beams and foundation feasible to take the additional load imposed due to telecommunication tower and further construction
  • 12. STRUCTURE STABILITY CERTIFICATE: •SSC’S issued to ensure that design structure is safe and designed in accordance with latest standard specification including wind pressure and earthquake effects. •SSC’S certified after completely checking the area, where the further construction required. •Check additional stresses in columns and pressure on footings due to dead load. •Check additional stresses in columns and pressure on footings due to wind load. •Calculate the reactions on the columns and footings.