APWA Self Assessment &
Accreditation
Charles R. (Chas) Jordan
M.P.A., P.W.E., F.M.P., ENV SP
President
Radiant Training & Consulting, LLC
Florida Public Works Institute
APWA Florida Chapter
Self Assessment &
Accreditation
APWA: The purpose of the
accreditation program is to provide a
means of formally verifying and
recognizing public works agencies for
compliance with the recommended
practices set forth in the Public Works
Management Practices Manual.
Self Assessment &
Accreditation
APWA: The purpose of the
accreditation program is to provide a
means of formally verifying and
recognizing public works agencies for
compliance with the recommended
practices set forth in the Public Works
Management Practices Manual.
Self Assessment vs.
Accreditation
Self Assessment
Voluntary
Free (w/ Book)
Good Management Practice
Can Be Done Anytime
Required First Step in
Accreditation
Self Assessment vs.
Accreditation
Accreditation
Request Through Contract
Costs $$$
Peer Reviewed
Has a Set Schedule
Official Recognition
What is Accreditation?
It is a voluntary, self-motivated approach to
objectively evaluate, verify and recognize
compliance with the recommended
management practices.
It is a prestigious acknowledgement of
excellence from the foremost public works
professional association in the USA!
What does it cost?
Based on the agency’s population and number of
functional areas provided by the agency and included for
review.
Designed to recover the actual costs associated with
administering the program.
An estimate of total accreditation costs based on the
characteristics of each agency will be provided to
applicants at the time of application.
Costs of the on-site evaluation represent the unknown
cost, since the agencies will be responsible for actual
costs.
Accreditation fees for a medium size municipal agency
are expected to be between $10,000 and $15,000, over
the two- to three-year process, not including the
agency’s staff expenses.
What is the Process?
Application
Self
Assessment
Improvement
Evaluation
ACCREDITATION
What is the Process?
Application Phase
1. Request information or application
package from APWA
2. Review the accreditation process guide
3. Make formal application and pay fees
4. APWA reviews application and
approves accreditation agreement
What is the Process?
Self Assessment Phase
1. Conduct Self Assessment
2. Present Results to Elected Officials
3. Mail in Notice of Completion and
Documentation
4. APWA Mails an Acknowledgement and
a Certificate
What is a
Self Assessment?
Internal evaluation of an organization’s:
policies, procedures and practices – used to
determine its strengths and areas for
improvement.
Documentation – forms the basis for making
continuous improvements in agency operations.
Prepares an agency for the accreditation review
and leads to the preparation of necessary
documentation.
When should you do a
Self Assessment?
Before you sign contract vs. after you sign
contract?
Or you might choose no contract?
A recent survey of accredited agencies and
found that:
55% did it before
45% did it after
Your decision may be based on
Politics of your community
Management decision
Discipline of your organization
Organization uncertainty
Lock in fee and edition
Why should you do a
Self Assessment?
International recognition for the commitment to
processes that promote good government
Increased productivity and effectiveness
through critical evaluation of programs and
services
Tools for establishing performance
measurement systems and internal performance
standards for operations, management and
administrative functions
Why should you do a
Self Assessment?
A visible form of recognition that can be used to
gain community support for improvement of
public works facilities and services
An opportunity for professional development of
your staff
A process to discover the latest developments
in public works operation and maintenance
What is the Process?
Improvement Phase
1. Implement improvements identified
during self assessment
2. Update Self Assessment documentation
3. File and Document Completion
4. Submit Application for Site Visit with
Checklist
What is the Process?
Evaluation Phase
1. APWA ackowledges request for Site
Visit
2. APWA identifies evaluation team
3. Site visit is conducted and an evaluation
report is prepared by team.
What is the Process?
Evaluation Phase
1. APWA ackowledges request for Site
Visit
2. APWA identifies evaluation team
3. Site visit is conducted and an evaluation
report is prepared by team.
What is the Process?
Accreditation Phase
1. Site Review Report submitted to the
APWA Accreditation Council
2. Council reviews and considers
Accreditation
3. APWA Notifies Agency of the Results
4. Plaque is Presented to Agency at
Elected Body Meeting
What Now?
Continuous Improvement
Self Assessment
Identify Needs
/ Set Goals
ImplementationEvaluation
Accreditation
/ Re-Accreditation
What are the
disadvantages?
1. There are obvious risks and other implications
associated with pursuing accreditation.
2. It does require a significant amount of effort to
conduct a self assessment and make necessary
improvements in the operations and management
of your agency.
3. There are also costs involved for the
accreditation process, though efforts will be made
to keep these reasonable and affordable to all
agencies regardless of size. (Approx. $15K-$20K
for a medium sized agency).
What are the
advantages?
1. Formal recognition of well run agencies
2. A mechanism to evaluate the organization
3. A target for improving operations
4. Public recognition of public works function
5. Justifying budget requests
6. Instilling pride in personnel
7. Reducing liability
8. Lowering insurance premiums
What are the
advantages?
9. Raising national public works profiles
10.Benefiting in personnel recruitment
11.Encouraging documentation of policies
12.Encouraging improvement of procedures
13.Raising competencies in public works
14.Consistent, comprehensive practices
15.Fostering interaction among personnel
16.Encouraging employee involvement.
What you will need:
• Support of your governing board and upper
management
• Cooperation of other departments, team leaders,
& your staff
• Discipline to stay the course, 3 years sneaks up
on you fast, don’t drag your feet.
• Strength to get others to do their part, YOU
CAN’T DO THIS ALONE. It is a team effort that
will ensure success.
• Resources dedicated to the mission
• Accountability for results, team leaders need to
have responsibility to get it done.
What you will get:
• Network – Help with just about anything you need.
Someone out there has done it before and will
assist you.
• Stronger Relationships will develop as a result of
the cooperation of other departments, team
leaders, & your staff.
• Mutual Respect of all those involved that will carry
into other projects and assignments.
• Teamwork will be the standard of behavior.
• Positive Attitude of success with dedication to the
continuous improvement of your organization.
• Results as staff has a sense of accountability.
What you will get:
Other Resources
• APWA website: http://www.apwa.net/
• APWA infoNOW Community
• Tracy Quintana, Accreditation Program
Manager
• accreditation@apwa.net
• 800-848-2792
• Self Assessment/Accreditation Workshops
Questions / Comments?

Contenu connexe

Similaire à APWA Accreditation Process - Public Works Institute

Introduction to Continous Quality Improvement
Introduction to Continous Quality ImprovementIntroduction to Continous Quality Improvement
Introduction to Continous Quality Improvement
Gina Ingrouille
 
2015 Personal Evaluation_ACF15 (3) (2)
2015 Personal Evaluation_ACF15 (3) (2)2015 Personal Evaluation_ACF15 (3) (2)
2015 Personal Evaluation_ACF15 (3) (2)
Durmon Coates
 
Final_Compliance Program _Internal Audit
Final_Compliance Program _Internal AuditFinal_Compliance Program _Internal Audit
Final_Compliance Program _Internal Audit
Lindsay DiFazio
 
C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...
C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...
C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...
ocasiconference
 
Establishing A Qms Ppt2
Establishing A Qms  Ppt2Establishing A Qms  Ppt2
Establishing A Qms Ppt2
guevarra_2000
 

Similaire à APWA Accreditation Process - Public Works Institute (20)

Welcome to Pathway College
Welcome to Pathway CollegeWelcome to Pathway College
Welcome to Pathway College
 
Guide for the implementation of a Quality management
Guide for the implementation of a Quality managementGuide for the implementation of a Quality management
Guide for the implementation of a Quality management
 
Introduction to Continous Quality Improvement
Introduction to Continous Quality ImprovementIntroduction to Continous Quality Improvement
Introduction to Continous Quality Improvement
 
Sub Contractor Evaluation - Sahil Bhutani
Sub Contractor Evaluation - Sahil BhutaniSub Contractor Evaluation - Sahil Bhutani
Sub Contractor Evaluation - Sahil Bhutani
 
2015 Personal Evaluation_ACF15 (3) (2)
2015 Personal Evaluation_ACF15 (3) (2)2015 Personal Evaluation_ACF15 (3) (2)
2015 Personal Evaluation_ACF15 (3) (2)
 
Choosing a behavioral health accreditator
Choosing a behavioral health accreditatorChoosing a behavioral health accreditator
Choosing a behavioral health accreditator
 
How to Choose a Behavioral Health Accreditator
How to Choose a Behavioral Health AccreditatorHow to Choose a Behavioral Health Accreditator
How to Choose a Behavioral Health Accreditator
 
Kelly Services LinkedIn Presentation
Kelly Services LinkedIn PresentationKelly Services LinkedIn Presentation
Kelly Services LinkedIn Presentation
 
PECB Webinar: Steps to OHSAS 18001 Certification
PECB Webinar: Steps to OHSAS 18001 CertificationPECB Webinar: Steps to OHSAS 18001 Certification
PECB Webinar: Steps to OHSAS 18001 Certification
 
HPass Pilot - Info Session 2 for Potential “Early Adopters”
HPass Pilot - Info Session 2 for Potential “Early Adopters” HPass Pilot - Info Session 2 for Potential “Early Adopters”
HPass Pilot - Info Session 2 for Potential “Early Adopters”
 
Performance appraisal ppt
Performance appraisal pptPerformance appraisal ppt
Performance appraisal ppt
 
Final_Compliance Program _Internal Audit
Final_Compliance Program _Internal AuditFinal_Compliance Program _Internal Audit
Final_Compliance Program _Internal Audit
 
C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...
C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...
C6 Advanced Information And Referral for Experienced Settlement Workers_Faed ...
 
MU01-04-RAA-guide-v3-LIVE
MU01-04-RAA-guide-v3-LIVEMU01-04-RAA-guide-v3-LIVE
MU01-04-RAA-guide-v3-LIVE
 
Establishing A Qms Ppt2
Establishing A Qms  Ppt2Establishing A Qms  Ppt2
Establishing A Qms Ppt2
 
What’s New for Firms’ Monitoring and Remediation Processes
What’s New for Firms’ Monitoring and Remediation ProcessesWhat’s New for Firms’ Monitoring and Remediation Processes
What’s New for Firms’ Monitoring and Remediation Processes
 
Jim Proce - American Public Works Association Accreditation Process presentat...
Jim Proce - American Public Works Association Accreditation Process presentat...Jim Proce - American Public Works Association Accreditation Process presentat...
Jim Proce - American Public Works Association Accreditation Process presentat...
 
Recruitment
RecruitmentRecruitment
Recruitment
 
Describe the quality improvement initiative and why it is important doc 16.docx
Describe the quality improvement initiative and why it is important doc 16.docxDescribe the quality improvement initiative and why it is important doc 16.docx
Describe the quality improvement initiative and why it is important doc 16.docx
 
QMS Audit Process June 2015
QMS Audit Process June 2015QMS Audit Process June 2015
QMS Audit Process June 2015
 

Plus de Charles Jordan, MPA, PWE, FMP

Plus de Charles Jordan, MPA, PWE, FMP (20)

Time Management for Infrastructure Professionals
Time Management for Infrastructure ProfessionalsTime Management for Infrastructure Professionals
Time Management for Infrastructure Professionals
 
Membership Development Town Hall - Second Visit
Membership Development Town Hall - Second VisitMembership Development Town Hall - Second Visit
Membership Development Town Hall - Second Visit
 
Membership Development Town Hall - First Visit
Membership Development Town Hall - First VisitMembership Development Town Hall - First Visit
Membership Development Town Hall - First Visit
 
GL of Florida Membership Development Orientation and Training
GL of Florida Membership Development Orientation and TrainingGL of Florida Membership Development Orientation and Training
GL of Florida Membership Development Orientation and Training
 
Leadership & Organizational Change - Public Works Institute
Leadership & Organizational Change - Public Works InstituteLeadership & Organizational Change - Public Works Institute
Leadership & Organizational Change - Public Works Institute
 
Succession Planning - Public Works Institute
Succession Planning - Public Works InstituteSuccession Planning - Public Works Institute
Succession Planning - Public Works Institute
 
Innovations in Pavement Rejuvenation and Preservation - APWA Suncoast Branch
Innovations in Pavement Rejuvenation and Preservation - APWA Suncoast BranchInnovations in Pavement Rejuvenation and Preservation - APWA Suncoast Branch
Innovations in Pavement Rejuvenation and Preservation - APWA Suncoast Branch
 
Motivating and Engaging Employees - Public Works Institute
Motivating and Engaging Employees - Public Works InstituteMotivating and Engaging Employees - Public Works Institute
Motivating and Engaging Employees - Public Works Institute
 
Embracing and Executing Change - Public Works Institute
Embracing and Executing Change - Public Works InstituteEmbracing and Executing Change - Public Works Institute
Embracing and Executing Change - Public Works Institute
 
Top of the Curve - Asphalt Preservation with Rejuvenators - APWA West Coast B...
Top of the Curve - Asphalt Preservation with Rejuvenators - APWA West Coast B...Top of the Curve - Asphalt Preservation with Rejuvenators - APWA West Coast B...
Top of the Curve - Asphalt Preservation with Rejuvenators - APWA West Coast B...
 
Sustainable Choice of Pavement Preservation
Sustainable Choice of Pavement PreservationSustainable Choice of Pavement Preservation
Sustainable Choice of Pavement Preservation
 
Return on Investment of Pavement Preservation
Return on Investment of Pavement PreservationReturn on Investment of Pavement Preservation
Return on Investment of Pavement Preservation
 
Communicating for Improved Productivity
Communicating for Improved ProductivityCommunicating for Improved Productivity
Communicating for Improved Productivity
 
The Science of Pavement Preservation - CAI Approved Course
The Science of Pavement Preservation - CAI Approved CourseThe Science of Pavement Preservation - CAI Approved Course
The Science of Pavement Preservation - CAI Approved Course
 
Pavement Rejuvenation and Preservation - Southwest Florida Branch
Pavement Rejuvenation and Preservation - Southwest Florida BranchPavement Rejuvenation and Preservation - Southwest Florida Branch
Pavement Rejuvenation and Preservation - Southwest Florida Branch
 
Conducting Effective Meetings - PWI
Conducting Effective Meetings - PWIConducting Effective Meetings - PWI
Conducting Effective Meetings - PWI
 
Developing Your Personal Strategy - PWI
Developing Your Personal Strategy - PWIDeveloping Your Personal Strategy - PWI
Developing Your Personal Strategy - PWI
 
Basic Project Management for the Public Sector
Basic Project Management for the Public SectorBasic Project Management for the Public Sector
Basic Project Management for the Public Sector
 
Project Management for Public Works Professionals - Santa Fe Branch 2017
Project Management for Public Works Professionals - Santa Fe Branch 2017Project Management for Public Works Professionals - Santa Fe Branch 2017
Project Management for Public Works Professionals - Santa Fe Branch 2017
 
Florida Public Works Expo 2016 - First Timers Meeting
Florida Public Works Expo 2016 - First Timers MeetingFlorida Public Works Expo 2016 - First Timers Meeting
Florida Public Works Expo 2016 - First Timers Meeting
 

Dernier

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Dernier (20)

Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 

APWA Accreditation Process - Public Works Institute

  • 1. APWA Self Assessment & Accreditation Charles R. (Chas) Jordan M.P.A., P.W.E., F.M.P., ENV SP President Radiant Training & Consulting, LLC Florida Public Works Institute APWA Florida Chapter
  • 2. Self Assessment & Accreditation APWA: The purpose of the accreditation program is to provide a means of formally verifying and recognizing public works agencies for compliance with the recommended practices set forth in the Public Works Management Practices Manual.
  • 3. Self Assessment & Accreditation APWA: The purpose of the accreditation program is to provide a means of formally verifying and recognizing public works agencies for compliance with the recommended practices set forth in the Public Works Management Practices Manual.
  • 4.
  • 5. Self Assessment vs. Accreditation Self Assessment Voluntary Free (w/ Book) Good Management Practice Can Be Done Anytime Required First Step in Accreditation
  • 6. Self Assessment vs. Accreditation Accreditation Request Through Contract Costs $$$ Peer Reviewed Has a Set Schedule Official Recognition
  • 7. What is Accreditation? It is a voluntary, self-motivated approach to objectively evaluate, verify and recognize compliance with the recommended management practices. It is a prestigious acknowledgement of excellence from the foremost public works professional association in the USA!
  • 8. What does it cost? Based on the agency’s population and number of functional areas provided by the agency and included for review. Designed to recover the actual costs associated with administering the program. An estimate of total accreditation costs based on the characteristics of each agency will be provided to applicants at the time of application. Costs of the on-site evaluation represent the unknown cost, since the agencies will be responsible for actual costs. Accreditation fees for a medium size municipal agency are expected to be between $10,000 and $15,000, over the two- to three-year process, not including the agency’s staff expenses.
  • 9. What is the Process? Application Self Assessment Improvement Evaluation ACCREDITATION
  • 10. What is the Process? Application Phase 1. Request information or application package from APWA 2. Review the accreditation process guide 3. Make formal application and pay fees 4. APWA reviews application and approves accreditation agreement
  • 11. What is the Process? Self Assessment Phase 1. Conduct Self Assessment 2. Present Results to Elected Officials 3. Mail in Notice of Completion and Documentation 4. APWA Mails an Acknowledgement and a Certificate
  • 12. What is a Self Assessment? Internal evaluation of an organization’s: policies, procedures and practices – used to determine its strengths and areas for improvement. Documentation – forms the basis for making continuous improvements in agency operations. Prepares an agency for the accreditation review and leads to the preparation of necessary documentation.
  • 13. When should you do a Self Assessment? Before you sign contract vs. after you sign contract? Or you might choose no contract? A recent survey of accredited agencies and found that: 55% did it before 45% did it after Your decision may be based on Politics of your community Management decision Discipline of your organization Organization uncertainty Lock in fee and edition
  • 14. Why should you do a Self Assessment? International recognition for the commitment to processes that promote good government Increased productivity and effectiveness through critical evaluation of programs and services Tools for establishing performance measurement systems and internal performance standards for operations, management and administrative functions
  • 15. Why should you do a Self Assessment? A visible form of recognition that can be used to gain community support for improvement of public works facilities and services An opportunity for professional development of your staff A process to discover the latest developments in public works operation and maintenance
  • 16. What is the Process? Improvement Phase 1. Implement improvements identified during self assessment 2. Update Self Assessment documentation 3. File and Document Completion 4. Submit Application for Site Visit with Checklist
  • 17. What is the Process? Evaluation Phase 1. APWA ackowledges request for Site Visit 2. APWA identifies evaluation team 3. Site visit is conducted and an evaluation report is prepared by team.
  • 18. What is the Process? Evaluation Phase 1. APWA ackowledges request for Site Visit 2. APWA identifies evaluation team 3. Site visit is conducted and an evaluation report is prepared by team.
  • 19. What is the Process? Accreditation Phase 1. Site Review Report submitted to the APWA Accreditation Council 2. Council reviews and considers Accreditation 3. APWA Notifies Agency of the Results 4. Plaque is Presented to Agency at Elected Body Meeting
  • 20.
  • 21. What Now? Continuous Improvement Self Assessment Identify Needs / Set Goals ImplementationEvaluation Accreditation / Re-Accreditation
  • 22. What are the disadvantages? 1. There are obvious risks and other implications associated with pursuing accreditation. 2. It does require a significant amount of effort to conduct a self assessment and make necessary improvements in the operations and management of your agency. 3. There are also costs involved for the accreditation process, though efforts will be made to keep these reasonable and affordable to all agencies regardless of size. (Approx. $15K-$20K for a medium sized agency).
  • 23. What are the advantages? 1. Formal recognition of well run agencies 2. A mechanism to evaluate the organization 3. A target for improving operations 4. Public recognition of public works function 5. Justifying budget requests 6. Instilling pride in personnel 7. Reducing liability 8. Lowering insurance premiums
  • 24. What are the advantages? 9. Raising national public works profiles 10.Benefiting in personnel recruitment 11.Encouraging documentation of policies 12.Encouraging improvement of procedures 13.Raising competencies in public works 14.Consistent, comprehensive practices 15.Fostering interaction among personnel 16.Encouraging employee involvement.
  • 25. What you will need: • Support of your governing board and upper management • Cooperation of other departments, team leaders, & your staff • Discipline to stay the course, 3 years sneaks up on you fast, don’t drag your feet. • Strength to get others to do their part, YOU CAN’T DO THIS ALONE. It is a team effort that will ensure success. • Resources dedicated to the mission • Accountability for results, team leaders need to have responsibility to get it done.
  • 26. What you will get: • Network – Help with just about anything you need. Someone out there has done it before and will assist you. • Stronger Relationships will develop as a result of the cooperation of other departments, team leaders, & your staff. • Mutual Respect of all those involved that will carry into other projects and assignments. • Teamwork will be the standard of behavior. • Positive Attitude of success with dedication to the continuous improvement of your organization. • Results as staff has a sense of accountability.
  • 28. Other Resources • APWA website: http://www.apwa.net/ • APWA infoNOW Community • Tracy Quintana, Accreditation Program Manager • accreditation@apwa.net • 800-848-2792 • Self Assessment/Accreditation Workshops