HONOLULU AUTHORITY FOR RAPID TRANSIT (HART)
WHEN ALL ELSE FAILS
LinkedIn SlideShare November 18, 2017
https://www.slideshare.net/cliftonmhasegawa/honolulu-authority-for-rapid-transit-hart-the-hard-reality-when-all-else-fails
THE SEQUEL
TELL THE TRUTH
Frank Fasi tried several times, and in 1992 came close to
making it happen. The Federal Transit Administration had
agreed to provide nearly one-third of the $2 billion estimated
cost. But things fell apart when a 5-4 majority of City Council
members refused to raise taxes needed to fund it.4 Fasi
avoided the term heavy rail, but that’s how rail experts would
have described his proposed system. When describing a rail
system, the terms heavy and light are not primarily about
weight. Light rail systems operate in or across city streets,
while heavy rail systems run overhead or below ground,
powered by a third rail.
Fasi’s successor, Jeremy Harris, expressed some interest in
heavy rail, but turned his attention to light rail, which the
governor at that time, Ben Cayetano, endorsed. Cayetano
explained to reporters that his opposition to rail on Oahu
applied only to heavy rail.
Harris’s light-rail proposal eventually morphed into bus rapid
transit, which is like light rail but uses rubber tires on
pavement rather than steel wheels on steel rails. One of
Cayetano’s last ofcial acts as governor was to approve an
Environmental Impact Statement that rated bus rapid transit
as superior to rail – for Honolulu.
Muf Hannemann made abrupt changes immediately after
succeeding Harris.
The just- declared superior alternative for Honolulu, bus rapid
transit, did not even make the list of fnalists: Hannemann’s
alternatives analysis considered three versions of elevated,
steel-on- steel rail, each of which ft into a new category
called metro-light. Like heavy rail, metro-light runs overhead
or underground. But like light rail, metro-light has less
carrying capacity than does a traditional heavy rail system.
One mainland commentator has described metro-light as “a
hybrid form of rail that [combines] the cost disadvantages of
heavy rail with the capacity limits of light rail.”
City ofcials sometimes mischaracterized Hannemann’s
proposed metro-light system as light rail, which might have
caused some citizens to picture something less expensive, less
noisy, and less imposing than Hannemann had in mind.
Even if one were to ignore the entire cost overrun, the per-
capita cost of Honolulu’s rail system would still be
dramatically higher than that of any other city. Part of the
reason is the high cost of building elevated rail on Oahu,
particularly from Chinatown to Ala Moana Center. The rest
of the explanation is our relatively low population: No city the
size of Honolulu has ever tried to build a rail system. The
next smallest metropolitan area with heavy rail has a
population four times larger than Honolulu’s.
"The capital cost is way too high, and the
expected ridership is way too low," said Dan
Chatman, associate professor of city and regional
planning at the University of California,
Berkeley. "It's pretty simple."
Source: The Future of Rail on Oahu: Plan A, B, or C? By
Randall W. Roth [Excerpt; Citations Omitted]
http://randallroth.com/fles/Rail%20Speech.pdf
Light Rail : it is one which needs low capital cost and high reliability, the rails could
be laid separately or could be laid on the roadways also as if the train is not there we
could use it as a normal road. The speed is quite low 30kmh [18.64114 mph]
Metro Rail : It is a type of high capacity transport system, like others it also runs on
electricity. These rails run on fyovers, underground as a multi purpose system and has
the highest passenger capacity in terms of speed of transport. Its average speed is
70kmh [43.49598mph] but in some areas it reaches 90kmh [55.92341mph]
[Emphasis and Clarifcation Supplied]
Source: Quora What is the diference between light metro, metro, and monorail? By Sia Varun,
September 22, 2016, accessed November 19, 2017 https://www.quora.com/What-is-the-
difference-between-light-metro-metro-and-monorail
Honolulu Rail Transit Project Update
Andrew Robbins, Executive Director & CEO
October 24, 2017
http://www.westoahu.org/resources/Documents/Andrew%20Robbins%20-%20HART.pdf
How fast will trains travel? 55 mph top speed & 30 mph average speed,
including train stops
Honolulu Rail Transit Tests Rail Cars
Published on Oct 22, 2017
HART & Ansaldo HNL are testing rail cars at maximum operational speeds of 55mph.
Testing will continue for the next several months
RUNNING AT 56.52 MPH
https://www.youtube.com/watch?v=9Wmzy9qrN-Q
HART to begin live train, energized track testing for rail project
KHON2, September 4, 2017
http://khon2.com/2017/09/04/hart-to-begin-live-train-energized-track-testing-for-rail-project/
When the trains start rolling, they will be tested for their
acceleration up to 55 mph, and then for their braking ability
under varying conditions.
Operators will be on board during that time, but once the
system is complete, the trains will be fully automated and
driver-less.
Honolulu Is Building America's First Fully Driverless Transit System
By Amy Crawford. City Lab. September 17, 2014, accessed November 19, 2017
https://www.citylab.com/life/2014/09/honolulu-is-building-americas-frst-fully-driverless-transit-system/380292/
Honolulu's system is modeled on the Copenhagen Metro, which has been
operating since 2002 and won "best subway" at the international MetroRail
conference in 2008 Grabauskas [Dan Grabauskas, executive director and CEO
of the Honolulu Authority for Rapid Transportation (HART)] reports "a
tremendous amount of interest" in Honolulu's system among his mainland U.S.
colleagues.
"The driverless operation we have is going to be very safe."
It should also be more reliable. Eliminating the unpredictability of human
drivers will help trains stick to their schedules, and consistent acceleration and
deceleration means they can safely run closer together. Over the course of a
20-hour daily schedule, system managers will also be able to increase the
frequency of service in response to demand, without having to call in
additional personnel. "We can make pretty nimble service changes,"
Grabauskas says, "almost literally with the press of a button. Driverless systems
ofer tremendous advantages."
[Clarifcation Supplied]
The Honolulu Rail Project - Based on the Copenhagen Driverless Metro System
Ansaldo JV – A Hitachi Group Joint Venture [Excerpts]
Accessed November 19, 2017
http://www.ansaldohonolulu.com/index.php?option=com_content&view=article&id=5
Copenhagen is a growing capital and has been reviewing future trafc plans
accordingly. [Population of 1.99 million in 2017]
In 1996, Copenhagen chose the most sophisticated metro system yet seen in
Europe, when the contract was signed with Ansaldo STS) for a driverless transit
system across and under the city.
The Copenhagen Metro originally opened in 2002. The two lines feature 22
stations and take you from the Copenhagen Airport, across the city center and
into the densely populated suburbs, crossing areas of new urban development.
Copenhagen has been the frst city in the world that introduced the Hitachi Rail
Italy’s driverless metro. Brescia the frst city in Italy. The other cities that
introduced this technological jewel are Milan, Italy, Rome, Italy and Riyadh,
Saudi Arabia, Honolulu, Hawaii [Population of 1.43 million] in 2017.
PUBLIC TRANSPORT
The public transportation in Copenhagen is very reliable, punctual, and it takes
you everywere. In Copenhagen the trains, Metro and busses (including
waterbuses) can be accessed with the same ticket. All you need to know is how
many zones you will pass on your journey. Note the Metro will take you from
the airport to central Copenhagen in only 20 minutes.
Buses
The A-buses are the primary buses in central Copenhagen. They drive every 3-
7 minutes during rush hour (which is between 07:00-09:00 in the morning and
15:30-17:30 in the afternoon) and usually about every 10 minutes before and
after rush hour. The A-buses serve at all hours.
The S-buses drive every 5-10 minutes during rush hour and every 20 minutes
outside of rush hour. The S-buses are faster than the A-busses due to fewer
stops. They usually serve between 06:00 in the morning and 01:00 at night.
Night buses are in service between 01:00 and 05:00 in the night. You can
recognise the bus stops by the grey colour of the bus stop signs.
Metro
The metro is in service all day and all night, every day of the week.
There are 2-4 minutes between each train during rush hour, and 3-6 minutes
outside rush hour and during the weekends. Friday and Saturday night (after
01:00) trains arrive with a 7-15 minutes interval and a 20 minutes interval after
midnight on weekdays (Sunday through Thursday).
Trains
The S-trains run between 05:00 in the morning and 00:30 at night. Line F runs
every 4-5 minutes, line A, B, C and E run every 10 minutes, and line H and Bx
run every 20 minutes.
Source: VISITCOPENHAGEN. http://www.visitcopenhagen.com/copenhagen/transportation/public-transport
RIDERSHIP
Copenhagen Metro
Record-high passenger numbers 2015 was a record year for the metroʼs
passenger numbers since it opened in 2002. More than 57.2 million people
took the metro in 2015, which is 1.2 million more than in 2014. This implies
that in 2015 the metro on average had 100,000 more passengers per month,
compared to 2014. Operations could be normalised as planned in the second
half of 2015, but now with more trains and improved operational stability. As
a consequence, the metro generally achieved higher passenger numbers during
the rest of the year. In November, a new passenger record was set, when no
less than 5.2 million passengers took the metro, with operational stability
ending at a record-high 98.8 per cent.
Source: Metro Service A/S http://intl.m.dk/#!/search?q=annual%20reports
TheBus
TheBus is privately managed by Oahu Transit Services Inc., which operates the system
under a public-private partnership with the City and County of Honolulu Department of
Transportation Services
TheBus Total Monthly Ridership
September 2017
5,435,893
September 2016
5,547,475
September 2015
5,728,587
September 2014
6,087,573
Peter Rogof, Formerly FTA Administrator
Currently Chief Executive Ofcer of Sound Transit
Address to the Boston Reserve Bank
May 18, 2010; Updated: Wednesday, March 16, 2016
http://randallroth.com/fles/Administrator%20Peter%20Rogof%20Remarks%20at%20the
%20Boston%20Reserve%20Bank%20updated%20to%20March%202016.pdf
Increasingly, I have become convinced that the solutions to these problems are
not about engineering. They are not just about economics.
• They are about honesty;
• They are about the necessity to tell truth to power
• They are about the necessity for political guts – the guts to tell it like it is –
the guts to say “no” when everyone around the table wants you to say yes.
• They are about the need to rethink the questions we ask of ourselves. And
insisting on asking them, again and again.
If we really care about what we leave to our grandchildren, we will each use
this summit to strengthen our resolve to do just that. And keep doing it –
because this problem isn’t going to be solved over just a few budget cycles or
even over one generation.
In the end, while we often like to sugarcoat it, these decisions we make are
truly moral decisions. Moral decisions about who we serve with scarce
resources. Moral decisions about whether we leave the next general manager,
the next Chief Engineer, the next bus driver, a system that is stressed even
further or is on the path to wellness.
Moral decisions about whether we direct scarce resources to transit riders that
might otherwise drive their car vs. transit riders who will have no choice but
endure the service we give them, not matter how troubled.
What do I mean by honesty?
Share some simple truths that folks don’t want to hear.
One is this -- Paint is cheap Riders often want rail – but you can entice diehard
rail riders onto a “special” bus, sometimes by just painting the bus a diferent
color than the rest of the feet. Busways are cheap. You can get a designated
lane just by painting it. And with signal preemption, you can move a lot of
people at very little cost compared to rail.
Earlier I pointed out that our new estimate for the deferred maintenance
backlog for the entire transit universe is roughly $78 billion. But you should
know that fully 75 percent of that fgure is for the replacement of rail assets.
Now remember that the majority of transit trips taken in America are still done
by bus. In fact, Americans take 21 percent more bus trips than rail trips.
But when it comes to the need to replace transit assets, the costs associated
with replacing rail assets eats up three quarters of the entire backlog.
Agencies deciding between bus and rail investments need to stare those
numbers in the face. It’s one thing to pay the cost diferential now. They
need to be mindful of the costs they are teeing up for future generations. Is
Bus Rapid Transit a workable option for every corridor – no. But it’s a fne ft
for more communities than are seriously considering it.
Another simple truth -- by ignoring deteriorating conditions at our transit
systems, we run the very real risk of losing riders.
The Obama Administration wants to grow transit ridership. It is wholly
consistent with the President’s goals to lower greenhouse gas emissions and
reduce our dependence on foreign oil. But we can’t achieve our goals while
ignoring the state of good repair. Transit riders – especially those that are not
transit dependent – will only put up with so much. There is a point where dirty
stations, unreliable service, slowed train speeds, inoperable escalators, and
worries about safety push riders back on the highway. Ironically, every study
ever conducted will show that, from a safety perspective, passengers are far
safer riding even our most fragile transit systems than driving on the highway.
But that doesn’t necessarily infuence the choices commuters make.
What do I mean by guts to say no?
I’m now concluding my frst year as Administrator. I meet with a great many
transit general managers. While these meetings are all diferent, they often
follow a certain pattern.
I start of the meeting by asking how things are going. They express gratitude
for the new Recovery Act funds but then go on to explain that the downturn in
municipal revenues, the downturn in sales tax receipts, the cutbacks in the city
and state levels, has necessitated service cuts. Sometimes we talk about serious
service cuts of 20 percent or more.
We talk about:
• route reductions
• layofs
• furloughs
• signifcant chunks of capital reinvestment being difered as they use Federal
capital dollars for preventive maintenance to close operating gaps.
It’s all very grim. But then we get to the second part of the meeting. The
consultants start to get excitable and the glossy brochures come out. And the
next thing you know, the general manager wants to talk about their new plans
for expansion -- the spanking new rail service to communities not yet served.
In fairness, many of these new communities have been waiting for a long time
to get rail service. Indeed, many were promised rail service as part of a sales
tax referendum that was passed a decade ago. The other communities got
service – but now those are more expensive than originally forecast – and the
sales tax is taking in far less than expected.
At times like these, we need to ask the hard question: if you can’t aford to
operate the system you have, why does it make sense for us to partner in your
expansion?
Are we not helping you dig a deeper hole for our children and our
grandchildren?]
These ARE moral questions.
Should we count on the economy coming back. Yes we must. And indeed, the
economy is coming back. But what will be required of us when it does. We
were already at record ridership when the economy started to contract. While
ridership has dipped with employment, we can expect it to come back to new
record levels when the economy fully recovers. So what pressures does that
put on our struggling systems.
I was recently talking to a friend in the freight rail industry. He told me that
one of the benefts of slower trafc on their main lines was that it gave them
the opportunity to reinvest and do some major restoration projects without
being so disruptive to their freight trafc. Well how many of our transit
agencies had a similar opportunity? How many systems actually had access to
enough money to seriously reinvest in the midst of a recession? There is no
question that the Recovery Act helped, but our transit agencies will still
struggle to handle the trafc that will come with a recovered economy.
When I said earlier that one of the solutions is to tell it like it is – that includes
the uncomfortable situation of calling someone out when their behavior isn’t
responsible.
My favorite example is the Douglas Branch of the Blue Line in Chicago. It
actually passed FTA’s funding test for a brand new rail line. Why, because it
was so slow and decrepid – it was allowed to deteriorate to such a state, its
restoration brought so many new riders – saving as much as 30 minutes over
current rail service over the identical route – the identical stations. Just the
absence of slow orders was the game changer.
But the question has to be asked, how was it allowed to just rot on the vine?
Where were the policymakers at all levels that allowed conditions to deteriorate
so.
When it comes to calling out the truth – let me praise Governor Patrick for
requesting the D'allesandro study. Tells a stark picture of what needs to be
done here in Boston.
Success will require us all to wake up those that want to stay asleep.

Contenu connexe

Tendances

Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Fs strategic insight_on_gcc_rail_sector
Fs strategic insight_on_gcc_rail_sectorFs strategic insight_on_gcc_rail_sector
Fs strategic insight_on_gcc_rail_sectorIbrahim Al-Hudhaif
 
Case for HSR in Australia
Case for HSR in AustraliaCase for HSR in Australia
Case for HSR in AustraliaRoss Lowrey
 
America 2050 High Speed Rail-works-best
America 2050 High Speed Rail-works-bestAmerica 2050 High Speed Rail-works-best
America 2050 High Speed Rail-works-bestVoice Malaysia
 
Metro islamabad rawalpindi
Metro islamabad rawalpindiMetro islamabad rawalpindi
Metro islamabad rawalpindiMahmood Ahmed
 
Metro Bus Lahore_2
Metro Bus Lahore_2Metro Bus Lahore_2
Metro Bus Lahore_2SHOJAT MUNIR
 
Islamabad Bus Rapid Transit
Islamabad Bus Rapid TransitIslamabad Bus Rapid Transit
Islamabad Bus Rapid Transityasarfayyaz
 
Transportaion service
Transportaion serviceTransportaion service
Transportaion serviceRonak Sangani
 
Government and Development of Rail Transport in Malaysia
Government and Development of Rail Transport in Malaysia Government and Development of Rail Transport in Malaysia
Government and Development of Rail Transport in Malaysia Nur Farah Waheda
 
High Speed Rail
High Speed RailHigh Speed Rail
High Speed Railsmehro
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)Muhammad Awais
 
Transportation & Logistics Industry in Turkey
Transportation & Logistics Industry in Turkey Transportation & Logistics Industry in Turkey
Transportation & Logistics Industry in Turkey FMC Group
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineeringAbdul Bais
 
The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...
The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...
The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...CliftonHasegawa1
 

Tendances (20)

Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Fs strategic insight_on_gcc_rail_sector
Fs strategic insight_on_gcc_rail_sectorFs strategic insight_on_gcc_rail_sector
Fs strategic insight_on_gcc_rail_sector
 
Metro bus project
Metro bus projectMetro bus project
Metro bus project
 
Public transport
Public transportPublic transport
Public transport
 
D04412429
D04412429D04412429
D04412429
 
Case for HSR in Australia
Case for HSR in AustraliaCase for HSR in Australia
Case for HSR in Australia
 
America 2050 High Speed Rail-works-best
America 2050 High Speed Rail-works-bestAmerica 2050 High Speed Rail-works-best
America 2050 High Speed Rail-works-best
 
Moving forward: Nationalize the lrt/mrt - agham
Moving forward: Nationalize the lrt/mrt - aghamMoving forward: Nationalize the lrt/mrt - agham
Moving forward: Nationalize the lrt/mrt - agham
 
Metro islamabad rawalpindi
Metro islamabad rawalpindiMetro islamabad rawalpindi
Metro islamabad rawalpindi
 
Metro Bus Lahore_2
Metro Bus Lahore_2Metro Bus Lahore_2
Metro Bus Lahore_2
 
Islamabad Bus Rapid Transit
Islamabad Bus Rapid TransitIslamabad Bus Rapid Transit
Islamabad Bus Rapid Transit
 
Transportaion service
Transportaion serviceTransportaion service
Transportaion service
 
Transportation Sector India
Transportation Sector IndiaTransportation Sector India
Transportation Sector India
 
Government and Development of Rail Transport in Malaysia
Government and Development of Rail Transport in Malaysia Government and Development of Rail Transport in Malaysia
Government and Development of Rail Transport in Malaysia
 
High Speed Rail
High Speed RailHigh Speed Rail
High Speed Rail
 
Congestion cost
Congestion costCongestion cost
Congestion cost
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
 
Transportation & Logistics Industry in Turkey
Transportation & Logistics Industry in Turkey Transportation & Logistics Industry in Turkey
Transportation & Logistics Industry in Turkey
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineering
 
The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...
The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...
The Honolulu Rail Project - RECLAMA Hawaii Senator Brian Schatz - Reality for...
 

Similaire à Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Else Fails - The Truth

Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docxRunning head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docxcowinhelen
 
Disadvantages Of Rail Industry
Disadvantages Of Rail IndustryDisadvantages Of Rail Industry
Disadvantages Of Rail IndustryBrenda Thomas
 
2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_iiVictor Peters
 
i Jessica Peters is a pseudonym. case W28C67 October 20
i  Jessica Peters is a pseudonym. case W28C67 October 20i  Jessica Peters is a pseudonym. case W28C67 October 20
i Jessica Peters is a pseudonym. case W28C67 October 20LizbethQuinonez813
 
A level-based approach to public transport network planning
A level-based approach to public transport network planningA level-based approach to public transport network planning
A level-based approach to public transport network planningAndrew Nash
 
Flow Capacity of the London Underground
Flow Capacity of the London UndergroundFlow Capacity of the London Underground
Flow Capacity of the London UndergroundJohn Dougherty
 
Urban, Road and Rail Transport of the Future
Urban, Road and Rail Transport of the Future Urban, Road and Rail Transport of the Future
Urban, Road and Rail Transport of the Future Faga1939
 
Implications of moving towards public transport based cities
Implications of moving towards public transport based citiesImplications of moving towards public transport based cities
Implications of moving towards public transport based citiesTristan Wiggill
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyScott Martin, CMILT
 
Understanding Transit Hubs - Karpagam Architecture.pdf
Understanding Transit Hubs - Karpagam Architecture.pdfUnderstanding Transit Hubs - Karpagam Architecture.pdf
Understanding Transit Hubs - Karpagam Architecture.pdfKarpagam Architecture
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemSagar Kaptan
 
Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...ShubhamSharma775952
 
Eidlin railvolution 20140921
Eidlin railvolution 20140921Eidlin railvolution 20140921
Eidlin railvolution 20140921Adina Levin
 
RV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric Eidlin
RV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric EidlinRV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric Eidlin
RV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric EidlinRail~Volution
 
THE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdf
THE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdfTHE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdf
THE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdfFaga1939
 
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...Clifton M. Hasegawa & Associates, LLC
 

Similaire à Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Else Fails - The Truth (20)

Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docxRunning head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
 
Disadvantages Of Rail Industry
Disadvantages Of Rail IndustryDisadvantages Of Rail Industry
Disadvantages Of Rail Industry
 
20090304-HSR-TxRailAdvocates
20090304-HSR-TxRailAdvocates20090304-HSR-TxRailAdvocates
20090304-HSR-TxRailAdvocates
 
2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii
 
i Jessica Peters is a pseudonym. case W28C67 October 20
i  Jessica Peters is a pseudonym. case W28C67 October 20i  Jessica Peters is a pseudonym. case W28C67 October 20
i Jessica Peters is a pseudonym. case W28C67 October 20
 
A level-based approach to public transport network planning
A level-based approach to public transport network planningA level-based approach to public transport network planning
A level-based approach to public transport network planning
 
highspeedrail_FINAL2
highspeedrail_FINAL2highspeedrail_FINAL2
highspeedrail_FINAL2
 
Flow Capacity of the London Underground
Flow Capacity of the London UndergroundFlow Capacity of the London Underground
Flow Capacity of the London Underground
 
Public Transportation
Public TransportationPublic Transportation
Public Transportation
 
Subway
SubwaySubway
Subway
 
Urban, Road and Rail Transport of the Future
Urban, Road and Rail Transport of the Future Urban, Road and Rail Transport of the Future
Urban, Road and Rail Transport of the Future
 
Implications of moving towards public transport based cities
Implications of moving towards public transport based citiesImplications of moving towards public transport based cities
Implications of moving towards public transport based cities
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st Century
 
Understanding Transit Hubs - Karpagam Architecture.pdf
Understanding Transit Hubs - Karpagam Architecture.pdfUnderstanding Transit Hubs - Karpagam Architecture.pdf
Understanding Transit Hubs - Karpagam Architecture.pdf
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...
 
Eidlin railvolution 20140921
Eidlin railvolution 20140921Eidlin railvolution 20140921
Eidlin railvolution 20140921
 
RV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric Eidlin
RV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric EidlinRV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric Eidlin
RV 2014: HSR for Midsize Cities: TOD Lessons from Near and Far by Eric Eidlin
 
THE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdf
THE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdfTHE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdf
THE FUTURE OF LAND, WATERWAY, AIR AND SPACE TRANSPORTATION MEANS.pdf
 
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
 

Plus de Clifton M. Hasegawa & Associates, LLC

Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...Clifton M. Hasegawa & Associates, LLC
 
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A MissionHawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A MissionClifton M. Hasegawa & Associates, LLC
 
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...Clifton M. Hasegawa & Associates, LLC
 
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...Clifton M. Hasegawa & Associates, LLC
 
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our FutureHawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our FutureClifton M. Hasegawa & Associates, LLC
 
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...Clifton M. Hasegawa & Associates, LLC
 
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...Clifton M. Hasegawa & Associates, LLC
 

Plus de Clifton M. Hasegawa & Associates, LLC (20)

Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
Hawaii Agricultural Development Agency (ADC) - Raising the Phoenix - Reconstr...
 
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
Hawaii Agricultural Development Agency (ADC) - Hawaii Legislature Special Inv...
 
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
Hawaii Agricultural Development Corporation (ADC) - Hawaii Legislature Specia...
 
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
Hawaii Agricultural Development Corporation (ADC) - Legislative Investigation...
 
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
Hawaii Agriculture - Dammed If You Do, Dammed If You Don't - The Fork in the ...
 
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
Hawaii Agriculture - David Murdock - Man on a Mission Making the Pivot - The ...
 
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
Hawaii - Working Together - Charting Hawaii's Course for a Resilient Future -...
 
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A MissionHawaii  - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
Hawaii - Hu Honua Biomass Plant -- Henk Rogers - Blue Planet, Man On A Mission
 
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
Hawaii Public Utilities Commission - Young Brothers Ltd. - Delivering The Bes...
 
Hawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for All
Hawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for AllHawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for All
Hawaii - Mayor Mitch Roth - Freedom, Equality, and Justice for All
 
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
Hawaii - Equal Justice Under The Law - Office Of The Public Defender - Advoca...
 
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
Hawaii - Red Hill Fuel Storage - GO NAVY - The Time is Now-The Future is Here...
 
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
Hawaii - Corona Tsunami - The Wake Up Call - Hawaii Pono`i - We Are Warriors ...
 
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...Hawaii - HART Rail Project - FTA  - Welcome Aboard - Taking Charge - Breaking...
Hawaii - HART Rail Project - FTA - Welcome Aboard - Taking Charge - Breaking...
 
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
HART - The Purge - The Prize - The Pivot - The Team - Great Opportunities and...
 
Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021
Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021
Hawaii - Unite 5 - Protect Our Workers - Labor Day 2021
 
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
Hawaii - John A. Burns School of Medicine - Graffiti - ID Root of the Problem...
 
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our FutureHawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
Hawaii - Vaccine Research - Advancing Humanity - Invest in Our Future
 
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
Hawaii - Merck and Pfizer - Providing for Humanity - Research and Clinical Tr...
 
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
Maui County, Hawaii - Fire and Public Safety - Outthinking Wildfire - A Tribu...
 

Dernier

Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for LearningCIToolkit
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 

Dernier (20)

Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 

Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Else Fails - The Truth

  • 1. HONOLULU AUTHORITY FOR RAPID TRANSIT (HART) WHEN ALL ELSE FAILS LinkedIn SlideShare November 18, 2017 https://www.slideshare.net/cliftonmhasegawa/honolulu-authority-for-rapid-transit-hart-the-hard-reality-when-all-else-fails THE SEQUEL TELL THE TRUTH Frank Fasi tried several times, and in 1992 came close to making it happen. The Federal Transit Administration had agreed to provide nearly one-third of the $2 billion estimated cost. But things fell apart when a 5-4 majority of City Council members refused to raise taxes needed to fund it.4 Fasi avoided the term heavy rail, but that’s how rail experts would have described his proposed system. When describing a rail system, the terms heavy and light are not primarily about weight. Light rail systems operate in or across city streets, while heavy rail systems run overhead or below ground, powered by a third rail. Fasi’s successor, Jeremy Harris, expressed some interest in heavy rail, but turned his attention to light rail, which the governor at that time, Ben Cayetano, endorsed. Cayetano explained to reporters that his opposition to rail on Oahu applied only to heavy rail. Harris’s light-rail proposal eventually morphed into bus rapid transit, which is like light rail but uses rubber tires on pavement rather than steel wheels on steel rails. One of Cayetano’s last ofcial acts as governor was to approve an Environmental Impact Statement that rated bus rapid transit as superior to rail – for Honolulu. Muf Hannemann made abrupt changes immediately after succeeding Harris.
  • 2. The just- declared superior alternative for Honolulu, bus rapid transit, did not even make the list of fnalists: Hannemann’s alternatives analysis considered three versions of elevated, steel-on- steel rail, each of which ft into a new category called metro-light. Like heavy rail, metro-light runs overhead or underground. But like light rail, metro-light has less carrying capacity than does a traditional heavy rail system. One mainland commentator has described metro-light as “a hybrid form of rail that [combines] the cost disadvantages of heavy rail with the capacity limits of light rail.” City ofcials sometimes mischaracterized Hannemann’s proposed metro-light system as light rail, which might have caused some citizens to picture something less expensive, less noisy, and less imposing than Hannemann had in mind. Even if one were to ignore the entire cost overrun, the per- capita cost of Honolulu’s rail system would still be dramatically higher than that of any other city. Part of the reason is the high cost of building elevated rail on Oahu, particularly from Chinatown to Ala Moana Center. The rest of the explanation is our relatively low population: No city the size of Honolulu has ever tried to build a rail system. The next smallest metropolitan area with heavy rail has a population four times larger than Honolulu’s. "The capital cost is way too high, and the expected ridership is way too low," said Dan Chatman, associate professor of city and regional planning at the University of California, Berkeley. "It's pretty simple." Source: The Future of Rail on Oahu: Plan A, B, or C? By Randall W. Roth [Excerpt; Citations Omitted] http://randallroth.com/fles/Rail%20Speech.pdf
  • 3. Light Rail : it is one which needs low capital cost and high reliability, the rails could be laid separately or could be laid on the roadways also as if the train is not there we could use it as a normal road. The speed is quite low 30kmh [18.64114 mph] Metro Rail : It is a type of high capacity transport system, like others it also runs on electricity. These rails run on fyovers, underground as a multi purpose system and has the highest passenger capacity in terms of speed of transport. Its average speed is 70kmh [43.49598mph] but in some areas it reaches 90kmh [55.92341mph] [Emphasis and Clarifcation Supplied] Source: Quora What is the diference between light metro, metro, and monorail? By Sia Varun, September 22, 2016, accessed November 19, 2017 https://www.quora.com/What-is-the- difference-between-light-metro-metro-and-monorail Honolulu Rail Transit Project Update Andrew Robbins, Executive Director & CEO October 24, 2017 http://www.westoahu.org/resources/Documents/Andrew%20Robbins%20-%20HART.pdf How fast will trains travel? 55 mph top speed & 30 mph average speed, including train stops Honolulu Rail Transit Tests Rail Cars Published on Oct 22, 2017 HART & Ansaldo HNL are testing rail cars at maximum operational speeds of 55mph. Testing will continue for the next several months RUNNING AT 56.52 MPH https://www.youtube.com/watch?v=9Wmzy9qrN-Q
  • 4. HART to begin live train, energized track testing for rail project KHON2, September 4, 2017 http://khon2.com/2017/09/04/hart-to-begin-live-train-energized-track-testing-for-rail-project/ When the trains start rolling, they will be tested for their acceleration up to 55 mph, and then for their braking ability under varying conditions. Operators will be on board during that time, but once the system is complete, the trains will be fully automated and driver-less. Honolulu Is Building America's First Fully Driverless Transit System By Amy Crawford. City Lab. September 17, 2014, accessed November 19, 2017 https://www.citylab.com/life/2014/09/honolulu-is-building-americas-frst-fully-driverless-transit-system/380292/ Honolulu's system is modeled on the Copenhagen Metro, which has been operating since 2002 and won "best subway" at the international MetroRail conference in 2008 Grabauskas [Dan Grabauskas, executive director and CEO of the Honolulu Authority for Rapid Transportation (HART)] reports "a tremendous amount of interest" in Honolulu's system among his mainland U.S. colleagues. "The driverless operation we have is going to be very safe." It should also be more reliable. Eliminating the unpredictability of human drivers will help trains stick to their schedules, and consistent acceleration and deceleration means they can safely run closer together. Over the course of a 20-hour daily schedule, system managers will also be able to increase the frequency of service in response to demand, without having to call in additional personnel. "We can make pretty nimble service changes," Grabauskas says, "almost literally with the press of a button. Driverless systems ofer tremendous advantages." [Clarifcation Supplied]
  • 5. The Honolulu Rail Project - Based on the Copenhagen Driverless Metro System Ansaldo JV – A Hitachi Group Joint Venture [Excerpts] Accessed November 19, 2017 http://www.ansaldohonolulu.com/index.php?option=com_content&view=article&id=5 Copenhagen is a growing capital and has been reviewing future trafc plans accordingly. [Population of 1.99 million in 2017] In 1996, Copenhagen chose the most sophisticated metro system yet seen in Europe, when the contract was signed with Ansaldo STS) for a driverless transit system across and under the city. The Copenhagen Metro originally opened in 2002. The two lines feature 22 stations and take you from the Copenhagen Airport, across the city center and into the densely populated suburbs, crossing areas of new urban development. Copenhagen has been the frst city in the world that introduced the Hitachi Rail Italy’s driverless metro. Brescia the frst city in Italy. The other cities that introduced this technological jewel are Milan, Italy, Rome, Italy and Riyadh, Saudi Arabia, Honolulu, Hawaii [Population of 1.43 million] in 2017. PUBLIC TRANSPORT The public transportation in Copenhagen is very reliable, punctual, and it takes you everywere. In Copenhagen the trains, Metro and busses (including waterbuses) can be accessed with the same ticket. All you need to know is how many zones you will pass on your journey. Note the Metro will take you from the airport to central Copenhagen in only 20 minutes. Buses The A-buses are the primary buses in central Copenhagen. They drive every 3- 7 minutes during rush hour (which is between 07:00-09:00 in the morning and 15:30-17:30 in the afternoon) and usually about every 10 minutes before and after rush hour. The A-buses serve at all hours. The S-buses drive every 5-10 minutes during rush hour and every 20 minutes outside of rush hour. The S-buses are faster than the A-busses due to fewer stops. They usually serve between 06:00 in the morning and 01:00 at night. Night buses are in service between 01:00 and 05:00 in the night. You can recognise the bus stops by the grey colour of the bus stop signs.
  • 6. Metro The metro is in service all day and all night, every day of the week. There are 2-4 minutes between each train during rush hour, and 3-6 minutes outside rush hour and during the weekends. Friday and Saturday night (after 01:00) trains arrive with a 7-15 minutes interval and a 20 minutes interval after midnight on weekdays (Sunday through Thursday). Trains The S-trains run between 05:00 in the morning and 00:30 at night. Line F runs every 4-5 minutes, line A, B, C and E run every 10 minutes, and line H and Bx run every 20 minutes. Source: VISITCOPENHAGEN. http://www.visitcopenhagen.com/copenhagen/transportation/public-transport RIDERSHIP Copenhagen Metro Record-high passenger numbers 2015 was a record year for the metroʼs passenger numbers since it opened in 2002. More than 57.2 million people took the metro in 2015, which is 1.2 million more than in 2014. This implies that in 2015 the metro on average had 100,000 more passengers per month, compared to 2014. Operations could be normalised as planned in the second half of 2015, but now with more trains and improved operational stability. As a consequence, the metro generally achieved higher passenger numbers during the rest of the year. In November, a new passenger record was set, when no less than 5.2 million passengers took the metro, with operational stability ending at a record-high 98.8 per cent. Source: Metro Service A/S http://intl.m.dk/#!/search?q=annual%20reports TheBus TheBus is privately managed by Oahu Transit Services Inc., which operates the system under a public-private partnership with the City and County of Honolulu Department of Transportation Services
  • 7. TheBus Total Monthly Ridership September 2017 5,435,893 September 2016 5,547,475 September 2015 5,728,587 September 2014 6,087,573 Peter Rogof, Formerly FTA Administrator Currently Chief Executive Ofcer of Sound Transit Address to the Boston Reserve Bank May 18, 2010; Updated: Wednesday, March 16, 2016 http://randallroth.com/fles/Administrator%20Peter%20Rogof%20Remarks%20at%20the %20Boston%20Reserve%20Bank%20updated%20to%20March%202016.pdf Increasingly, I have become convinced that the solutions to these problems are not about engineering. They are not just about economics. • They are about honesty; • They are about the necessity to tell truth to power • They are about the necessity for political guts – the guts to tell it like it is – the guts to say “no” when everyone around the table wants you to say yes. • They are about the need to rethink the questions we ask of ourselves. And insisting on asking them, again and again. If we really care about what we leave to our grandchildren, we will each use this summit to strengthen our resolve to do just that. And keep doing it – because this problem isn’t going to be solved over just a few budget cycles or even over one generation.
  • 8. In the end, while we often like to sugarcoat it, these decisions we make are truly moral decisions. Moral decisions about who we serve with scarce resources. Moral decisions about whether we leave the next general manager, the next Chief Engineer, the next bus driver, a system that is stressed even further or is on the path to wellness. Moral decisions about whether we direct scarce resources to transit riders that might otherwise drive their car vs. transit riders who will have no choice but endure the service we give them, not matter how troubled. What do I mean by honesty? Share some simple truths that folks don’t want to hear. One is this -- Paint is cheap Riders often want rail – but you can entice diehard rail riders onto a “special” bus, sometimes by just painting the bus a diferent color than the rest of the feet. Busways are cheap. You can get a designated lane just by painting it. And with signal preemption, you can move a lot of people at very little cost compared to rail. Earlier I pointed out that our new estimate for the deferred maintenance backlog for the entire transit universe is roughly $78 billion. But you should know that fully 75 percent of that fgure is for the replacement of rail assets. Now remember that the majority of transit trips taken in America are still done by bus. In fact, Americans take 21 percent more bus trips than rail trips. But when it comes to the need to replace transit assets, the costs associated with replacing rail assets eats up three quarters of the entire backlog. Agencies deciding between bus and rail investments need to stare those numbers in the face. It’s one thing to pay the cost diferential now. They need to be mindful of the costs they are teeing up for future generations. Is Bus Rapid Transit a workable option for every corridor – no. But it’s a fne ft for more communities than are seriously considering it. Another simple truth -- by ignoring deteriorating conditions at our transit systems, we run the very real risk of losing riders.
  • 9. The Obama Administration wants to grow transit ridership. It is wholly consistent with the President’s goals to lower greenhouse gas emissions and reduce our dependence on foreign oil. But we can’t achieve our goals while ignoring the state of good repair. Transit riders – especially those that are not transit dependent – will only put up with so much. There is a point where dirty stations, unreliable service, slowed train speeds, inoperable escalators, and worries about safety push riders back on the highway. Ironically, every study ever conducted will show that, from a safety perspective, passengers are far safer riding even our most fragile transit systems than driving on the highway. But that doesn’t necessarily infuence the choices commuters make. What do I mean by guts to say no? I’m now concluding my frst year as Administrator. I meet with a great many transit general managers. While these meetings are all diferent, they often follow a certain pattern. I start of the meeting by asking how things are going. They express gratitude for the new Recovery Act funds but then go on to explain that the downturn in municipal revenues, the downturn in sales tax receipts, the cutbacks in the city and state levels, has necessitated service cuts. Sometimes we talk about serious service cuts of 20 percent or more. We talk about: • route reductions • layofs • furloughs • signifcant chunks of capital reinvestment being difered as they use Federal capital dollars for preventive maintenance to close operating gaps. It’s all very grim. But then we get to the second part of the meeting. The consultants start to get excitable and the glossy brochures come out. And the next thing you know, the general manager wants to talk about their new plans for expansion -- the spanking new rail service to communities not yet served.
  • 10. In fairness, many of these new communities have been waiting for a long time to get rail service. Indeed, many were promised rail service as part of a sales tax referendum that was passed a decade ago. The other communities got service – but now those are more expensive than originally forecast – and the sales tax is taking in far less than expected. At times like these, we need to ask the hard question: if you can’t aford to operate the system you have, why does it make sense for us to partner in your expansion? Are we not helping you dig a deeper hole for our children and our grandchildren?] These ARE moral questions. Should we count on the economy coming back. Yes we must. And indeed, the economy is coming back. But what will be required of us when it does. We were already at record ridership when the economy started to contract. While ridership has dipped with employment, we can expect it to come back to new record levels when the economy fully recovers. So what pressures does that put on our struggling systems. I was recently talking to a friend in the freight rail industry. He told me that one of the benefts of slower trafc on their main lines was that it gave them the opportunity to reinvest and do some major restoration projects without being so disruptive to their freight trafc. Well how many of our transit agencies had a similar opportunity? How many systems actually had access to enough money to seriously reinvest in the midst of a recession? There is no question that the Recovery Act helped, but our transit agencies will still struggle to handle the trafc that will come with a recovered economy. When I said earlier that one of the solutions is to tell it like it is – that includes the uncomfortable situation of calling someone out when their behavior isn’t responsible.
  • 11. My favorite example is the Douglas Branch of the Blue Line in Chicago. It actually passed FTA’s funding test for a brand new rail line. Why, because it was so slow and decrepid – it was allowed to deteriorate to such a state, its restoration brought so many new riders – saving as much as 30 minutes over current rail service over the identical route – the identical stations. Just the absence of slow orders was the game changer. But the question has to be asked, how was it allowed to just rot on the vine? Where were the policymakers at all levels that allowed conditions to deteriorate so. When it comes to calling out the truth – let me praise Governor Patrick for requesting the D'allesandro study. Tells a stark picture of what needs to be done here in Boston. Success will require us all to wake up those that want to stay asleep.