SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
Renewable Energy in Indonesia
      Carbon Market
                              Dicky Edwin Hindarto
      National Council on Climate Change of Indonesia
                    The Indonesia DNA


National Council on Climate Change of Indonesia
Outlines
                                 1. NCCC roles in carbon market
                                 2. Indonesia carbon market
                                    current condition
                                 3. Indonesia future carbon
                                    market scenario
                                 4. RE in Indonesia future
                                    carbon market scenario
                                 5. Nusantara Carbon Scheme.


                                                                  2
 National Council on Climate Change of Indonesia
NCCC of Indonesia roles on carbon market
    NCCC has 5 tasks, one of the most important thing is to develop carbon
     trading within Indonesia area (Presidential Decree number 46, 2008)
    NCCC is the Indonesia UNFCCC focal point and also the focal point for another
     carbon market related international forum and negotiation e.g. bilateral
     initiative with the Japan and Australia
    The Executive Chairman of the NCCC is also the head of the Designated
     National Authority for Clean Development Mechanism (CDM) in Indonesia,
     called “Komite Nasional Mekanisme Pembangunan Bersih” (Komnas MPB)
    The Carbon Trading Mechanism Division also act as the secretariat of DNA-
     CDM in Indonesia.



                                                               The CDM Projects
                                                               development in
                                                               Indonesia



                                                                                     3
    National Council on Climate Change of Indonesia
The Indonesia CDM and voluntary projects
                     Solar, 1                                                                      Solar, 1      Afforestation,
                                      Afforestation, 1
                                                                                                                       0
        Agriculture, 1                                                                  Agriculture, 0
                                                             Cement, 1
                                                                                                                 Reforestation,        Cement, 1
   PFCs and SF6, 3                 Reforestation, 1                              PFCs and SF6, 1                       0
                                                                   EE                                                                         EE
   N2O, 2                                                                             N2O, 1                                             households, 0
                                                              households, 1
                                                                                                                                        EE Industry, 2
                                 Biomass                      EE Industry, 7                                   Biomass                    EE supply
                                energy, 33                                                                    energy, 11                    side, 2
                                                             EE supply side, 7
                                                                                                                                               EE own
                                                                                                                                            generation, 0
              Methane                                             EE own                   Methane
                                                                generation, 6                                                             Fossil fuel
            avoidance, 95                                                                avoidance, 35
                                                                                                                                           switch, 3
                                                                  Fossil fuel                                                          Fugitive, 1
                                                                 switch, 10
                                                                                                                                       Geothermal, 4
                                                              Fugitive, 4

                                                         Geothermal, 12
                                                                                                                                   Hydro, 6
Coal bed/mine                         Hydro, 27                                                     Coal bed/mine
 methane, 2       Landfill gas, 12                                                                                         Landfill gas, 7
                                                                                                     methane, 0
  The CDM projects in UNFCCC pipeline                                                          The registered CDM projects in UNFCCC

 Total CER expected until 2012 : 50,132,380 CER; mostly from methane avoidance
 Total CER expected until 2012from the registered projects : 27,513,180 CERs; mostly from
  geothermal
 There are more than 20 voluntary carbon markets that being developed in Indonesia
 Some of the so called “REDD+” projects goes to the voluntary carbon market
 About 2,5 millions VER are already issuanced for voluntary carbon market projects.
                                                                                                                                                   4
      National Council on Climate Change of Indonesia
The Indonesia issuanced CDM projects
                                                                                                                               Expected     Issuance
No.                        Title                         Province / State           Type           Sub-type        CERs
                                                                                                                                 CERs        success
1     CDM SOLAR COOKER PROJECT Aceh 1                  Aceh                 Solar            Solar cooking             1,077        6,060      18%

2     Methane Capture and Combustion from              Riau                 Methane          Manure                   42,716      221,485     19%
      Swine Manure Treatment Project at PT                                  avoidance
      Indotirta Suaka Bulan Farm in Indonesia
3     Indocement Alternative Fuels Project             West Java & South    Biomass energy   Agricultural             80,967      258,308     31%
                                                       Kalimantan                            residues: other
                                                                                             kinds
4     Indocement Blended Cement Project                West Java & South    Cement           Clinker replacement     333,076    1,211,054     28%
                                                       Kalimantan
5     Darajat Unit III Geothermal Project              West Java            Geothermal       Geothermal            1,329,960    1,390,111     96%
                                                                                             electricity
6     Tambun LPG Associated Gas Recovery and           West Java            Fugitive         Oil field flaring     1,483,279    1,040,953    142%
      Utilization Project                                                                    reduction
7     MEN-Tangerang 13.6MW Natural Gas Co-             Banten               EE supply side   Cogeneration             17,154       21,836     79%
      generation Project
8     Emission reductions through partial                West Java &        Biomass energy   Agricultural             12,335      106,284     12%
      substitution of fossil fuel with alternative fuels Central Java                        residues: other
      in the 2 cement plants of PT Holcim                                                    kinds
9     Indonesia Tbk Power Plants Using Waste
      4MW Biomass                                        Central Java       Biomass energy   Forest residues:         10,982       14,322     77%
      Wood Chips & Sawdust in Central Java                                                   sawmill waste
10    Province, Indonesia
      Gianyar Waste Recovery Project                     Bali               Methane          Composting                2,110        6,713     31%
                                                                            avoidance
11    Methane Recovery in Wastewater                   South Sumatra        Methane          Waste water              14,472       41,349     35%
      Treatment, Project AIN07-W-01, Sumatera                               avoidance
12    Utara (North Sumatera), Indonesia
      Methane Recovery in Wastewater                   North Sumatra        Methane          Waste water              30,235       42,206     72%
      Treatment, Project AIN07-W-05, Sumatera                               avoidance
13    Utara, Indonesia
      AIN08-W-03, Methane Recovery in                  North Sumatra        Methane          Waste water              15,537       38,319     41%
      Wastewater Treatment, Sumatera Utara,                                 avoidance
14    Indonesia
      BAJ Gunung Agung Factory tapioca starch          Lampung              Methane          Waste water               6,858       30,779     22%
      wastewater biogas extraction and utilization                          avoidance
15    project, Lampung Province, Republic of
      Kamojang Geothermal                              West Java            Geothermal       Geothermal               92,691       81,660    114%
                                                                                             electricity
16    Wayang Windu Phase 2 Geothermal Power            West Java            Geothermal       Geothermal              379,773      372,373    102%
      Project                                                                                electricity
                                                                                                     Total         3,853,222    4,883,812     79%


                                                                                                                                             5
      National Council on Climate Change of Indonesia
New carbon market scenarios for Indonesia

                                                                             • New CDM
                                                    Readiness of the         • REDD+
                                                    government and           • Crediting NAMAs
                                   Voluntary                                 •
          CDM                       Carbon
                                    Market
                                                    privates to prepare
                                                    legal, organizational,   •
                                                                               Regional market
                                                                               Domestic market
                                                    and technical            • Bilateral offset
                                                    structures of market.      credit
                                                                               mechanism
                                                                             • Others


•   Reformed CDM post-2012
•   Programmatic CDM (we have issued 5 LoAs)
•   REDD+
•   Creditable NAMAs
•   Bilateral offset credit mechanism, 32 FS have been done)
•   Voluntary market and domestic market
•   Regional market (with Australia and New Zealand)
                                                                                                  6
        National Council on Climate Change of Indonesia
Indonesia future carbon market frame work

             International Carbon Markets

                                 Direct link with other            International
 Linking via offset
                                   domestic market                   Crediting
    mechanism
                                      mechanism                     Mechanism



     DOMESTIC MARKET MECHANISMS
        that based on voluntary market system
                                                              REGIONAL AND
 (e.g. Emissions trading scheme or sectoral trading)        BILATERAL MARKET
   Indonesia will prepare standard, policies, and             that based on regional and
                 market instrument.                       bilateral agreement and domestic
           CARBON CREDIT SUPPLIER                             emission reduction policies
     Indonesia will produce carbon credit for             (e.g. NAMA or sectoral crediting)
 mandatory and voluntary based market system for
              international market.

                                                                                              7
   National Council on Climate Change of Indonesia
Where do we put the RE in future carbon markets?

                                                        CDM
                                                       and PoA


                               Other
                                                                   Creditable
                               New                                  NAMAs
                              Markets         Renewable
                                                Energy

                                      BOCM                       VCM

   Traditionally, RE can be developed in future CDM and PoA.
   Large RE is one of the main target in Creditable NAMAs.
   VCM can be used for the small to the large capacity of RE.
   Some countries are eager to invest the RE projects using BOCM scenario (geothermal, hydro, biomass).
   One or two other new markets mechanism still will be developed and use RE as one of the main target.

                                                                                                    8
     National Council on Climate Change of Indonesia
Designing new market mechanism
    Voluntary Offset                            Cap and Trade                New Market
                                                                             Mechanism?
• Politically easier to adopt           • Need strong political will   • Easy to adopt
• Relatively harder to                    to adopt                     • Simple governance
  operate due to its                    • Easier to implement due      • Does not require lengthy
  ‘project-based’ nature                  its nature of ‘inventory-      preparation
• Governance is simple                    based’                       • Customize-able
• Does not require lengthy              • Friendlier to large-scale    • Easy to implement
  preparation eg.                         ‘green’ investment             (inventory-based?)
  Preparing sectoral                    • Need rigorous                • Support large-scale
  baseline, etc.                          preparation to establish       ‘green’ investment
• Can be customized by                    baseline
  design to accommodate                 • Governance is complex
  specific need eg. Micro                  cap setting and
  project, co-benefit value,              mechanism design
  etc.                                  • Leakage issues
New market mechanism should seek to feature only the merits of existing
mechanisms with regard of UNFCCC negotiation results.
                                                                                             9
   National Council on Climate Change of Indonesia
Indonesia initiative on domestic carbon market
 Skema Karbon Nusantara, or Nusantara Carbon Scheme (NCS), is
  an Indonesian-based voluntary carbon market scheme.
 By entering NCS, Indonesians can reduce greenhouse gas
  emissions by developing low carbon project or buying NCS credits.
 NCS features:
   A simple yet robust procedures;
   Technical assistance from National Council on Climate Change;
      and
   Assurance that the project had delivered real and measurable
      emissions reduction and contributes directly to Indonesia low
      carbon and sustainable development.
                                                      Skema
                                                      Karbon
                                                      Nusantara
                                                                 10
   National Council on Climate Change of Indonesia
Renewable energy is one of our main target
Specifically, SKN will be targetted:
• Projects that ‘traditionally’ not feasible for carbon market, e.g.
  micro projects (<5MW energy generation, <10 GWh/yr. of energy
  saving, <20.000 tCO2/yr. of emissions reduction) and community-
  based forestry/agriculture projects as Seller; and
• Indonesian entities interested in offsetting GHG emission and
  contributes to sustainable development as Buyer
Along with other countries initiative and VCM standards!

         K-CER
      J-VER                                          Skema
                                                     Karbon
                                                     Nusantara
                                                                  11
  National Council on Climate Change of Indonesia
SKN’s flow of operation
 Project Design                         Validation                          No                     Yes     Registry and
   Document           Validation         Report                                  Credit Issuance          Distribution of
                                                                                                              Credits



                                 No                     Yes Monitoring and        Monitoring
                                       Assessment                                  Report
                                                             Verification




          By Project Developer                   By Validator/Verificator                    By SKN Committee



• SKN flow of operation is comparable with CDM.
• Validation/verification in SKN will prioritize local entities (private
  companies/NGOs/research institutes) with reference to ISO 14064 series
  and ISO 14065
                                                                                                                       12
      National Council on Climate Change of Indonesia
Terima kasih                                       Skema
Thank you                                          Karbon
                                                   Nusantara
 National Council on Climate Change of Indonesia

Contenu connexe

Tendances

PPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptx
PPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptxPPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptx
PPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptxefrianmuharrom
 
Introduction to Carbon Markets
Introduction to Carbon Markets Introduction to Carbon Markets
Introduction to Carbon Markets sanjoysanyal
 
RAPBN 2023 - Energi - Sampe.pptx
RAPBN 2023 - Energi - Sampe.pptxRAPBN 2023 - Energi - Sampe.pptx
RAPBN 2023 - Energi - Sampe.pptxSampe Purba
 
Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...
Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...
Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...OECD Environment
 
Tax treaty Application on PSC Contracts.pptx
Tax treaty Application on PSC Contracts.pptxTax treaty Application on PSC Contracts.pptx
Tax treaty Application on PSC Contracts.pptxSampe Purba
 
Prospect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in IndonesiaProspect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in IndonesiaBadariahYosiyana
 
Pengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment FundPengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment FundCIFOR-ICRAF
 
Experience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLN
Experience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLNExperience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLN
Experience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLNOECD Environment
 
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMRIndonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMROECD Environment
 
Carbon Mechanisms, Markets, and Projects
Carbon Mechanisms, Markets, and ProjectsCarbon Mechanisms, Markets, and Projects
Carbon Mechanisms, Markets, and ProjectsThe Climate Trust
 
Energy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, IndonesiaEnergy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, IndonesiaOECD Environment
 
Development of Renewable Energy and Energy Conservations towards Net Zero Emi...
Development of Renewable Energy and Energy Conservations towards Net Zero Emi...Development of Renewable Energy and Energy Conservations towards Net Zero Emi...
Development of Renewable Energy and Energy Conservations towards Net Zero Emi...Sampe Purba
 
Towards carbon market in Indonesia: Progress and lessons
Towards carbon market in Indonesia: Progress and lessonsTowards carbon market in Indonesia: Progress and lessons
Towards carbon market in Indonesia: Progress and lessonsCIFOR-ICRAF
 
An Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and ProjectsAn Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and ProjectsThe Climate Trust
 
SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...
SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...
SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...OECD Environment
 
USU - Migas dalam konteks ketahanan energi nasional.pptx
USU - Migas dalam konteks ketahanan energi nasional.pptxUSU - Migas dalam konteks ketahanan energi nasional.pptx
USU - Migas dalam konteks ketahanan energi nasional.pptxSampe Purba
 
RPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdf
RPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdfRPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdf
RPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdfOECD Environment
 
6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx
6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx
6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptxSmDanang
 
Materi Paparan Bappenas KPBU.pdf
Materi Paparan Bappenas KPBU.pdfMateri Paparan Bappenas KPBU.pdf
Materi Paparan Bappenas KPBU.pdfarif129194
 
Kebijakan Blue Carbon dalam operasionalisasi global
Kebijakan Blue Carbon dalam operasionalisasi globalKebijakan Blue Carbon dalam operasionalisasi global
Kebijakan Blue Carbon dalam operasionalisasi globalCIFOR-ICRAF
 

Tendances (20)

PPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptx
PPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptxPPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptx
PPT. PERPRES NEK No 98_2021 (samarinda 1 Desember 2021) .pptx
 
Introduction to Carbon Markets
Introduction to Carbon Markets Introduction to Carbon Markets
Introduction to Carbon Markets
 
RAPBN 2023 - Energi - Sampe.pptx
RAPBN 2023 - Energi - Sampe.pptxRAPBN 2023 - Energi - Sampe.pptx
RAPBN 2023 - Energi - Sampe.pptx
 
Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...
Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...
Dian Lestari, BFK, Ministry of Finance - Green Finance Facility to Support Cl...
 
Tax treaty Application on PSC Contracts.pptx
Tax treaty Application on PSC Contracts.pptxTax treaty Application on PSC Contracts.pptx
Tax treaty Application on PSC Contracts.pptx
 
Prospect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in IndonesiaProspect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in Indonesia
 
Pengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment FundPengelolaan dana REDD+: Indonesian Environment Fund
Pengelolaan dana REDD+: Indonesian Environment Fund
 
Experience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLN
Experience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLNExperience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLN
Experience from the Emission Trading System (ETS) Trials - Syovfi Roekman, PLN
 
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMRIndonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
 
Carbon Mechanisms, Markets, and Projects
Carbon Mechanisms, Markets, and ProjectsCarbon Mechanisms, Markets, and Projects
Carbon Mechanisms, Markets, and Projects
 
Energy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, IndonesiaEnergy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, Indonesia
 
Development of Renewable Energy and Energy Conservations towards Net Zero Emi...
Development of Renewable Energy and Energy Conservations towards Net Zero Emi...Development of Renewable Energy and Energy Conservations towards Net Zero Emi...
Development of Renewable Energy and Energy Conservations towards Net Zero Emi...
 
Towards carbon market in Indonesia: Progress and lessons
Towards carbon market in Indonesia: Progress and lessonsTowards carbon market in Indonesia: Progress and lessons
Towards carbon market in Indonesia: Progress and lessons
 
An Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and ProjectsAn Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and Projects
 
SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...
SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...
SDGs financing hub as innovative funding scheme - Dr Ir. Yahya Rachmana Hiday...
 
USU - Migas dalam konteks ketahanan energi nasional.pptx
USU - Migas dalam konteks ketahanan energi nasional.pptxUSU - Migas dalam konteks ketahanan energi nasional.pptx
USU - Migas dalam konteks ketahanan energi nasional.pptx
 
RPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdf
RPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdfRPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdf
RPN 2022 Manila: Session 2.3 Yusuf Suryanto Bappenas.pdf
 
6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx
6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx
6.-Pak-Hendro-Semnas_Medan_industri-Hijau_2022.pptx
 
Materi Paparan Bappenas KPBU.pdf
Materi Paparan Bappenas KPBU.pdfMateri Paparan Bappenas KPBU.pdf
Materi Paparan Bappenas KPBU.pdf
 
Kebijakan Blue Carbon dalam operasionalisasi global
Kebijakan Blue Carbon dalam operasionalisasi globalKebijakan Blue Carbon dalam operasionalisasi global
Kebijakan Blue Carbon dalam operasionalisasi global
 

En vedette

The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyThe Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyDicky Edwin Hindarto
 
Unveiling the Potential of Market Based Mechanism Implementation in Indonesia
Unveiling the Potential of Market Based Mechanism Implementation in IndonesiaUnveiling the Potential of Market Based Mechanism Implementation in Indonesia
Unveiling the Potential of Market Based Mechanism Implementation in IndonesiaDicky Edwin Hindarto
 
Perubahan iklim, apa dan bagaimana
Perubahan iklim, apa dan bagaimanaPerubahan iklim, apa dan bagaimana
Perubahan iklim, apa dan bagaimanaDicky Edwin Hindarto
 
InvestmentOpportunities_RenewableEnergy_Oct2014ed
InvestmentOpportunities_RenewableEnergy_Oct2014edInvestmentOpportunities_RenewableEnergy_Oct2014ed
InvestmentOpportunities_RenewableEnergy_Oct2014edFrank Mercado
 
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088Annelies Sewell
 
Dicky presentation for ebtke econex
Dicky presentation for ebtke econexDicky presentation for ebtke econex
Dicky presentation for ebtke econexDicky Edwin Hindarto
 
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaThe Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaDicky Edwin Hindarto
 
Project participants role in Joint Crediting Mechanism
Project participants role in Joint Crediting MechanismProject participants role in Joint Crediting Mechanism
Project participants role in Joint Crediting MechanismDicky Edwin Hindarto
 
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...UNDP Eurasia
 
Green Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramGreen Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramDicky Edwin Hindarto
 
GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014Dinno Kurniawan
 
Cicatih mini hydro site visit report
Cicatih mini hydro site visit report Cicatih mini hydro site visit report
Cicatih mini hydro site visit report Dato Mat Isa
 
Melaka Greencity Cogeneration system
Melaka Greencity Cogeneration systemMelaka Greencity Cogeneration system
Melaka Greencity Cogeneration systemDato Mat Isa
 
Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...
Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...
Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...Smart Villages
 
Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013Eric Stryson
 
Ipp business analysis & financial modeling summary
Ipp business analysis & financial modeling summaryIpp business analysis & financial modeling summary
Ipp business analysis & financial modeling summaryJi Won Seo
 

En vedette (20)

Mari Berdagang Karbon
Mari Berdagang KarbonMari Berdagang Karbon
Mari Berdagang Karbon
 
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyThe Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
 
Unveiling the Potential of Market Based Mechanism Implementation in Indonesia
Unveiling the Potential of Market Based Mechanism Implementation in IndonesiaUnveiling the Potential of Market Based Mechanism Implementation in Indonesia
Unveiling the Potential of Market Based Mechanism Implementation in Indonesia
 
Perubahan iklim, apa dan bagaimana
Perubahan iklim, apa dan bagaimanaPerubahan iklim, apa dan bagaimana
Perubahan iklim, apa dan bagaimana
 
InvestmentOpportunities_RenewableEnergy_Oct2014ed
InvestmentOpportunities_RenewableEnergy_Oct2014edInvestmentOpportunities_RenewableEnergy_Oct2014ed
InvestmentOpportunities_RenewableEnergy_Oct2014ed
 
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
 
Dicky presentation for ebtke econex
Dicky presentation for ebtke econexDicky presentation for ebtke econex
Dicky presentation for ebtke econex
 
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaThe Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
 
Project participants role in Joint Crediting Mechanism
Project participants role in Joint Crediting MechanismProject participants role in Joint Crediting Mechanism
Project participants role in Joint Crediting Mechanism
 
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
 
Green Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramGreen Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset Program
 
Green job in indonesia
Green job in indonesia Green job in indonesia
Green job in indonesia
 
Jejak Karbon di Sektor Pariwisata
Jejak Karbon di Sektor PariwisataJejak Karbon di Sektor Pariwisata
Jejak Karbon di Sektor Pariwisata
 
GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014
 
Cicatih mini hydro site visit report
Cicatih mini hydro site visit report Cicatih mini hydro site visit report
Cicatih mini hydro site visit report
 
Iran
IranIran
Iran
 
Melaka Greencity Cogeneration system
Melaka Greencity Cogeneration systemMelaka Greencity Cogeneration system
Melaka Greencity Cogeneration system
 
Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...
Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...
Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons le...
 
Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013
 
Ipp business analysis & financial modeling summary
Ipp business analysis & financial modeling summaryIpp business analysis & financial modeling summary
Ipp business analysis & financial modeling summary
 

Plus de Dicky Edwin Hindarto

Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission
Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission
Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission Dicky Edwin Hindarto
 
Perkembangan Implementasi Joint Crediting Mechanism (JCM) di Indonesia
Perkembangan Implementasi Joint Crediting Mechanism (JCM) di IndonesiaPerkembangan Implementasi Joint Crediting Mechanism (JCM) di Indonesia
Perkembangan Implementasi Joint Crediting Mechanism (JCM) di IndonesiaDicky Edwin Hindarto
 
Green Growth and Sustainability Implementation in Indonesia
Green Growth and Sustainability Implementation in IndonesiaGreen Growth and Sustainability Implementation in Indonesia
Green Growth and Sustainability Implementation in IndonesiaDicky Edwin Hindarto
 
Oleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas Ditulis
Oleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas DitulisOleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas Ditulis
Oleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas DitulisDicky Edwin Hindarto
 
Market Based Mechanism in Indonesia, a Joint Crediting Mechanism Case Study
Market Based Mechanism in Indonesia, a Joint Crediting Mechanism Case StudyMarket Based Mechanism in Indonesia, a Joint Crediting Mechanism Case Study
Market Based Mechanism in Indonesia, a Joint Crediting Mechanism Case StudyDicky Edwin Hindarto
 
Joint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaJoint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaDicky Edwin Hindarto
 
Workshop pmr perkembangan perdagangan emisi di dunia
Workshop pmr perkembangan perdagangan emisi di duniaWorkshop pmr perkembangan perdagangan emisi di dunia
Workshop pmr perkembangan perdagangan emisi di duniaDicky Edwin Hindarto
 
Pemikiran Mitigasi di Tingkat Kota
Pemikiran Mitigasi di Tingkat KotaPemikiran Mitigasi di Tingkat Kota
Pemikiran Mitigasi di Tingkat KotaDicky Edwin Hindarto
 

Plus de Dicky Edwin Hindarto (12)

Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission
Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission
Mekanisme Berbasis Pasar dalam Pencapaian Target Net-Zro Emission
 
Bekerja dari Rumah Secara Efektif
Bekerja dari Rumah Secara EfektifBekerja dari Rumah Secara Efektif
Bekerja dari Rumah Secara Efektif
 
Perkembangan Implementasi Joint Crediting Mechanism (JCM) di Indonesia
Perkembangan Implementasi Joint Crediting Mechanism (JCM) di IndonesiaPerkembangan Implementasi Joint Crediting Mechanism (JCM) di Indonesia
Perkembangan Implementasi Joint Crediting Mechanism (JCM) di Indonesia
 
#pasarkarbon
#pasarkarbon#pasarkarbon
#pasarkarbon
 
Green Growth and Sustainability Implementation in Indonesia
Green Growth and Sustainability Implementation in IndonesiaGreen Growth and Sustainability Implementation in Indonesia
Green Growth and Sustainability Implementation in Indonesia
 
Oleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas Ditulis
Oleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas DitulisOleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas Ditulis
Oleh Oleh dari Katowice, Buku Panduan yang Belum Tuntas Ditulis
 
4 Years of JCM Implementation
4 Years of JCM Implementation4 Years of JCM Implementation
4 Years of JCM Implementation
 
Hemat energi untuk anak anak
Hemat energi untuk anak anakHemat energi untuk anak anak
Hemat energi untuk anak anak
 
Market Based Mechanism in Indonesia, a Joint Crediting Mechanism Case Study
Market Based Mechanism in Indonesia, a Joint Crediting Mechanism Case StudyMarket Based Mechanism in Indonesia, a Joint Crediting Mechanism Case Study
Market Based Mechanism in Indonesia, a Joint Crediting Mechanism Case Study
 
Joint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaJoint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in Indonesia
 
Workshop pmr perkembangan perdagangan emisi di dunia
Workshop pmr perkembangan perdagangan emisi di duniaWorkshop pmr perkembangan perdagangan emisi di dunia
Workshop pmr perkembangan perdagangan emisi di dunia
 
Pemikiran Mitigasi di Tingkat Kota
Pemikiran Mitigasi di Tingkat KotaPemikiran Mitigasi di Tingkat Kota
Pemikiran Mitigasi di Tingkat Kota
 

Dernier

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 

Dernier (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Renewable Energy in Carbon Market

  • 1. Renewable Energy in Indonesia Carbon Market Dicky Edwin Hindarto National Council on Climate Change of Indonesia The Indonesia DNA National Council on Climate Change of Indonesia
  • 2. Outlines 1. NCCC roles in carbon market 2. Indonesia carbon market current condition 3. Indonesia future carbon market scenario 4. RE in Indonesia future carbon market scenario 5. Nusantara Carbon Scheme. 2 National Council on Climate Change of Indonesia
  • 3. NCCC of Indonesia roles on carbon market  NCCC has 5 tasks, one of the most important thing is to develop carbon trading within Indonesia area (Presidential Decree number 46, 2008)  NCCC is the Indonesia UNFCCC focal point and also the focal point for another carbon market related international forum and negotiation e.g. bilateral initiative with the Japan and Australia  The Executive Chairman of the NCCC is also the head of the Designated National Authority for Clean Development Mechanism (CDM) in Indonesia, called “Komite Nasional Mekanisme Pembangunan Bersih” (Komnas MPB)  The Carbon Trading Mechanism Division also act as the secretariat of DNA- CDM in Indonesia. The CDM Projects development in Indonesia 3 National Council on Climate Change of Indonesia
  • 4. The Indonesia CDM and voluntary projects Solar, 1 Solar, 1 Afforestation, Afforestation, 1 0 Agriculture, 1 Agriculture, 0 Cement, 1 Reforestation, Cement, 1 PFCs and SF6, 3 Reforestation, 1 PFCs and SF6, 1 0 EE EE N2O, 2 N2O, 1 households, 0 households, 1 EE Industry, 2 Biomass EE Industry, 7 Biomass EE supply energy, 33 energy, 11 side, 2 EE supply side, 7 EE own generation, 0 Methane EE own Methane generation, 6 Fossil fuel avoidance, 95 avoidance, 35 switch, 3 Fossil fuel Fugitive, 1 switch, 10 Geothermal, 4 Fugitive, 4 Geothermal, 12 Hydro, 6 Coal bed/mine Hydro, 27 Coal bed/mine methane, 2 Landfill gas, 12 Landfill gas, 7 methane, 0 The CDM projects in UNFCCC pipeline The registered CDM projects in UNFCCC  Total CER expected until 2012 : 50,132,380 CER; mostly from methane avoidance  Total CER expected until 2012from the registered projects : 27,513,180 CERs; mostly from geothermal  There are more than 20 voluntary carbon markets that being developed in Indonesia  Some of the so called “REDD+” projects goes to the voluntary carbon market  About 2,5 millions VER are already issuanced for voluntary carbon market projects. 4 National Council on Climate Change of Indonesia
  • 5. The Indonesia issuanced CDM projects Expected Issuance No. Title Province / State Type Sub-type CERs CERs success 1 CDM SOLAR COOKER PROJECT Aceh 1 Aceh Solar Solar cooking 1,077 6,060 18% 2 Methane Capture and Combustion from Riau Methane Manure 42,716 221,485 19% Swine Manure Treatment Project at PT avoidance Indotirta Suaka Bulan Farm in Indonesia 3 Indocement Alternative Fuels Project West Java & South Biomass energy Agricultural 80,967 258,308 31% Kalimantan residues: other kinds 4 Indocement Blended Cement Project West Java & South Cement Clinker replacement 333,076 1,211,054 28% Kalimantan 5 Darajat Unit III Geothermal Project West Java Geothermal Geothermal 1,329,960 1,390,111 96% electricity 6 Tambun LPG Associated Gas Recovery and West Java Fugitive Oil field flaring 1,483,279 1,040,953 142% Utilization Project reduction 7 MEN-Tangerang 13.6MW Natural Gas Co- Banten EE supply side Cogeneration 17,154 21,836 79% generation Project 8 Emission reductions through partial West Java & Biomass energy Agricultural 12,335 106,284 12% substitution of fossil fuel with alternative fuels Central Java residues: other in the 2 cement plants of PT Holcim kinds 9 Indonesia Tbk Power Plants Using Waste 4MW Biomass Central Java Biomass energy Forest residues: 10,982 14,322 77% Wood Chips & Sawdust in Central Java sawmill waste 10 Province, Indonesia Gianyar Waste Recovery Project Bali Methane Composting 2,110 6,713 31% avoidance 11 Methane Recovery in Wastewater South Sumatra Methane Waste water 14,472 41,349 35% Treatment, Project AIN07-W-01, Sumatera avoidance 12 Utara (North Sumatera), Indonesia Methane Recovery in Wastewater North Sumatra Methane Waste water 30,235 42,206 72% Treatment, Project AIN07-W-05, Sumatera avoidance 13 Utara, Indonesia AIN08-W-03, Methane Recovery in North Sumatra Methane Waste water 15,537 38,319 41% Wastewater Treatment, Sumatera Utara, avoidance 14 Indonesia BAJ Gunung Agung Factory tapioca starch Lampung Methane Waste water 6,858 30,779 22% wastewater biogas extraction and utilization avoidance 15 project, Lampung Province, Republic of Kamojang Geothermal West Java Geothermal Geothermal 92,691 81,660 114% electricity 16 Wayang Windu Phase 2 Geothermal Power West Java Geothermal Geothermal 379,773 372,373 102% Project electricity Total 3,853,222 4,883,812 79% 5 National Council on Climate Change of Indonesia
  • 6. New carbon market scenarios for Indonesia • New CDM Readiness of the • REDD+ government and • Crediting NAMAs Voluntary • CDM Carbon Market privates to prepare legal, organizational, • Regional market Domestic market and technical • Bilateral offset structures of market. credit mechanism • Others • Reformed CDM post-2012 • Programmatic CDM (we have issued 5 LoAs) • REDD+ • Creditable NAMAs • Bilateral offset credit mechanism, 32 FS have been done) • Voluntary market and domestic market • Regional market (with Australia and New Zealand) 6 National Council on Climate Change of Indonesia
  • 7. Indonesia future carbon market frame work International Carbon Markets Direct link with other International Linking via offset domestic market Crediting mechanism mechanism Mechanism DOMESTIC MARKET MECHANISMS that based on voluntary market system REGIONAL AND (e.g. Emissions trading scheme or sectoral trading) BILATERAL MARKET Indonesia will prepare standard, policies, and that based on regional and market instrument. bilateral agreement and domestic CARBON CREDIT SUPPLIER emission reduction policies Indonesia will produce carbon credit for (e.g. NAMA or sectoral crediting) mandatory and voluntary based market system for international market. 7 National Council on Climate Change of Indonesia
  • 8. Where do we put the RE in future carbon markets? CDM and PoA Other Creditable New NAMAs Markets Renewable Energy BOCM VCM  Traditionally, RE can be developed in future CDM and PoA.  Large RE is one of the main target in Creditable NAMAs.  VCM can be used for the small to the large capacity of RE.  Some countries are eager to invest the RE projects using BOCM scenario (geothermal, hydro, biomass).  One or two other new markets mechanism still will be developed and use RE as one of the main target. 8 National Council on Climate Change of Indonesia
  • 9. Designing new market mechanism Voluntary Offset Cap and Trade New Market Mechanism? • Politically easier to adopt • Need strong political will • Easy to adopt • Relatively harder to to adopt • Simple governance operate due to its • Easier to implement due • Does not require lengthy ‘project-based’ nature its nature of ‘inventory- preparation • Governance is simple based’ • Customize-able • Does not require lengthy • Friendlier to large-scale • Easy to implement preparation eg. ‘green’ investment (inventory-based?) Preparing sectoral • Need rigorous • Support large-scale baseline, etc. preparation to establish ‘green’ investment • Can be customized by baseline design to accommodate • Governance is complex specific need eg. Micro  cap setting and project, co-benefit value, mechanism design etc. • Leakage issues New market mechanism should seek to feature only the merits of existing mechanisms with regard of UNFCCC negotiation results. 9 National Council on Climate Change of Indonesia
  • 10. Indonesia initiative on domestic carbon market  Skema Karbon Nusantara, or Nusantara Carbon Scheme (NCS), is an Indonesian-based voluntary carbon market scheme.  By entering NCS, Indonesians can reduce greenhouse gas emissions by developing low carbon project or buying NCS credits.  NCS features:  A simple yet robust procedures;  Technical assistance from National Council on Climate Change; and  Assurance that the project had delivered real and measurable emissions reduction and contributes directly to Indonesia low carbon and sustainable development. Skema Karbon Nusantara 10 National Council on Climate Change of Indonesia
  • 11. Renewable energy is one of our main target Specifically, SKN will be targetted: • Projects that ‘traditionally’ not feasible for carbon market, e.g. micro projects (<5MW energy generation, <10 GWh/yr. of energy saving, <20.000 tCO2/yr. of emissions reduction) and community- based forestry/agriculture projects as Seller; and • Indonesian entities interested in offsetting GHG emission and contributes to sustainable development as Buyer Along with other countries initiative and VCM standards! K-CER J-VER Skema Karbon Nusantara 11 National Council on Climate Change of Indonesia
  • 12. SKN’s flow of operation Project Design Validation No Yes Registry and Document Validation Report Credit Issuance Distribution of Credits No Yes Monitoring and Monitoring Assessment Report Verification By Project Developer By Validator/Verificator By SKN Committee • SKN flow of operation is comparable with CDM. • Validation/verification in SKN will prioritize local entities (private companies/NGOs/research institutes) with reference to ISO 14064 series and ISO 14065 12 National Council on Climate Change of Indonesia
  • 13. Terima kasih Skema Thank you Karbon Nusantara National Council on Climate Change of Indonesia