Time Studies
By Lance Latham
Senior Managing Partner
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Definition of a Time Study
Time Studies provide an objective method for determining
meaningful work-to-time relationships for a given task, including:
The resulting hourly rates represent task process capacity (see
Module #3). These – in turn – lay the groundwork for establishing
measurable, challenging but achievable base-line performance
targets for each task a team member performs.
v Number of quality work units that can be completed per direct
hour
v Average amount of time per quality work unit completed
Time studies are conducted through extended first-hand
observation of a skilled, conscientious and motivated
subject matter expert (SME).
2
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Step 1: Task Definition / Set-Up
v Identify process task to be observed.
v Identify skilled, conscientious and motivated subject matter
expert (SME) to be observed.
v Confirm ‘start’ and ‘end’ task points with SME.
v Review with SME an example of the process task prior to the
observation.
v Confirm primary unit of measure (i.e., the ‘thing’ to be counted).
v If necessary, confirm a secondary unit of measure.
5
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Step 2: Observation Rough Draft Documentation (cont.)
Time Study Header:
Descriptive info. completed by
Observer prior to task
observation.
Time Study Body:
Detailed process data and info.
documented by Observer
during the course of the task
observation.
Time Study Summary:
Quantified observation data
automatically calculated by
electronic Time Study
template.
8
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Step 2: Observation Rough Draft Documentation (cont.)
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Time Study Summary (Bottom Section)
14
Total minutes, primary UOM and secondary
UOM counts automatically total in the
electronic Time Study template.
15
Based on total
minutes and total
UOM counts, the
‘units per hr.’ value
is automatically
calculated for both
primary and
secondary units of
measure
documented within
the electronic Time
Study template.
15
16
The formula for this value for
both primary and secondary
units of measure is:
60 min. / ‘units per hour’ value.
These 2 values are
automatically calculated within
the electronic Time Study
template.
16
11
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Step 3: Final Draft (cont.)
Continued
example of a
completed
Time Study
(bottom portion
of page 7 of 7).
14
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Example of a Task Rate Estimator Template
For some tasks, it may be difficult or impractical to conduct a
detailed Time Study to establish process capacity rates. For example :
v A task may be performed infrequently - say, just 2 or 3 times a year, at
year end only.
v A task might have multiple steps that are carried out over weeks or
months, with extended multi-day interruptions between steps.
v Tasks may be performed by SME’s in remote geographic locations,
making travel to conduct a first-hand onsite Time Study observation too
costly or time-consuming.
In such cases, a task capacity rate estimation can be derived through
facilitated discussion with a given task’s SME. While this approach is less
desirable than gathering first-hand process data through a detailed Time
Study, it can – nonetheless – provide a reliable set of values that garner a
high level of team member and management buy-in.
17
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Example of a Task Rate Estimator Template (cont.)
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Logistics / Supply Chain Example
20
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Module 4 Summary
v A Time Study is an objective approach used to establish work-to-time
relationships for tasks performed in virtually any operating environment
(manufacturing, logistics / supply chain, financial services, IT, etc.).
v It is extremely important for an Observer to gain a preliminary
understanding of a process task prior to beginning a detailed Time Study.
v In the absence of detailed Time Study data, a task’s hourly capacity
rate can be reliably estimated via facilitated discussion with a SME.
v Validation of a given Time Study (i.e., its duration, the number of
finished process tasks observed, and the representative nature of the
work mix) by observed SME’s and their supervisors is necessary in
order to confirm a task’s hourly capacity rate and achieve team buy-in.
v Observers must take detailed notes during a Time Study, without
interrupting the SME or interfering with the normal task process.
23
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
1
Flevy (www.flevy.com) is the marketplace
for premium documents. These
documents can range from Business
Frameworks to Financial Models to
PowerPoint Templates.
Flevy was founded under the principle that
companies waste a lot of time and money
recreating the same foundational business
documents. Our vision is for Flevy to
become a comprehensive knowledge base
of business documents. All organizations,
from startups to large enterprises, can use
Flevy— whether it's to jumpstart projects, to
find reference or comparison materials, or
just to learn.
Contact Us
Please contact us with any questions you may have
about our company.
• General Inquiries
support@flevy.com
• Media/PR
press@flevy.com
• Billing
billing@flevy.com

Contenu connexe

En vedette

Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1
hgalinova
 
Walmart value chain-analysis
Walmart value chain-analysisWalmart value chain-analysis
Walmart value chain-analysis
Monica Mishra
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
Kamal Singh
 
Key principles in continuous improvement culture
Key principles in continuous improvement cultureKey principles in continuous improvement culture
Key principles in continuous improvement culture
Gopala P.
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
Monish rm
 

En vedette (20)

Continuous Improvement Strategy
Continuous Improvement StrategyContinuous Improvement Strategy
Continuous Improvement Strategy
 
How to Use VSM Correctly
How to Use VSM CorrectlyHow to Use VSM Correctly
How to Use VSM Correctly
 
Value Stream Mapping Workshop
Value Stream Mapping WorkshopValue Stream Mapping Workshop
Value Stream Mapping Workshop
 
Toyota Production System and Lean Tools
Toyota Production System and Lean ToolsToyota Production System and Lean Tools
Toyota Production System and Lean Tools
 
Heineken Strategy Analysis and Discussion
Heineken Strategy Analysis and DiscussionHeineken Strategy Analysis and Discussion
Heineken Strategy Analysis and Discussion
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1
 
Walmart value chain-analysis
Walmart value chain-analysisWalmart value chain-analysis
Walmart value chain-analysis
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Value Stream Mapping in Office and Service
Value Stream Mapping in Office and ServiceValue Stream Mapping in Office and Service
Value Stream Mapping in Office and Service
 
Heineken Case Study business Analysis
Heineken Case Study business AnalysisHeineken Case Study business Analysis
Heineken Case Study business Analysis
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mapping
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Key principles in continuous improvement culture
Key principles in continuous improvement cultureKey principles in continuous improvement culture
Key principles in continuous improvement culture
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service Setttings
 

Plus de Flevy.com Best Practices

100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf
Flevy.com Best Practices
 
Project Management for MBA (in French)
Project Management for MBA (in French)Project Management for MBA (in French)
Project Management for MBA (in French)
Flevy.com Best Practices
 
Customer-centric Culture
Customer-centric CultureCustomer-centric Culture
Customer-centric Culture
Flevy.com Best Practices
 
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
Flevy.com Best Practices
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
Flevy.com Best Practices
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
Flevy.com Best Practices
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
Flevy.com Best Practices
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
Flevy.com Best Practices
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
Flevy.com Best Practices
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
Flevy.com Best Practices
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
Flevy.com Best Practices
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
Flevy.com Best Practices
 

Plus de Flevy.com Best Practices (20)

100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf100 Case Studies on Strategy & Transformation.pdf
100 Case Studies on Strategy & Transformation.pdf
 
Project Management for MBA (in French)
Project Management for MBA (in French)Project Management for MBA (in French)
Project Management for MBA (in French)
 
4 Stages of Disruption
4 Stages of Disruption4 Stages of Disruption
4 Stages of Disruption
 
Customer-centric Culture
Customer-centric CultureCustomer-centric Culture
Customer-centric Culture
 
[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors[Whitepaper] Business Transformation Success Factors
[Whitepaper] Business Transformation Success Factors
 
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
[Whitepaper] 5 Dimensions of Employee Engagement Scorecard
 
[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization[Whitepaper] Digital Transformation: Workforce Digitization
[Whitepaper] Digital Transformation: Workforce Digitization
 
[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition[Whitepaper] Strategic Human Resources: Evolution of Competition
[Whitepaper] Strategic Human Resources: Evolution of Competition
 
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
 

Dernier

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Dernier (20)

BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Robust Production Management (RPM) Module 4: Time Studies

  • 1. Copyright © 2005 Metrilogics, LLC. All rights reserved. Robust Production Management Metrilogics Front-line controls for bottom-line savings. TM SM Module 4: Time Studies By Lance Latham Senior Managing Partner
  • 2. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Definition of a Time Study Time Studies provide an objective method for determining meaningful work-to-time relationships for a given task, including: The resulting hourly rates represent task process capacity (see Module #3). These – in turn – lay the groundwork for establishing measurable, challenging but achievable base-line performance targets for each task a team member performs. v Number of quality work units that can be completed per direct hour v Average amount of time per quality work unit completed Time studies are conducted through extended first-hand observation of a skilled, conscientious and motivated subject matter expert (SME). 2 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 3. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Step 1: Task Definition / Set-Up v Identify process task to be observed. v Identify skilled, conscientious and motivated subject matter expert (SME) to be observed. v Confirm ‘start’ and ‘end’ task points with SME. v Review with SME an example of the process task prior to the observation. v Confirm primary unit of measure (i.e., the ‘thing’ to be counted). v If necessary, confirm a secondary unit of measure. 5 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 4. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Step 2: Observation Rough Draft Documentation (cont.) Time Study Header: Descriptive info. completed by Observer prior to task observation. Time Study Body: Detailed process data and info. documented by Observer during the course of the task observation. Time Study Summary: Quantified observation data automatically calculated by electronic Time Study template. 8 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 5. Step 2: Observation Rough Draft Documentation (cont.) Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Time Study Summary (Bottom Section) 14 Total minutes, primary UOM and secondary UOM counts automatically total in the electronic Time Study template. 15 Based on total minutes and total UOM counts, the ‘units per hr.’ value is automatically calculated for both primary and secondary units of measure documented within the electronic Time Study template. 15 16 The formula for this value for both primary and secondary units of measure is: 60 min. / ‘units per hour’ value. These 2 values are automatically calculated within the electronic Time Study template. 16 11 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 6. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Step 3: Final Draft (cont.) Continued example of a completed Time Study (bottom portion of page 7 of 7). 14 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 7. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Example of a Task Rate Estimator Template For some tasks, it may be difficult or impractical to conduct a detailed Time Study to establish process capacity rates. For example : v A task may be performed infrequently - say, just 2 or 3 times a year, at year end only. v A task might have multiple steps that are carried out over weeks or months, with extended multi-day interruptions between steps. v Tasks may be performed by SME’s in remote geographic locations, making travel to conduct a first-hand onsite Time Study observation too costly or time-consuming. In such cases, a task capacity rate estimation can be derived through facilitated discussion with a given task’s SME. While this approach is less desirable than gathering first-hand process data through a detailed Time Study, it can – nonetheless – provide a reliable set of values that garner a high level of team member and management buy-in. 17 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 8. Example of a Task Rate Estimator Template (cont.) Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Logistics / Supply Chain Example 20 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 9. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Module 4 Summary v A Time Study is an objective approach used to establish work-to-time relationships for tasks performed in virtually any operating environment (manufacturing, logistics / supply chain, financial services, IT, etc.). v It is extremely important for an Observer to gain a preliminary understanding of a process task prior to beginning a detailed Time Study. v In the absence of detailed Time Study data, a task’s hourly capacity rate can be reliably estimated via facilitated discussion with a SME. v Validation of a given Time Study (i.e., its duration, the number of finished process tasks observed, and the representative nature of the work mix) by observed SME’s and their supervisors is necessary in order to confirm a task’s hourly capacity rate and achieve team buy-in. v Observers must take detailed notes during a Time Study, without interrupting the SME or interfering with the normal task process. 23 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-4-time-studies-462
  • 10. 1 Flevy (www.flevy.com) is the marketplace for premium documents. These documents can range from Business Frameworks to Financial Models to PowerPoint Templates. Flevy was founded under the principle that companies waste a lot of time and money recreating the same foundational business documents. Our vision is for Flevy to become a comprehensive knowledge base of business documents. All organizations, from startups to large enterprises, can use Flevy— whether it's to jumpstart projects, to find reference or comparison materials, or just to learn. Contact Us Please contact us with any questions you may have about our company. • General Inquiries support@flevy.com • Media/PR press@flevy.com • Billing billing@flevy.com