SlideShare une entreprise Scribd logo
1  sur  116
Operational Excellence – Statistical Process Control Presented by Frank Adler, Ph.D. www.Operational-Excellence-Consulting.com
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
The History of Statistical and Process Thinking The  quality control methods and techniques used today got their start in the American Civil War, when  Eli Whitney  tried in year  1789  to produce 10,000 rifles by copying one rifle, part by part. At that time most of the products were hand made by small owner-managed shops and product parts were thus not interchangeable. The result of Whitney’s mass production trail was that the rifles did not work as well as the handmade rifles. In addition, the copied parts did not fit as expected.
The History of Statistical and Process Thinking GO - Test NO-GO - Test The first time that one presented machine produced parts was 1851 at the industry exhibition in the Crystal Palace in London. An American gun smith took 10 working guns, took them apart, mixed all the parts in a box and re-assembled them again. This was found a quite surprising “experiment”.
The Traditional Production Concept The Detection Control Scheme Process Inspection Good Bad Repair Scrap + Monitor/Adjust
The Traditional Production Concept ,[object Object],[object Object],[object Object],[object Object]
An Advanced Production Concept Prevention Control Scheme Process Inspection Good Bad Repair Scrap + Monitor/Adjust Learn/Improve ,[object Object],[object Object],[object Object]
Statistical Thinking - A Definition All work is a series of interconnected processes All processes vary Understanding and reducing variation are keys to success ASQ
Customer Satisfaction Process/ System M aterial M achines M ethods M en E nvironment The Variation Management Approach
[object Object],Variation Management – Defect Definition
The  A   and  O  of process control and continuous process improvement is to understand the meaning and causes of variation in the outcome of the process. Variation Management – Continuous Improvement
Process Improvement vs. Process Development ,[object Object],[object Object],[object Object],[object Object]
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
[object Object],Collect at  least 50 data points , but better 75 to 100 points.  0 10 20 30 40 50 The Histogram
[object Object],Number of data points: Number of classes: < 50 50 - 100 100 - 250 over  250 5 -  7 (odd number) 5 -  11 (odd number) 7 - 15 11 - 19 The Histogram – Constructing a Histogram
[object Object],[object Object],[object Object],The Histogram – Typical Patterns of Variation
[object Object],[object Object],[object Object],The Histogram – Typical Patterns of Variation
[object Object],[object Object],[object Object],The Histogram – Typical Patterns of Variation
[object Object],[object Object],[object Object],The Histogram – Typical Patterns of Variation
[object Object],[object Object],[object Object],The Histogram – Typical Patterns of Variation
The Histogram – The Normal Distribution
The Histogram – Exercise 1 Distribution of Heights of U.S. Population: Use the plot area below to construct a histogram from the random sample of heights on the right:
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
Measure of Location – The Sample Average Example:  ,[object Object],[object Object],[object Object],[object Object],[object Object],Definition:
Measure of Location – The Sample Median Example:  ,[object Object],[object Object],[object Object],Construction : Order all observations from the smallest to largest. Then choose the middle observation if the number of observations is odd, or the mean value of the two middle observations if the number of observations is even.  Example:  ,[object Object],[object Object],[object Object],[object Object],Example:  ,[object Object],[object Object],[object Object],[object Object],[object Object],median = 4 median = 4.5 ?
Measure of Variability – The Sample Range Example:  ,[object Object],[object Object],[object Object],[object Object],[object Object],Definition:
Measure of Variability – Sample Variance x 3 x 2 x 1 x 10 x average _
Measure of Variability – Sample Variance Example:  ,[object Object],[object Object],[object Object],[object Object],[object Object],Definition:
Measure of Variability – Sample Standard Deviation Example:  ,[object Object],[object Object],[object Object],[object Object],[object Object],Definition:
Measure of Variability – The Normal Distribution ,[object Object],average average +1*s(igma) average -1*s(igma) average +2*s(igma) average -2*s(igma) average -3*s(igma) average +3*s(igma) 34.13 % 34.13 % 13.60 % 13.60 % 2.14 % 2.14 % 0.13 % 0.13 % Variability
Measure of Variability – The Principle of Subgrouping Time t Performance Characteristic Process not in control average Subgroup size n = 5 Number of subgroups N = 7
[object Object],[object Object],Measure of Variability – Standard Deviation s ST Where is the  range  of subgroup  j ,  N  the number of subgroups, and  d 2  depends on the size  n  of a subgroup (see handout).
Measure of Variability – Difference between  s LT  and  s ST Long-term standard deviation : Short-term standard deviation : The difference between the standard deviations  s LT  and  s ST   gives an indication of how much better one can do when using appropriate production control, like Statistical Process Control (SPC).
Measure of Location and Variability – Exercise 2 Distribution of Heights of U.S. Population: Calculate the Mean Value or Average, Median, Range, and long-term Standard Deviation of the sample data. You may copy the data into MS Excel and simplify the calculations.  Mean Value = Median = Range = Long-term Standard Deviation =
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
Process Control Charts – Types of Control Charts Count or classification (attribute data) Measurements (variable data) Count Classification (Yes/No) Incidences or nonconformities Defectives or nonconforming units Fixed oppor- tunity Variable oppor- tunity Fixed subgroup size Variable subgroup size Variable subgroup size Subgroup size of 1 Fixed subgroup size c - chart u - chart np - chart p - chart x chart x-bar R chart x-bar s chart Type of data
Process Control Charts  –  The x - Chart The x - chart is a method of looking at variation in a variable data or measurement.  One source is the variation in the individual sample results. This represents “long term” variation in the process.  The second source of variation is the variation in the range between successive samples. This represents “short term” variation. Individual or x - charts should be used when there is only one data point to represent a situation at a given time. To use the x - chart, the individual sample results should be sufficient normally distributed. If not, the x - chart will give more false signals.
Process Control Charts  –  x/mR Chart Example
Process Control Charts – The Central Limit Theorem Regardless of the shape of the distribution of a population, the distribution of average values, x-bar’s, of subgroups of size n drawn from that population will tend toward a normal distribution as the subgroup size n becomes large. Laplace and Gauss or The standard deviation s x  of the distribution of the average values is related to the standard deviation s of the individual values by the following: _
Process Control Charts – The (x-bar/R) - Chart ,[object Object],[object Object],[object Object],[object Object],[object Object]
Process Control Charts – (x-bar/R) - Chart Example
Process Control Charts – The (x-bar/s) - Chart The (x-bar / s) - chart is a method of looking at sources of variation. One chart looks at variation in the subgroup averages x-bar. The other chart examines variation in the subgroups standard deviation  s . The (x-bar / s) - chart can be used whenever one can use the (x-bar / R) - chart.  The (x-bar / s) - chart should be used instead the (x-bar / R) - chart if the subgroup is larger than 10. In this case, the standard deviation is a better measurement than the range for the variation between individual measurements in a subgroup.
Process Control Charts – Exercise 3 Throw the Dice: Step 1: Throw the dice 30 times and record the results in the table on the right. Step 2: Draw a Histogram of the 30 data points in one of the spreadsheets below. Step 3: Calculate the average to 2 consecutive throws and draw the histogram of the resulting 15 data points. What do you see and why?
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Process Control Charts – The Binomial Distribution
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Process Control Charts – Binomial Distribution Example where
Process Control Charts – The Binomial Distribution Number of defect items 1 0 2 3 4 5 6 7 8 9 Average
Process Control Charts – The p - Chart The p - chart is used to look at variation in the yes/no type. It can for example be used  to determine the  percentage  p  of defective items  in a group of items. The  number  n  of items in each group  has not to be constant, but should not vary more than 25 %.  Operational definitions must be used to determine what constitutes a defective item. The percentage of defect items is given by
Process Control Charts – The p – Chart Example
Process Control Charts – The np - Chart The np - chart, like the p - chart, is used to look at variation in yes/no type attributes data. np - charts are used to determine  the number  np  of defective items  in a group of items. The p - chart looked at the percentage of defective items in a group of items. Because the np - chart uses the number of defects, it is easier to use. However, the major difference between the np - chart and the  p - chart is that the subgroup size has to be constant for the np - chart. This is not necessary for the p - chart.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Process Control Charts – The Poisson Distribution
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Process Control Charts – Poisson Distribution Example where and
Process Control Charts – The Poisson Distribution Number of defects 1 0 2 3 4 5 6 7 8 9 Average
Process Control Charts – The c - Chart The c - chart is used to look at variation in counting-type  attributes data. It is used to determine the variation in the number of defects in a constant subgroup size. For example, a c - chart can be used to monitor the number on injuries in a plant. In this case, the plant is the subgroup. To use the c - chart, the opportunities for defects to occur in the subgroup must be very large, but the number that actually occur must be small.
Process Control Charts – The u - Chart A u - chart is used to examine the variation in counting-type attributes data. It is used to determine the variation in the number of defects per inspection unit (subgroup). The size of the subgroup does not have to be constant. The subgroup size,  n , for a u - chart is expressed in terms of the number of inspection units. The u - chart is very similar to the c - chart. The only difference is that the subgroup size for the c - chart must be constant. This is not necessary for the subgroup size of a u - chart. To use the u - chart, the opportunities for defects to occur in the subgroup must be very large, but the number that actually occur must be small.
Process Control Charts – Charts for Attribute Data Defective Items Defects Number (constant subgroup size) Percentage (variable subgroup size) np - chart c - chart u - chart p - chart
Process Control Charts – Summary Statistics Mean Value Standard Deviation Normal Poisson Binomial Distribution x 1 , x 2 , ..., x N  are the measurements and N is the number of measurements. (np) 1 , (np) 2 , ..., (np) N  are the number of defects in the  N  subgroups and n, n 1 , n 2 , ...,n N  are the number of items in each subgroup. (np) 1 , (np) 2 , ..., (np) N  are the number of defects at each time and N is the number of measurements/subgroups.
Process Control Charts – Exercise 4 Black Beads: Step 1: Take 20 beads out of the bag and record the number of black beads in the sample.  Step 2: Repeat Step 1 until you have 25 data points. Step 3: Draw the histogram of the 25 data points in the left spreadsheets below. Step 3: Select the correct process control chart and draw it in the right spreadsheet.
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
Process Control Limit – The Basic Idea ,[object Object],Upper Control Limit Lower Control Limit average average +1*s(igma) average -1*s(igma) average +2*s(igma) average -2*s(igma) average -3*s(igma) average +3*s(igma) 34.13 % 34.13 % 13.60 % 13.60 % 2.14 % 2.14 % 0.13 % 0.13 % Variability
Process Control Limit – Upper & Lower Control Limit Upper Control Limit (UCL) =   average   + 3*sigma Lower Control Limit (LCL)  =   average   - 3*sigma average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
Process Control Limit – Upper & Lower Control Limit Because the variation of a process is not known in before hand,  one can not calculate or define the control limits in advance . Control limits are  characteristics of a stable process .  They bound the variation of the process that is due to  common causes . The  calculation  of the control limits should be based on at  least 20 to 25 data points  from a process that was in statistical control (stable). The  limits should not be recalculated and modified  unless there is a reason to do so (e.g. a process change).
Process Control Limit – Two Types of Process Variability where the constant d 2  depends on the number of items in each subgroup used to calculate the range. The LT and ST subscripts represent long-term and short-term variability. The difference between s LT  and s ST  gives an indication of how much better one can do when using SPC.
Process Control Limit – The x - Chart Upper control limit  =  Lower control limit =  Upper control limit =  Lower control limit =  The x- chart The R- chart ,  where x 1 , x 2 , ..., x N  are the measurements, N the number of measurements, , and .
Process Control Limit – The x-bar/R - Chart Upper control limit  =  Lower control limit  =  The R- chart Upper control limit =  Lower control limit =  The x-bar - chart where x-bar 1 , x-bar 2 , ..., x-bar N  are the averages of each subgroup, n the number of items in a subgroup, N the number of subgroups, .  ,  and
Process Control Limit – Factors for x- and x-bar/R - Charts n 2 3 4 5 6 7 8 9 10 A 2 1.880 1.023 0.729 0.577 0.483 0.419 0.373 0.337 0.308 D 3 0 0 0 0 0 0.076 0.136 0.184 0.223 D 4 3.267 2.574 2.282 2.114 2.004 1.924 1.864 1.816 1.777 d 2 1.128 1.693 2.059 2.326 2.534 2.704 2.847 2.970 3.078
Process Control Limit – The x-bar/s - Chart Upper control limit =  Lower control limit =  Upper control limit =  Lower control limit =  The s- chart The x-bar - chart , and  where x-bar 1 , x-bar 2 , ..., x-bar N  are the averages of each subgroup, s 1 , s 2 , ..., s N  are the standard deviations of each subgroup, n the number of items in a subgroup, N the number of subgroups, .
Process Control Limit – Factors for x-bar/s - Charts n 2 3 4 5 6 7 8 9 10 A 3 2.659 1.954 1.628 1.427 1.287 1.182 1.099 1.032 0.975 B 3 0 0 0 0 0.030 0.118 0.185 0.239 0.284 B 4 3.267 2.568 2.266 2.089 1.970 1.882 1.815 1.761 1.716 c 4 0.7979 0.8862 0.9213 0.9400 0.9515 0.9594 0.9650 0.9693 0.9727
Process Control Limit – The np - Chart Lower control limit = Upper control limit =  with and where np 1 , np 2 , ..., np N  are the number of defect items in each subgroup of constant size n,  and N the number of subgroups.
Process Control Limit – The p - Chart Lower control limit = Upper control limit =  for i = 1, 2, 3,..., N, where (np) 1 , (np) 2 , ..., (np) N  are the number of defect items in the subgroups and n 1 , n 2 , ..., n N  are the number of items in the N subgroups. Note : The sample sizes should not vary more than 25% around the average sample size when using control limits for the whole chart. with  and  or  or  Control limits for whole chart Control limits for each subgroup
Process Control Limit – The c - Chart Lower control limit = Upper control limit =  with  where c 1 , c 2 , ..., c N  are the number of defects in each subgroup of constant size and N the number of subgroups.
Process Control Limit – The u - Chart Lower control limit = Upper control limit =  with  and  where c 1 , c 2 , ..., c N  are the number of defects in the subgroups and n 1 , n 2 , ..., n N  are the number of items in each of the N subgroups. Note : The sample sizes should not vary more than 25% around the average sample size.
Process Control Charts – Exercise 5 Black Beads: Calculate the average and the upper and lower control limit for the “Bead” exercise.
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
USL LSL USL LSL large variation   problem exist     root cause analysis    process improvement trend   problem occurs     root cause analysis    corrective and/or preventive action Defect Defect nominal value nominal value Out-of-Control & Process Improvement
50 55 = USL LSL= 45 50 55 45 Sample Sample 50 55 45 50 55 45 Process Tempering & Overcontrol
50 55 45 LSL USL Process tampering may substantially increase the product variability since the process average is shifted each time an adjustment is made. Process Tempering & Overcontrol
Out-of-Control Criteria – Two Causes of Variation Common Causes : Causes that are implemented in the process due to the design of the process, and affect all outcomes of the process. Identifying these types of causes requires Design of Experiment (DOE) methods. Special Causes : Causes that are not present in the process all the time and do not affect all outcomes, but arise because of specific circumstances. Special causes can be identified using SPC. Shewhart (1931)
Out-of-Control Criteria – Two Types of Processes Unstable Process : A process in which variation is a result of both  common and special causes . Stable Process : A process in which variation in outcomes arises only from  common causes .
Time Target Target Target Target UCL LCL UCL LCL UCL LCL UCL LCL &quot;In-Control&quot; and &quot;Out-of-Control&quot; Processes
Target Time Target Target Target UCL LCL UCL LCL UCL LCL UCL LCL &quot;In-Control&quot; and &quot;Out-of-Control&quot; Processes
SPC Out-of-Control Criteria – The Types of Signals ,[object Object],[object Object],[object Object]
P = 0.0013 (0.13 %) SPC Criteria – 1 Point above or below 3 Sigma Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
P = 0.001 (0.1 %) SPC Criteria – 2 of 3 Points above or below 2 Sigma Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
P =  SPC Criteria – 4 of 5 Points above or below 1 Sigma Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
P =  SPC Criteria – 8 Points on the same Side of the Average Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
SPC Criteria – Trend of 7 Points Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
P =  SPC Criteria – 15 consecutive Points in the 1 Sigma Zone Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
*) The number of runs (crossing the average line) should be about one-half of the number of points on the control chart. SPC Criteria – Too few or too many Runs *)  Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
P =  SPC Criteria – 8 Consecutive Points with none in the 1 Sigma Zone Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
SPC Criteria – Seasonal Variation Patterns Example: ___________________________________________________ average average   + 3*sigma average   + 2*sigma average   + 1*sigma average   - 1*sigma average   - 3*sigma average   -  2*sigma
SPC Out-of-Control Criteria – Summary x  x / R x / s c u np p Rule 1  Rule 2  Rule 3  Rule 4  Rule 5  Rule 6  Rule 7  Rule 8  Rule 9  Chart  -  -
SPC Out-of-Control Criteria – Exercise 6 Efficiency Out-of-Control Conditions: Determine why the process control chart below indicates that the efficiency of production line H300 is out-of-control. Notes:
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
[object Object],[object Object],[object Object],Sample Size and Frequency – Rational Subgrouping
If a shift in the process average of “E” units will harm the customer or one of the next process stages, the necessary subgroup sample size (n) can be calculated as: where The next plotted point will with 90% confidence identify a process shift larger than “E” units, that means the next point will be above or below 3 sigma control limits. Sample Size and Frequency – Subgroup Size and Precision
avg avg + avg +   E E Sample Size and Frequency – Subgroup Size and Sensitivity
[object Object],[object Object],Sample Size and Frequency – Sample Frequency
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
Out-of-Control-Action-Plans (OCAP)  Activators   (out-of-control decision rules) Checkpoints   (list of possible assignable causes) Terminators   (corrective actions) An OCAP is a flowchart that  guides the operator  through a defined and repeatable  response to “any” out-of-control situation .
Out-of-Control-Action-Plans (OCAP)  Start Checkpoints Activators Corrective Actions No No No Yes Yes Yes Yes Yes Yes End No No
Out-of-Control-Action-Plans – Activators  1. One point outside the 3-sigma control limits. 2. A run of at least seven or eight consecutive points, where the type of run could be either a run up or down, a run above or below the centre line. 3. Two out of three consecutive points plot beyond from the 2-sigma warning level. 4. Four out of five consecutive points at a distance of 1-sigma or beyond. 5. One or more consecutive points near a 2-sigma warning or 3-sigma control level. etc.
Out-of-Control-Action-Plans – Checkpoints The checkpoints instruct the operator to investigate specific items as  possible assignable causes  for the out-of-control situation. Once a checkpoint has identified a probable assignable cause for the out-of-control situation, the OCAP will flow into a terminator or corrective action.
Out-of-Control-Action-Plans – Terminators The terminator contains a detailed description of the  corrective action  that the operator has to take to resolve the out-of-control situation.
An Analysis of Out-of-Control-Action-Plans ... ,[object Object],[object Object],[object Object],[object Object],[object Object]
Some Benefits of Out-of-Control-Action-Plans ... ,[object Object],[object Object],[object Object]
Remarks or Questions ?!?
Statistical Process Control – Table of Content Section  1: Introduction Section  2: The Histogram Section  3: Measure of Location and Variability Section  4: Process Control Charts Section  5: Process Control Limits Section  6: Out-of-Control Criteria Section  7: Sample Size and Frequency Section  8: Out-of-Control Action Plan
When SPC fails, look in the mirror ... ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Contenu connexe

Tendances

A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...
A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...
A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...Md. Maksudul Islam
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process controlPrashant Tomar
 
Introduction To Statistical Process Control 20 Jun 2011
Introduction To Statistical Process Control 20 Jun  2011Introduction To Statistical Process Control 20 Jun  2011
Introduction To Statistical Process Control 20 Jun 2011Robert_Wade_Sherrill
 
How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...
How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...
How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...NHS England
 
Six Sigma Statistical Process Control (SPC) Training Module
Six Sigma Statistical Process Control (SPC) Training ModuleSix Sigma Statistical Process Control (SPC) Training Module
Six Sigma Statistical Process Control (SPC) Training ModuleFrank-G. Adler
 
Statistical Control Process - Class Presentation
Statistical Control Process - Class PresentationStatistical Control Process - Class Presentation
Statistical Control Process - Class PresentationMillat Afridi
 
Chapter 20 Lecture Notes
Chapter 20 Lecture NotesChapter 20 Lecture Notes
Chapter 20 Lecture NotesMatthew L Levy
 

Tendances (20)

Control charts
Control chartsControl charts
Control charts
 
SPC and Control Charts
SPC and Control ChartsSPC and Control Charts
SPC and Control Charts
 
Spc la
Spc laSpc la
Spc la
 
Sqc-charts
Sqc-chartsSqc-charts
Sqc-charts
 
A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...
A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...
A CASE STUDY OF QUALITY CONTROL CHARTS IN A MANUFACTURING INDUSTRY (Ijsetr vo...
 
Spc training
Spc training Spc training
Spc training
 
Control charts
Control charts Control charts
Control charts
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 
Introduction To SPC
Introduction To SPCIntroduction To SPC
Introduction To SPC
 
Introduction To Statistical Process Control 20 Jun 2011
Introduction To Statistical Process Control 20 Jun  2011Introduction To Statistical Process Control 20 Jun  2011
Introduction To Statistical Process Control 20 Jun 2011
 
How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...
How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...
How to use and interpret SPC (Statistical Process Control) charts – 20 Januar...
 
Control Charts
Control ChartsControl Charts
Control Charts
 
Six Sigma Statistical Process Control (SPC) Training Module
Six Sigma Statistical Process Control (SPC) Training ModuleSix Sigma Statistical Process Control (SPC) Training Module
Six Sigma Statistical Process Control (SPC) Training Module
 
Statistical Control Process - Class Presentation
Statistical Control Process - Class PresentationStatistical Control Process - Class Presentation
Statistical Control Process - Class Presentation
 
Shewhart Charts for Variables
Shewhart Charts for VariablesShewhart Charts for Variables
Shewhart Charts for Variables
 
CONTROL CHARTS
CONTROL CHARTSCONTROL CHARTS
CONTROL CHARTS
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
6 sigma
6 sigma 6 sigma
6 sigma
 
Chapter 20 Lecture Notes
Chapter 20 Lecture NotesChapter 20 Lecture Notes
Chapter 20 Lecture Notes
 
Control chart basics
Control chart basicsControl chart basics
Control chart basics
 

En vedette

Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlMarwa Abo-Amra
 
The Myth Of Process Excellence - Aditya Yadav
The Myth Of Process Excellence - Aditya YadavThe Myth Of Process Excellence - Aditya Yadav
The Myth Of Process Excellence - Aditya YadavAditya Yadav
 
GSK- Management Trainee Program
GSK- Management Trainee ProgramGSK- Management Trainee Program
GSK- Management Trainee ProgramFaisal Chohan
 
Measuring quality in education
Measuring quality in educationMeasuring quality in education
Measuring quality in educationHesham A. Elsunni
 
Black belt manual_sample
Black belt manual_sampleBlack belt manual_sample
Black belt manual_samplejsembiring
 
Ops A La Carte Statistical Process Control (SPC) Seminar
Ops A La Carte Statistical Process Control (SPC) SeminarOps A La Carte Statistical Process Control (SPC) Seminar
Ops A La Carte Statistical Process Control (SPC) SeminarJay Muns
 
GlaxoSmithKline Pakistan - Career Development
GlaxoSmithKline Pakistan - Career DevelopmentGlaxoSmithKline Pakistan - Career Development
GlaxoSmithKline Pakistan - Career DevelopmentZeeshan Ali
 
Mark Harrison SPC Implementation
Mark Harrison   SPC ImplementationMark Harrison   SPC Implementation
Mark Harrison SPC ImplementationMark Harrison
 
Asq Auto Minitab Tips And Tricks
Asq Auto Minitab Tips And TricksAsq Auto Minitab Tips And Tricks
Asq Auto Minitab Tips And TricksWalter Oldeck
 
21 total-quality-management-concepts
21 total-quality-management-concepts21 total-quality-management-concepts
21 total-quality-management-conceptsSantiago Urquizo
 
Kra & kpa by nitish rathi
Kra & kpa by nitish rathiKra & kpa by nitish rathi
Kra & kpa by nitish rathiNitish Rathi
 
Management Training Program Introduction
Management Training Program IntroductionManagement Training Program Introduction
Management Training Program IntroductionNguyen Trong Quy
 
MBA760 Chapter 05
MBA760 Chapter 05MBA760 Chapter 05
MBA760 Chapter 05iDocs
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsBabasab Patil
 
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...Mike Gammage
 
GlaxoSmithKline Ethics Case Analysis
GlaxoSmithKline Ethics Case AnalysisGlaxoSmithKline Ethics Case Analysis
GlaxoSmithKline Ethics Case AnalysisDavid Kolapudi
 
Quality gurus and their contribution to TQM
Quality gurus and their contribution to TQMQuality gurus and their contribution to TQM
Quality gurus and their contribution to TQMRagulan Rex
 
Statistical process control ppt @ bec doms
Statistical process control ppt @ bec domsStatistical process control ppt @ bec doms
Statistical process control ppt @ bec domsBabasab Patil
 
Meet minitab tutorial
Meet minitab tutorialMeet minitab tutorial
Meet minitab tutorialshanmu31
 

En vedette (20)

Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
The Myth Of Process Excellence - Aditya Yadav
The Myth Of Process Excellence - Aditya YadavThe Myth Of Process Excellence - Aditya Yadav
The Myth Of Process Excellence - Aditya Yadav
 
GSK- Management Trainee Program
GSK- Management Trainee ProgramGSK- Management Trainee Program
GSK- Management Trainee Program
 
Measuring quality in education
Measuring quality in educationMeasuring quality in education
Measuring quality in education
 
Black belt manual_sample
Black belt manual_sampleBlack belt manual_sample
Black belt manual_sample
 
Ops A La Carte Statistical Process Control (SPC) Seminar
Ops A La Carte Statistical Process Control (SPC) SeminarOps A La Carte Statistical Process Control (SPC) Seminar
Ops A La Carte Statistical Process Control (SPC) Seminar
 
GlaxoSmithKline Pakistan - Career Development
GlaxoSmithKline Pakistan - Career DevelopmentGlaxoSmithKline Pakistan - Career Development
GlaxoSmithKline Pakistan - Career Development
 
Mark Harrison SPC Implementation
Mark Harrison   SPC ImplementationMark Harrison   SPC Implementation
Mark Harrison SPC Implementation
 
Asq Auto Minitab Tips And Tricks
Asq Auto Minitab Tips And TricksAsq Auto Minitab Tips And Tricks
Asq Auto Minitab Tips And Tricks
 
21 total-quality-management-concepts
21 total-quality-management-concepts21 total-quality-management-concepts
21 total-quality-management-concepts
 
Kra & kpa by nitish rathi
Kra & kpa by nitish rathiKra & kpa by nitish rathi
Kra & kpa by nitish rathi
 
Management Training Program Introduction
Management Training Program IntroductionManagement Training Program Introduction
Management Training Program Introduction
 
MBA760 Chapter 05
MBA760 Chapter 05MBA760 Chapter 05
MBA760 Chapter 05
 
Basics of Statistical Quality Control for Pharmaceuticals.
Basics of Statistical Quality Control for Pharmaceuticals.Basics of Statistical Quality Control for Pharmaceuticals.
Basics of Statistical Quality Control for Pharmaceuticals.
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
 
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
 
GlaxoSmithKline Ethics Case Analysis
GlaxoSmithKline Ethics Case AnalysisGlaxoSmithKline Ethics Case Analysis
GlaxoSmithKline Ethics Case Analysis
 
Quality gurus and their contribution to TQM
Quality gurus and their contribution to TQMQuality gurus and their contribution to TQM
Quality gurus and their contribution to TQM
 
Statistical process control ppt @ bec doms
Statistical process control ppt @ bec domsStatistical process control ppt @ bec doms
Statistical process control ppt @ bec doms
 
Meet minitab tutorial
Meet minitab tutorialMeet minitab tutorial
Meet minitab tutorial
 

Similaire à Statistical Process Control Guide

Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlTushar Naik
 
Statistical Process Control Part 1
Statistical Process Control Part 1Statistical Process Control Part 1
Statistical Process Control Part 1Malay Pandya
 
Statstical process control
Statstical process controlStatstical process control
Statstical process controlXenChisti
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capabilityvaidehishah25
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)Bindutesh Saner
 
Courses on quality management
Courses on quality managementCourses on quality management
Courses on quality managementselinasimpson381
 
4 26 2013 1 IME 674 Quality Assurance Reliability EXAM TERM PROJECT INFO...
4 26 2013 1 IME 674  Quality Assurance   Reliability EXAM   TERM PROJECT INFO...4 26 2013 1 IME 674  Quality Assurance   Reliability EXAM   TERM PROJECT INFO...
4 26 2013 1 IME 674 Quality Assurance Reliability EXAM TERM PROJECT INFO...Robin Beregovska
 
SPC Presentation.pptx
SPC Presentation.pptxSPC Presentation.pptx
SPC Presentation.pptxssuserb1c139
 

Similaire à Statistical Process Control Guide (20)

Qc tools
Qc toolsQc tools
Qc tools
 
Qc tools
Qc toolsQc tools
Qc tools
 
100018718.ppt
100018718.ppt100018718.ppt
100018718.ppt
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Statistical Process Control Part 1
Statistical Process Control Part 1Statistical Process Control Part 1
Statistical Process Control Part 1
 
Statstical process control
Statstical process controlStatstical process control
Statstical process control
 
Contol charts
Contol chartsContol charts
Contol charts
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capability
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)
 
Chapter 18
Chapter 18Chapter 18
Chapter 18
 
Spc
SpcSpc
Spc
 
Process Control
Process ControlProcess Control
Process Control
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spc methods
Spc methods Spc methods
Spc methods
 
Courses on quality management
Courses on quality managementCourses on quality management
Courses on quality management
 
CHAPTER 7.pptx
CHAPTER 7.pptxCHAPTER 7.pptx
CHAPTER 7.pptx
 
QA QC
QA QCQA QC
QA QC
 
4 26 2013 1 IME 674 Quality Assurance Reliability EXAM TERM PROJECT INFO...
4 26 2013 1 IME 674  Quality Assurance   Reliability EXAM   TERM PROJECT INFO...4 26 2013 1 IME 674  Quality Assurance   Reliability EXAM   TERM PROJECT INFO...
4 26 2013 1 IME 674 Quality Assurance Reliability EXAM TERM PROJECT INFO...
 
SPC Presentation.pptx
SPC Presentation.pptxSPC Presentation.pptx
SPC Presentation.pptx
 

Dernier

Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Dernier (20)

Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

Statistical Process Control Guide

  • 1. Operational Excellence – Statistical Process Control Presented by Frank Adler, Ph.D. www.Operational-Excellence-Consulting.com
  • 2. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 3. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 4. The History of Statistical and Process Thinking The quality control methods and techniques used today got their start in the American Civil War, when Eli Whitney tried in year 1789 to produce 10,000 rifles by copying one rifle, part by part. At that time most of the products were hand made by small owner-managed shops and product parts were thus not interchangeable. The result of Whitney’s mass production trail was that the rifles did not work as well as the handmade rifles. In addition, the copied parts did not fit as expected.
  • 5. The History of Statistical and Process Thinking GO - Test NO-GO - Test The first time that one presented machine produced parts was 1851 at the industry exhibition in the Crystal Palace in London. An American gun smith took 10 working guns, took them apart, mixed all the parts in a box and re-assembled them again. This was found a quite surprising “experiment”.
  • 6. The Traditional Production Concept The Detection Control Scheme Process Inspection Good Bad Repair Scrap + Monitor/Adjust
  • 7.
  • 8.
  • 9. Statistical Thinking - A Definition All work is a series of interconnected processes All processes vary Understanding and reducing variation are keys to success ASQ
  • 10. Customer Satisfaction Process/ System M aterial M achines M ethods M en E nvironment The Variation Management Approach
  • 11.
  • 12. The A and O of process control and continuous process improvement is to understand the meaning and causes of variation in the outcome of the process. Variation Management – Continuous Improvement
  • 13.
  • 15. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. The Histogram – The Normal Distribution
  • 24. The Histogram – Exercise 1 Distribution of Heights of U.S. Population: Use the plot area below to construct a histogram from the random sample of heights on the right:
  • 26. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 27.
  • 28.
  • 29.
  • 30. Measure of Variability – Sample Variance x 3 x 2 x 1 x 10 x average _
  • 31.
  • 32.
  • 33.
  • 34. Measure of Variability – The Principle of Subgrouping Time t Performance Characteristic Process not in control average Subgroup size n = 5 Number of subgroups N = 7
  • 35.
  • 36. Measure of Variability – Difference between s LT and s ST Long-term standard deviation : Short-term standard deviation : The difference between the standard deviations s LT and s ST gives an indication of how much better one can do when using appropriate production control, like Statistical Process Control (SPC).
  • 37. Measure of Location and Variability – Exercise 2 Distribution of Heights of U.S. Population: Calculate the Mean Value or Average, Median, Range, and long-term Standard Deviation of the sample data. You may copy the data into MS Excel and simplify the calculations. Mean Value = Median = Range = Long-term Standard Deviation =
  • 39. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 40. Process Control Charts – Types of Control Charts Count or classification (attribute data) Measurements (variable data) Count Classification (Yes/No) Incidences or nonconformities Defectives or nonconforming units Fixed oppor- tunity Variable oppor- tunity Fixed subgroup size Variable subgroup size Variable subgroup size Subgroup size of 1 Fixed subgroup size c - chart u - chart np - chart p - chart x chart x-bar R chart x-bar s chart Type of data
  • 41. Process Control Charts – The x - Chart The x - chart is a method of looking at variation in a variable data or measurement. One source is the variation in the individual sample results. This represents “long term” variation in the process. The second source of variation is the variation in the range between successive samples. This represents “short term” variation. Individual or x - charts should be used when there is only one data point to represent a situation at a given time. To use the x - chart, the individual sample results should be sufficient normally distributed. If not, the x - chart will give more false signals.
  • 42. Process Control Charts – x/mR Chart Example
  • 43. Process Control Charts – The Central Limit Theorem Regardless of the shape of the distribution of a population, the distribution of average values, x-bar’s, of subgroups of size n drawn from that population will tend toward a normal distribution as the subgroup size n becomes large. Laplace and Gauss or The standard deviation s x of the distribution of the average values is related to the standard deviation s of the individual values by the following: _
  • 44.
  • 45. Process Control Charts – (x-bar/R) - Chart Example
  • 46. Process Control Charts – The (x-bar/s) - Chart The (x-bar / s) - chart is a method of looking at sources of variation. One chart looks at variation in the subgroup averages x-bar. The other chart examines variation in the subgroups standard deviation s . The (x-bar / s) - chart can be used whenever one can use the (x-bar / R) - chart. The (x-bar / s) - chart should be used instead the (x-bar / R) - chart if the subgroup is larger than 10. In this case, the standard deviation is a better measurement than the range for the variation between individual measurements in a subgroup.
  • 47. Process Control Charts – Exercise 3 Throw the Dice: Step 1: Throw the dice 30 times and record the results in the table on the right. Step 2: Draw a Histogram of the 30 data points in one of the spreadsheets below. Step 3: Calculate the average to 2 consecutive throws and draw the histogram of the resulting 15 data points. What do you see and why?
  • 48.
  • 49.
  • 50. Process Control Charts – The Binomial Distribution Number of defect items 1 0 2 3 4 5 6 7 8 9 Average
  • 51. Process Control Charts – The p - Chart The p - chart is used to look at variation in the yes/no type. It can for example be used to determine the percentage p of defective items in a group of items. The number n of items in each group has not to be constant, but should not vary more than 25 %. Operational definitions must be used to determine what constitutes a defective item. The percentage of defect items is given by
  • 52. Process Control Charts – The p – Chart Example
  • 53. Process Control Charts – The np - Chart The np - chart, like the p - chart, is used to look at variation in yes/no type attributes data. np - charts are used to determine the number np of defective items in a group of items. The p - chart looked at the percentage of defective items in a group of items. Because the np - chart uses the number of defects, it is easier to use. However, the major difference between the np - chart and the p - chart is that the subgroup size has to be constant for the np - chart. This is not necessary for the p - chart.
  • 54.
  • 55.
  • 56. Process Control Charts – The Poisson Distribution Number of defects 1 0 2 3 4 5 6 7 8 9 Average
  • 57. Process Control Charts – The c - Chart The c - chart is used to look at variation in counting-type attributes data. It is used to determine the variation in the number of defects in a constant subgroup size. For example, a c - chart can be used to monitor the number on injuries in a plant. In this case, the plant is the subgroup. To use the c - chart, the opportunities for defects to occur in the subgroup must be very large, but the number that actually occur must be small.
  • 58. Process Control Charts – The u - Chart A u - chart is used to examine the variation in counting-type attributes data. It is used to determine the variation in the number of defects per inspection unit (subgroup). The size of the subgroup does not have to be constant. The subgroup size, n , for a u - chart is expressed in terms of the number of inspection units. The u - chart is very similar to the c - chart. The only difference is that the subgroup size for the c - chart must be constant. This is not necessary for the subgroup size of a u - chart. To use the u - chart, the opportunities for defects to occur in the subgroup must be very large, but the number that actually occur must be small.
  • 59. Process Control Charts – Charts for Attribute Data Defective Items Defects Number (constant subgroup size) Percentage (variable subgroup size) np - chart c - chart u - chart p - chart
  • 60. Process Control Charts – Summary Statistics Mean Value Standard Deviation Normal Poisson Binomial Distribution x 1 , x 2 , ..., x N are the measurements and N is the number of measurements. (np) 1 , (np) 2 , ..., (np) N are the number of defects in the N subgroups and n, n 1 , n 2 , ...,n N are the number of items in each subgroup. (np) 1 , (np) 2 , ..., (np) N are the number of defects at each time and N is the number of measurements/subgroups.
  • 61. Process Control Charts – Exercise 4 Black Beads: Step 1: Take 20 beads out of the bag and record the number of black beads in the sample. Step 2: Repeat Step 1 until you have 25 data points. Step 3: Draw the histogram of the 25 data points in the left spreadsheets below. Step 3: Select the correct process control chart and draw it in the right spreadsheet.
  • 63. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 64.
  • 65. Process Control Limit – Upper & Lower Control Limit Upper Control Limit (UCL) = average + 3*sigma Lower Control Limit (LCL) = average - 3*sigma average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 66. Process Control Limit – Upper & Lower Control Limit Because the variation of a process is not known in before hand, one can not calculate or define the control limits in advance . Control limits are characteristics of a stable process . They bound the variation of the process that is due to common causes . The calculation of the control limits should be based on at least 20 to 25 data points from a process that was in statistical control (stable). The limits should not be recalculated and modified unless there is a reason to do so (e.g. a process change).
  • 67. Process Control Limit – Two Types of Process Variability where the constant d 2 depends on the number of items in each subgroup used to calculate the range. The LT and ST subscripts represent long-term and short-term variability. The difference between s LT and s ST gives an indication of how much better one can do when using SPC.
  • 68. Process Control Limit – The x - Chart Upper control limit = Lower control limit = Upper control limit = Lower control limit = The x- chart The R- chart , where x 1 , x 2 , ..., x N are the measurements, N the number of measurements, , and .
  • 69. Process Control Limit – The x-bar/R - Chart Upper control limit = Lower control limit = The R- chart Upper control limit = Lower control limit = The x-bar - chart where x-bar 1 , x-bar 2 , ..., x-bar N are the averages of each subgroup, n the number of items in a subgroup, N the number of subgroups, . , and
  • 70. Process Control Limit – Factors for x- and x-bar/R - Charts n 2 3 4 5 6 7 8 9 10 A 2 1.880 1.023 0.729 0.577 0.483 0.419 0.373 0.337 0.308 D 3 0 0 0 0 0 0.076 0.136 0.184 0.223 D 4 3.267 2.574 2.282 2.114 2.004 1.924 1.864 1.816 1.777 d 2 1.128 1.693 2.059 2.326 2.534 2.704 2.847 2.970 3.078
  • 71. Process Control Limit – The x-bar/s - Chart Upper control limit = Lower control limit = Upper control limit = Lower control limit = The s- chart The x-bar - chart , and where x-bar 1 , x-bar 2 , ..., x-bar N are the averages of each subgroup, s 1 , s 2 , ..., s N are the standard deviations of each subgroup, n the number of items in a subgroup, N the number of subgroups, .
  • 72. Process Control Limit – Factors for x-bar/s - Charts n 2 3 4 5 6 7 8 9 10 A 3 2.659 1.954 1.628 1.427 1.287 1.182 1.099 1.032 0.975 B 3 0 0 0 0 0.030 0.118 0.185 0.239 0.284 B 4 3.267 2.568 2.266 2.089 1.970 1.882 1.815 1.761 1.716 c 4 0.7979 0.8862 0.9213 0.9400 0.9515 0.9594 0.9650 0.9693 0.9727
  • 73. Process Control Limit – The np - Chart Lower control limit = Upper control limit = with and where np 1 , np 2 , ..., np N are the number of defect items in each subgroup of constant size n, and N the number of subgroups.
  • 74. Process Control Limit – The p - Chart Lower control limit = Upper control limit = for i = 1, 2, 3,..., N, where (np) 1 , (np) 2 , ..., (np) N are the number of defect items in the subgroups and n 1 , n 2 , ..., n N are the number of items in the N subgroups. Note : The sample sizes should not vary more than 25% around the average sample size when using control limits for the whole chart. with and or or Control limits for whole chart Control limits for each subgroup
  • 75. Process Control Limit – The c - Chart Lower control limit = Upper control limit = with where c 1 , c 2 , ..., c N are the number of defects in each subgroup of constant size and N the number of subgroups.
  • 76. Process Control Limit – The u - Chart Lower control limit = Upper control limit = with and where c 1 , c 2 , ..., c N are the number of defects in the subgroups and n 1 , n 2 , ..., n N are the number of items in each of the N subgroups. Note : The sample sizes should not vary more than 25% around the average sample size.
  • 77. Process Control Charts – Exercise 5 Black Beads: Calculate the average and the upper and lower control limit for the “Bead” exercise.
  • 79. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 80. USL LSL USL LSL large variation  problem exist  root cause analysis  process improvement trend  problem occurs  root cause analysis  corrective and/or preventive action Defect Defect nominal value nominal value Out-of-Control & Process Improvement
  • 81. 50 55 = USL LSL= 45 50 55 45 Sample Sample 50 55 45 50 55 45 Process Tempering & Overcontrol
  • 82. 50 55 45 LSL USL Process tampering may substantially increase the product variability since the process average is shifted each time an adjustment is made. Process Tempering & Overcontrol
  • 83. Out-of-Control Criteria – Two Causes of Variation Common Causes : Causes that are implemented in the process due to the design of the process, and affect all outcomes of the process. Identifying these types of causes requires Design of Experiment (DOE) methods. Special Causes : Causes that are not present in the process all the time and do not affect all outcomes, but arise because of specific circumstances. Special causes can be identified using SPC. Shewhart (1931)
  • 84. Out-of-Control Criteria – Two Types of Processes Unstable Process : A process in which variation is a result of both common and special causes . Stable Process : A process in which variation in outcomes arises only from common causes .
  • 85. Time Target Target Target Target UCL LCL UCL LCL UCL LCL UCL LCL &quot;In-Control&quot; and &quot;Out-of-Control&quot; Processes
  • 86. Target Time Target Target Target UCL LCL UCL LCL UCL LCL UCL LCL &quot;In-Control&quot; and &quot;Out-of-Control&quot; Processes
  • 87.
  • 88. P = 0.0013 (0.13 %) SPC Criteria – 1 Point above or below 3 Sigma Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 89. P = 0.001 (0.1 %) SPC Criteria – 2 of 3 Points above or below 2 Sigma Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 90. P = SPC Criteria – 4 of 5 Points above or below 1 Sigma Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 91. P = SPC Criteria – 8 Points on the same Side of the Average Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 92. SPC Criteria – Trend of 7 Points Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 93. P = SPC Criteria – 15 consecutive Points in the 1 Sigma Zone Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 94. *) The number of runs (crossing the average line) should be about one-half of the number of points on the control chart. SPC Criteria – Too few or too many Runs *) Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 95. P = SPC Criteria – 8 Consecutive Points with none in the 1 Sigma Zone Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 96. SPC Criteria – Seasonal Variation Patterns Example: ___________________________________________________ average average + 3*sigma average + 2*sigma average + 1*sigma average - 1*sigma average - 3*sigma average - 2*sigma
  • 97. SPC Out-of-Control Criteria – Summary x x / R x / s c u np p Rule 1 Rule 2 Rule 3 Rule 4 Rule 5 Rule 6 Rule 7 Rule 8 Rule 9 Chart - -
  • 98. SPC Out-of-Control Criteria – Exercise 6 Efficiency Out-of-Control Conditions: Determine why the process control chart below indicates that the efficiency of production line H300 is out-of-control. Notes:
  • 100. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 101.
  • 102. If a shift in the process average of “E” units will harm the customer or one of the next process stages, the necessary subgroup sample size (n) can be calculated as: where The next plotted point will with 90% confidence identify a process shift larger than “E” units, that means the next point will be above or below 3 sigma control limits. Sample Size and Frequency – Subgroup Size and Precision
  • 103. avg avg + avg + E E Sample Size and Frequency – Subgroup Size and Sensitivity
  • 104.
  • 106. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 107. Out-of-Control-Action-Plans (OCAP) Activators (out-of-control decision rules) Checkpoints (list of possible assignable causes) Terminators (corrective actions) An OCAP is a flowchart that guides the operator through a defined and repeatable response to “any” out-of-control situation .
  • 108. Out-of-Control-Action-Plans (OCAP) Start Checkpoints Activators Corrective Actions No No No Yes Yes Yes Yes Yes Yes End No No
  • 109. Out-of-Control-Action-Plans – Activators 1. One point outside the 3-sigma control limits. 2. A run of at least seven or eight consecutive points, where the type of run could be either a run up or down, a run above or below the centre line. 3. Two out of three consecutive points plot beyond from the 2-sigma warning level. 4. Four out of five consecutive points at a distance of 1-sigma or beyond. 5. One or more consecutive points near a 2-sigma warning or 3-sigma control level. etc.
  • 110. Out-of-Control-Action-Plans – Checkpoints The checkpoints instruct the operator to investigate specific items as possible assignable causes for the out-of-control situation. Once a checkpoint has identified a probable assignable cause for the out-of-control situation, the OCAP will flow into a terminator or corrective action.
  • 111. Out-of-Control-Action-Plans – Terminators The terminator contains a detailed description of the corrective action that the operator has to take to resolve the out-of-control situation.
  • 112.
  • 113.
  • 115. Statistical Process Control – Table of Content Section 1: Introduction Section 2: The Histogram Section 3: Measure of Location and Variability Section 4: Process Control Charts Section 5: Process Control Limits Section 6: Out-of-Control Criteria Section 7: Sample Size and Frequency Section 8: Out-of-Control Action Plan
  • 116.