CENTRAL WATER COMMISSION
Hydrology Project Phase-I
 To establish a functional hydrological
information system.
 To improve institutional capacity
 Implemented in 9 States viz. Andhra
Pradesh, Chhattisgarh, Gujarat, Karnataka,
Kerala, Madhya
Pradesh, Maharashtra, Orissa, and Tamil
Nadu and 6 Central Agencies viz.
CWC, CGWB, IMD, NIH, CWPRS and MOWR.
 The project started in September, 1995 and
closed on December, 2003.
Hydrology Project
Hydrology Project–II
Cleared by the CCEA in October, 2005.
The agreement was signed on 19th January, 2006
and approved by the GOI in May, 2006.
The overall project objective is to extend and
promote the sustained and effective use of HIS
by all stakeholder.
4 new states (Himachal Pradesh, Punjab Goa &
Pondicherry) & 2 new Central Agencies
(CPCB, BBMB) included in the phase-II of the
project.
The original completion period of HP-II was
June, 2012. The project completion period has
been extended up to May, 2014 by the World
Bank.
Hydrology Project
Institutional Strengthening
Constructed two Lecture halls, one computer lab and
extended Krishna Hostel at NWA, CWC, Pune.
Upgraded Godavari Hostel by installing TV, AC etc in
each room at NWA, CWC, Pune.
Conducted 57 training programmes and trained 1342
officers from Central as well as State official.
19 CWC officials participated in 9 International
Training courses.
Major Activities of CWC
Institutional Strengthening- Contd-
 Development of online Surface Water Information
System (eSWIS) to upgrade the functionality of the
existing SWDES, HYMOS and WISDOM Software(HIS) .
 Installed Real Time Water Quality Monitoring
System(RTWQMS) at three sites namely Agra
(Jawahar Bridge) on river Yamuna, Lucknow on river
Gomti and Moradabad on river Ramganga for
monitoring of 6 parameters The real time water
quality data is available for above sites from 18th
July, 2013 on web site http://cwc.rtwqms.com .
 Three training on e-SWIS was conducted.
Major Activities of CWC
Development of Hydrological Design Aids (Surface
Water”(HDA-SW)
• Standardization of Methodologies/protocols for
rational design and analysis and carry out
integrated water resources analysis including
study of hydrology of the complete water system
Components
 Assessment of Water Resources Potential -
Availability/yield Assessment (HDA-Y);
 Estimation of Design Flood(HDA-F); and
 Sediment Rate Estimation(HDA-S)
Vertical Extension
Major Activities of CWC
HDA-SW
 The software is under development .
Following reports have been submitted and accepted:
 State of the Art Report(SAR)
 Inception Reports of all three modules
 Draft Final Report of HDA-F
 Draft Final Report of HDA-S
Financial Component-
Total Cost of the HDA project -- INR 8 Crore (Approx)
Likely booking under HP-II -- INR 3.76 Crore
Balance cost to be booked in other scheme - INR 4.24
Crore.
Vertical Extension – Contd-
 Installed Video-conferencing facilities at
Delhi, Pune, Gandhinagar, Hyderabad, Lucknow, Bhuba
neswar & Coimbatore since October, 2011.
 Lectures on subject matters for training at NWA are
being delivered using Video-conferencing.
 Provided One Atomic Absorption Spectrophotometer
for analysis of trace and toxic metals at National River
Water Quality Laboratory, CWC, New Delhi
 Modernize Hydrological Observation Stations by
installing Acoustic Doppler Current Profilers (ADCP) for
discharge measurement on large rivers at 15 sites
under CWC.
 Procured two set of Arc GIS (Arc Info, Arc 3-D
Analyst, Arc Spatial) software for various application in
water sector.
Other Achievements
Financial Target and Achievement
 Allocation under the Project as per PIP –Rs. 24.90 Crore
 Allocation as per Revised Cost Table, 2013-Rs. 26.73
Crore
 Expenditure upto March 2014- Rs. 17.38Crore
 Reimbursement Claim upto March,2014- Rs.17.38 Crore
 Likely Expenditure by May 31, 2014
 On HDA-SW Rs.0.85 Crore
 eSWIS Rs.0.73 Crore
 Others Rs.0.17 Crore
Total Rs.1.75Crore
But it is very unlikely that payment for above activities
could be made up to May, 2014 due to 1/3 ceiling on the
expenditure imposed by MOWR
 The infrastructure / facility created under HP-II will
be maintained through support provided by the
Government of India under different Plan Schemes.
 Training on the software developed under HP-II will
be provided by trained CWC official as and when
required.
 Dissemination data and application of HIS :
All hydro meteorological data will be entered online
through new eSWIS software and the same will be
disseminated as per Hydro-meteorological Data
Dissemination Policy of MOWR through eSWIS and
www.india-wris.nrsc.gov.in web site.
Post Project Plan for continuation of HP-II
activities
 Hydrology Project has been implemented mainly in
Peninsular India.
 There is need to expand the project in remaining parts
of India also to cover all hydrological basins of India
for better management of water resources.
 The Project should be initiated in the early phase of
starting of Hydrology Project to achieve the target
within stipulated time frame.
 The processes of tender preparation/award also get
delayed due to delay in obtaining clearances from
different authorities. Capacity building as per project
could not achieve because International Training
Courses as stipulated in the project plan could not
materialized.
Lessons Learnt
http://www.cwc.nic.in

Contenu connexe

Tendances

Sustainable Water Resources in India
Sustainable Water Resources in IndiaSustainable Water Resources in India
Sustainable Water Resources in IndiaHarshit Sankhla
 
Land reclamation-Presentation(civil 3rd year)
Land reclamation-Presentation(civil 3rd year)Land reclamation-Presentation(civil 3rd year)
Land reclamation-Presentation(civil 3rd year)chami8082084
 
Water & its sustainable development
Water & its sustainable developmentWater & its sustainable development
Water & its sustainable developmentVenkat Ramana Littu
 
National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)
National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)
National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)Deepu Kishore
 
Storm water management and its techniques
Storm water management and its techniquesStorm water management and its techniques
Storm water management and its techniquesRajat Nainwal
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management ReportArissa Loh
 
Participatory irrigation management (pim) ranjan
Participatory irrigation management (pim) ranjanParticipatory irrigation management (pim) ranjan
Participatory irrigation management (pim) ranjanIndependent
 
Water, source of conflict ?
Water, source of conflict ?Water, source of conflict ?
Water, source of conflict ?salmanmaslam
 
Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Denish Jangid
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankC. P. Kumar
 
irrigation methods.ppt
irrigation methods.pptirrigation methods.ppt
irrigation methods.pptJafarsadik19
 
Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearanceJegan Nadar
 
Construction of dams
Construction of damsConstruction of dams
Construction of damskoach1787
 
Estimation of runoff by table method
Estimation  of runoff by table methodEstimation  of runoff by table method
Estimation of runoff by table methodAaliya Afroz
 

Tendances (20)

Sustainable Water Resources in India
Sustainable Water Resources in IndiaSustainable Water Resources in India
Sustainable Water Resources in India
 
Rural water supply
Rural water supplyRural water supply
Rural water supply
 
Land reclamation-Presentation(civil 3rd year)
Land reclamation-Presentation(civil 3rd year)Land reclamation-Presentation(civil 3rd year)
Land reclamation-Presentation(civil 3rd year)
 
Water & its sustainable development
Water & its sustainable developmentWater & its sustainable development
Water & its sustainable development
 
National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)
National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)
National River Conservation Plan (NRCP) and Ganga Action Plan (GAP)
 
02 water demand
02 water demand02 water demand
02 water demand
 
Storm water management and its techniques
Storm water management and its techniquesStorm water management and its techniques
Storm water management and its techniques
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management Report
 
0623 Participatory Irrigation Management
0623 Participatory Irrigation Management0623 Participatory Irrigation Management
0623 Participatory Irrigation Management
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Participatory irrigation management (pim) ranjan
Participatory irrigation management (pim) ranjanParticipatory irrigation management (pim) ranjan
Participatory irrigation management (pim) ranjan
 
Drip irrigation
Drip irrigationDrip irrigation
Drip irrigation
 
Water, source of conflict ?
Water, source of conflict ?Water, source of conflict ?
Water, source of conflict ?
 
Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation Tank
 
irrigation methods.ppt
irrigation methods.pptirrigation methods.ppt
irrigation methods.ppt
 
Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearance
 
Construction of dams
Construction of damsConstruction of dams
Construction of dams
 
Sujalam
SujalamSujalam
Sujalam
 
Estimation of runoff by table method
Estimation  of runoff by table methodEstimation  of runoff by table method
Estimation of runoff by table method
 

Similaire à Cwc

Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface waterhydrologywebsite1
 
Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)indiawrm
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sepindiawrm
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtrahydrologyproject0
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014hydrologyproject0
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...hydrologywebsite1
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterhydrologywebsite1
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014indiawrm
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian examplehydrologywebsite1
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final reporthydrologywebsite1
 

Similaire à Cwc (20)

Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Background Material
Background MaterialBackground Material
Background Material
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
Puducherry
Puducherry Puducherry
Puducherry
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
 
Cwprs
CwprsCwprs
Cwprs
 
Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Overview of workshop
Overview of workshopOverview of workshop
Overview of workshop
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
 
Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
 
Pcs 070514
Pcs 070514Pcs 070514
Pcs 070514
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 

Plus de hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Dernier

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 

Dernier (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 

Cwc

  • 2. Hydrology Project Phase-I  To establish a functional hydrological information system.  To improve institutional capacity  Implemented in 9 States viz. Andhra Pradesh, Chhattisgarh, Gujarat, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Orissa, and Tamil Nadu and 6 Central Agencies viz. CWC, CGWB, IMD, NIH, CWPRS and MOWR.  The project started in September, 1995 and closed on December, 2003. Hydrology Project
  • 3. Hydrology Project–II Cleared by the CCEA in October, 2005. The agreement was signed on 19th January, 2006 and approved by the GOI in May, 2006. The overall project objective is to extend and promote the sustained and effective use of HIS by all stakeholder. 4 new states (Himachal Pradesh, Punjab Goa & Pondicherry) & 2 new Central Agencies (CPCB, BBMB) included in the phase-II of the project. The original completion period of HP-II was June, 2012. The project completion period has been extended up to May, 2014 by the World Bank. Hydrology Project
  • 4. Institutional Strengthening Constructed two Lecture halls, one computer lab and extended Krishna Hostel at NWA, CWC, Pune. Upgraded Godavari Hostel by installing TV, AC etc in each room at NWA, CWC, Pune. Conducted 57 training programmes and trained 1342 officers from Central as well as State official. 19 CWC officials participated in 9 International Training courses. Major Activities of CWC
  • 5. Institutional Strengthening- Contd-  Development of online Surface Water Information System (eSWIS) to upgrade the functionality of the existing SWDES, HYMOS and WISDOM Software(HIS) .  Installed Real Time Water Quality Monitoring System(RTWQMS) at three sites namely Agra (Jawahar Bridge) on river Yamuna, Lucknow on river Gomti and Moradabad on river Ramganga for monitoring of 6 parameters The real time water quality data is available for above sites from 18th July, 2013 on web site http://cwc.rtwqms.com .  Three training on e-SWIS was conducted. Major Activities of CWC
  • 6. Development of Hydrological Design Aids (Surface Water”(HDA-SW) • Standardization of Methodologies/protocols for rational design and analysis and carry out integrated water resources analysis including study of hydrology of the complete water system Components  Assessment of Water Resources Potential - Availability/yield Assessment (HDA-Y);  Estimation of Design Flood(HDA-F); and  Sediment Rate Estimation(HDA-S) Vertical Extension Major Activities of CWC
  • 7. HDA-SW  The software is under development . Following reports have been submitted and accepted:  State of the Art Report(SAR)  Inception Reports of all three modules  Draft Final Report of HDA-F  Draft Final Report of HDA-S Financial Component- Total Cost of the HDA project -- INR 8 Crore (Approx) Likely booking under HP-II -- INR 3.76 Crore Balance cost to be booked in other scheme - INR 4.24 Crore. Vertical Extension – Contd-
  • 8.  Installed Video-conferencing facilities at Delhi, Pune, Gandhinagar, Hyderabad, Lucknow, Bhuba neswar & Coimbatore since October, 2011.  Lectures on subject matters for training at NWA are being delivered using Video-conferencing.  Provided One Atomic Absorption Spectrophotometer for analysis of trace and toxic metals at National River Water Quality Laboratory, CWC, New Delhi  Modernize Hydrological Observation Stations by installing Acoustic Doppler Current Profilers (ADCP) for discharge measurement on large rivers at 15 sites under CWC.  Procured two set of Arc GIS (Arc Info, Arc 3-D Analyst, Arc Spatial) software for various application in water sector. Other Achievements
  • 9. Financial Target and Achievement  Allocation under the Project as per PIP –Rs. 24.90 Crore  Allocation as per Revised Cost Table, 2013-Rs. 26.73 Crore  Expenditure upto March 2014- Rs. 17.38Crore  Reimbursement Claim upto March,2014- Rs.17.38 Crore  Likely Expenditure by May 31, 2014  On HDA-SW Rs.0.85 Crore  eSWIS Rs.0.73 Crore  Others Rs.0.17 Crore Total Rs.1.75Crore But it is very unlikely that payment for above activities could be made up to May, 2014 due to 1/3 ceiling on the expenditure imposed by MOWR
  • 10.  The infrastructure / facility created under HP-II will be maintained through support provided by the Government of India under different Plan Schemes.  Training on the software developed under HP-II will be provided by trained CWC official as and when required.  Dissemination data and application of HIS : All hydro meteorological data will be entered online through new eSWIS software and the same will be disseminated as per Hydro-meteorological Data Dissemination Policy of MOWR through eSWIS and www.india-wris.nrsc.gov.in web site. Post Project Plan for continuation of HP-II activities
  • 11.  Hydrology Project has been implemented mainly in Peninsular India.  There is need to expand the project in remaining parts of India also to cover all hydrological basins of India for better management of water resources.  The Project should be initiated in the early phase of starting of Hydrology Project to achieve the target within stipulated time frame.  The processes of tender preparation/award also get delayed due to delay in obtaining clearances from different authorities. Capacity building as per project could not achieve because International Training Courses as stipulated in the project plan could not materialized. Lessons Learnt