SlideShare une entreprise Scribd logo
1  sur  18
Télécharger pour lire hors ligne
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
494
FEASIBILITY OF DIRECT PUMPING FOR IRRIGATION
IMPROVEMENT PROJECTS
Ibrahim R. Teaima1
, Alaa A. A. Gharieb2
and M. A. Younes1
1
Mechanical and Electrical Research Institute, National Water Research Center, Delta
Barrage, Egypt
2
Water Management Research Institute, National Water Research Center, Delta Barrage,
Egypt
ABSTRACT
This research was initiated with the objective of studying the feasibility of replacing
the head tank as a safety system feeder at the irrigation pipeline with air valve in order to
reduce the cost of meska improvement per feddan. Field measurements were conducted on
three mesqa pumping stations at Meet Yazid command area. A numerical simulation to the
pressure variation for unsteady state flow was performed using KY Pipe 2010 code. Pressure
history during power failure was presented. A comparison between the computation and field
measurements was held. The comparison indicated that the numerical simulations were in
good agreement with actual field measurements values. The research indicated that the head
tank, at the pumping station, could be replaced with an air valve without any dangerous effect
and might save about 606 LE/feddan.
Keywords: Irrigation improvement, direct pumping, pipeline safety, head tank.
1. INTRODUCTION
Improvement of tertiary canals (meska) constitutes the major part of improving
irrigation performance. It includes replacement of the existing system with improved ones.
The old system is usually earthen and low level ditch with non-organized water withdrawal
through multiple pumping/lifting points along its length. Two types were recommended for
improving the old system, open elevated mesqa and buried low-pressure pipe. Elevated one is
an open ditch, but lined and elevated. Normal water level in the elevated mesqa was set to
INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING
AND TECHNOLOGY (IJMET)
ISSN 0976 – 6340 (Print)
ISSN 0976 – 6359 (Online)
Volume 4, Issue 2, March - April (2013), pp. 494-511
© IAEME: www.iaeme.com/ijmet.asp
Journal Impact Factor (2013): 5.7731 (Calculated by GISI)
www.jifactor.com
IJMET
© I A E M E
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
495
permit gravity flow to fields at 15 cm above the level. Alternatives for elevated mesqa
include a rectangular concrete cast-in place selection and pre-cast concrete “J” section. Low
pressure PVC pipeline mesqa is another option for replacing the old mesqa. It is set at
approximately one meter below grad and is provided with risers at spacing of 100 meters.
Such types of mesqas, elevated or pipeline are intended to reduce the seepage of water to
minimum value.
This research was initiated with the objective of studying the feasibility of replacing the head
tank as a safety system feeder at the irrigation pipeline with air valve in order to reduce the
cost of meska improvement per feddan.
The investigation phases during the course of this research are presented in this paper under
the following headlines:
• Outlining Irrigation Improvement Project (IIP)
• Describing the study area
• Outlining the pumping system within the study area
• Describing the hydraulic transient
• Executing simulations
• Executing field measurements
• Analyzing and presenting the results
• Comparing the field and numerical results
• Undergoing a financial and an economic analyses:
2. OUTLINING THE IRRIGATION IMPROVEMENT PROJECT (IIP)
The Irrigation Improvement Project (IIP) is a project which is implemented in order to
increase water use efficiency and agricultural productivity in Egypt’s old lands. Increasing
water use efficiency is used in a broad sense with a connotation of improving irrigation water
management rather than in the sense of the traditional definitions of water use efficiency, this
is to be accomplished by implementing a series of interventions at the irrigation delivery
system and on-farm levels, designed to remove irrigation related constraints to increased
agricultural production and to consider a full range of technical, economic, environmental
and social factors impacting irrigation water management. The IIP package includes both
hard and soft interventions at the delivery and tertiary (meska) system levels. Hardware
interventions at the meska level comprise the construction of collective pumping stations
(single-point lifting) at the head of each meska and replacing the old earth meskas with either
lined sections (prefabricated “J” sections) or low pressure buried pipelines with alfalfa valves.
More than 2200 new meskas have been constructed so far, all meskas are equipped with
diesel pumping stations.
The general layout of the systems is similar. It comprise from a small pumping station,
a head tank (a stand), and a pipeline (Mesqa) up to a bout 2000 m long at the end of which is
a vent/surge stand pipe, figure (1). This pipeline is composed of PVC pipe with diameters of
315-450 mm. The pipeline has outlets at intervals along it which serve quaternary units
(Marwas). Each outlet has a screw down valve allowing water to be discharged into open
channels.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
496
Figure (1) General layout of the meska pumping station
Irrigation Improvement Project (IIP) was one of two schemes to achieve irrigation
improvement. IIP is made up of improved control structures using modern methods in land
leveling/tillage, on-farm development, rehabilitation of main and branch canals and most of
all mesqas (using pipeline mesqa instead of earth mesqa), promoting equity of water
distribution, and attaining a form of cooperation between the irrigation directorate and
farmers by forming water users associations [1]. The Egyptian government is planning to
continue the improvement works to reach a target of more than 3 million feddan by the year
2017 [2], [3] and [4]. IIP project has interesting impacts on the improved irrigation system
through increasing crop yield, land area and other variable impacts [5], [6] and [7]. Integrated
Irrigation Improvement and Management Project, (IIIMP) was the second scheme to achieve
optimal water resources use. The impacts of IIIMP is expected to achieve additional positive
effects on water distribution, quantity, quality, equity, timeliness, water saving by using
pipeline marwa instead of existing earth cross section and other technical assistance required
for establishing water boards and water user associations [8].
The existing pumping stations with head tank as shown in figure (2) in addition,
future IIP projects are currently under preparation to bring more areas under improvement.
The contribution of pipeline cost, pumping station, civil work cost, pump sets cost and
backfilling cost on the total cost are 47%, 29%, 14% and 10% respectively [9]. It means that
the main affective items on the total cost are the pipeline, pumping station and civil works.
The cost of the head tank is the major element which affects civil works.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
497
Figure (2) Existing pumping station with head tank
El-Askari et.al [10] studied the technical, economic and social feasibilities of electrifying the
pumping stations of the improved meskas in future IIP projects instead of using diesel
pumping sets.
3. DESCRIBING THE STUDY AREA
A study area was chosen to be investigated. This area is about 105,325 feddans within
Meet Yazid Canal command area. The area belongs to Gharbia and Kafr El-Sheikh
Directorates in the Nile Delta and is located adjacent to existing IIP areas.
Slightly more than 500 existing old meskas feed the irrigated lands in the study area
with water from the delivery canals. It was decided to implement electric pumping stations as
they are advantageous over the diesel ones from many perspectives. Technically electric
motors provide a wider range of power selection (from 1 to 5 HP). They are readily available
on-the-shelf, have higher efficiency than diesel motors, require less maintenance and provide
greater ease so as flexibility of operation. Economically the annual total cost per feddan of
the electric pumping stations is 20% lower due to their lower running costs, although the
estimated total capital cost of the electric pumping stations is 11% higher than the estimated
cost of the diesel pumps for the study area.
The intake of Meet Yazid canal is located at Km 21 on the left-hand side of Bahr
Shebein carrier. Canal flows with a gentle slope in north-western direction until it ends close
to Borolls coastal lake with 63 Km length. It serves a total command area of about 197000
feddan through 19 branch canals. Several cross regulators are located on the canal in order to
control water.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
498
4. OUTLINING THE PUMPING SYSTEM WITHIN THE STUDY AREA
Direct pumping system is applied at three pumping stations.
• The first one is pumping station number (4) located at Km 52.67 on the left-hand side
of Meet Yazid Canal. It serves a total command area of about 35.83 feddan. The
pipeline material is composed of PVC with diameter of 200 mm and 329 m length.
The pipeline has four outlets at intervals along its length which serves quaternary
units (Marwas). Each outlet has a butterfly valve allowing water to be discharged into
open channel. The pumping station consists of two small single stage end suction
centrifugal pump, flow rate 40 L/s and 20 L/s, head (4.5-6 m), rated horse power (7.5-
4 hp) at 1450 revaluation per min (rpm).
• The second one is pumping station number (7) located at Km 55.25 on the left-hand
side of Meet Yazid canal. It serves a total command area of about 45.9 feddan. The
pipeline material is composed of PVC pipe with diameter of 200 mm and 253 m
length, the pipeline has five outlets at intervals along its length. The pumping station
consists of two small single stage end suction centrifugal pump, flow rate 40 L/s and
20 L/s, head (4.5-6 m), rated horse power (7.5-4 hp) at 1450 rpm.
• The third one is pumping station number (12) located at Km 56.93 on the left-hand
side of Meet Yazid canal. It serves a total command area of about 30.00 feddan. The
pipeline material is composed of PVC pipe with diameter of 200 mm and 409 m
length, the pipeline has five outlets. The pumping station consists of two small single
stage end suction centrifugal pump. The flow rate is 30 L/s and 20 L/s. The head is (6-
7.1 m) with a rated horse power of (5.5 hp) at 1450 rpm. Electric pumping station
system can be modified by replacing the head tank by air valve and using the direct
pumping method. This change in the design of the improved meska is an attempt to
reduce the cost, which will be recovered from the farmers. Figure (3) shows the
modified pumping station with air valve installation.
Figure (3) Modified pumping station with air valve installation
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
499
5. DESCRIBING THE HYDRAULIC TRANSIENT
Transient flow is the most important item in the field of pipeline design and operation.
Transient flow exists in any pipeline system when the rate of flow changes abruptly for various
reasons. Some of the most common reasons are quick closing of valves accidental or planned,
starting or stopping of pumps and power failure. Power failure is considered the worst-case
scenario to produce hydraulic transient [11].
When transient flow occurs at the pipeline system, high intensity pressure waves travel
through the piping system until it reaches a point of some relief such as a large diameter reservoir
or piping main. The shock waves will then surge back and forth between the point of relief and
the point of impact until the destructive energy is dissipated in the piping system. If severe
negative pressures are allowed to occur along the pipeline, problems may arise due to pipe seal
joint failure. The maximum allowable negative pressure in the pipes is specified to be –3 m of
water. This is considered as the limiting value for the present transient analysis. The allowable
maximum pressure along the pipeline is considered to be 4 bars. The transient flow direct impacts
can be presented as follow, [12]:
• The pressure fluctuation leads to high stresses. The effective value depends upon the
pressure value and the rate of the pressure change. It might lead to rapture for pipes,
fittings, leaking and weakened connections, damage for water meters and gauges, pipe
support damage, valves, connections, column separation and high pressure after the two
columns rejoining which might lead to serious damage.
• Vibration and its effect on the pipe structure. High levels of vibration might cause a
resonance or failure or a form of fatigue failure or fatigue accumulation.
• Noise and impulsive noise might induce impacts on labors.
6. EXECUTING SIMULATIONS
Numerical computations are carried out by using KY Pipe 2010, Ver.5 [13] code. KY
Pipe is a water dynamic simulation tool used to calculate pressure transients in piping systems
caused by water hammer and that leads to design and operate systems with great reliability and
safety by avoiding the potentially catastrophic effects of water hammer and other undesirable
system transients.
6.a. PIPE 2010
Pipe 2010 is a powerful graphical user interface for laying out comprehensive pipe
system models, accessing and running associated engineering analysis engines and presenting
results in various ways. The models are entirely made up of pipe links end nodes and internal
nodes. Using this approach only a few simple steps are required to develop and modify pipe
systems and define the associated data. Friction losses through force mains shall be calculated
using the Hazen-Williams equation:
87.4
852.1
852.1
675.10
D
Q
C
L
hf = (1)
Where:
hf is the head loss due to friction in m of water
L is the pipe length in m
Q is the flow rate in m3
/s
D is the pipe diameter in m
C is the friction coefficient which depends on roughness. For PVC material, it is common to use
C=120~130.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
500
6.b. BOUNDARY CONDITIONS
To get an accurate simulation, the mass flow rate, manometric head, pipeline profile
of each meska are obtained. The simulation time of 120 second is presented. The pumping
station is running in steady state condition and after 3 second the pumping station are stopped
and the unsteady state analysis are taken. Table (1) shows the boundary conditions for three
cases.
Table (1): Boundary conditions for three cases
Meska
Number
of
pumps
Q
(L/s)
Head
(m)
Pipeline
diameter
(mm)
Pipeline
length
(m)
No. of
valves
Pipeline
material
Wave
speed
(m/s)
No.4 2 60 6.75 200 329 3 PVC 550
No.7 2 60 6.75 200 253 5 PVC 550
No.12 2 50 6.75 200 405 4 PVC 550
6.c. NUMERICAL RESULTS
A hydraulic transient analysis was carried out on the three pumping stations to ensure
the system sufficient protection from hydraulic transient. The maximum and minimum
pressures, at any point along the pipeline profile, are taken. Also the pressure history at the
beginning of meska pumping station is given.
6.c.1. MAXIMUM AND MINIMUM PRESSURE ON PIPELINE
The maximum and minimum pressures inside pipeline for all tested meska are
extracted at different sections in pipeline length. These distributions of pressure with time are
obtained at operating conditions of meska pumping stations using numerical modeling.
Figures (4), (5) and 6) show the maximum and minimum pressure during power failure when
using air valve at the beginning of for all tested meskas. It is clear from these figures that the
values of maximum and minimum pressure variation at any point along the pipeline profile
are in the save mode. It means that the pressure variation decreases and the pipeline doesn’t
expose to high stresses due to pressure change.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
501
Figure (4) Envelops of maximum and minimum pressure for
meska pumping station no.4
Figure (5) Envelops of maximum and minimum pressure for
meska pumping station no.7
Maximum pressure
HGL
Pipeline
Lower limitMinimum pressure
Air valve
Pumping station
Lower limitMinimum pressure
Pipeline
Pumping station
Air valve
Maximum pressure
HGL
Time (sec)
Elevation(meters)
Time (sec)
Elevation(meters)
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
502
Figure (6) Envelops of maximum and minimum pressure for meska pumping station no.12
Figures (7) and (8) show the pressure variation inside the pipeline of meska pumping
station no.7 and 12, respectively. From these figures it can be illustrated that, when shutdown
pumping stations the pressure at the beginning of meska pipeline decreases from the steady
state operating pressure about 8 meter of water, reach to the negative values then the pressure
recovery reach the positive values and fluctuate about 1 meter and 0.5 meter of water for two
measks, respectively. This means that the pipeline operate without any risks and more safety.
Figure (7) Pressure history at the beginning of meska pumping station no.7
Pipeline
Minimum pressure
Lower limit
HGL
Maximum pressure
Pumping station
Air valve
Time (sec)
Elevation(meters)
Time (sec)
Head(meters)
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
503
Figure (8) Pressure history at the beginning of meska pumping station no.12
7. EXECUTING FIELD MEASUREMENTS
After complete studies of modified system numerically by using KY pipe code, field
work was conducted on the three pumping stations at Meet Yazid canal Kafr El-Sheikh
Governorate.
A transit-time ultrasonic flow-meter type (1010) was used to measure the volume
flow rate through the pipeline. A calibrated pressure transducer was used to measure pressure
at the delivery side of the pumping units. Record card and signal conditioner, (Type ATMIO
- 16E - 2) was used to collect the measured pressure value. The time history for pressure
measurements were converted to a data file by using an application of LABVIEW software as
a data acquisition system. Through another application of the MATLAB software program
for signal, the electrical output signals data file was transformed and converted to a pressure
head then pressure graph was prepared to give a complete view about the pressure history at
the measuring point. Energy analyzer, (MICRO VIP MK12) was used to measure voltage,
ampere, active power, energy, apparent power, frequency and power factor. The pressure
head developed by the pumps are recorded with time at different operating conditions.
8. ANALYZING AND PRESENTING THE RESULTS
Results were obtained, analyzed and presented, as follows.
8.a. HYDRAULIC PERFORMANCE
Actual measurement of flow rate is a simple way to find out how a pumping unit is
performing. Measuring flow rate and operating pressures is required to determine if a
pumping station is operating efficiently to convey desired flow rate. This is a cheap and easy
task which should be performed regularly as part of the routine maintenance. Also, the power
absorbed to drive the pump is a direct function of the discharge rate, the total pumping head
Time (sec)
Head(meters)
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
504
and the efficiency of the pump at that operating point. The efficiency of the pumping unit
during normal operation becomes a significant factor in the capital and operating costs of the
pumping unit. To evaluate the performance of Mesqa pumping station, delivery pressure,
(Pd), suction pressure, (Ps), discharge, (Q), static head, (Zd-Zs) and electric power consumed,
(kW) were measured for three pumping stations. The total head and efficiency can be
calculated as follows:
)(
2
22
sd
sdsd
t ZZ
g
VV
g
PP
H −+
−
+
⋅
−
=
ρ
(2)
C
HQg
PW t...
.
ρ
= (3)
100*
.
.
(%)
PE
PW
Overall =η (4)
Where,
Ht : is the total head (m)
Zd-Zs : is the potential energy
g
PP sd
⋅
−
ρ
: is the pressure energy
g
VV sd
2
22
−
: is the kinetic energy
ρ : is the water density (kg/m3
)
W.P : is the water power (kW)
E.P ; is the electric power consumed (kW)
ηoverall : is the overall efficiency
Table (2) shows the test results for three pumping station. The desired total flow rate of
pumping station can be achieved from two units in operation and at least two valves are
opened at the same time. Pump performance can be affected by a combination of many
factors like sump condition and suction side.
Table (2) shows that the pump delivers the design flow rate at manometric head about 10 m
of water. The average overall efficiency of pumping unit (motor, coupling and pump) is about
66.5%. The overall efficiency of pumping unit is about the design values according to ISO
9906. Which recommended the tolerance of efficiency is (-5%). Also the pumps are operated
satisfactory to give flow requirements MERI [14].
Table (2) Hydraulic test results for three pumping station
Pump
Station
no.
Q
(l/s)
Total Head
(m)
Electric Power
(kW)
Water Power
(kW)
Overall
Efficiency
(%)
4 40 10.05 5.83 3.94 67.60
7 40 9.97 5.7 3.91 68.59
12 30 9.95 4.66 2.93 62.80
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
505
8.b. TRANSIENT ANALYSIS OF PUMPING STATION NUMBER 4
The pipeline is connected to air valve at the beginning of manifold to protect the
installations against water hammer and pressure surges, while check valves are provided for
each pump to eliminate reverse flow, figure (3). A transient hydraulic analysis was carried
out on the three chosen pumping station. The pressure history was recorded with high
response pressure transducer located at beginning of the manifold of pipeline. Figure (9)
shows the pressure history during shutdown of pumping station no.4 when opening valves
no.2 and 3 also the measured flow rate of two pumps are 60 l/s. It can be seen that the
pressure at the pipeline decrease gradually to reach (-2 m) water and increase to (1.2 m) water
when using air valve.
Figure (9) pressure history during power failure
using air valve when open valves no. 2 and 3
Figure (10) pressure history during power
failure without air valve when open valves
no. 2 and 3
Figure (10) shows the pressure history during shutdown of pumping station no.4 when
opening valves no.2 and 3. Also the measured flow rates, of two pumps, are 61.2 l/s. It can be
seen that the pressure at the pipeline decreases gradually to reach (-2.4 m) water and increase
to about (-1.5 m) water without air valve. From figures (9) and (10), it can be concluded that
the pressure decreases at shutdown the pumps in case of without air valve more than in case
of using air valve. Also the negative pressure fluctuated inside the pipeline in case of not
using air valve. Figure (11) shows the pressure history during shutdown the pumping station
and the last two valves no.3 and no.4 are opened with air valve installation. The measured
flow rate of two pumps are 62 l/s. Figure (12) illustrates the pressure history during shutdown
the pumping station and the two last valves no.3 and 4 are open without air valve
installation. The measured flow rate of two pumps is 60 l/s.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
506
Figure (11) pressure history during power
failure using air valve when open valves no. 3
and 4
Figure (12) pressure history during power
failure without air valve when open valves no.
3 and 4
It is clear from figures (11) and (12) that when using air valve the pressure history fluctuated
inside pipe line are about the positive values that means the installation of air valve at the
beginning of the pipeline decrease the causing of negative pressures.
8.c. TRANSIENT ANALYSIS OF PUMPING STATION NUMBER 7
Pumping station number 7 consists of two pump sets connected in parallel with each
other, the discharge of one pump is 40 l/s and the other one is 20 l/s the total capacity of the
pumping station are 60 l/s at the static head (6-7.1) m of water the variation of static head
according to the Meet Yazid canal water level.
Figure (13) illustrates the pressure history during shutdown of pumping station
number 7 when opening valve no.5 also the measured flow rate of two pumps are 52 l/s. It
can be seen that the pressure at the pipeline decrease suddenly to reach (-0.85 m) water and
increase to fluctuated about (0.85 m) water when using air valve.
Figure (14) shows the pressure history during startup and shutdown the pumping
station number 7 when opening the valve number 5 and flow rate measured 52 l/s without air
valve installation. From this figure it can illustrate that the pressure inside the pipeline
increases suddenly when startup the pumps to reach 8 m of water and decreases gradually to
reach about 6 m of water. Also when shutdown the pumps, the pressure inside the pipeline
deceases suddenly reach to (-2.1) m of water and increases to reach (2.2) m of water then
fluctuate about 0.5 m of water.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
507
Figure (13) pressure history during power failure
using air valve when open valve no. 5
Figure (14) pressure history during start up
and power failure without air valve when
open valve no. 5
Figure (15) illustrates the pressure history during shutdown of pumping station no.7
when opening valves no.2 and 4 also the measured flow rate of two pumps are 54 l/s, and
using air valve. From this figure it can illustrate that the pressure inside the pipeline increases
suddenly when starting up the pumps to reach 8 m of water and deceases gradually to reach
about 5.8 m of water. Also when shutdown the pumps, the pressure inside the pipeline
deceases suddenly reach to -2 m of water and increases to reach 2.1 m of water then fluctuate
about 0.2 m of water.
Figure (16) shows the pressure history during starting up and shutdown the pumping
station number 7 when opening the valves number 2 and 4. The total flow rate measured is
61.5 l/s. From this figure it can illustrate that, the pressure inside the pipeline increases
suddenly when starting up the pumps to reach 7.8 m of water and deceases gradually to reach
about 4.7 m of water, also when shutdown the pumps the pressure inside the pipeline
deceases suddenly reach to (-2.9) m of water and increases to reach (1.35) m of water then
fluctuate about this value.
Figure (15) pressure history during power
failure using air valve when open valves no. 2
and 4
Figure (16) pressure history during start up
and power failure without air valve when
open valves no. 2 and 4
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
508
When shutdown the pumping station at the design flow rate without air valve installation,
figure (16). The negative pressure values reach to (-3) m of water. Figure (15) shows that the
negative pressure values reach -2 m of water with air valve installation. It can be concluded
that using air valve at the beginning of meska pipeline allows the pipeline operating condition
to be more safe.
8.d. TRANSIENT ANALYSIS OF PUMPING STATION NUMBER 12
Pumping station number 12 consists of two pump sets connected in parallel with each
other. The discharge of one pump is 30 l/s and the other one is 20 l/s. The total capacity of
the pumping station is 50 l/s at the static head 6 to 7.1 m of water, and five alfalfa valves
distributed along the pipeline to irrigate all served area.
Figure (17) illustrates the pressure history during starting up and shutdown the
pumping station number 12 when valve number 5 is opening alone and measured flow rate is
40 l/s with air valve installation. From this figure it can illustrate that the pressure inside the
pipeline increases suddenly when starting up the pumps to reach (6.8) m of water and
deceases gradually to reach about (5) m of water. Also when the pumps were shut down the
pressure inside the pipeline deceased suddenly to reach -2 m of water and increased to reach
2.7 m of water then fluctuate about (1) m of water.
Figure (18) shows the pressure history during starting up and shutdown the pumping
station number 12 when valve number 5 is opening alone and measured flow rate is flow rate
40 l/s without air valve installation. From this figure it can illustrate that the pressure inside
the pipeline increases suddenly when the pumps were upstarted to reach (8) m of water and
deceased gradually to reach about 6.8 m of water.
Also when the pumps were shut down the pressure inside the pipeline deceased suddenly
reach to -3.1 m of water and increased to reach (2.1) m of water then fluctuate about zero m
of water.
Figure (17) pressure history during start up and
power failure using air valve when open valve
no. 5
Figure (18) pressure history during start up
and power failure without air valve when
open valve no. 5
From the two figures it can be seen that the negative pressure inside the pipeline without air
valve installation while, in the case of using air valve pipeline exposes to positive value.
The advantages of air valves are easy operation, low maintenance, low operation cost and
high reliability. Direct pumping systems save the cost of head tank construction and
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
509
maintenance, furthermore the stand pipe intervals at the end of each valve are play the
important role to prevent the system from water hammer phenomena. This intervals are
damping the pressure waves when shutdown the system.
9. COMPARING FIELD AND NUMERICAL RESULTS
Figure (19.a) and (19.b) show a sample of the executed comparison between the field
and numerical results of pressure variation inside the pipeline meska no.4.
From the figure, it is clear that the numerical curve complies well the field curve.
Generally, the matching between them is fairly good and the pressure details inside the pump
are obtained by using the software without carrying the filed measurements. The small
deviation is attributed to the smoothness of the fittings and the use of friction coefficient "C"
for PVC material. In the present study a value of C is equal to 120.
Figure (19.a) Numerical results Figure (19.b) Field results
Figure (19) Comparison between the numerical and field results for meska no.4
10. UNDERGOING A FINANCIAL AND AN ECONOMIC ANALYSES
Financial and economic analyses were conducted in order to improve meskas in the
study area and to compare the cost of air valve versus delivery tank based on 2009 prices.
The comparison was based on the total cost per feddan. The main items affect the
total cost of improving meska are backfilling, pipeline, pump house, pumps and others such
as valves, head tank ( as in IIP1), air valves ( as in IIP2 or IIIMP) etc. The average cost for
improving meska in IIP1 is about 8500 LE/fed. The average cost for improving meska in IIP2
is about 6000 LE/fed. The cost of pipe line was about 30% from the total cost. The
contribution of direct pumping in the cost saving is decreasing pipe line diameter from (315:
500 mm) to (200: 400 mm) and replacing head tank by air valve which cost about 18000 LE
for meska (served about 50 feddan), while, air valve cost is equal to 200 LE. The decreasing
of pipe line diameter leads to increase pumping operation duration from 16 to 20 hr/day,
according to new design criteria of IIP2 and IIIMP projects, increase flow velocity and
decreasing of water duty from 1.45 to 1.05 l/s/fed. Cost saving from decreasing pipe line
diameter is equal to 250 LE/fed. So, the total cost saving is about 606 LE/feddan.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
510
11. CONCLUSION AND RECOMMENDATION
Based on the results reached in the present research, the following was concluded:
• The direct pumping systems save about 606 LE/fadden due to replace the head
tank by air valve.
• Pipeline system equipped with air valve, air vent and distribution valves is
effective and is a safe solution for water hammer control.
• KY Pipe 2010 code is a hand tool for design. It can predict accurately the
different pressure phenomena and assist the choice of suitable protection
devices to protect the water hammer phenomena and to evaluate system.
• Comparison between the computation and field measurements indicated that the
numerical simulation results were found to comply well with actual values
obtained from the field measurements.
At the design stage, it is recommended to:
• Check the transient state especially for long pipelines (more than 500 m). It may
be required more than one air valve.
• Slow the time of opening and closing selected distribution valves not less than 4
second.
12. REFERENCES
[1] Dalal Alnagar Director (RCTWS), Ministry of Water Resources and Irrigation, "Policies
and strategic options for water management in the Islamic countries", International
hydrological program Tehran, Islamic Republic of Iran, 15-16 Dec. 2003.
[2] R.J.Oosterbaan, International Institute for Land Reclamation and Improvement (ILRI),
Wageningen, "Impacts of the Irrigation Improvement Projects in Egypt", Consultancy Report
to the Egyptian-Dutch Advisory Panel on Land Drainage and Drainage Related Water
Management, 2010.
[3] Walid E. Elshorbagy, "Impact Assessment of an Irrigation Improvement Project in
Egypt", Water Resources Management, 2000.
[4] New Partnership for Africa’s Development (NEPAD), "Support to NEPAD–CAADP
Implementation “, Bankable Investment Project Profile, 2005.
[5] M. Allam, F. El-Gamal, and M. Hesham, "Irrigation Systems Performance in Egypt",
Irrigation Systems Performance. Options méditerranéennes, Series B, no 52, 2004.
[6] M.N. Allam Department of Irrigation and Drainage Engineering, Faculty of Engineering,
Cairo University, "Participatory Irrigation Water Management in Egypt: Review and
Analysis", Options méditerranéennes Series B, no 48, 2009.
[7] World Bank, "Implementation Completion and Results Report: Irrigation Improvement
Project ", Report, 2007.
[8] Sabour Consultant, "Terms of Reference for the Tendering of Consulting Services for the
Integrated Irrigation Improvement and Management Project (IIIMP) and Instruction to
Tenders", Report, 2008.
[9] Hany G. Radwan, Ashraf S. Zahloul and Kamal A. Ibrahim, "Analysis of Optimal
Velocity for Improved Irrigation Design in Egypt", Canadian Journal on Environmental,
Construction and Civil Engineering Vol.2 No. 5,2011, pp.94-102.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME
511
[10] K. Al-Askari, G. Fawzy and M.A.Younes, "Electrification of Meska Pumping Stations
as an Option for Future Irrigation Improvement Projects in Egypt", Third Arab water
Regional Conference National Water Research Center, 9-11 Dec. 2005.
[11] Kroon, R., "Water Hammer: Causes and Effects", AWWA Journal, 1984, pp. 39-45.
[12] Lingireddy, "Pressure Surges in Pipeline Systems Resulting From Air Releases",
AWWA Journal, 2004, pp. 88-94.
[13] Don J. Wood and Lingireddy, "KY Pipe 2010 documentation Version 5" Advanced
Scientific Computing, Ltd, Lexington, USA 2010.
[14] Mechanical & Electrical Research Institute (MERI), "Direct Pumping hydraulic test for
Irrigation Improvement project at Meet Yazid canal", Technical report, Delta Barrage, Egypt,
2008.
[15] Omar K M Ouda, Abdullatif A. Al-Shuhail, Tawfiq Qubbaj and Rana Samara,
“Assessing the Applicability of Ground Penetrating Radar (GPR) Techniques for Estimating
Soil Water Content and Irrigation Requirements in the Eastern Province of Saudi Arabia: A
Project Methodology”, International Journal of Advanced Research in Engineering &
Technology (IJARET), Volume 4, Issue 1, 2013, pp. 114 - 123, ISSN Print: 0976-6480,
ISSN Online: 0976-6499.
[16] Anubhav Gupta and Harish Bansal, “Design of Area Optimized AES Encryption Core
using Pipelining Technology”, International Journal of Electronics and Communication
Engineering &Technology (IJECET), Volume 4, Issue 2, 2013, pp. 308 - 314, ISSN Print:
0976- 6464, ISSN Online: 0976 –6472.

Contenu connexe

Tendances

Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...
Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...
Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...Ingo Valgma
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentIRJET Journal
 
design specification and problems of kuraz irrigation scheme
 design specification and problems  of kuraz irrigation scheme design specification and problems  of kuraz irrigation scheme
design specification and problems of kuraz irrigation schemetamasgenqmokonnin
 
Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...
Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...
Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...CrimsonpublishersMedical
 
Paper-11th ACUUS International Conference
Paper-11th ACUUS International ConferencePaper-11th ACUUS International Conference
Paper-11th ACUUS International ConferenceMeliti Pappa
 
Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...eSAT Journals
 
Studying Effect Inclination of cutoff on the percolation Length under Aprons ...
Studying Effect Inclination of cutoff on the percolation Length under Aprons ...Studying Effect Inclination of cutoff on the percolation Length under Aprons ...
Studying Effect Inclination of cutoff on the percolation Length under Aprons ...IRJET Journal
 
Improvement to Village Road Based on Traffic Characteristics
Improvement to Village Road Based on Traffic CharacteristicsImprovement to Village Road Based on Traffic Characteristics
Improvement to Village Road Based on Traffic CharacteristicsIJERA Editor
 
IRJET- Rainfall-Runoff Analysis of the Watershed for River AIE
IRJET-  	  Rainfall-Runoff Analysis of the Watershed for River AIEIRJET-  	  Rainfall-Runoff Analysis of the Watershed for River AIE
IRJET- Rainfall-Runoff Analysis of the Watershed for River AIEIRJET Journal
 
Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...
Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...
Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...IJERA Editor
 
Exaple of use of decision support system planning dss (p) kerala state
Exaple of use of decision support system planning dss (p)   kerala stateExaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p) kerala statehydrologyproject0
 
Application of Swat Model for Generating Surface Runoff and Estimation of Wat...
Application of Swat Model for Generating Surface Runoff and Estimation of Wat...Application of Swat Model for Generating Surface Runoff and Estimation of Wat...
Application of Swat Model for Generating Surface Runoff and Estimation of Wat...IRJET Journal
 
Optimal operation of a multi reservoir system and performance evaluation
Optimal operation of a multi reservoir system and performance evaluationOptimal operation of a multi reservoir system and performance evaluation
Optimal operation of a multi reservoir system and performance evaluationIAEME Publication
 
Feasibility study of small hydropower schemes in giba and
Feasibility study of small hydropower schemes in giba andFeasibility study of small hydropower schemes in giba and
Feasibility study of small hydropower schemes in giba andAlexander Decker
 

Tendances (20)

Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...
Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...
Lind robam valgma_sokman_developing_computational_groundwater_monitoring_and_...
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
design specification and problems of kuraz irrigation scheme
 design specification and problems  of kuraz irrigation scheme design specification and problems  of kuraz irrigation scheme
design specification and problems of kuraz irrigation scheme
 
Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...
Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...
Condition Studied Moisture of Ground Agryculture Production in Azerbaijan to ...
 
Paper-11th ACUUS International Conference
Paper-11th ACUUS International ConferencePaper-11th ACUUS International Conference
Paper-11th ACUUS International Conference
 
Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...
 
50120140501011
5012014050101150120140501011
50120140501011
 
Ijciet 06 10_015
Ijciet 06 10_015Ijciet 06 10_015
Ijciet 06 10_015
 
RUNOFF AND SEDIMENT YIELD
RUNOFF AND SEDIMENT YIELDRUNOFF AND SEDIMENT YIELD
RUNOFF AND SEDIMENT YIELD
 
Studying Effect Inclination of cutoff on the percolation Length under Aprons ...
Studying Effect Inclination of cutoff on the percolation Length under Aprons ...Studying Effect Inclination of cutoff on the percolation Length under Aprons ...
Studying Effect Inclination of cutoff on the percolation Length under Aprons ...
 
Improvement to Village Road Based on Traffic Characteristics
Improvement to Village Road Based on Traffic CharacteristicsImprovement to Village Road Based on Traffic Characteristics
Improvement to Village Road Based on Traffic Characteristics
 
Shyam 17 ag62r13_cycle3
Shyam 17 ag62r13_cycle3Shyam 17 ag62r13_cycle3
Shyam 17 ag62r13_cycle3
 
IRJET- Rainfall-Runoff Analysis of the Watershed for River AIE
IRJET-  	  Rainfall-Runoff Analysis of the Watershed for River AIEIRJET-  	  Rainfall-Runoff Analysis of the Watershed for River AIE
IRJET- Rainfall-Runoff Analysis of the Watershed for River AIE
 
Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...
Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...
Validation of Passive Microwave Remotely Sensed Soil Moisture (Amsr-E) Produc...
 
Exaple of use of decision support system planning dss (p) kerala state
Exaple of use of decision support system planning dss (p)   kerala stateExaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p) kerala state
 
WEPP MODEL
WEPP MODELWEPP MODEL
WEPP MODEL
 
Application of Swat Model for Generating Surface Runoff and Estimation of Wat...
Application of Swat Model for Generating Surface Runoff and Estimation of Wat...Application of Swat Model for Generating Surface Runoff and Estimation of Wat...
Application of Swat Model for Generating Surface Runoff and Estimation of Wat...
 
Optimal operation of a multi reservoir system and performance evaluation
Optimal operation of a multi reservoir system and performance evaluationOptimal operation of a multi reservoir system and performance evaluation
Optimal operation of a multi reservoir system and performance evaluation
 
J012415965
J012415965J012415965
J012415965
 
Feasibility study of small hydropower schemes in giba and
Feasibility study of small hydropower schemes in giba andFeasibility study of small hydropower schemes in giba and
Feasibility study of small hydropower schemes in giba and
 

En vedette

estimation of irrigation requirement using remote sensing
estimation of irrigation requirement using remote sensingestimation of irrigation requirement using remote sensing
estimation of irrigation requirement using remote sensingNayan Rao
 
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...Dirk Kassenaar M.Sc. P.Eng.
 
Lobel solar 5 hp vfd controller for pumping and irrigation project
Lobel solar 5 hp vfd controller for pumping and irrigation projectLobel solar 5 hp vfd controller for pumping and irrigation project
Lobel solar 5 hp vfd controller for pumping and irrigation projectL'Obel Solar Power System
 
FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...
FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...
FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...IAEME Publication
 
NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS
NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS
NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS IAEME Publication
 
MICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTERMICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTERIAEME Publication
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solutionHarish Agarwal
 
REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...
REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...
REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...IAEME Publication
 
DESIGN CONTROL SYSTEM OF AN AIRCRAFT
DESIGN CONTROL SYSTEM OF AN AIRCRAFTDESIGN CONTROL SYSTEM OF AN AIRCRAFT
DESIGN CONTROL SYSTEM OF AN AIRCRAFTIAEME Publication
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business planIndrajith Nair
 

En vedette (10)

estimation of irrigation requirement using remote sensing
estimation of irrigation requirement using remote sensingestimation of irrigation requirement using remote sensing
estimation of irrigation requirement using remote sensing
 
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
 
Lobel solar 5 hp vfd controller for pumping and irrigation project
Lobel solar 5 hp vfd controller for pumping and irrigation projectLobel solar 5 hp vfd controller for pumping and irrigation project
Lobel solar 5 hp vfd controller for pumping and irrigation project
 
FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...
FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...
FIRING ANGLE SVC MODEL FOR ANALYZING THE PERFORMANCE OF TRANSMISSION NETWORK ...
 
NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS
NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS
NON-ISOLATED SOFT SWITCHING DC-DC CONVERTER AND LOAD AT FULL RANGE OF ZVS
 
MICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTERMICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTER
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solution
 
REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...
REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...
REDUCTION OF HARMONIC DISTORTION IN BLDC DRIVE USING BL-BUCK BOOST CONVERTER ...
 
DESIGN CONTROL SYSTEM OF AN AIRCRAFT
DESIGN CONTROL SYSTEM OF AN AIRCRAFTDESIGN CONTROL SYSTEM OF AN AIRCRAFT
DESIGN CONTROL SYSTEM OF AN AIRCRAFT
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business plan
 

Similaire à Feasibility of direct pumping for irrigation improvement projects

The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...IJECEIAES
 
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...IJERA Editor
 
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, EgyptDynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, EgyptIJERA Editor
 
SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...
SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...
SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...IAEME Publication
 
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...IAEME Publication
 
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...IAEME Publication
 
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...IRJET Journal
 
Selection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egyptSelection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egypteSAT Publishing House
 
Design and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala PanchayatDesign and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala PanchayatIRJET Journal
 
H Fuyana_Research Presantation 2015
H Fuyana_Research Presantation 2015H Fuyana_Research Presantation 2015
H Fuyana_Research Presantation 2015Hlosokuhle Fuyana
 
Numerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap FlowNumerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap FlowIRJET Journal
 
LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS
LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS
LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS IAEME Publication
 
EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...
EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...
EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...IAEME Publication
 

Similaire à Feasibility of direct pumping for irrigation improvement projects (20)

The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...The Development of an Application Conceived for the Design, Feasibility Study...
The Development of an Application Conceived for the Design, Feasibility Study...
 
20320130405018
2032013040501820320130405018
20320130405018
 
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
 
20320130406013
2032013040601320320130406013
20320130406013
 
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, EgyptDynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
 
SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...
SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...
SIMULATION OF PRESSURE VARIATIONS WITHIN KIMILILI WATER SUPPLY SYSTEM USING E...
 
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...
 
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
 
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
 
Implementation of Variable Frequency Drive on Underground Main Fans for Energ...
Implementation of Variable Frequency Drive on Underground Main Fans for Energ...Implementation of Variable Frequency Drive on Underground Main Fans for Energ...
Implementation of Variable Frequency Drive on Underground Main Fans for Energ...
 
Ijeet 06 08_003
Ijeet 06 08_003Ijeet 06 08_003
Ijeet 06 08_003
 
11 426-151730323021-26
11 426-151730323021-2611 426-151730323021-26
11 426-151730323021-26
 
Selection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egyptSelection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egypt
 
Design and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala PanchayatDesign and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala Panchayat
 
H Fuyana_Research Presantation 2015
H Fuyana_Research Presantation 2015H Fuyana_Research Presantation 2015
H Fuyana_Research Presantation 2015
 
Numerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap FlowNumerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap Flow
 
LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS
LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS
LOWERING GROUNDWATER IN THE ARCHAELOGICAL BABYLON CITY USING UNDERGROUND DAMS
 
30120140505001 2
30120140505001 230120140505001 2
30120140505001 2
 
EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...
EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...
EFFECT OF DIFFUSER LENGTH ON PERFORMANCE CHARACTERISTICS OF ELBOW DRAFT TUBE ...
 
Ijmet 10 01_198
Ijmet 10 01_198Ijmet 10 01_198
Ijmet 10 01_198
 

Plus de IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

Plus de IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Dernier

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Dernier (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Feasibility of direct pumping for irrigation improvement projects

  • 1. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 494 FEASIBILITY OF DIRECT PUMPING FOR IRRIGATION IMPROVEMENT PROJECTS Ibrahim R. Teaima1 , Alaa A. A. Gharieb2 and M. A. Younes1 1 Mechanical and Electrical Research Institute, National Water Research Center, Delta Barrage, Egypt 2 Water Management Research Institute, National Water Research Center, Delta Barrage, Egypt ABSTRACT This research was initiated with the objective of studying the feasibility of replacing the head tank as a safety system feeder at the irrigation pipeline with air valve in order to reduce the cost of meska improvement per feddan. Field measurements were conducted on three mesqa pumping stations at Meet Yazid command area. A numerical simulation to the pressure variation for unsteady state flow was performed using KY Pipe 2010 code. Pressure history during power failure was presented. A comparison between the computation and field measurements was held. The comparison indicated that the numerical simulations were in good agreement with actual field measurements values. The research indicated that the head tank, at the pumping station, could be replaced with an air valve without any dangerous effect and might save about 606 LE/feddan. Keywords: Irrigation improvement, direct pumping, pipeline safety, head tank. 1. INTRODUCTION Improvement of tertiary canals (meska) constitutes the major part of improving irrigation performance. It includes replacement of the existing system with improved ones. The old system is usually earthen and low level ditch with non-organized water withdrawal through multiple pumping/lifting points along its length. Two types were recommended for improving the old system, open elevated mesqa and buried low-pressure pipe. Elevated one is an open ditch, but lined and elevated. Normal water level in the elevated mesqa was set to INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND TECHNOLOGY (IJMET) ISSN 0976 – 6340 (Print) ISSN 0976 – 6359 (Online) Volume 4, Issue 2, March - April (2013), pp. 494-511 © IAEME: www.iaeme.com/ijmet.asp Journal Impact Factor (2013): 5.7731 (Calculated by GISI) www.jifactor.com IJMET © I A E M E
  • 2. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 495 permit gravity flow to fields at 15 cm above the level. Alternatives for elevated mesqa include a rectangular concrete cast-in place selection and pre-cast concrete “J” section. Low pressure PVC pipeline mesqa is another option for replacing the old mesqa. It is set at approximately one meter below grad and is provided with risers at spacing of 100 meters. Such types of mesqas, elevated or pipeline are intended to reduce the seepage of water to minimum value. This research was initiated with the objective of studying the feasibility of replacing the head tank as a safety system feeder at the irrigation pipeline with air valve in order to reduce the cost of meska improvement per feddan. The investigation phases during the course of this research are presented in this paper under the following headlines: • Outlining Irrigation Improvement Project (IIP) • Describing the study area • Outlining the pumping system within the study area • Describing the hydraulic transient • Executing simulations • Executing field measurements • Analyzing and presenting the results • Comparing the field and numerical results • Undergoing a financial and an economic analyses: 2. OUTLINING THE IRRIGATION IMPROVEMENT PROJECT (IIP) The Irrigation Improvement Project (IIP) is a project which is implemented in order to increase water use efficiency and agricultural productivity in Egypt’s old lands. Increasing water use efficiency is used in a broad sense with a connotation of improving irrigation water management rather than in the sense of the traditional definitions of water use efficiency, this is to be accomplished by implementing a series of interventions at the irrigation delivery system and on-farm levels, designed to remove irrigation related constraints to increased agricultural production and to consider a full range of technical, economic, environmental and social factors impacting irrigation water management. The IIP package includes both hard and soft interventions at the delivery and tertiary (meska) system levels. Hardware interventions at the meska level comprise the construction of collective pumping stations (single-point lifting) at the head of each meska and replacing the old earth meskas with either lined sections (prefabricated “J” sections) or low pressure buried pipelines with alfalfa valves. More than 2200 new meskas have been constructed so far, all meskas are equipped with diesel pumping stations. The general layout of the systems is similar. It comprise from a small pumping station, a head tank (a stand), and a pipeline (Mesqa) up to a bout 2000 m long at the end of which is a vent/surge stand pipe, figure (1). This pipeline is composed of PVC pipe with diameters of 315-450 mm. The pipeline has outlets at intervals along it which serve quaternary units (Marwas). Each outlet has a screw down valve allowing water to be discharged into open channels.
  • 3. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 496 Figure (1) General layout of the meska pumping station Irrigation Improvement Project (IIP) was one of two schemes to achieve irrigation improvement. IIP is made up of improved control structures using modern methods in land leveling/tillage, on-farm development, rehabilitation of main and branch canals and most of all mesqas (using pipeline mesqa instead of earth mesqa), promoting equity of water distribution, and attaining a form of cooperation between the irrigation directorate and farmers by forming water users associations [1]. The Egyptian government is planning to continue the improvement works to reach a target of more than 3 million feddan by the year 2017 [2], [3] and [4]. IIP project has interesting impacts on the improved irrigation system through increasing crop yield, land area and other variable impacts [5], [6] and [7]. Integrated Irrigation Improvement and Management Project, (IIIMP) was the second scheme to achieve optimal water resources use. The impacts of IIIMP is expected to achieve additional positive effects on water distribution, quantity, quality, equity, timeliness, water saving by using pipeline marwa instead of existing earth cross section and other technical assistance required for establishing water boards and water user associations [8]. The existing pumping stations with head tank as shown in figure (2) in addition, future IIP projects are currently under preparation to bring more areas under improvement. The contribution of pipeline cost, pumping station, civil work cost, pump sets cost and backfilling cost on the total cost are 47%, 29%, 14% and 10% respectively [9]. It means that the main affective items on the total cost are the pipeline, pumping station and civil works. The cost of the head tank is the major element which affects civil works.
  • 4. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 497 Figure (2) Existing pumping station with head tank El-Askari et.al [10] studied the technical, economic and social feasibilities of electrifying the pumping stations of the improved meskas in future IIP projects instead of using diesel pumping sets. 3. DESCRIBING THE STUDY AREA A study area was chosen to be investigated. This area is about 105,325 feddans within Meet Yazid Canal command area. The area belongs to Gharbia and Kafr El-Sheikh Directorates in the Nile Delta and is located adjacent to existing IIP areas. Slightly more than 500 existing old meskas feed the irrigated lands in the study area with water from the delivery canals. It was decided to implement electric pumping stations as they are advantageous over the diesel ones from many perspectives. Technically electric motors provide a wider range of power selection (from 1 to 5 HP). They are readily available on-the-shelf, have higher efficiency than diesel motors, require less maintenance and provide greater ease so as flexibility of operation. Economically the annual total cost per feddan of the electric pumping stations is 20% lower due to their lower running costs, although the estimated total capital cost of the electric pumping stations is 11% higher than the estimated cost of the diesel pumps for the study area. The intake of Meet Yazid canal is located at Km 21 on the left-hand side of Bahr Shebein carrier. Canal flows with a gentle slope in north-western direction until it ends close to Borolls coastal lake with 63 Km length. It serves a total command area of about 197000 feddan through 19 branch canals. Several cross regulators are located on the canal in order to control water.
  • 5. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 498 4. OUTLINING THE PUMPING SYSTEM WITHIN THE STUDY AREA Direct pumping system is applied at three pumping stations. • The first one is pumping station number (4) located at Km 52.67 on the left-hand side of Meet Yazid Canal. It serves a total command area of about 35.83 feddan. The pipeline material is composed of PVC with diameter of 200 mm and 329 m length. The pipeline has four outlets at intervals along its length which serves quaternary units (Marwas). Each outlet has a butterfly valve allowing water to be discharged into open channel. The pumping station consists of two small single stage end suction centrifugal pump, flow rate 40 L/s and 20 L/s, head (4.5-6 m), rated horse power (7.5- 4 hp) at 1450 revaluation per min (rpm). • The second one is pumping station number (7) located at Km 55.25 on the left-hand side of Meet Yazid canal. It serves a total command area of about 45.9 feddan. The pipeline material is composed of PVC pipe with diameter of 200 mm and 253 m length, the pipeline has five outlets at intervals along its length. The pumping station consists of two small single stage end suction centrifugal pump, flow rate 40 L/s and 20 L/s, head (4.5-6 m), rated horse power (7.5-4 hp) at 1450 rpm. • The third one is pumping station number (12) located at Km 56.93 on the left-hand side of Meet Yazid canal. It serves a total command area of about 30.00 feddan. The pipeline material is composed of PVC pipe with diameter of 200 mm and 409 m length, the pipeline has five outlets. The pumping station consists of two small single stage end suction centrifugal pump. The flow rate is 30 L/s and 20 L/s. The head is (6- 7.1 m) with a rated horse power of (5.5 hp) at 1450 rpm. Electric pumping station system can be modified by replacing the head tank by air valve and using the direct pumping method. This change in the design of the improved meska is an attempt to reduce the cost, which will be recovered from the farmers. Figure (3) shows the modified pumping station with air valve installation. Figure (3) Modified pumping station with air valve installation
  • 6. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 499 5. DESCRIBING THE HYDRAULIC TRANSIENT Transient flow is the most important item in the field of pipeline design and operation. Transient flow exists in any pipeline system when the rate of flow changes abruptly for various reasons. Some of the most common reasons are quick closing of valves accidental or planned, starting or stopping of pumps and power failure. Power failure is considered the worst-case scenario to produce hydraulic transient [11]. When transient flow occurs at the pipeline system, high intensity pressure waves travel through the piping system until it reaches a point of some relief such as a large diameter reservoir or piping main. The shock waves will then surge back and forth between the point of relief and the point of impact until the destructive energy is dissipated in the piping system. If severe negative pressures are allowed to occur along the pipeline, problems may arise due to pipe seal joint failure. The maximum allowable negative pressure in the pipes is specified to be –3 m of water. This is considered as the limiting value for the present transient analysis. The allowable maximum pressure along the pipeline is considered to be 4 bars. The transient flow direct impacts can be presented as follow, [12]: • The pressure fluctuation leads to high stresses. The effective value depends upon the pressure value and the rate of the pressure change. It might lead to rapture for pipes, fittings, leaking and weakened connections, damage for water meters and gauges, pipe support damage, valves, connections, column separation and high pressure after the two columns rejoining which might lead to serious damage. • Vibration and its effect on the pipe structure. High levels of vibration might cause a resonance or failure or a form of fatigue failure or fatigue accumulation. • Noise and impulsive noise might induce impacts on labors. 6. EXECUTING SIMULATIONS Numerical computations are carried out by using KY Pipe 2010, Ver.5 [13] code. KY Pipe is a water dynamic simulation tool used to calculate pressure transients in piping systems caused by water hammer and that leads to design and operate systems with great reliability and safety by avoiding the potentially catastrophic effects of water hammer and other undesirable system transients. 6.a. PIPE 2010 Pipe 2010 is a powerful graphical user interface for laying out comprehensive pipe system models, accessing and running associated engineering analysis engines and presenting results in various ways. The models are entirely made up of pipe links end nodes and internal nodes. Using this approach only a few simple steps are required to develop and modify pipe systems and define the associated data. Friction losses through force mains shall be calculated using the Hazen-Williams equation: 87.4 852.1 852.1 675.10 D Q C L hf = (1) Where: hf is the head loss due to friction in m of water L is the pipe length in m Q is the flow rate in m3 /s D is the pipe diameter in m C is the friction coefficient which depends on roughness. For PVC material, it is common to use C=120~130.
  • 7. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 500 6.b. BOUNDARY CONDITIONS To get an accurate simulation, the mass flow rate, manometric head, pipeline profile of each meska are obtained. The simulation time of 120 second is presented. The pumping station is running in steady state condition and after 3 second the pumping station are stopped and the unsteady state analysis are taken. Table (1) shows the boundary conditions for three cases. Table (1): Boundary conditions for three cases Meska Number of pumps Q (L/s) Head (m) Pipeline diameter (mm) Pipeline length (m) No. of valves Pipeline material Wave speed (m/s) No.4 2 60 6.75 200 329 3 PVC 550 No.7 2 60 6.75 200 253 5 PVC 550 No.12 2 50 6.75 200 405 4 PVC 550 6.c. NUMERICAL RESULTS A hydraulic transient analysis was carried out on the three pumping stations to ensure the system sufficient protection from hydraulic transient. The maximum and minimum pressures, at any point along the pipeline profile, are taken. Also the pressure history at the beginning of meska pumping station is given. 6.c.1. MAXIMUM AND MINIMUM PRESSURE ON PIPELINE The maximum and minimum pressures inside pipeline for all tested meska are extracted at different sections in pipeline length. These distributions of pressure with time are obtained at operating conditions of meska pumping stations using numerical modeling. Figures (4), (5) and 6) show the maximum and minimum pressure during power failure when using air valve at the beginning of for all tested meskas. It is clear from these figures that the values of maximum and minimum pressure variation at any point along the pipeline profile are in the save mode. It means that the pressure variation decreases and the pipeline doesn’t expose to high stresses due to pressure change.
  • 8. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 501 Figure (4) Envelops of maximum and minimum pressure for meska pumping station no.4 Figure (5) Envelops of maximum and minimum pressure for meska pumping station no.7 Maximum pressure HGL Pipeline Lower limitMinimum pressure Air valve Pumping station Lower limitMinimum pressure Pipeline Pumping station Air valve Maximum pressure HGL Time (sec) Elevation(meters) Time (sec) Elevation(meters)
  • 9. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 502 Figure (6) Envelops of maximum and minimum pressure for meska pumping station no.12 Figures (7) and (8) show the pressure variation inside the pipeline of meska pumping station no.7 and 12, respectively. From these figures it can be illustrated that, when shutdown pumping stations the pressure at the beginning of meska pipeline decreases from the steady state operating pressure about 8 meter of water, reach to the negative values then the pressure recovery reach the positive values and fluctuate about 1 meter and 0.5 meter of water for two measks, respectively. This means that the pipeline operate without any risks and more safety. Figure (7) Pressure history at the beginning of meska pumping station no.7 Pipeline Minimum pressure Lower limit HGL Maximum pressure Pumping station Air valve Time (sec) Elevation(meters) Time (sec) Head(meters)
  • 10. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 503 Figure (8) Pressure history at the beginning of meska pumping station no.12 7. EXECUTING FIELD MEASUREMENTS After complete studies of modified system numerically by using KY pipe code, field work was conducted on the three pumping stations at Meet Yazid canal Kafr El-Sheikh Governorate. A transit-time ultrasonic flow-meter type (1010) was used to measure the volume flow rate through the pipeline. A calibrated pressure transducer was used to measure pressure at the delivery side of the pumping units. Record card and signal conditioner, (Type ATMIO - 16E - 2) was used to collect the measured pressure value. The time history for pressure measurements were converted to a data file by using an application of LABVIEW software as a data acquisition system. Through another application of the MATLAB software program for signal, the electrical output signals data file was transformed and converted to a pressure head then pressure graph was prepared to give a complete view about the pressure history at the measuring point. Energy analyzer, (MICRO VIP MK12) was used to measure voltage, ampere, active power, energy, apparent power, frequency and power factor. The pressure head developed by the pumps are recorded with time at different operating conditions. 8. ANALYZING AND PRESENTING THE RESULTS Results were obtained, analyzed and presented, as follows. 8.a. HYDRAULIC PERFORMANCE Actual measurement of flow rate is a simple way to find out how a pumping unit is performing. Measuring flow rate and operating pressures is required to determine if a pumping station is operating efficiently to convey desired flow rate. This is a cheap and easy task which should be performed regularly as part of the routine maintenance. Also, the power absorbed to drive the pump is a direct function of the discharge rate, the total pumping head Time (sec) Head(meters)
  • 11. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 504 and the efficiency of the pump at that operating point. The efficiency of the pumping unit during normal operation becomes a significant factor in the capital and operating costs of the pumping unit. To evaluate the performance of Mesqa pumping station, delivery pressure, (Pd), suction pressure, (Ps), discharge, (Q), static head, (Zd-Zs) and electric power consumed, (kW) were measured for three pumping stations. The total head and efficiency can be calculated as follows: )( 2 22 sd sdsd t ZZ g VV g PP H −+ − + ⋅ − = ρ (2) C HQg PW t... . ρ = (3) 100* . . (%) PE PW Overall =η (4) Where, Ht : is the total head (m) Zd-Zs : is the potential energy g PP sd ⋅ − ρ : is the pressure energy g VV sd 2 22 − : is the kinetic energy ρ : is the water density (kg/m3 ) W.P : is the water power (kW) E.P ; is the electric power consumed (kW) ηoverall : is the overall efficiency Table (2) shows the test results for three pumping station. The desired total flow rate of pumping station can be achieved from two units in operation and at least two valves are opened at the same time. Pump performance can be affected by a combination of many factors like sump condition and suction side. Table (2) shows that the pump delivers the design flow rate at manometric head about 10 m of water. The average overall efficiency of pumping unit (motor, coupling and pump) is about 66.5%. The overall efficiency of pumping unit is about the design values according to ISO 9906. Which recommended the tolerance of efficiency is (-5%). Also the pumps are operated satisfactory to give flow requirements MERI [14]. Table (2) Hydraulic test results for three pumping station Pump Station no. Q (l/s) Total Head (m) Electric Power (kW) Water Power (kW) Overall Efficiency (%) 4 40 10.05 5.83 3.94 67.60 7 40 9.97 5.7 3.91 68.59 12 30 9.95 4.66 2.93 62.80
  • 12. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 505 8.b. TRANSIENT ANALYSIS OF PUMPING STATION NUMBER 4 The pipeline is connected to air valve at the beginning of manifold to protect the installations against water hammer and pressure surges, while check valves are provided for each pump to eliminate reverse flow, figure (3). A transient hydraulic analysis was carried out on the three chosen pumping station. The pressure history was recorded with high response pressure transducer located at beginning of the manifold of pipeline. Figure (9) shows the pressure history during shutdown of pumping station no.4 when opening valves no.2 and 3 also the measured flow rate of two pumps are 60 l/s. It can be seen that the pressure at the pipeline decrease gradually to reach (-2 m) water and increase to (1.2 m) water when using air valve. Figure (9) pressure history during power failure using air valve when open valves no. 2 and 3 Figure (10) pressure history during power failure without air valve when open valves no. 2 and 3 Figure (10) shows the pressure history during shutdown of pumping station no.4 when opening valves no.2 and 3. Also the measured flow rates, of two pumps, are 61.2 l/s. It can be seen that the pressure at the pipeline decreases gradually to reach (-2.4 m) water and increase to about (-1.5 m) water without air valve. From figures (9) and (10), it can be concluded that the pressure decreases at shutdown the pumps in case of without air valve more than in case of using air valve. Also the negative pressure fluctuated inside the pipeline in case of not using air valve. Figure (11) shows the pressure history during shutdown the pumping station and the last two valves no.3 and no.4 are opened with air valve installation. The measured flow rate of two pumps are 62 l/s. Figure (12) illustrates the pressure history during shutdown the pumping station and the two last valves no.3 and 4 are open without air valve installation. The measured flow rate of two pumps is 60 l/s.
  • 13. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 506 Figure (11) pressure history during power failure using air valve when open valves no. 3 and 4 Figure (12) pressure history during power failure without air valve when open valves no. 3 and 4 It is clear from figures (11) and (12) that when using air valve the pressure history fluctuated inside pipe line are about the positive values that means the installation of air valve at the beginning of the pipeline decrease the causing of negative pressures. 8.c. TRANSIENT ANALYSIS OF PUMPING STATION NUMBER 7 Pumping station number 7 consists of two pump sets connected in parallel with each other, the discharge of one pump is 40 l/s and the other one is 20 l/s the total capacity of the pumping station are 60 l/s at the static head (6-7.1) m of water the variation of static head according to the Meet Yazid canal water level. Figure (13) illustrates the pressure history during shutdown of pumping station number 7 when opening valve no.5 also the measured flow rate of two pumps are 52 l/s. It can be seen that the pressure at the pipeline decrease suddenly to reach (-0.85 m) water and increase to fluctuated about (0.85 m) water when using air valve. Figure (14) shows the pressure history during startup and shutdown the pumping station number 7 when opening the valve number 5 and flow rate measured 52 l/s without air valve installation. From this figure it can illustrate that the pressure inside the pipeline increases suddenly when startup the pumps to reach 8 m of water and decreases gradually to reach about 6 m of water. Also when shutdown the pumps, the pressure inside the pipeline deceases suddenly reach to (-2.1) m of water and increases to reach (2.2) m of water then fluctuate about 0.5 m of water.
  • 14. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 507 Figure (13) pressure history during power failure using air valve when open valve no. 5 Figure (14) pressure history during start up and power failure without air valve when open valve no. 5 Figure (15) illustrates the pressure history during shutdown of pumping station no.7 when opening valves no.2 and 4 also the measured flow rate of two pumps are 54 l/s, and using air valve. From this figure it can illustrate that the pressure inside the pipeline increases suddenly when starting up the pumps to reach 8 m of water and deceases gradually to reach about 5.8 m of water. Also when shutdown the pumps, the pressure inside the pipeline deceases suddenly reach to -2 m of water and increases to reach 2.1 m of water then fluctuate about 0.2 m of water. Figure (16) shows the pressure history during starting up and shutdown the pumping station number 7 when opening the valves number 2 and 4. The total flow rate measured is 61.5 l/s. From this figure it can illustrate that, the pressure inside the pipeline increases suddenly when starting up the pumps to reach 7.8 m of water and deceases gradually to reach about 4.7 m of water, also when shutdown the pumps the pressure inside the pipeline deceases suddenly reach to (-2.9) m of water and increases to reach (1.35) m of water then fluctuate about this value. Figure (15) pressure history during power failure using air valve when open valves no. 2 and 4 Figure (16) pressure history during start up and power failure without air valve when open valves no. 2 and 4
  • 15. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 508 When shutdown the pumping station at the design flow rate without air valve installation, figure (16). The negative pressure values reach to (-3) m of water. Figure (15) shows that the negative pressure values reach -2 m of water with air valve installation. It can be concluded that using air valve at the beginning of meska pipeline allows the pipeline operating condition to be more safe. 8.d. TRANSIENT ANALYSIS OF PUMPING STATION NUMBER 12 Pumping station number 12 consists of two pump sets connected in parallel with each other. The discharge of one pump is 30 l/s and the other one is 20 l/s. The total capacity of the pumping station is 50 l/s at the static head 6 to 7.1 m of water, and five alfalfa valves distributed along the pipeline to irrigate all served area. Figure (17) illustrates the pressure history during starting up and shutdown the pumping station number 12 when valve number 5 is opening alone and measured flow rate is 40 l/s with air valve installation. From this figure it can illustrate that the pressure inside the pipeline increases suddenly when starting up the pumps to reach (6.8) m of water and deceases gradually to reach about (5) m of water. Also when the pumps were shut down the pressure inside the pipeline deceased suddenly to reach -2 m of water and increased to reach 2.7 m of water then fluctuate about (1) m of water. Figure (18) shows the pressure history during starting up and shutdown the pumping station number 12 when valve number 5 is opening alone and measured flow rate is flow rate 40 l/s without air valve installation. From this figure it can illustrate that the pressure inside the pipeline increases suddenly when the pumps were upstarted to reach (8) m of water and deceased gradually to reach about 6.8 m of water. Also when the pumps were shut down the pressure inside the pipeline deceased suddenly reach to -3.1 m of water and increased to reach (2.1) m of water then fluctuate about zero m of water. Figure (17) pressure history during start up and power failure using air valve when open valve no. 5 Figure (18) pressure history during start up and power failure without air valve when open valve no. 5 From the two figures it can be seen that the negative pressure inside the pipeline without air valve installation while, in the case of using air valve pipeline exposes to positive value. The advantages of air valves are easy operation, low maintenance, low operation cost and high reliability. Direct pumping systems save the cost of head tank construction and
  • 16. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 509 maintenance, furthermore the stand pipe intervals at the end of each valve are play the important role to prevent the system from water hammer phenomena. This intervals are damping the pressure waves when shutdown the system. 9. COMPARING FIELD AND NUMERICAL RESULTS Figure (19.a) and (19.b) show a sample of the executed comparison between the field and numerical results of pressure variation inside the pipeline meska no.4. From the figure, it is clear that the numerical curve complies well the field curve. Generally, the matching between them is fairly good and the pressure details inside the pump are obtained by using the software without carrying the filed measurements. The small deviation is attributed to the smoothness of the fittings and the use of friction coefficient "C" for PVC material. In the present study a value of C is equal to 120. Figure (19.a) Numerical results Figure (19.b) Field results Figure (19) Comparison between the numerical and field results for meska no.4 10. UNDERGOING A FINANCIAL AND AN ECONOMIC ANALYSES Financial and economic analyses were conducted in order to improve meskas in the study area and to compare the cost of air valve versus delivery tank based on 2009 prices. The comparison was based on the total cost per feddan. The main items affect the total cost of improving meska are backfilling, pipeline, pump house, pumps and others such as valves, head tank ( as in IIP1), air valves ( as in IIP2 or IIIMP) etc. The average cost for improving meska in IIP1 is about 8500 LE/fed. The average cost for improving meska in IIP2 is about 6000 LE/fed. The cost of pipe line was about 30% from the total cost. The contribution of direct pumping in the cost saving is decreasing pipe line diameter from (315: 500 mm) to (200: 400 mm) and replacing head tank by air valve which cost about 18000 LE for meska (served about 50 feddan), while, air valve cost is equal to 200 LE. The decreasing of pipe line diameter leads to increase pumping operation duration from 16 to 20 hr/day, according to new design criteria of IIP2 and IIIMP projects, increase flow velocity and decreasing of water duty from 1.45 to 1.05 l/s/fed. Cost saving from decreasing pipe line diameter is equal to 250 LE/fed. So, the total cost saving is about 606 LE/feddan.
  • 17. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 510 11. CONCLUSION AND RECOMMENDATION Based on the results reached in the present research, the following was concluded: • The direct pumping systems save about 606 LE/fadden due to replace the head tank by air valve. • Pipeline system equipped with air valve, air vent and distribution valves is effective and is a safe solution for water hammer control. • KY Pipe 2010 code is a hand tool for design. It can predict accurately the different pressure phenomena and assist the choice of suitable protection devices to protect the water hammer phenomena and to evaluate system. • Comparison between the computation and field measurements indicated that the numerical simulation results were found to comply well with actual values obtained from the field measurements. At the design stage, it is recommended to: • Check the transient state especially for long pipelines (more than 500 m). It may be required more than one air valve. • Slow the time of opening and closing selected distribution valves not less than 4 second. 12. REFERENCES [1] Dalal Alnagar Director (RCTWS), Ministry of Water Resources and Irrigation, "Policies and strategic options for water management in the Islamic countries", International hydrological program Tehran, Islamic Republic of Iran, 15-16 Dec. 2003. [2] R.J.Oosterbaan, International Institute for Land Reclamation and Improvement (ILRI), Wageningen, "Impacts of the Irrigation Improvement Projects in Egypt", Consultancy Report to the Egyptian-Dutch Advisory Panel on Land Drainage and Drainage Related Water Management, 2010. [3] Walid E. Elshorbagy, "Impact Assessment of an Irrigation Improvement Project in Egypt", Water Resources Management, 2000. [4] New Partnership for Africa’s Development (NEPAD), "Support to NEPAD–CAADP Implementation “, Bankable Investment Project Profile, 2005. [5] M. Allam, F. El-Gamal, and M. Hesham, "Irrigation Systems Performance in Egypt", Irrigation Systems Performance. Options méditerranéennes, Series B, no 52, 2004. [6] M.N. Allam Department of Irrigation and Drainage Engineering, Faculty of Engineering, Cairo University, "Participatory Irrigation Water Management in Egypt: Review and Analysis", Options méditerranéennes Series B, no 48, 2009. [7] World Bank, "Implementation Completion and Results Report: Irrigation Improvement Project ", Report, 2007. [8] Sabour Consultant, "Terms of Reference for the Tendering of Consulting Services for the Integrated Irrigation Improvement and Management Project (IIIMP) and Instruction to Tenders", Report, 2008. [9] Hany G. Radwan, Ashraf S. Zahloul and Kamal A. Ibrahim, "Analysis of Optimal Velocity for Improved Irrigation Design in Egypt", Canadian Journal on Environmental, Construction and Civil Engineering Vol.2 No. 5,2011, pp.94-102.
  • 18. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 4, Issue 2, March - April (2013) © IAEME 511 [10] K. Al-Askari, G. Fawzy and M.A.Younes, "Electrification of Meska Pumping Stations as an Option for Future Irrigation Improvement Projects in Egypt", Third Arab water Regional Conference National Water Research Center, 9-11 Dec. 2005. [11] Kroon, R., "Water Hammer: Causes and Effects", AWWA Journal, 1984, pp. 39-45. [12] Lingireddy, "Pressure Surges in Pipeline Systems Resulting From Air Releases", AWWA Journal, 2004, pp. 88-94. [13] Don J. Wood and Lingireddy, "KY Pipe 2010 documentation Version 5" Advanced Scientific Computing, Ltd, Lexington, USA 2010. [14] Mechanical & Electrical Research Institute (MERI), "Direct Pumping hydraulic test for Irrigation Improvement project at Meet Yazid canal", Technical report, Delta Barrage, Egypt, 2008. [15] Omar K M Ouda, Abdullatif A. Al-Shuhail, Tawfiq Qubbaj and Rana Samara, “Assessing the Applicability of Ground Penetrating Radar (GPR) Techniques for Estimating Soil Water Content and Irrigation Requirements in the Eastern Province of Saudi Arabia: A Project Methodology”, International Journal of Advanced Research in Engineering & Technology (IJARET), Volume 4, Issue 1, 2013, pp. 114 - 123, ISSN Print: 0976-6480, ISSN Online: 0976-6499. [16] Anubhav Gupta and Harish Bansal, “Design of Area Optimized AES Encryption Core using Pipelining Technology”, International Journal of Electronics and Communication Engineering &Technology (IJECET), Volume 4, Issue 2, 2013, pp. 308 - 314, ISSN Print: 0976- 6464, ISSN Online: 0976 –6472.