SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 157
FUZZIFIED PSO FOR MULTIOBJECTIVE ECONOMIC LOAD
DISPATCH PROBLEM
N.Ramyasri1
, G. Srinivasulu Reddy2
1
Assistant Professor, 2
Associate Professor, Dept. of EEE, Narayana Engineering College, Nellore, AP – 524004
n.ramyasri10@gmail.com, gsmeghana@gmail.com
Abstract
Power system engineers are always striving hard to run the system with effective utilization of real and reactive powers generated by
the generating plants. Reactive power is used to provide better voltage profile as well as to reduce system losses. Membership
functions are written for fuel cost, losses, stability index and emission release. As minimization of real power loss over the
transmission lines, an attempt is made in this paper to optimize each objective individually using Fuzzy logic approach. In this paper
basic assumption is Decision Maker (DM) has imprecise or fuzzy goals of satisfying each of the objectives, the multi objective
problem is thus formulated as a fuzzy satisfaction maximization problem which is basically a min-max problem. The multi objective
problem is handled using the fuzzy decision satisfaction maximization technique which is an efficient technique to obtain trade off
solution in multi objective problems. The developed algorithm for Optimization of each objective is tested on IEEE 30 bus system.
Simulation results of IEEE 30 bus network are presented to show the effectiveness of the proposed method.
Keywords: Real power, Reactive power, losses, membership functions, fuzzy logic and trade off solution
----------------------------------------------------------------------***-----------------------------------------------------------------------
1 INTRODUCTION
The real power optimization sub-problem minimizes fuel cost
by controlling controllable generator outputs while keeping
the PV bus voltages unchanged. The system losses, stability
index and emission computed at this power dispatch are very
high compared with the results obtained when respective ones
are taken as objective. Similarly the reactive power sub-
problem deals with minimization of total transmission loss of
the system by controlling all the reactive power sources such
as taps, shunts etc. Thus when loss minimization is taken as
objective total system losses reduces but cost, emission and
stability indices are high. The emission dispatch sub problem
minimizes total emission output from the fossil fuel plants by
controlling the generator outputs. At this power output of
generator, the cost, total system losses and stability index are
high. Similarly Stability index sub problem minimizes the
index by controlling the PV bus voltages and thus improves
the system stability limit. But the cost, emission and system
losses are very high. Thus results of all the four sub problems
are conflicting with one other. This can be inferred from
previous chapters. In order to meet all the four objectives, we
need a compromised solution which minimizes fuel cost,
emission release, total transmission and losses and improved
stability limit. This trade-off solution is obtained using a fuzzy
decision satisfaction maximization method.
In this paper the data of four problems are fuzzified using
fuzzy Min-Max approach and then Particle swarm
optimization is used to determine the final trade off solution
from all these Fuzzified values. This method is tested on IEEE
30 bus system and the results are presented.
2. PROBLEM FORMULATION
Each particle consists of power generations of all units
excluding slack bus voltages, taps and shunts encoded in it.
The size of each particle is equal to sum of active power
generations, no of voltages excluding slack bus, number of
voltage, taps, and shunts.
Assuming the decision maker (DM) has imprecise or fuzzy
goals of satisfying each of the objectives, the multi objective
problem can be formulated as a fuzzy satisfaction
maximization problem which is basically a min-max problem.
Our task over here is to determine the compromise solution for
all the four optimization sub problems. Our goal is to
minimize G(X) = compromised solution of {G1(X1), G2 (X2),
G3(X3), G4(X4)}
While satisfying the set of constraints AX <B.
Where G1(X) is Fuel cost minimization sub problem.
G2(X) is Loss minimization sub problem.
G3(X) is emission minimization sub problem.
G4(X) is index minimization sub problem.
Let F1(Xi) be the fuel cost in $/hr for ith
control vector.
F2(Xi) be the losses in P.U for ith
control vector
F3(Xi) be the Stability index for ith
control vector
F4(Xi) be the Emission release in kg/hr for ith
control vector
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 158
Let the individual optimal control vectors for the sub problems
be X1*, X2*, X3*, X4* respectively. We have to find out a
global optimal control vector X *such that
* * * * *
1 2 3 4
* * * * *
2 1 3 4
* * * * *
3 1 2 4
* * * * *
4 1 2 3
1 1 1X X (X , X , X )
2 2 3X X (X , X , X )
3 3 3X X (X , X , X )
4 4 4X X (X , X , X )
F F F
F F F
F F F
F F F
≤ ≤
≤ ≤
≤ ≤
≤ ≤
(1)
The imprecise or fuzzy goal of the DM for each of the
objective functions is quantified by defining their
corresponding membership functions µi as a strictly
monotonically decreasing function with respect to the
objective function f where i=1 to 4. In case of a minimization
problem,
µi=0 or tends to zero, if fi > fi
max
and
µi = 1 or tends to 1,
if fi < fi
min
(2)
Where fi
max
and fi
min
are the unacceptable and desirable level
for respectively. In our proposed approach we have considered
a simple linear membership function for fi because none of the
objectives have very strict limits. The membership function, µi
for ith
objective is depicted in Fig. 1.1
Figure 1.1 Membership function for ith
objective
The membership function can be defined as
i im ax
m ax
i i
i im in i im axm ax m in
i i
i im in
0 F > F
F -F
µ = F F F
F -F
1 F < F
≤ ≤
(3)
Using Eq. (3) the membership functions can be formulated as
2.1 Membership Function for Fuel Cost
1 1m ax
m ax
1 1
1 1m in 1 1m axm ax m in
1 1
1 1m in
0 F > F
F -F (X )
µ = F F F
F -F
1 F < F
≤ ≤
(4)
Where F1max=max {F1(X1
*
), F1(X2
*
), F1(X3
*
), F1(X4
*
)}
F1min=min {F1(X1
*
), F1(X2
*
), F1(X3
*
), F1(X4
*
)}
2.2 Membership Function for Losses
2 2max
max
2 2
2 2min 2 2maxmax min
2 2
2 2min
0 F >F
F -F (X)
µ = F F F
F -F
1 F <F
≤ ≤
(5)
Where F2max = max {F2(X1
*
), F2(X2
*
), F2(X3
*
), F2(X4
*
)}
F2min = min {F2(X1
*
), F2(X2
*
), F2(X3
*
), F2(X4
*
)}
2.3 Membership Function for Stability Index
3 3max
max
3 3
3 3min 3 3maxmax min
3 3
3 3min
0 F >F
F -F (X)
µ = F F F
F -F
1 F <F
≤ ≤
(6)
Where F3max = max {F3(X1
*
), F3(X2
*
), F3(X3
*
), F3(X4
*
)}
F3min = min {F3(X1
*
), F3(X2
*
), F3(X3
*
), F3(X4
*
)}
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 159
2.4 Membership Function for Emission Release
4 4max
max
4 4
4 4min 4 4maxm ax m in
4 4
4 4min
0 F >F
F -F (X)
µ = F F F
F -F
1 F <F
≤ ≤
(7)
Where F4max = max {F4(X1
*
), F4(X2
*
), F4(X3
*
), F4(X4
*
)}
F4min = min {F4(X1
*
), F4(X2
*
), F4(X3
*
), F4(X4
*
)}
The maximum degree of overall satisfaction can be achieved
by maximizing a scalar λ, which is the intersection of the four
fuzzy membership functions.
Therefore objective function is maximization of λ = max (µ1,
µ2, µ3, µ4).
Where λ varies from 0 to 1.
3. PROPOSED ALGORITHM
The proposed solution strategy for the multi objective problem
is shown in the following algorithm
1. Reading the system data.
2. Reading the values of fixed cost, loss, index, emission for
each sub-problem.
3. Forming Ybus matrix and FLG matrix for Lindex
calculation.
4. Forming B1 sub matrix. Decompose B1 by Cholesky
decomposition.
5. Randomly population and velocities are initialized.
6. Set Pbest=0 and itercount=1.
7. Set particle count=1
8. Decoding the particle, then the Decoded particle gives the
values of power generations, voltage, magnitudes, tap
values and shunts.
9. Forming the Ybus and B2 sub matrix. Decompose B2 by
Cholesky decomposition
10. Run FDC load flow and compute loss.
11. Compute emission cost, fixed cost, and index values.
12. Fuzzifying the fuel cost, loss, emission and index
obtained in step (11) using equations from Eq. 4 to 7.
13. Calculating the evaluation value of each individual in the
population using Eq.(8). Compare each individual’s
evaluation value with its Pbest . If the evaluation value of
each individual is better than the previous Pbest, the
current value is set to be Pbest.
14. Incrementing the individual count by 1. If count <
population size go to step (8).
15. The best evaluation value among the Pbests is denoted as
gbest.
16. Modifying the member velocity V of each individual
according to
vi
k+1
=k*( w* vi
k
+ c1*rand1*(pbesti - xi) +
c2*rand2*(gbesti - xi))
xi
k+1
= xi + vi
k+1
17. Modifying the member position of each individual Pi
according to
Pi(k+1)
=Pi(k)
+Vi(k+1)
Pi(k+1)
must satisfy the constraints.
18. Incrementing iteration count by 1.If the number of
iterations reaches the maximum,
then go to Step 19, Otherwise, go to Step 7
19. The individual that generates the latest gbest, is the
required control vector for the final trade off solution.
Print the results
4. CASE STUDIES AND RESULTS
4. 1 IEEE 30 Bus System
25 independent runs are made for each sub problem and the
values of four factors considered at minimum value of each
sub problem (data) over 25 independent runs are determined.
These values for all sub problems are given in Table 1.1.
Table 1.1 results of various sub problems and final trade off solution for IEEE 30 bus system
Optimization Problem
Fuel Cost
($/hr)
Losses (
MW )
Stability
Index
Emission (
kg/hr)
Fuel cost minimization sub
problem results 806.498033 10.583711 0.272369 381.671279
Losses minimization sub problem
results
945.214704 4.328367 .272443 233.701959
Stability Index minimization sub
problem 897.142571 33.557655 0.162446 375.611008
Emission minimization sub problem 932.094511 4.404039 0.267070 229.144834
Final trade off solution
926.200519 4.634725 0.266459 242.142237
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 160
System generation =288.034725, total load 283.4 MW. The
control variables are given in table 1.2 and 1.3.and Final bus
voltages, power generation, line index values are given in
table1.4.
Table 1.2 Positions of tap changing transformers
S.No From-To buses Tap value
1 6-9 0.9
2 6-10 1.1
3 4-12 0.975
4 28-27 0.9875
Table 1.3 Shunt suceptance values
S.No
From-To
buses
Shunt suceptance
1 10 1.009617
2 24 1.0
Figure 1.2 Gbest particles (λ) Vs Iterations
Table 1.4 Final bus voltages, Power generations, Lindex
S.No Voltage Pgen Qgen Lindex
1. 1.000000 0.712626 -0.231329 0.000000
2. 1.003158 0.729346 -0.027326 0.000000
3. 0.991421 0.500045 0.130286 0.000000
4. 0.995914 0.349738 0.633051 0.000000
5. 1.013388 0.222398 0.008802 0.000000
6. 1.000000 0.365994 0.674902 0.000000
7. 1.004216 -0.000000 -0.000000 0.001359
8. 0.998299 -0.000001 -0.000000 0.004968
9. 1.065043 0.000114 -0.000000 0.091909
10. 1.042844 0.000594 -0.000001 0.111362
11. 1.065043 0.000000 0.000000 0.091909
12. 1.055699 -0.000930 -0.000005 0.114096
13. 1.045549 -0.000019 -0.000007 0.122494
14. 1.040786 -0.000015 0.000001 0.120544
0 10 20 30 40 50 60 70 80 90 100
0.8
0.82
0.84
0.86
0.88
0.9
0.92
0.94
0.96
0.98
1
Gbest particle Vs iterations
IterationsGbest
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 161
15. 1.036565 -0.000020 0.000002 0.118529
16. 1.027964 0.000961 0.000004 0.110391
17. 1.033049 0.000009 0.000002 0.113342
18. 1.025878 -0.000003 0.000001 0.126912
19. 1.023364 -0.000002 -0.000000 0.128017
20. 1.027458 0.000004 -0.000001 0.124354
21. 1.027112 0.000018 -0.000005 0.115108
22. 1.026608 -0.000500 -0.000001 0.114624
23. 1.026413 -0.000004 -0.000000 0.118209
24. 1.021240 0.000003 -0.000002 0.114837
25. 1.043109 -0.000003 0.000000 0.099710
26. 1.025885 -0.000002 -0.000000 0.105356
27. 1.064945 0.000067 -0.000003 0.089225
28. 0.992422 -0.000060 0.000000 0.012565
29. 1.045961 -0.000002 0.000000 0.104411
30. 1.034977 -0.000008 0.000001 0.118026
CONCLUSIONS
The final trade off solution is obtained. 25 independent runs
are made for each sub problem and the optimal values of four
objectives considered at minimum value of each sub problem
over 25 independent runs are determined. In this work basic
assumption made is that the decision maker (DM) has
imprecise or fuzzy goals of satisfying each of the objectives,
the multi objective problem is thus formulated as a fuzzy
satisfaction maximization problem which is basically a min-
max problem. The multi objective problem is handled using
the fuzzy decision satisfaction maximization technique which
is an efficient technique to obtain trade off solution in multi
objective problems.
REFERENCES
[1] E. H. Chowdhury, Salfur Rahrnan, “A Review of Recent
Advances in Economic Dispatch”, IEEE Trans. on Power
Syst., Vol. 5, No. 4, pp 1248- 1259, November 1990.
[2] Allen J. Wood, Bruce F. Wollenberg, “Power Generation,
Operation, And Control”, John Wiley & Sona, Inc., New
York, 2004.
[3] J. Kennedy and R. Eberhart, “Particle swarm
optimization,” in Proc. IEEE International Conference
Neural Networks (ICNN’95), Perth, Australia, vol. 4, pp1942-
1948, 1995.
[4] M. R. AlRashidi, M. E. El-Hawary, “A Survey of Particle
Swarm Optimization Applications in Electric Power Systems”
IEEE Trans. On Evolutionary Computation Vol.13 ,No.
4,August 2009.
[5] Bo Yang and Yunping Chen, Zunlian Zhao “Survey on
Applications of Particle swarm Optimization in Electric
Power Systems”, 2007 IEEE International Conference on
Control and Automation, Guangzhou, CHINA -,pp 481-486,
May 30 to June 1, 2007
[6] Zwe-Lee Gaing, “Particle Swarm Optimization to Solving
the Economic Dispatch Considering the Generator
Constraints”, IEEE Tans. on Power Syst., Vol 18, No. 3, pp
1187- 1195, Aug. 2003.
[7] J.H.Talaq,F.El-Hawary, M.E.El-Hawary , “A Summary
of Environmental/Economic dispatch algorithms” IEEE
Trans. Power Syst., vol. 9, pp.1508–1516, Aug. 1994.
[8] A. Immanuel Selva Kumar, K. Dhanushkodi, J. Jaya
Kumar, C. Kumar Charlie Paul, “Particle Swarm
Optimization Solution to Emission and Economic Dispatch
Problem”, IEEE TENCON, Vol.1, pp 435-439, 2003.
[9] T.Thakur, Kanik Sem, Sumedha Saini, and Sudhanshu
Sharma “A Particle SwarmOptimization Solution to NO2 and
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 162
SO2 Emissions for Environmentally Constrained Economic
Dispatch Problem”, IEEE PES Transmission and Distribution
Conference and Exposition Latin America, pp 1-5,2006.
[10] Papiya Dutta , A.K.Sinha- IIT Kharagpur Professor,
“Environmental Economic Dispatch constrained by voltage
stability using PSO” IEE ICIT 2006, IIT Kharagpur- pp.
1879-1884, 2006.
[11] Wen Zhang, Yutian Liu, “Reactive Power Optimization
based on PSO in a Practical Power System” Power society
engineering general meeting,vol.1, pp.239-243, 2004.
[12] Claudia Reis, F.P. Maciel Barbosa” A Comparison of
Voltage Stability Indices,” IEEE MELECON, Benalmádena
(Málaga), Spain, pp.1007-1010, May 16-19, 2006.

Contenu connexe

Tendances

Duality in lpp
Duality in lppDuality in lpp
Duality in lpp
Abu Bashar
 
Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...
Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...
Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...
ijsrd.com
 

Tendances (19)

SOLVING A MULTI-OBJECTIVE REACTIVE POWER MARKET CLEARING MODEL USING NSGA-II
SOLVING A MULTI-OBJECTIVE REACTIVE POWER MARKET CLEARING MODEL USING NSGA-IISOLVING A MULTI-OBJECTIVE REACTIVE POWER MARKET CLEARING MODEL USING NSGA-II
SOLVING A MULTI-OBJECTIVE REACTIVE POWER MARKET CLEARING MODEL USING NSGA-II
 
Application of Gravitational Search Algorithm and Fuzzy For Loss Reduction of...
Application of Gravitational Search Algorithm and Fuzzy For Loss Reduction of...Application of Gravitational Search Algorithm and Fuzzy For Loss Reduction of...
Application of Gravitational Search Algorithm and Fuzzy For Loss Reduction of...
 
Probability Collectives
Probability CollectivesProbability Collectives
Probability Collectives
 
C31013022
C31013022C31013022
C31013022
 
Duality in lpp
Duality in lppDuality in lpp
Duality in lpp
 
FUZZY LOGIC CONTROLLER TUNNING VIA ADAPTIVE GENETIC ALGORITHM APPLIED TO AIRC...
FUZZY LOGIC CONTROLLER TUNNING VIA ADAPTIVE GENETIC ALGORITHM APPLIED TO AIRC...FUZZY LOGIC CONTROLLER TUNNING VIA ADAPTIVE GENETIC ALGORITHM APPLIED TO AIRC...
FUZZY LOGIC CONTROLLER TUNNING VIA ADAPTIVE GENETIC ALGORITHM APPLIED TO AIRC...
 
2008 spie gmm
2008 spie gmm2008 spie gmm
2008 spie gmm
 
Id135
Id135Id135
Id135
 
Capstone paper
Capstone paperCapstone paper
Capstone paper
 
Concept of Duality
Concept of DualityConcept of Duality
Concept of Duality
 
Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...
Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...
Sensitivity Analysis of GRA Method for Interval Valued Intuitionistic Fuzzy M...
 
Kernighan lin
Kernighan linKernighan lin
Kernighan lin
 
Hybrid method for achieving Pareto front on economic emission dispatch
Hybrid method for achieving Pareto front on economic  emission dispatch Hybrid method for achieving Pareto front on economic  emission dispatch
Hybrid method for achieving Pareto front on economic emission dispatch
 
20320130406030
2032013040603020320130406030
20320130406030
 
E010232732
E010232732E010232732
E010232732
 
IRJET- Comparison for Max-Flow Min-Cut Algorithms for Optimal Assignment Problem
IRJET- Comparison for Max-Flow Min-Cut Algorithms for Optimal Assignment ProblemIRJET- Comparison for Max-Flow Min-Cut Algorithms for Optimal Assignment Problem
IRJET- Comparison for Max-Flow Min-Cut Algorithms for Optimal Assignment Problem
 
IRJET- Solving Economic Load Dispatch Problem with Valve Point Effect
IRJET- Solving Economic Load Dispatch Problem with Valve Point EffectIRJET- Solving Economic Load Dispatch Problem with Valve Point Effect
IRJET- Solving Economic Load Dispatch Problem with Valve Point Effect
 
Modified sub-gradient based combined objective technique and evolutionary pro...
Modified sub-gradient based combined objective technique and evolutionary pro...Modified sub-gradient based combined objective technique and evolutionary pro...
Modified sub-gradient based combined objective technique and evolutionary pro...
 
Hand gesture recognition using discrete wavelet transform and hidden Markov m...
Hand gesture recognition using discrete wavelet transform and hidden Markov m...Hand gesture recognition using discrete wavelet transform and hidden Markov m...
Hand gesture recognition using discrete wavelet transform and hidden Markov m...
 

En vedette

En vedette (20)

Impact and analytical study of the patch and slot for
Impact and analytical study of the patch and slot forImpact and analytical study of the patch and slot for
Impact and analytical study of the patch and slot for
 
Experimental study on emission analysis of oxygenated
Experimental study on emission analysis of oxygenatedExperimental study on emission analysis of oxygenated
Experimental study on emission analysis of oxygenated
 
Fpga implementation of race control algorithm for full bridge prcp converter
Fpga implementation of race control algorithm for full bridge prcp converterFpga implementation of race control algorithm for full bridge prcp converter
Fpga implementation of race control algorithm for full bridge prcp converter
 
Developing reusable software components for distributed embedded systems
Developing reusable software components for distributed embedded systemsDeveloping reusable software components for distributed embedded systems
Developing reusable software components for distributed embedded systems
 
Ultra sonic testing of weldjoints prepared at different
Ultra sonic testing of weldjoints prepared at differentUltra sonic testing of weldjoints prepared at different
Ultra sonic testing of weldjoints prepared at different
 
Optimization of productivity with surface miner using
Optimization of productivity with surface miner usingOptimization of productivity with surface miner using
Optimization of productivity with surface miner using
 
Dsp based implementation of field oriented control of
Dsp based implementation of field oriented control ofDsp based implementation of field oriented control of
Dsp based implementation of field oriented control of
 
Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...
 
Fpga implementation of linear ldpc encoder
Fpga implementation of linear ldpc encoderFpga implementation of linear ldpc encoder
Fpga implementation of linear ldpc encoder
 
Information search using text and image query
Information search using text and image queryInformation search using text and image query
Information search using text and image query
 
Efficient ddos attacks security scheme using asvs
Efficient ddos attacks security scheme using asvsEfficient ddos attacks security scheme using asvs
Efficient ddos attacks security scheme using asvs
 
Image processing techniques applied for pitting
Image processing techniques applied for pittingImage processing techniques applied for pitting
Image processing techniques applied for pitting
 
An interactive image segmentation using multiple user input’s
An interactive image segmentation using multiple user input’sAn interactive image segmentation using multiple user input’s
An interactive image segmentation using multiple user input’s
 
Transition for regular to mach reflection hysteresis
Transition for regular to mach reflection hysteresisTransition for regular to mach reflection hysteresis
Transition for regular to mach reflection hysteresis
 
Firing patterns and its effect on muckpile shape
Firing patterns and its effect on muckpile shapeFiring patterns and its effect on muckpile shape
Firing patterns and its effect on muckpile shape
 
Prevention against new cell counting attack against tor network
Prevention against new cell counting attack against tor networkPrevention against new cell counting attack against tor network
Prevention against new cell counting attack against tor network
 
An efficient routing approach for aggregated data transmission along with per...
An efficient routing approach for aggregated data transmission along with per...An efficient routing approach for aggregated data transmission along with per...
An efficient routing approach for aggregated data transmission along with per...
 
Speech compression analysis using matlab
Speech compression analysis using matlabSpeech compression analysis using matlab
Speech compression analysis using matlab
 
An experimental investigation into the performance
An experimental investigation into the performanceAn experimental investigation into the performance
An experimental investigation into the performance
 
Managing drought short term strategies in semi arid
Managing drought short term strategies in semi aridManaging drought short term strategies in semi arid
Managing drought short term strategies in semi arid
 

Similaire à Fuzzified pso for multiobjective economic load

Ch3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhh
Ch3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhhCh3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhh
Ch3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhh
danielgetachew0922
 

Similaire à Fuzzified pso for multiobjective economic load (20)

Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
 
Paper id 28201438
Paper id 28201438Paper id 28201438
Paper id 28201438
 
E010123337
E010123337E010123337
E010123337
 
Economic Load Dispatch Optimization of Six Interconnected Generating Units Us...
Economic Load Dispatch Optimization of Six Interconnected Generating Units Us...Economic Load Dispatch Optimization of Six Interconnected Generating Units Us...
Economic Load Dispatch Optimization of Six Interconnected Generating Units Us...
 
Reducting Power Dissipation in Fir Filter: an Analysis
Reducting Power Dissipation in Fir Filter: an AnalysisReducting Power Dissipation in Fir Filter: an Analysis
Reducting Power Dissipation in Fir Filter: an Analysis
 
Dynamic Economic Dispatch Assessment Using Particle Swarm Optimization Technique
Dynamic Economic Dispatch Assessment Using Particle Swarm Optimization TechniqueDynamic Economic Dispatch Assessment Using Particle Swarm Optimization Technique
Dynamic Economic Dispatch Assessment Using Particle Swarm Optimization Technique
 
Gy3312241229
Gy3312241229Gy3312241229
Gy3312241229
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
 
Design of an Adaptive Hearing Aid Algorithm using Booth-Wallace Tree Multiplier
Design of an Adaptive Hearing Aid Algorithm using Booth-Wallace Tree MultiplierDesign of an Adaptive Hearing Aid Algorithm using Booth-Wallace Tree Multiplier
Design of an Adaptive Hearing Aid Algorithm using Booth-Wallace Tree Multiplier
 
40220140503006
4022014050300640220140503006
40220140503006
 
IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...
IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...
IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...
 
Locational marginal pricing framework in secured dispatch scheduling under co...
Locational marginal pricing framework in secured dispatch scheduling under co...Locational marginal pricing framework in secured dispatch scheduling under co...
Locational marginal pricing framework in secured dispatch scheduling under co...
 
Optimal Power System Planning with Renewable DGs with Reactive Power Consider...
Optimal Power System Planning with Renewable DGs with Reactive Power Consider...Optimal Power System Planning with Renewable DGs with Reactive Power Consider...
Optimal Power System Planning with Renewable DGs with Reactive Power Consider...
 
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
 
IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...
IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...
IRJET- Optimal Placement and Size of DG and DER for Minimizing Power Loss and...
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Determination of Optimal Product Mix for Profit Maximization using Linear Pro...
Determination of Optimal Product Mix for Profit Maximization using Linear Pro...Determination of Optimal Product Mix for Profit Maximization using Linear Pro...
Determination of Optimal Product Mix for Profit Maximization using Linear Pro...
 
Determination of Optimal Product Mix for Profit Maximization using Linear Pro...
Determination of Optimal Product Mix for Profit Maximization using Linear Pro...Determination of Optimal Product Mix for Profit Maximization using Linear Pro...
Determination of Optimal Product Mix for Profit Maximization using Linear Pro...
 
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
 
Ch3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhh
Ch3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhhCh3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhh
Ch3(1).pptxbbbbbbbbbbbbbbbbbbbhhhhhhhhhh
 

Plus de eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
eSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
eSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
eSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
eSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
eSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
eSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
eSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
eSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
eSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
eSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
eSAT Publishing House
 

Plus de eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Dernier

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

Fuzzified pso for multiobjective economic load

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 157 FUZZIFIED PSO FOR MULTIOBJECTIVE ECONOMIC LOAD DISPATCH PROBLEM N.Ramyasri1 , G. Srinivasulu Reddy2 1 Assistant Professor, 2 Associate Professor, Dept. of EEE, Narayana Engineering College, Nellore, AP – 524004 n.ramyasri10@gmail.com, gsmeghana@gmail.com Abstract Power system engineers are always striving hard to run the system with effective utilization of real and reactive powers generated by the generating plants. Reactive power is used to provide better voltage profile as well as to reduce system losses. Membership functions are written for fuel cost, losses, stability index and emission release. As minimization of real power loss over the transmission lines, an attempt is made in this paper to optimize each objective individually using Fuzzy logic approach. In this paper basic assumption is Decision Maker (DM) has imprecise or fuzzy goals of satisfying each of the objectives, the multi objective problem is thus formulated as a fuzzy satisfaction maximization problem which is basically a min-max problem. The multi objective problem is handled using the fuzzy decision satisfaction maximization technique which is an efficient technique to obtain trade off solution in multi objective problems. The developed algorithm for Optimization of each objective is tested on IEEE 30 bus system. Simulation results of IEEE 30 bus network are presented to show the effectiveness of the proposed method. Keywords: Real power, Reactive power, losses, membership functions, fuzzy logic and trade off solution ----------------------------------------------------------------------***----------------------------------------------------------------------- 1 INTRODUCTION The real power optimization sub-problem minimizes fuel cost by controlling controllable generator outputs while keeping the PV bus voltages unchanged. The system losses, stability index and emission computed at this power dispatch are very high compared with the results obtained when respective ones are taken as objective. Similarly the reactive power sub- problem deals with minimization of total transmission loss of the system by controlling all the reactive power sources such as taps, shunts etc. Thus when loss minimization is taken as objective total system losses reduces but cost, emission and stability indices are high. The emission dispatch sub problem minimizes total emission output from the fossil fuel plants by controlling the generator outputs. At this power output of generator, the cost, total system losses and stability index are high. Similarly Stability index sub problem minimizes the index by controlling the PV bus voltages and thus improves the system stability limit. But the cost, emission and system losses are very high. Thus results of all the four sub problems are conflicting with one other. This can be inferred from previous chapters. In order to meet all the four objectives, we need a compromised solution which minimizes fuel cost, emission release, total transmission and losses and improved stability limit. This trade-off solution is obtained using a fuzzy decision satisfaction maximization method. In this paper the data of four problems are fuzzified using fuzzy Min-Max approach and then Particle swarm optimization is used to determine the final trade off solution from all these Fuzzified values. This method is tested on IEEE 30 bus system and the results are presented. 2. PROBLEM FORMULATION Each particle consists of power generations of all units excluding slack bus voltages, taps and shunts encoded in it. The size of each particle is equal to sum of active power generations, no of voltages excluding slack bus, number of voltage, taps, and shunts. Assuming the decision maker (DM) has imprecise or fuzzy goals of satisfying each of the objectives, the multi objective problem can be formulated as a fuzzy satisfaction maximization problem which is basically a min-max problem. Our task over here is to determine the compromise solution for all the four optimization sub problems. Our goal is to minimize G(X) = compromised solution of {G1(X1), G2 (X2), G3(X3), G4(X4)} While satisfying the set of constraints AX <B. Where G1(X) is Fuel cost minimization sub problem. G2(X) is Loss minimization sub problem. G3(X) is emission minimization sub problem. G4(X) is index minimization sub problem. Let F1(Xi) be the fuel cost in $/hr for ith control vector. F2(Xi) be the losses in P.U for ith control vector F3(Xi) be the Stability index for ith control vector F4(Xi) be the Emission release in kg/hr for ith control vector
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 158 Let the individual optimal control vectors for the sub problems be X1*, X2*, X3*, X4* respectively. We have to find out a global optimal control vector X *such that * * * * * 1 2 3 4 * * * * * 2 1 3 4 * * * * * 3 1 2 4 * * * * * 4 1 2 3 1 1 1X X (X , X , X ) 2 2 3X X (X , X , X ) 3 3 3X X (X , X , X ) 4 4 4X X (X , X , X ) F F F F F F F F F F F F ≤ ≤ ≤ ≤ ≤ ≤ ≤ ≤ (1) The imprecise or fuzzy goal of the DM for each of the objective functions is quantified by defining their corresponding membership functions µi as a strictly monotonically decreasing function with respect to the objective function f where i=1 to 4. In case of a minimization problem, µi=0 or tends to zero, if fi > fi max and µi = 1 or tends to 1, if fi < fi min (2) Where fi max and fi min are the unacceptable and desirable level for respectively. In our proposed approach we have considered a simple linear membership function for fi because none of the objectives have very strict limits. The membership function, µi for ith objective is depicted in Fig. 1.1 Figure 1.1 Membership function for ith objective The membership function can be defined as i im ax m ax i i i im in i im axm ax m in i i i im in 0 F > F F -F µ = F F F F -F 1 F < F ≤ ≤ (3) Using Eq. (3) the membership functions can be formulated as 2.1 Membership Function for Fuel Cost 1 1m ax m ax 1 1 1 1m in 1 1m axm ax m in 1 1 1 1m in 0 F > F F -F (X ) µ = F F F F -F 1 F < F ≤ ≤ (4) Where F1max=max {F1(X1 * ), F1(X2 * ), F1(X3 * ), F1(X4 * )} F1min=min {F1(X1 * ), F1(X2 * ), F1(X3 * ), F1(X4 * )} 2.2 Membership Function for Losses 2 2max max 2 2 2 2min 2 2maxmax min 2 2 2 2min 0 F >F F -F (X) µ = F F F F -F 1 F <F ≤ ≤ (5) Where F2max = max {F2(X1 * ), F2(X2 * ), F2(X3 * ), F2(X4 * )} F2min = min {F2(X1 * ), F2(X2 * ), F2(X3 * ), F2(X4 * )} 2.3 Membership Function for Stability Index 3 3max max 3 3 3 3min 3 3maxmax min 3 3 3 3min 0 F >F F -F (X) µ = F F F F -F 1 F <F ≤ ≤ (6) Where F3max = max {F3(X1 * ), F3(X2 * ), F3(X3 * ), F3(X4 * )} F3min = min {F3(X1 * ), F3(X2 * ), F3(X3 * ), F3(X4 * )}
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 159 2.4 Membership Function for Emission Release 4 4max max 4 4 4 4min 4 4maxm ax m in 4 4 4 4min 0 F >F F -F (X) µ = F F F F -F 1 F <F ≤ ≤ (7) Where F4max = max {F4(X1 * ), F4(X2 * ), F4(X3 * ), F4(X4 * )} F4min = min {F4(X1 * ), F4(X2 * ), F4(X3 * ), F4(X4 * )} The maximum degree of overall satisfaction can be achieved by maximizing a scalar λ, which is the intersection of the four fuzzy membership functions. Therefore objective function is maximization of λ = max (µ1, µ2, µ3, µ4). Where λ varies from 0 to 1. 3. PROPOSED ALGORITHM The proposed solution strategy for the multi objective problem is shown in the following algorithm 1. Reading the system data. 2. Reading the values of fixed cost, loss, index, emission for each sub-problem. 3. Forming Ybus matrix and FLG matrix for Lindex calculation. 4. Forming B1 sub matrix. Decompose B1 by Cholesky decomposition. 5. Randomly population and velocities are initialized. 6. Set Pbest=0 and itercount=1. 7. Set particle count=1 8. Decoding the particle, then the Decoded particle gives the values of power generations, voltage, magnitudes, tap values and shunts. 9. Forming the Ybus and B2 sub matrix. Decompose B2 by Cholesky decomposition 10. Run FDC load flow and compute loss. 11. Compute emission cost, fixed cost, and index values. 12. Fuzzifying the fuel cost, loss, emission and index obtained in step (11) using equations from Eq. 4 to 7. 13. Calculating the evaluation value of each individual in the population using Eq.(8). Compare each individual’s evaluation value with its Pbest . If the evaluation value of each individual is better than the previous Pbest, the current value is set to be Pbest. 14. Incrementing the individual count by 1. If count < population size go to step (8). 15. The best evaluation value among the Pbests is denoted as gbest. 16. Modifying the member velocity V of each individual according to vi k+1 =k*( w* vi k + c1*rand1*(pbesti - xi) + c2*rand2*(gbesti - xi)) xi k+1 = xi + vi k+1 17. Modifying the member position of each individual Pi according to Pi(k+1) =Pi(k) +Vi(k+1) Pi(k+1) must satisfy the constraints. 18. Incrementing iteration count by 1.If the number of iterations reaches the maximum, then go to Step 19, Otherwise, go to Step 7 19. The individual that generates the latest gbest, is the required control vector for the final trade off solution. Print the results 4. CASE STUDIES AND RESULTS 4. 1 IEEE 30 Bus System 25 independent runs are made for each sub problem and the values of four factors considered at minimum value of each sub problem (data) over 25 independent runs are determined. These values for all sub problems are given in Table 1.1. Table 1.1 results of various sub problems and final trade off solution for IEEE 30 bus system Optimization Problem Fuel Cost ($/hr) Losses ( MW ) Stability Index Emission ( kg/hr) Fuel cost minimization sub problem results 806.498033 10.583711 0.272369 381.671279 Losses minimization sub problem results 945.214704 4.328367 .272443 233.701959 Stability Index minimization sub problem 897.142571 33.557655 0.162446 375.611008 Emission minimization sub problem 932.094511 4.404039 0.267070 229.144834 Final trade off solution 926.200519 4.634725 0.266459 242.142237
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 160 System generation =288.034725, total load 283.4 MW. The control variables are given in table 1.2 and 1.3.and Final bus voltages, power generation, line index values are given in table1.4. Table 1.2 Positions of tap changing transformers S.No From-To buses Tap value 1 6-9 0.9 2 6-10 1.1 3 4-12 0.975 4 28-27 0.9875 Table 1.3 Shunt suceptance values S.No From-To buses Shunt suceptance 1 10 1.009617 2 24 1.0 Figure 1.2 Gbest particles (λ) Vs Iterations Table 1.4 Final bus voltages, Power generations, Lindex S.No Voltage Pgen Qgen Lindex 1. 1.000000 0.712626 -0.231329 0.000000 2. 1.003158 0.729346 -0.027326 0.000000 3. 0.991421 0.500045 0.130286 0.000000 4. 0.995914 0.349738 0.633051 0.000000 5. 1.013388 0.222398 0.008802 0.000000 6. 1.000000 0.365994 0.674902 0.000000 7. 1.004216 -0.000000 -0.000000 0.001359 8. 0.998299 -0.000001 -0.000000 0.004968 9. 1.065043 0.000114 -0.000000 0.091909 10. 1.042844 0.000594 -0.000001 0.111362 11. 1.065043 0.000000 0.000000 0.091909 12. 1.055699 -0.000930 -0.000005 0.114096 13. 1.045549 -0.000019 -0.000007 0.122494 14. 1.040786 -0.000015 0.000001 0.120544 0 10 20 30 40 50 60 70 80 90 100 0.8 0.82 0.84 0.86 0.88 0.9 0.92 0.94 0.96 0.98 1 Gbest particle Vs iterations IterationsGbest
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 161 15. 1.036565 -0.000020 0.000002 0.118529 16. 1.027964 0.000961 0.000004 0.110391 17. 1.033049 0.000009 0.000002 0.113342 18. 1.025878 -0.000003 0.000001 0.126912 19. 1.023364 -0.000002 -0.000000 0.128017 20. 1.027458 0.000004 -0.000001 0.124354 21. 1.027112 0.000018 -0.000005 0.115108 22. 1.026608 -0.000500 -0.000001 0.114624 23. 1.026413 -0.000004 -0.000000 0.118209 24. 1.021240 0.000003 -0.000002 0.114837 25. 1.043109 -0.000003 0.000000 0.099710 26. 1.025885 -0.000002 -0.000000 0.105356 27. 1.064945 0.000067 -0.000003 0.089225 28. 0.992422 -0.000060 0.000000 0.012565 29. 1.045961 -0.000002 0.000000 0.104411 30. 1.034977 -0.000008 0.000001 0.118026 CONCLUSIONS The final trade off solution is obtained. 25 independent runs are made for each sub problem and the optimal values of four objectives considered at minimum value of each sub problem over 25 independent runs are determined. In this work basic assumption made is that the decision maker (DM) has imprecise or fuzzy goals of satisfying each of the objectives, the multi objective problem is thus formulated as a fuzzy satisfaction maximization problem which is basically a min- max problem. The multi objective problem is handled using the fuzzy decision satisfaction maximization technique which is an efficient technique to obtain trade off solution in multi objective problems. REFERENCES [1] E. H. Chowdhury, Salfur Rahrnan, “A Review of Recent Advances in Economic Dispatch”, IEEE Trans. on Power Syst., Vol. 5, No. 4, pp 1248- 1259, November 1990. [2] Allen J. Wood, Bruce F. Wollenberg, “Power Generation, Operation, And Control”, John Wiley & Sona, Inc., New York, 2004. [3] J. Kennedy and R. Eberhart, “Particle swarm optimization,” in Proc. IEEE International Conference Neural Networks (ICNN’95), Perth, Australia, vol. 4, pp1942- 1948, 1995. [4] M. R. AlRashidi, M. E. El-Hawary, “A Survey of Particle Swarm Optimization Applications in Electric Power Systems” IEEE Trans. On Evolutionary Computation Vol.13 ,No. 4,August 2009. [5] Bo Yang and Yunping Chen, Zunlian Zhao “Survey on Applications of Particle swarm Optimization in Electric Power Systems”, 2007 IEEE International Conference on Control and Automation, Guangzhou, CHINA -,pp 481-486, May 30 to June 1, 2007 [6] Zwe-Lee Gaing, “Particle Swarm Optimization to Solving the Economic Dispatch Considering the Generator Constraints”, IEEE Tans. on Power Syst., Vol 18, No. 3, pp 1187- 1195, Aug. 2003. [7] J.H.Talaq,F.El-Hawary, M.E.El-Hawary , “A Summary of Environmental/Economic dispatch algorithms” IEEE Trans. Power Syst., vol. 9, pp.1508–1516, Aug. 1994. [8] A. Immanuel Selva Kumar, K. Dhanushkodi, J. Jaya Kumar, C. Kumar Charlie Paul, “Particle Swarm Optimization Solution to Emission and Economic Dispatch Problem”, IEEE TENCON, Vol.1, pp 435-439, 2003. [9] T.Thakur, Kanik Sem, Sumedha Saini, and Sudhanshu Sharma “A Particle SwarmOptimization Solution to NO2 and
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 162 SO2 Emissions for Environmentally Constrained Economic Dispatch Problem”, IEEE PES Transmission and Distribution Conference and Exposition Latin America, pp 1-5,2006. [10] Papiya Dutta , A.K.Sinha- IIT Kharagpur Professor, “Environmental Economic Dispatch constrained by voltage stability using PSO” IEE ICIT 2006, IIT Kharagpur- pp. 1879-1884, 2006. [11] Wen Zhang, Yutian Liu, “Reactive Power Optimization based on PSO in a Practical Power System” Power society engineering general meeting,vol.1, pp.239-243, 2004. [12] Claudia Reis, F.P. Maciel Barbosa” A Comparison of Voltage Stability Indices,” IEEE MELECON, Benalmádena (Málaga), Spain, pp.1007-1010, May 16-19, 2006.