Soumettre la recherche
Mettre en ligne
TQM Practices Effect on Financial and Innovation Performance
•
0 j'aime
•
47 vues
Titre amélioré par l'IA
IRJET Journal
Suivre
https://irjet.net/archives/V4/i7/IRJET-V4I7539.pdf
Lire moins
Lire la suite
Ingénierie
Signaler
Partager
Signaler
Partager
1 sur 7
Télécharger maintenant
Télécharger pour lire hors ligne
Recommandé
Effect of TQM Practices on Quality Performance through Operating Performance ...
Effect of TQM Practices on Quality Performance through Operating Performance ...
IRJET Journal
Total Quality Management (TQM) Practices toward Product Quality Performance: ...
Total Quality Management (TQM) Practices toward Product Quality Performance: ...
IOSRJBM
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET Journal
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
IJERD Editor
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
iosrjce
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
International Journal of Modern Research in Engineering and Technology
Quality Improvement Practices and Compliance Performance of Selected Malaysia...
Quality Improvement Practices and Compliance Performance of Selected Malaysia...
Business, Management and Economics Research
Implementing total quality management to improve facilities
Implementing total quality management to improve facilities
Laukik Raut
Recommandé
Effect of TQM Practices on Quality Performance through Operating Performance ...
Effect of TQM Practices on Quality Performance through Operating Performance ...
IRJET Journal
Total Quality Management (TQM) Practices toward Product Quality Performance: ...
Total Quality Management (TQM) Practices toward Product Quality Performance: ...
IOSRJBM
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET Journal
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
IJERD Editor
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
iosrjce
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
International Journal of Modern Research in Engineering and Technology
Quality Improvement Practices and Compliance Performance of Selected Malaysia...
Quality Improvement Practices and Compliance Performance of Selected Malaysia...
Business, Management and Economics Research
Implementing total quality management to improve facilities
Implementing total quality management to improve facilities
Laukik Raut
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET Journal
Total Quality Management
Total Quality Management
aman1312
A STUDY ON THE RELATIONSHIP AMONG SUPPLY CHAIN MANAGEMENT COMPONENTS, SUPPLY ...
A STUDY ON THE RELATIONSHIP AMONG SUPPLY CHAIN MANAGEMENT COMPONENTS, SUPPLY ...
Dr.Ganeshkumar C
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Waqas Tariq
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational Performance
IRJET Journal
10120140401029 2
10120140401029 2
IAEME Publication
Resm tp021569
Resm tp021569
Jessica Allison
Quality management and performance a review
Quality management and performance a review
iaemedu
Quality management and performance a review
Quality management and performance a review
iaemedu
Presentasi jurnal
Presentasi jurnal
Brian Christinus
Case study tqm
Case study tqm
ashukumar114
30120140502010
30120140502010
IAEME Publication
Lean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in Malysia
khalidGGG
self_assessment_practice_with_a_tqm_model_tqm_case_study
self_assessment_practice_with_a_tqm_model_tqm_case_study
International advisers
TQM in small and big organizations
TQM in small and big organizations
Enaam Alotaibi
Quantitative Research Modelling: Hard and Soft Criteria of Total Quality Serv...
Quantitative Research Modelling: Hard and Soft Criteria of Total Quality Serv...
inventionjournals
Effect of total quality management on industrial performance in nigeria an em...
Effect of total quality management on industrial performance in nigeria an em...
Alexander Decker
Total Quality Management (TQM): Definition, elements, philosophies, B.Pha...
Total Quality Management (TQM): Definition, elements, philosophies, B.Pha...
snigdharanibehera
Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...
IRJET Journal
QUALITY MANAGEMENT SYSTEM IN R&D: A CRITICAL LITERATURE REVIEW
QUALITY MANAGEMENT SYSTEM IN R&D: A CRITICAL LITERATURE REVIEW
IAEME Publication
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by the
eSAT Publishing House
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
eSAT Journals
Contenu connexe
Tendances
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET Journal
Total Quality Management
Total Quality Management
aman1312
A STUDY ON THE RELATIONSHIP AMONG SUPPLY CHAIN MANAGEMENT COMPONENTS, SUPPLY ...
A STUDY ON THE RELATIONSHIP AMONG SUPPLY CHAIN MANAGEMENT COMPONENTS, SUPPLY ...
Dr.Ganeshkumar C
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Waqas Tariq
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational Performance
IRJET Journal
10120140401029 2
10120140401029 2
IAEME Publication
Resm tp021569
Resm tp021569
Jessica Allison
Quality management and performance a review
Quality management and performance a review
iaemedu
Quality management and performance a review
Quality management and performance a review
iaemedu
Presentasi jurnal
Presentasi jurnal
Brian Christinus
Case study tqm
Case study tqm
ashukumar114
30120140502010
30120140502010
IAEME Publication
Lean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in Malysia
khalidGGG
self_assessment_practice_with_a_tqm_model_tqm_case_study
self_assessment_practice_with_a_tqm_model_tqm_case_study
International advisers
TQM in small and big organizations
TQM in small and big organizations
Enaam Alotaibi
Quantitative Research Modelling: Hard and Soft Criteria of Total Quality Serv...
Quantitative Research Modelling: Hard and Soft Criteria of Total Quality Serv...
inventionjournals
Effect of total quality management on industrial performance in nigeria an em...
Effect of total quality management on industrial performance in nigeria an em...
Alexander Decker
Total Quality Management (TQM): Definition, elements, philosophies, B.Pha...
Total Quality Management (TQM): Definition, elements, philosophies, B.Pha...
snigdharanibehera
Tendances
(18)
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
Total Quality Management
Total Quality Management
A STUDY ON THE RELATIONSHIP AMONG SUPPLY CHAIN MANAGEMENT COMPONENTS, SUPPLY ...
A STUDY ON THE RELATIONSHIP AMONG SUPPLY CHAIN MANAGEMENT COMPONENTS, SUPPLY ...
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational Performance
10120140401029 2
10120140401029 2
Resm tp021569
Resm tp021569
Quality management and performance a review
Quality management and performance a review
Quality management and performance a review
Quality management and performance a review
Presentasi jurnal
Presentasi jurnal
Case study tqm
Case study tqm
30120140502010
30120140502010
Lean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in Malysia
self_assessment_practice_with_a_tqm_model_tqm_case_study
self_assessment_practice_with_a_tqm_model_tqm_case_study
TQM in small and big organizations
TQM in small and big organizations
Quantitative Research Modelling: Hard and Soft Criteria of Total Quality Serv...
Quantitative Research Modelling: Hard and Soft Criteria of Total Quality Serv...
Effect of total quality management on industrial performance in nigeria an em...
Effect of total quality management on industrial performance in nigeria an em...
Total Quality Management (TQM): Definition, elements, philosophies, B.Pha...
Total Quality Management (TQM): Definition, elements, philosophies, B.Pha...
Similaire à TQM Practices Effect on Financial and Innovation Performance
Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...
IRJET Journal
QUALITY MANAGEMENT SYSTEM IN R&D: A CRITICAL LITERATURE REVIEW
QUALITY MANAGEMENT SYSTEM IN R&D: A CRITICAL LITERATURE REVIEW
IAEME Publication
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by the
eSAT Publishing House
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
eSAT Journals
TQM: A Quality and Performance Enhancer
TQM: A Quality and Performance Enhancer
inventy
A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...
IRJET Journal
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
Dereck Downing
Au4102342349
Au4102342349
IJERA Editor
Benefits derived by sm es through implementation of tqm
Benefits derived by sm es through implementation of tqm
eSAT Publishing House
A State-Of-Art Review Of Total Quality Management Application In Service Sector
A State-Of-Art Review Of Total Quality Management Application In Service Sector
inventionjournals
Quality management and performance a review
Quality management and performance a review
IAEME Publication
Quality management and performance a review
Quality management and performance a review
iaemedu
Perceptions of smes (manufacturing firms) towards the key elements of tqm
Perceptions of smes (manufacturing firms) towards the key elements of tqm
eSAT Journals
Perceptions of smes (manufacturing firms) towards the key elements of tqm
Perceptions of smes (manufacturing firms) towards the key elements of tqm
eSAT Publishing House
A REVIEW ON THE CLASSIFICATION OF TOTAL QUALITY MANAGEMENT
A REVIEW ON THE CLASSIFICATION OF TOTAL QUALITY MANAGEMENT
Stacy Vasquez
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET Journal
Connie FarrisProject Performance and Quality Assurance(M.docx
Connie FarrisProject Performance and Quality Assurance(M.docx
margaretr5
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET Journal
IRJET- Total Quality Management based Improvement of Teaching and Learnin...
IRJET- Total Quality Management based Improvement of Teaching and Learnin...
IRJET Journal
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms organizational
IAEME Publication
Similaire à TQM Practices Effect on Financial and Innovation Performance
(20)
Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...
QUALITY MANAGEMENT SYSTEM IN R&D: A CRITICAL LITERATURE REVIEW
QUALITY MANAGEMENT SYSTEM IN R&D: A CRITICAL LITERATURE REVIEW
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
TQM: A Quality and Performance Enhancer
TQM: A Quality and Performance Enhancer
A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
Au4102342349
Au4102342349
Benefits derived by sm es through implementation of tqm
Benefits derived by sm es through implementation of tqm
A State-Of-Art Review Of Total Quality Management Application In Service Sector
A State-Of-Art Review Of Total Quality Management Application In Service Sector
Quality management and performance a review
Quality management and performance a review
Quality management and performance a review
Quality management and performance a review
Perceptions of smes (manufacturing firms) towards the key elements of tqm
Perceptions of smes (manufacturing firms) towards the key elements of tqm
Perceptions of smes (manufacturing firms) towards the key elements of tqm
Perceptions of smes (manufacturing firms) towards the key elements of tqm
A REVIEW ON THE CLASSIFICATION OF TOTAL QUALITY MANAGEMENT
A REVIEW ON THE CLASSIFICATION OF TOTAL QUALITY MANAGEMENT
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
Connie FarrisProject Performance and Quality Assurance(M.docx
Connie FarrisProject Performance and Quality Assurance(M.docx
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Total Quality Management based Improvement of Teaching and Learnin...
IRJET- Total Quality Management based Improvement of Teaching and Learnin...
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms organizational
Plus de IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
Plus de IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Dernier
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Call Girls in Nagpur High Profile
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
ranjana rawat
result management system report for college project
result management system report for college project
Tonystark477637
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
KurinjimalarL3
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
upamatechverse
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
sanyuktamishra911
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Dr.Costas Sachpazis
Extrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
120cr0395
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
ssuser5c9d4b1
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Dernier
(20)
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
result management system report for college project
result management system report for college project
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Extrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
TQM Practices Effect on Financial and Innovation Performance
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2649 Effect of TQM Practices on Financial Performance through Innovation Performance - In Indian Manufacturing Context Farish K A1, Anu P Anil 2, Dr. Satish K P3 1 M.Tech Student, Dept. of Production Engineering, GEC Trichur, Thrissur, Kerala, India 2 PhD Research scholar Dept. of Mechanical Engineering, GEC Trichur, Thrissur, Kerala, India 3 Professor, Dept. of Production Engineering, GEC Trichur, Thrissur, Kerala, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Total quality management (TQM) is a management approach of an organization, centered on quality, based on the participation of all its members and aiming at long term successthroughcustomer satisfactionand benefits to all members in the organizationandtosociety. This study examines the direct and indirecteffectsofTQMpractices on financial and innovation performance by using structural equation modelling (SEM). Previous literatures described different results of the relationship between TQM practices and these two performance measures. Thus, the scope of this study is to investigate the relationship between the TQM practices and organization performance more precisely, Indian manufacturing context. The data was collected from a survey of 260 Indian manufacturing organizations using a self-structured detailedquestionnaire. BasedonreviewofTQM literatures, 13 TQM constructs were identifiedandselectedfor this study. From results of the survey, the data was analyzed and hypotheses were tested using SEM. Overall, findingsofthis study highlight that, TQM practices has a direct and significant effect on both financial performance and innovation performance. The results also shows that, there is an indirect and significant effect of TQM practicesonfinancial performance through innovation performance. Thestudyalso revealed that supplier quality management, continuous improvement, quality information analysis, quality assurance and knowledge management were perceived as the most dominant TQM practices associated with both financial and innovation performance. Key Words: Total quality management practices, Financial performance, Innovation performance, Structural equation modelling, Supplier quality management, Quality assurance. 1. INTRODUCTION Total Quality Management (TQM) is a system of managing quality in organizations in order to improve products and services. Crosby (1979) stated “QM is a logical way of ensuring that organized activities happen the way they are planned.”. It provides lasting solutions to the organizations plagued with problems of defects, high costs on account of rework and waste, and delayed delivery of products and services etc. All successful organizations adopt TQM in one form or other. It has helped people, organizations and nations to alter their destiny and attain superiority, prosperity, and international performance. In recent years, with the emergence of globalization, market competition, and the improvement in communication flows, total quality management (TQM) has become a crucial strategy for companies to maintain their market position Santos Vijande et al. (2007). At the same time, innovation has been widely used as a winning order criterion for companies to gain sustained competition and financial benefits.This study attempts to understand the effect of TQM practices on firm performance (financial performance (FP) and innovation performance (IP)), asking whether TQM practices foster or hinder the FP and IP. Even though there has been significant research into this area, the conclusions are still argued. For example, research scholarssuchasPrajogoandSohal (2001) have debated that, organizations that implementing TQM practices will promote a rich situation forinnovation,enable knowledge sharing, and introduce positive organizational change. Hence TQM practices are viewed as a driver for organizational innovation. ButSlaterandNarver(1994), and some others debate that total quality management practices obstruct creativity, as they involve the implementation of standards, which can grow into a “stickiness” regarding repeated or established procedures or processes; it is thus supposed that employees will be less likely to explore new way of changing. Some authors found that effectively implementation of TQM improved financial performance (Barker and Cagwin, 2000; Hendricks and Singhal, 2001b; York and Miree, 2004). However, some companies did not gain from TQM implementation.Forexample,Chapmanet al. (1997), Yeung and Chan (1998) found from casestudiesthat manufacturing companies with a quality management system in Hong Kong did not gain any financial benefits. Hence, its claims are debatable. From there, this study aims to investigate the direct and indirect effect of TQM practices on financial and innovation performance in the Indian
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2650 manufacturing context, with theobjectiveof bridgingthe gap and clearing up confusions. 2. LITERATURE REVIEW 2.1 Critical factors of TQM Various studies have examined that; constitutesof quality management, common barriers to quality management implementation and factors are critical forthesuccessofQM (Ahire et al., 1996; Flynn et al., 1994; Rao et al., 1999;Saraph et al., 1989; Sila, 2007; Yusof & Aspinwall, 2000). Although these studies have provided different results such as critical factors, they have identified a common set of practices considered essential to the success of quality management implementation. To generate distinct generic constructs, a list of constructs proposed in a large set of literature was analysed. The critical factors identified in the previous TQM literature are given below. • Leadership and top management Commitment • Supplier performance • Customer focus • Supplier quality management • Continuous improvement • Team work • Communication • Quality improvement systems • Employees involvement • Employees empowerment • Rewards and recognition • Education and training • Strategic quality planning • Strategic management • Quality information and analysis • Quality assurance • SPC usage • Quality citizenship • Quality culture • Benchmarking • Role of quality department • Quality policy • Process and product design • Quality management environment • Operational quality planning • Quality information availability • Process management • Product quality and innovation • Quality information usage • Knowledge management Through the thorough review of the TQM literatures, the present study identified a set of 13 TQM practices by frequency of occurrence method and it is shown in Table 1. These 13 factors selected for this study. Table -1: Critical TQM factors identified for the present study Sl No Critical factors selected for the present study 1 Leadership and top management commitment (LTMC) 2 Customer focus (CF) 3 Supplier quality management (SQM) 4 Continuous improvement (CI) 5 Employees empowerment (EE) 6 Education and training (ET) 7 Quality information analysis (QIA) 8 Quality assurance (QA) 9 Quality citizenship (QCZ) 10 Quality culture (QC) 11 Process management (PM) 12 Product innovation (PI) 13 Knowledge management (KM) 2.2 Performance measure indicators Having suggested a set of TQM practices, this section presents anoverviewofperformancemeasures constructs.A review of previous empirical studies on organizational performance indicatesthattherearevariationsin measuring performance of organizations (Monge et al., 2006).Different variables used for measuring organizational performance have been identified from the literatures. Prajogo and Sohal (2004) measured organizational performance with the help of quality performance (e.g. reliability, performance, durability and conformance to specification)andinnovation performance (e.g. product and process innovation). Zakuan et al. (2010) in their study measured organizational performance over two categories which are; satisfaction level (example employee satisfaction and customer satisfaction) and business results (example productivity, number of successful new products, cost performance and profitability). Numerous studies have been carried out to determine the positive and negative (or non-significant) relationships or correlations between TQM practices and various performance measures. Considering the comprehensive study and the availability of data in this study, organization performance will be measured through financial performance(FP)andinnovationperformance(IP).
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2651 3. RESEARCH FRAME WORK AND PROPOSED HYPOTHESES A review of the previous empirical studies on TQM practices suggests that researchers have defined TQM practices construct in various ways although they are complementary to each other. In this study, we decided to use one of these models or framework forthe TQMpracticesconstruct. Based on the analysis of previous research, a conceptual research framework is developed and a research model has been proposed to examine the direct and indirect effect of TQM practices on company’s performance by measuring the financial and innovation performance as a performance indicators in the Indian manufacturing companies. The proposed TQM conceptual research frameworks are shown in Figure 1. This research models suggests that the greater the extent to which these TQM practices are present, the financial performance andinnovationperformanceofIndian manufacturing organizations will be higher. In this framework, the independent variables are TQM practices and a dependent variables are financial and innovation performance. The two research questions of this study can be articulated as follows: Do the identified TQM practices have direct andindirect effect on company’s financial and innovation performance? Which TQM practices are more associated with the company’s financial and innovation performance? Therefore aim of this study is to find out the direct and indirect effect of TQM practices on financial and innovation performance inIndianmanufacturingcompaniesandfinding out which TQM practices are more associated with the company’s financial and innovation performance. Hence, in guiding the direction of the analysis, three research hypotheses were developed and will be tested in this research. They were based on the findings identified in the literature review. H1: TQM practices have direct and positive effects on financial performance of Indian manufacturing organizations. H2: TQM practices have direct and positive effects on innovation performance of Indian manufacturing organizations. H3: TQM practices have indirect and positive effects on financial performance through innovation performance of Indian manufacturing organizations. Figure -1: Conceptual research framework 4. RESEARCH METHODOLOGY In order to accomplish the objective of this research study, a questionnaire survey methodology was adopted and was carried out in selected Indian manufacturing organizations. 4.1 Survey instrument Based on previous literatures (Salaheldin (2009), Bayraktar et al. (2008), Saravanan R and Rao, K.S.P. (2007), Sila and Ebrahimpour (2002), Antony et al. (2002) and Brah et al. (2000)) a self-structured detailed questionnaire was developed with the items for 13 TQM constructs along with the questions on performance measure and information about the respondents. Which includes questions that are capable of extracting maximum available data from the industries. The level of implementation is marked in a seven point likert scale, 1(Strongly disagree), 2 (Disagree), 3 (Somewhat disagree), 4 (Neutral), 5 (Somewhat agree), 6 (Agree), 7 (Strongly agree). 4.2 Data collection The study employed the survey method, which makes use of a research instrument. The study was conducted in small, medium and large scale manufacturing organizations in India. The questionnaire is sent to theorganizationsthrough electronic mail and direct contact approach. Before conducting the full survey, initially a pilot study was conducted using this questionnaire and 34 responses were obtained out of 46 organizations.Theseresponseswereused to check the reliability of the questionnaire. After the pilot study the survey is extended to around 700 organizations. Addressed to the top and middle level administrators/managers of the companies, the survey instruments were e-mailed and directly given to 680 Indian manufacturing companies (large, medium, small). After several follow-ups and personal contacts, a total of 260 companies responded which are approximately 38.24 percent of the sample size, were selected for the study. A response rate of 38.24 percent which is well and lies within the range of 85-300 cases as suggested by Kureshi et al. (2010) and Hair et al. (1998). Thesedata obtainedvia survey was tabulated using Microsoft Excel. Then the data were
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2652 analyzed using IBMSPSS(20.0)statisticssoftwareandAMOS (20.0) software. 4.3 Data analysis and hypotheses test results 4.3.1 Reliability analysis Reliability is the ability of the instrument to measure consistently. Reliability coefficients were initially computed to check the internal consistency of the measuring items of the independent and dependent variables. As the internal consistency method is the most common form of reliability estimation (Nunnally, 1978) and it has been used in this study. This method assesses the equivalence, homogeneity and inter correlation of the items used in a measure. IBM SPSS Statistics software (version 20.0) is used for the evaluation of collected data. Reliabilitytestswereperformed separately for the items of each TQM practice (13 independent variables) and two dependent variables (financial performance and innovation performance). The Cronbach's alpha (α) values of the study variables are summarized in Table 2 and Table 3. One item from process management was deleted, so that it became reliable. Nunnally (1978) is often related with the assertion that instruments used in the basic research should have reliability of 0.7 or better. Table -2: Reliability analysis of TQM practices Sl No TQM Practices No of items Cronbach's alpha (α) 1 LTMC 5 0.725 2 CF 4 0.811 3 SQM 5 0.922 4 CI 5 0.792 5 EE 4 0.853 6 ET 4 0.837 7 QIA 4 0.760 8 QA 5 0.900 9 QCZ 5 0.736 10 QC 5 0.765 11 PM 4 0.785 12 PI 5 0.772 13 KM 3 0.898 Table -3: Reliability analysis of financial and innovation performances Here final reliability analysis result shows that all the constructs have α > 0.7 (ranges from 0.725 to 0.922). So we can conclude that the data collection instrument i.e., the questionnaire developed were reliable. 4.3.2 Validity analysis Validity is referred to how well our concept is defined by the measures. The concept of validity was formulated by Kelly (1927, p. 14) and who stated that a test is valid means if it measures what it claims to measure. The general purpose of checking validity is to find a way of minimizing the loss of information and summarizing these information into smaller sizes. There are mainly two types validity ; content validity and construct validity. Content validity is a subjective evaluation, which was considered suitable because these critical factors and results in the evaluation of quality management have been obtained from a literature review expert opinions. The main objective of the content validity is to ensure that the previous empirical issue must be extend by the selection of construct items, it also include theoretical and practical considerations (Robinson et al., 1991). In this study the 13 critical factors for measuring TQM implementation should have content validity, as the measurement items were developed based on both an comprehensive review of the literature and detailed evaluations by academicians and practicing managers. Although construct validity means the degree to which a measure or other test assesses the fundamental theoretical construct it is supposed to measure. Theconstructvalidityof each measure was evaluated through a factor analysis. 4.3.3 Factor analysis Factor analysis is used for checking the validity of collected data. It is is a statistical approach that can be used to analyze the interrelationships among large number of variables and explain these variables in terms of their common underlying factors(Prasad et al., 2010). Factor structure of dependent and independent variables can be find out with the help of factor analysis with principal component by varimax rotation.For assessing theconstruct validity, factor loadings are obtained for each item. The loadings indicate the strength oftherelationship betweenan item and a particular factor or practice. The higher the loading, the better the representation that particular item has on the factor. For this study, a loading of 0.40 or greater on the factor was considered (Hair etal.,1998;Arumugam et Sl No Performance Indicator No of items Cronbach's alpha (α) 1 IP 5 0.871 2 FP 5 0.783
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2653 al., 2008; Ooi et al., 2008). Fortheindependentvariablesince some items were below 0.40 or are having collinearity with more than one factor. Hence it is continuedtoperformfactor analysis and thereby removing the items one by one untill we get all the item have factor loading above 0.4. And totally 12 items relating to these factorswereeliminated.Further,it was found that these 8 independent varibles explained 74.992 percent of total variance. The Kaiser-Meyer-Olkin (KMO) measure of sampling adequacy was 0.803 which is greater than 0.60 indicate there exist a sufficient intercorrelations while the Barlett's test of sphericity was significant (χ2=14127.378, p=0.000 <0.01). For dependent variables all items are higher factor loading and these two variables explaining 62.619 percent of variance in the data. Also KMO is 0.778 and Barlett's test of sphericity was significant (χ2= 1255.273, p=0.000 <0.01). Findings show that our sample is suitable for the hypothesis analyses. 4.3.4 Structural equation modelling (SEM) It was proposed where the thirteen TQM practices were related against the two performance indicators (financial performance and innovation performance). The purpose of SEM was to observe the combined effect of TQM practices on performance measures (Hair, Black, & Anderson, 2010). Instead of performing two individual multiple regression which would regress only one dependent variable of performance at a time, but by performing structural equation modelling we can observe altogether at the same time the combined effect of 13 TQM practices on the two dependent variables. Thereby determining systematic and statistically significant co variation between the constructs. The latent factors were created based on the combined effect of the 13 TQM practices and two performance measures. AMOS software was used to conduct analysis for SEM to examine the strength of the relationships between the model independent and dependent variables. Confirmatory modelling approach is employed to examine the relationships. The building of the SEM model was based on literature review documenting the 13 TQM practicesrelated to the two performance measures. The structural equation modelling provided outcomes that assessed how well the model fitted the empirically collected data. Before evaluating the structural equationmodel,thevalidity of the measurement model (as shown in fig 2) was tested. After estimating the measurement model for all factors without constraining the covariance matrix of the factors, the SEM for the factors together with the measurement models was estimated. At each step, whether or not the model fitted the data was assessed. This assessment of the model was done by examining the standard errors, by deleting, adding, and or modifying paths in the model (modification indices), then re tested using the same data set, and also examining t-values, p-values, a number of goodness of fit statistics (CFI, GFI, RMSEA etc.). AMOS 20.0 software was used to test the measurement model. During the process, some practices namely, customer focus, employee empowerment, education and training, quality citizenship and quality culture is eliminated due to low loading. Figure -2: Measurement model of the relationship between TQM practices and performance measures The assumptions of multivariate analysis– normality, linearity, and homoscedasticity were testedforthevariables used in the measurement model. The analysis of the assumptions of the multivariate model indicated there is no statistically significantviolationsexist.Duringtheestimation of the measurement model for TQM practices and performance measures, an examination of the modification indices andstandardisedresidualsrevealedredundantitems in some scales. These redundant items were eliminated, which resulted in better-fitted models. The results of the measurement model and structural model with the recommended values of the fit indices for the satisfactory fit of a model to data are shown in Table 4. Table -4: Test results of the measurement models and structural model
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2654 For hypothesis testing, structural equation model were proposed to observe the relationships between 13 TQM practices and two performance measures of Indian manufacturing organizations (as shown in fig 3). The primary purpose of this study was to identify the direct and indirect effects of TQM practices on the various dimensions of performances (financial and innovation). Through testing the hypothesised structural model, which was developed based on a comprehensive literature review, this purpose was accomplished. Parameter estimates includingthefactor loadings of TQM practices on the TQM construct, regression path coefficients for the structural paths, are shown in fig 3. Figure -3: Structural equation model of the relationship between TQM practices and performances The goodness of fit statistics used to assess the fit of the data to the hypothesised model are the same as those usedtotest the measurement models and are presented in table 4. Also the table 5 shows, the hypotheses H1, H2 and H3 were significant at p <0.05 and all the paths in the model are supported. H1 and H2 significant, means TQM practiceshave direct and positive effects on financial performance and innovation performance of Indian manufacturing organizations. Similarly hypothesis H3 is significant, means there is an indirect effect on financial performance by TQM practices through innovation performance. Supplier quality management, continuous improvement, qualityinformation analysis, quality assurance and knowledge management were found to contribute more on improvement of financial performance throughtheeffectofinnovationperformancein Indian manufacturing organizations. Table -5: Construct structural model (TQM on financial performance through innovation performance) 5. CONCLUSIONS This paper has accomplished the stated objectives of the study successfully and analyzed thedirectandindirecteffect of TQM practices on financial and innovation performances in Indian manufacturing organizations. The study also revealed that supplier quality management, continuous improvement, quality information analysis, quality assurance and knowledge management were perceived as the most dominant TQM practices associated with both financial and innovation performances of Indian manufacturing organizations. The findings of this study suggest that these five practices of TQM should be explored to achieve high innovation performance and there by high financial benefits in Indian manufacturing companies. So they can improve their competitive position in global market. This study has also demonstrated that manufacturing companies in India believe total quality management is a key contributing factor to firm performance and survival. ACKNOWLEDGEMENT Gratitude goes to all the organizations and the employees of those organizations for their immense contributiontowards this research. REFERENCES [1] Santos-Vijande M.L. and Alvarez-Gonzalez L.I., “Innovativeness and Organizational Innovation in Total Quality Oriented Firms: The Moderating Role of Market Turbulence”, Technovation, Vol. 27, 2007, pp. 514-532. [2] Prajogo D.I. and Sohal A.S., “Tqm and Innovation: A Literature Review and Research Framework” Technovation, Vol .21, 2001, pp. 539-558. [3] Slater S.F. and Narver J.C., “Does Competitive Environment Moderate the Market Orientation Performance relationship?”, Journal of Marketing, Vol.58, 1994, pp. 46-55. [4] Saraph J. V., Benson P. G. and Schroeder R. G., “An instrument for measuring the critical factors of quality management”, Decision Sciences, Vol.20,No.4,1989, pp. 810-829.
7.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2655 [5] Ahire S.L., Golhar D.Y. and Waller M.A., “Development and validation of TQM implementation constructs”, Decision Sciences, Vol. 27, 1996, pp. 23–56. [6] Flynn B.B., Schroeder R.G. and Sakakibara S., “A framework for quality management research and an associated measurement instrument”, Journal of Operations Management, Vol. 11, 1994, pp. 339–366. [7] Rao S.S., Solis L.E. and Raghunathan T.S., “A framework for international quality management research: Development and validation of a measurement”, Total Quality Management, Vol. 10, 1999, pp. 1047–1075. [8] Sila I., “Examining the effects of contextual factors on TQM and performance through the lens of organizational theories: An empirical study”, Journal of Operations Management, Vol. 25, 2007, pp. 83–109. [9] Yusof S.M. and Aspinwall E., “Critical success factors for total quality management implementation in small and medium enterprises”, Total Quality Management, Vol. 10, 2000, pp. 803–809. [10] Monge C.A.M., Rao S.S., Gonzalez M.E. and Sohal A.S., “Performance measurement of AMT: A cross-regional study”, Benchmarking: An International Journal, Vol.13, 2006, pp. 135–146. [11] Prajogo D.I. and Sohal A.S., “The multidimensionality of TQM practices in determining quality and innovation performance: An empirical examination”,Technovation, Vol. 24, 2004, pp. 443–453. [12] Salaheldin S.I. and Mukhalalati B.A., “The implementation of TQM in the Qatari healthcaresector”, Journal of Accounting-Business and Management, Vol. 16 No. 2, 2009, pp. 1-14. [13] Bayraktar E., Tatiglu E. and Zaim S., “An instrument for measuring the critical factor of TQM in Turkish higher education”, Total Quality Management and Business Excellence, Vol. 19 No. 6, 2008, pp. 551-74. [14] Saravanan R. and Rao K.S.P., “The impact of total quality service age on quality and operational: an empirical study”, The TQM Magazine, Vol.19, No.3, 2007, pp. 197- 205. [15] Sila I. and Ebrahimpour M., “An investigation of the total quality management survey based research published between 1989 and 2000: a literaturereview”, International Journal of Quality and Reliability Management, Vol.19, No.7, 2002 , pp. 902-970. [16] Brah S.A., Wong J.L. and Rao B.M., “TQM and business performance in the service sector: A Singapore study”, International Journal of Operations & Production Management, Vol. 20, 2000, pp. 1293–1314. [17] Zakuan N.M., Yusof S.M., Laosirihongthong T. and Shaharoun A.M., “Proposed relationship of TQM and organizational performance using structured equation modeling”, Total Quality Management, Vol.21, No.2, 2010, pp. [18] Nunnally, J.C., Psychometric Theory, second edition McGraw-Hill, New York, 1978. [19] Kelley,T.L.,Interpretationofeducational measurements. New York: World Book Company, 1927. [20] Arumugam V., Ooi K.-B., Teh P.-L. and Chong A. Y.-L., “TQM practices and its association with production workers”, Industrial ManagementandData Systems,Vol. 108, No. 7, 2008, pp. 909-927. [21] Anu P. Anil and Dr. Satish K. P., “Investigating the relationship between TQM practices and Firm’s performance: A conceptual framework for Indian organizations”, Elsevier Science Direct Procedia Technology , Vol. 24, 2016, pp. 555-561. [22] Hair J.F. Jr, Anderson R.E., Tatham R.L. and Black W.C., Multivariate Data Analysis, 5th edition., Prentice-Hall, Englewood Cliffs, NJ, 1998. [23] Durbin J. and Watson G.S., “Tests for serial correlationin least squares regression II”, Biometrika, Vol. 30, 1951, pp. 159-78. [24] Ooi K.-B., Arumugam V., Safa M.S. and Bakar N.A. “HRM and TQM: association with job involvement”, Personnel Review, Vol. 36 No. 6, (2007a), pp. 939-62. [25] Ooi K.-B., Cheah W.-C., Lin B. and Teh P.-L., “Total quality management practices and knowledge sharing: an empirical study of Malaysia’s manufacturing organizations”, Asia Pacific Journal of Management, Vol. 29 No. 1, 2012, pp. 59-78. [26] Cohen, J., Statistical Power Analysis for the Behavioral Sciences, 2nd edition, Lawrence Erlbaum, Hillsdale, NJ, p. 1309, 1988. [27] Sadikoglu E., “Total quality management practices and performance”, The Business Review,Cambridge,Vol.10, No.2, 2008, pp. 60- 68. [28] Jitpaiboon T. and Rao, S.S., “A meta-analysis of quality measures in manufacturing system”, International Journal of Quality & Reliability Management, Vol. 24 No. 1, 2007, pp. 78-102. [29] Comrey A., A First Course on Factor Analysis, Academic Press, London, 1973.
Télécharger maintenant