SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1147
Building Information Modeling (BIM) Survey in Surat, Gujarat
Bryan Christian1, DR. Dilip A Patel2
1Department of Civil Engineering, Construction & Project Management, Parul Institute of Technology, Parul
University, Vadodara, Gujarat, India.
2Assistant professor, Department of Civil Engineering, Sardar Vallabh National Institute of Technology (SV-NIT),
Surat, Gujarat, India.
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - This Building Information Modeling (BIM) is
now spreading in Indian as it shows great acceptance of
technological advancement. This research work was aimed
to find the current degree of familiarity of Building
Information Modeling (BIM) in construction industry(AEC)
in Surat, Gujarat. In this survey a questionnaire was
prepared containing questions regarding knowledge of BIM,
usage of tool, etc. From the data we are going to run
analysis and then graphically represent it.
Key Words: Building Information modeling (BIM),
Survey, AEC industry, BIM tools
1. INTRODUCTION
This design, engineering, and construction (AEC) industry
has extended sought techniques to cut project price, rise
productivity and quality, and drop project delivery time.
BIM offers the possible to attain these objectives. BIM
mimics the construction project in extremely virtual
surroundings. A precise computer-generated model of a
building, brought up as a BIM is digitally created when
finalized, it contains precise geometry and relevant
knowledge required to help the planning and execution of
the project. BIM is the illustration of the digital evolution
from traditional 2D model to 3D mode and even to 4D
model (scheduling) and 5D model (cost estimating) with
an information throughout the building life cycle. Special
capabilities of constant parametric modelling and inter
operability facilitate this evolution method. The
advantages and outcome of BIM execution will be utilized
to validate the necessity to push BIM within the AEC
industry. Edward (2007) claimed “One of the key edges of
BIM is that it includes information concerning length,
width, and volume, yet as info concerning content like
doors, windows, and finishes, all of which might be used
for estimation.” Moreover, estimating depends on BIM
eradicates overlooked details when undertaking quantity
take-off from 2D Drawings regularly with common
updates which creates it hard to catch. A relative new
technology that is progressively getting accepted in the
construction industry is BIM. It is playing a major role on
improving construction management background. There
are several factors that have made BIM technology
popular in the construction industry. First, its popularity
may be attributed to the accessibility of both software and
hardware applications that are likely to minimize errors.
Similarly, BIM technology has created very competitive
markets for the modern construction. 5D-model task give
careful and correct 5D estimates and living price plans.
This help is provided to projects at any section from
concept design through to construction and completion.
Certain software package providers are currently
advertising that it's potential to develop cost planning
through linking a 5D price Library to BIM model, which
implements the function of an estimating database. In this
thesis, virtual model will be generated & simulated using
project design software and project management software.
This provides opportunities to import 3D BIM models then
cost planning will be carried forward. Moreover the
capacity to tie a 3D BIM with schedule and cost provides a
5D BIM model and simulation.
2. FINDINGS
The majority of respondents 51 percent are developer and
builders, they are actively working in Surat city more than
20 years. Second group of respondents was of architects,
which are 31 percent. The third group is of PMCs which are
17 percent. These are the stakeholders which are
authorized use BIM in projects so they are mainly targeted
for survey.
Chart 1: respondents
2.1 Validation of questionnaire:
The validation of questionnaire is done by different field
experts as well as strategic consultants.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1148
2.2 Sample Size Determination:
Selection can be definite as the process of selecting
descriptive units of a population for the education in the
study analysis. The independent of the selection is to
provide an applied means of assisting the data gathering
and processing the modules of investigation to be
approved out with ensuring that the sample provides a
good demonstration of the people. A sample is a small
quantity of the population designated for scrutiny and
analysis. The sample was selected haphazardly from the
population.
N (population)=50
Confidence level = 95%
Standard deviation=0.5
Z score for 95% confidence level= 1.96
Necessary sample size (SS)= (Z score)2∗standard
deviation)∗1−std.deviation)(margin of error)2 = 384
Adjusted sample size = SS1+[�.�.−POPULATION] = 45
3. RESULTS & DISCUSSION
An analysis will be run in accordance of series of question.
First of all we asked respondents about weather he is
aware of Building Information Modeling (BIM) or not
where we found that only 9 percent of our respondents
are using BIM as daily practice. While rest 91 percent were
not using/not aware of BIM.
Chart 2: BIM users & non users
Chart 3: familiarity with BIM
With the survey who were non BIM user or not aware of
what BIM is, are given the basic idea of BIM by verbally
and also by visual video presentation. And many unaware
BIM users were happy to learn about new technology. So
the further questions are regarding future use/acceptance
of BIM and 9 percent of respondents are using BIM right
now. Now after given idea of what BIM is few respondents
were think of no use and chose not to use BIM in future,
these respondents are 26 percent. Respondents who are
willing to use BIM in future are outstanding both, users
and not expecting to use BIM is 65 percent.
Chart 4: Future expectancy of BIM
BIM users in Surat mostly use Auto-desk Revit for drawing
purpose and Auto-desk Navisworks for simulation run.
BIM users were asked about their experience and they
sometime face the BIM tool related problems, Like
communication gap between different contractors and sub
contractors. Sometimes documentation issues occurs. But
this issues does not let them stop using BIM. There is also
a major problem of not having enough of BIM training
provider. They added that clients are now becoming aware
about time and cost efficiency so now they have start
accepting BIM, on a very few projects but they are looking
forward to it in the future.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1149
3. CONCLUSION
Stakeholders in construction industry in Surat are not
aware/not knowing of BIM, however few BIM service
providers in Surat have found the future scope and
providing services that brings awareness for BIM. Many
developers who are in this industry coming to known to
BIM they are happily to accept BIM in their future projects.
However it will take time but in a short future BIM will be
common in Surat city.
REFERENCES
1) M. X. N. Chang and B. Wei, “The Application of
Project Management Maturity Model,” Appl. Mech.
Mater., vol. 475–476, pp. 1707–1712, 2013
2) Weisheng Lu, Yi Peng, Qiping Shen, “Generic
Model for Measuring Benefits of BIM as a Learning
Tool in Construction Tasks ”, Journal of
Construction Engineering and Management,
volume 139, issue 2, pages 195-203,(Feb 2013)
3) Angelo Joseph Garcia, Sinem Mollaoglu,”
Implementation of BIM in Small Home-Building
Businesses Angelo”, Journal of Practice Periodical
on Structural Design and Construction. Volume
23,issue 2 (Jan 2018)
4) [4] Jyh-Bin Yang, Hung-Yu Chou “Mixed approach
to government BIM implementation policy: An
empirical study of Taiwan” Journal of Building
Engineering, volume 32, issue 2 (Aug 2018).

Contenu connexe

Tendances

Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignmentjk tan
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONSubhendu Datta
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM group project aug 2016
CSCM group project aug 2016CSCM group project aug 2016
CSCM group project aug 2016Est
 
Building Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research PaperBuilding Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research Paperabhishek chougule
 
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679Siddharth Nallagounder
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET Journal
 
Chicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki JauhiainenChicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki Jauhiainenjjauhiai
 
AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...
AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...
AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...vivatechijri
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementIRJET Journal
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group reportlohwenjun
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...IRJET Journal
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2Stephen Au
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 

Tendances (20)

Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM group project aug 2016
CSCM group project aug 2016CSCM group project aug 2016
CSCM group project aug 2016
 
Building Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research PaperBuilding Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research Paper
 
BIM & Safety
BIM & SafetyBIM & Safety
BIM & Safety
 
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
Chicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki JauhiainenChicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki Jauhiainen
 
AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...
AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...
AUGMENTECHTURE - 3D Projection of Building Construction Floor Plan using Mark...
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project Management
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 

Similaire à IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat

Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...eSAT Journals
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxyustofiachmad
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed
 
BIM Presentation
BIM PresentationBIM Presentation
BIM PresentationOmer Syed
 
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdfWaliEdwardian1
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...IRJET Journal
 
Sc bim
Sc bimSc bim
Sc bimLam Yu
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...IRJET Journal
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...IRJET Journal
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...IRJET Journal
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...IRJET Journal
 
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsBenefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsAM Publications
 

Similaire à IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat (20)

Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM-1.pptx
BIM-1.pptxBIM-1.pptx
BIM-1.pptx
 
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
 
Sc bim
Sc bimSc bim
Sc bim
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...
 
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsBenefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
 

Plus de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Plus de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Dernier

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Dernier (20)

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1147 Building Information Modeling (BIM) Survey in Surat, Gujarat Bryan Christian1, DR. Dilip A Patel2 1Department of Civil Engineering, Construction & Project Management, Parul Institute of Technology, Parul University, Vadodara, Gujarat, India. 2Assistant professor, Department of Civil Engineering, Sardar Vallabh National Institute of Technology (SV-NIT), Surat, Gujarat, India. ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - This Building Information Modeling (BIM) is now spreading in Indian as it shows great acceptance of technological advancement. This research work was aimed to find the current degree of familiarity of Building Information Modeling (BIM) in construction industry(AEC) in Surat, Gujarat. In this survey a questionnaire was prepared containing questions regarding knowledge of BIM, usage of tool, etc. From the data we are going to run analysis and then graphically represent it. Key Words: Building Information modeling (BIM), Survey, AEC industry, BIM tools 1. INTRODUCTION This design, engineering, and construction (AEC) industry has extended sought techniques to cut project price, rise productivity and quality, and drop project delivery time. BIM offers the possible to attain these objectives. BIM mimics the construction project in extremely virtual surroundings. A precise computer-generated model of a building, brought up as a BIM is digitally created when finalized, it contains precise geometry and relevant knowledge required to help the planning and execution of the project. BIM is the illustration of the digital evolution from traditional 2D model to 3D mode and even to 4D model (scheduling) and 5D model (cost estimating) with an information throughout the building life cycle. Special capabilities of constant parametric modelling and inter operability facilitate this evolution method. The advantages and outcome of BIM execution will be utilized to validate the necessity to push BIM within the AEC industry. Edward (2007) claimed “One of the key edges of BIM is that it includes information concerning length, width, and volume, yet as info concerning content like doors, windows, and finishes, all of which might be used for estimation.” Moreover, estimating depends on BIM eradicates overlooked details when undertaking quantity take-off from 2D Drawings regularly with common updates which creates it hard to catch. A relative new technology that is progressively getting accepted in the construction industry is BIM. It is playing a major role on improving construction management background. There are several factors that have made BIM technology popular in the construction industry. First, its popularity may be attributed to the accessibility of both software and hardware applications that are likely to minimize errors. Similarly, BIM technology has created very competitive markets for the modern construction. 5D-model task give careful and correct 5D estimates and living price plans. This help is provided to projects at any section from concept design through to construction and completion. Certain software package providers are currently advertising that it's potential to develop cost planning through linking a 5D price Library to BIM model, which implements the function of an estimating database. In this thesis, virtual model will be generated & simulated using project design software and project management software. This provides opportunities to import 3D BIM models then cost planning will be carried forward. Moreover the capacity to tie a 3D BIM with schedule and cost provides a 5D BIM model and simulation. 2. FINDINGS The majority of respondents 51 percent are developer and builders, they are actively working in Surat city more than 20 years. Second group of respondents was of architects, which are 31 percent. The third group is of PMCs which are 17 percent. These are the stakeholders which are authorized use BIM in projects so they are mainly targeted for survey. Chart 1: respondents 2.1 Validation of questionnaire: The validation of questionnaire is done by different field experts as well as strategic consultants.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1148 2.2 Sample Size Determination: Selection can be definite as the process of selecting descriptive units of a population for the education in the study analysis. The independent of the selection is to provide an applied means of assisting the data gathering and processing the modules of investigation to be approved out with ensuring that the sample provides a good demonstration of the people. A sample is a small quantity of the population designated for scrutiny and analysis. The sample was selected haphazardly from the population. N (population)=50 Confidence level = 95% Standard deviation=0.5 Z score for 95% confidence level= 1.96 Necessary sample size (SS)= (Z score)2∗standard deviation)∗1−std.deviation)(margin of error)2 = 384 Adjusted sample size = SS1+[�.�.−POPULATION] = 45 3. RESULTS & DISCUSSION An analysis will be run in accordance of series of question. First of all we asked respondents about weather he is aware of Building Information Modeling (BIM) or not where we found that only 9 percent of our respondents are using BIM as daily practice. While rest 91 percent were not using/not aware of BIM. Chart 2: BIM users & non users Chart 3: familiarity with BIM With the survey who were non BIM user or not aware of what BIM is, are given the basic idea of BIM by verbally and also by visual video presentation. And many unaware BIM users were happy to learn about new technology. So the further questions are regarding future use/acceptance of BIM and 9 percent of respondents are using BIM right now. Now after given idea of what BIM is few respondents were think of no use and chose not to use BIM in future, these respondents are 26 percent. Respondents who are willing to use BIM in future are outstanding both, users and not expecting to use BIM is 65 percent. Chart 4: Future expectancy of BIM BIM users in Surat mostly use Auto-desk Revit for drawing purpose and Auto-desk Navisworks for simulation run. BIM users were asked about their experience and they sometime face the BIM tool related problems, Like communication gap between different contractors and sub contractors. Sometimes documentation issues occurs. But this issues does not let them stop using BIM. There is also a major problem of not having enough of BIM training provider. They added that clients are now becoming aware about time and cost efficiency so now they have start accepting BIM, on a very few projects but they are looking forward to it in the future.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1149 3. CONCLUSION Stakeholders in construction industry in Surat are not aware/not knowing of BIM, however few BIM service providers in Surat have found the future scope and providing services that brings awareness for BIM. Many developers who are in this industry coming to known to BIM they are happily to accept BIM in their future projects. However it will take time but in a short future BIM will be common in Surat city. REFERENCES 1) M. X. N. Chang and B. Wei, “The Application of Project Management Maturity Model,” Appl. Mech. Mater., vol. 475–476, pp. 1707–1712, 2013 2) Weisheng Lu, Yi Peng, Qiping Shen, “Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks ”, Journal of Construction Engineering and Management, volume 139, issue 2, pages 195-203,(Feb 2013) 3) Angelo Joseph Garcia, Sinem Mollaoglu,” Implementation of BIM in Small Home-Building Businesses Angelo”, Journal of Practice Periodical on Structural Design and Construction. Volume 23,issue 2 (Jan 2018) 4) [4] Jyh-Bin Yang, Hung-Yu Chou “Mixed approach to government BIM implementation policy: An empirical study of Taiwan” Journal of Building Engineering, volume 32, issue 2 (Aug 2018).