International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1672
A Review of Impact on Labour Management in Construction Industry
Srilakshmi V. Annigeri1, Prof. Amey A. Kelkar2, Rajani V. Kulgude3
1M.TECH student, Civil Engineering Dept, Jain College of Engineering, Karnataka, India
2Assistant Professor, Civil Engineering Dept, Jain College of Engineering, Karnataka, India
3M.TECH student, Civil Engineering Dept, Jain College of Engineering, Karnataka, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – Improving production efficiency is one the
biggest challenge in the construction industry. The
productivity of any project relies mainly on labour force
as labour play an integral part in the success of the
project. Proper management of labours increases the
productivity along with this the project is completed on
time with optimum cost. Thisstudymainlyfocusesonthe
various factors or parameters related to labours that
have a great impact on the project productivity.
Key Words: Labour productivity, Labour management.
1. INTRODUCTION
The construction segment plays a key part in the
development of nation by providinginfrastructureandother
various facilities. At present the development segment is
proceeding with fast growth, these developments influence
the expanded needs of the components connected with the
development in administration sector, a standout amongst
which may be labor management. Workforce is a significant
component that influences the coherence and smooth
implementation of construction undertakings. Labour
management in construction activity includes improving
labour productivity and reducing time and cost overrun of
projects, solving problems etc
Construction industry is the major and demanding
industry in the world. Human asset plays a vital role
construction field, with the efficient and optimal use of
human resource increase in productivity can be achieved.
Labour productivity is one of the important variable which
influences progress of any construction project. Enhancing
productivity is the foremost concern for any profit oriented
association. Labour productivity can be defined as the ratio
of input to output. Labour is an integral part of construction
organization and proper management of labours can yield
higher productivity. Success of any construction project
depends on the work carried out by the labours. Labour
productivity directly influences construction productivity
and hence it is important toknowthefactorsaffectinglabour
productivity.
Labour is an essential aspect of construction
industry hence sound labour management cannot be
disregarded. Labour management is the process of
channeling mankind’s vitality and abilities under
accomplishing business targets. Labour managementisthus
concerned with both the efficiency and the effectiveness of
the labour i.e. how fast the job is done and also how useful
the task is.
1.1 LITERATURE REVIEW
Labour productivity and its management play a key role
in construction project. The success of any construction
projects depends on the factors influencing labour
productivity and its overall impact on the project. Thus a
literaturereview wasconductedtounderstandtheaspectsof
labour productivity management.
Jisha Chakkappan et.al.,[2] conducted an accurate
estimation ofworkbenefitforchosenlocales.Aquestionnaire
survey wasconducted and the data was analyzed by utilizing
Statistical Software Package SPSS 19.0 for deciding work
profit. Based on the analyzed results Multiple Linear
Regression Model was prepared to anticipateproductivityof
the work.
Nay Chi Soe et.al.,[8] depicts the current labour management
practices in construction projects in Myanmar. The paper
consists of 4 classes of labour management practices i.e.
labour management practices affect on project, manpower
problems by shortcoming of labour management practices,
factors on increasing labour productivity by good
management practices and factors on reducing labour
productivity by poor labour management practices.
Information to this studywasacquiredthroughanorganized
questionnaire administered to respondents. The responses
were then analyzed by utilizing Relative Importance Index
(RII) to rank the factors. H test or Kruskal Wallis test was
used to check the opinions of all respondents.
Odysseus Manoliadis[11] implemented benchmarking
standards in some projects in Greece, by the utilization of
indices. Indices for example, such as the disruption index,
performance ratio, project management index and project
waste index were calculated for the undertaken projects. By
the implementation of the above mentioned indices on the
projects it was concluded that benchmarks of labour
productivity acts as a critical delineator between good and
poorly performing activities.
Prachi R. Ghate et.al.,[7] said that in construction there are
three basic planning elements: time, cost and quality. These
concepts are in a close relationship with each other. Labour
productivity is also a key concept of construction planning
efforts and has a direct interrelationship with the triple
constraint mentioned. Lower labourperformanceisstrongly
related to the presence of change of work, disruption and
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1673
rework. The most significant types of disruption are lack of
materials and information and having to perform the work
out of sequence.
2. FACTORS INFLUENCING PRODUCTIVITY
2.1 Documentation
Documentation is the first step that comes under
construction process. When there is impediment in the
documentation the further process’s also gets delayed, due
to which there will be delay in the start of the project which
ultimately increases the time and cost of the project. The
factors affecting labour productivityunderthiscategoryare:
 Delay for approval of permission drawing
 Changes in permission drawing
 Site inspection
2.2 Technical
Technical parameters play a key role in the success of
construction projects. While hiring an individual in an
organization it should been seen that they are well qualified
and have enough of construction knowledge to tackle with
the problems that arises during the construction phase.
Construction methods adopted should be such that all the
labours are familiar to the method for the smooth
completion of the project in the given time period.
The influencing criteria are:
 Drawing errors
 Lack of experience
 Lack of construction knowledge
 Construction methods adopted
2.3 Management
Project management is the basic groundwork on whicheach
construction project is established. A project manager will
have to acquire different types of skills and qualifications to
navigate through the project and establish a utilitarian
relationship with various groups. Changes in construction
projects are a continuous requirement and in this sense
project management is important for the stability of the
whole process. The important factors affecting productivity
are:
 Improper planning
 Improper resource allocation
 Improper work schedule
2.4 Resources
Resources directly and indirectly affect the project by
affecting time and cost of the overall projects. Resources
need to be well planned, organized and managed for
completion of the project in the give time frame and
budgeted cost. Disorganized resource management leads to
delay in the completion as well as success of any project.
Factors influencing under this category are:
 Material quality
 Increase in the price of materials
 Tools and equipment shortages
2.5 Safety
Construction work is a dangerous land based vocation. It
includes works such as construction of edifices, bridges,
dams, roads, repair and maintenance of infrastructures etc.
construction incorporates numerous unsafe errands and
situations like excavation, working with height, noise, dust,
machineries etc. The most common deathsarecauseddue to
falling from height, being struck with between two objects,
working without safety equipments, being hit by an object.
Labour productivity is influenced by the following factors:
 Lack of safety trainings
 Dangerous working conditions
 Safety measures available at site
2.6 Wages
A wage can be defined as a fiscal payment paid towards an
employee by an employer in return for the work completed.
Pay scales may be different for each individual depending on
the work assigned to them, on their qualification, type of
work carried out by the labours etc. when lower wages are
paid labours show lack of interest in continuing the work
given to them hence, extra bonus and compensation has to
be given for their performance which in turn motivates the
labours to work hard.
The factors affecting labour productivity are:
 Lower wages
 Difference in pay scales
 Payment delays
2.7 Others
Construction industry also get affected due to various
parameters such as age of labour,mental conditionoflabour,
physical health of labours, basic facilities provided to
labours. Therefore proper planning is required to carry out
work effectively utilizing the potency of the labours.Some of
the influencing factors are:
 Age
 Absenteeism
 Poor health of the workers
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1674
3. CONCLUSIONS
From the study it can be concluded that to accomplish
the expected output from any construction project, it is vital
to have a good controlling hand on the productivity factors
that have a great impact on the completion of the project
within the budgeted cost and given time frame. In order to
increase the productivity it is necessary to makeuseofsome
strategies and techniques to overcome the factors
influencing labour productivity and management.
REFERENCES
[1] Mr.C.Thiyagu, Mr.M.Dheenadhayalan, Mr.S.Janagan,
“Construction Labour Productivity and Its
Improvement”, International Research Journal of
Engineering and Technology (IRJET) Volume: 03, Issue:
06 (2016).
[2] Jisha Chakkappan, Lakshmi G Das, “Labour
Productivity Analysis Using Multi-variable Linear
Regression Technique”, International Research Journal
of Engineering and Technology (IRJET) Volume: 03,
Issue: 09 (2016).
[3] Muhammad Asadullah Tahir, Hashimhanif, Zuhaib
Aslam Shahid, Abdullah Hanif, “Factors Affecting Labor
Productivity In Building Projects Of Pakistan”,
International Journal of Management and Applied
Science, Volume:1, Issue:2 (2015).
[4] Shinde V. J., Hedaoo M. N., “A Review on Productivity
Improvement in Construction Industry” International
Research Journal of Engineering and Technology
(IRJET), Volume: 04, Issue: 11 (2017).
[5] Mr.T.R.Vignesh, Mr.S.S.Janagan, “Investigating
Factors Influencing Labour ProductivityinConstruction
Projects”, International ResearchJournal ofEngineering
and Technology (IRJET) Volume: 02, Issue: 08 (2015).
[6] Mistry Soham, Bhatt Rajiv, “Critical FactorsAffecting
Labour Productivity In Construction Projects: Case
Study Of South Gujarat Region Of India”, International
Journal of Engineering and Advanced Technology
(IJEAT), Volume: 2, Issue: 4 (2013).
[7] Prachi R. Ghate, Ashok. B. More, Pravin R. Minde,
“Importance of Measurement of Labour Productivity in
Construction”, International Journal of Research in
Engineering and Technology (IJRET), Volume:05,Issue:
07 (2016).
[8]Nay Chi Soe, Aye Mya Cho, “Current Practices on
Labour Management in Building ConstructionProjects”,
International Journal of Scientific Engineering and
Technology Research, Volume: 3, Issue: 10 (2014).
[9] Dharani K, “Study on Labours Productivity
Management in Construction Industry”,
International Journal of Latest Trends in Engineering
and Technology (IJLTET), Volume: 6, Issue: 1 (2015).
[10] Desai Megha, Dr Bhatt Rajiv, “A Methodology for
Ranking of Causes of Delay for Residential Construction
Projects in Indian Context”, International Journal of
Emerging Technology and Advanced Engineering,
Volume: 3, Issue: 3 (2013).
[11]Odysseus Manoliadis, “Labour Productivity
Benchmarking in Greek Projects”.
[12] P. Dayakar, P. JothiKrishnan, “Onsite Labour
Productivity in Construction Industry in and Around
Chennai”, International Journal of Biotech Trends and
Technology (IJBTT), Volume: 2, Issue: 4(2012).
[13]Yogendra Kumar, Gadde Harish Kumar,SatishBabu
Mynemi and C.V.N. Sai Charan, “Productivity Analysis of
Small Construction Projects in India”, Asian Journal of
Applied Sciences (2013).

Contenu connexe

Tendances

ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSIAEME Publication
 
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...IAEME Publication
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
G0363052058
G0363052058G0363052058
G0363052058theijes
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
A REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULING
A REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULINGA REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULING
A REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULINGIAEME Publication
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
Site Safety Management and planning for Building Construction
Site Safety Management and planning for Building ConstructionSite Safety Management and planning for Building Construction
Site Safety Management and planning for Building ConstructionAbu Yousuf Jamil
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
Factors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India regionFactors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India regionAyush khandelwal
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET Journal
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET Journal
 
76 s201903
76 s20190376 s201903
76 s201903IJRAT
 
Introduction to industrial management
Introduction to industrial management  Introduction to industrial management
Introduction to industrial management Prof.Satinder Singh
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...eSAT Journals
 
Оксана Вей “To risk or not to risk?”
Оксана Вей “To risk or not to risk?”Оксана Вей “To risk or not to risk?”
Оксана Вей “To risk or not to risk?”Dakiry
 

Tendances (17)

ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
 
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
G0363052058
G0363052058G0363052058
G0363052058
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
A REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULING
A REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULINGA REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULING
A REVIEW ON FACTORS INFLUENCING CONSTRUCTION PROJECT SCHEDULING
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)
 
Site Safety Management and planning for Building Construction
Site Safety Management and planning for Building ConstructionSite Safety Management and planning for Building Construction
Site Safety Management and planning for Building Construction
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
Factors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India regionFactors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India region
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
76 s201903
76 s20190376 s201903
76 s201903
 
Introduction to industrial management
Introduction to industrial management  Introduction to industrial management
Introduction to industrial management
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...Occupational health and safety (ohs) management vis à-vis different phases of...
Occupational health and safety (ohs) management vis à-vis different phases of...
 
Оксана Вей “To risk or not to risk?”
Оксана Вей “To risk or not to risk?”Оксана Вей “To risk or not to risk?”
Оксана Вей “To risk or not to risk?”
 

Similaire à IRJET-A Review of Impact on Labour Management in Construction Industry

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIRJET Journal
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
The Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaThe Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaIRJET Journal
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Journals
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for ConstructionIRJET Journal
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...eSAT Journals
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurementSiddharth Mantri
 
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET Journal
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projectsIRJET Journal
 

Similaire à IRJET-A Review of Impact on Labour Management in Construction Industry (20)

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
The Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaThe Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in India
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
D012251726
D012251726D012251726
D012251726
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for Construction
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurement
 
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 

Plus de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Plus de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Dernier

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Dernier (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

IRJET-A Review of Impact on Labour Management in Construction Industry

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1672 A Review of Impact on Labour Management in Construction Industry Srilakshmi V. Annigeri1, Prof. Amey A. Kelkar2, Rajani V. Kulgude3 1M.TECH student, Civil Engineering Dept, Jain College of Engineering, Karnataka, India 2Assistant Professor, Civil Engineering Dept, Jain College of Engineering, Karnataka, India 3M.TECH student, Civil Engineering Dept, Jain College of Engineering, Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – Improving production efficiency is one the biggest challenge in the construction industry. The productivity of any project relies mainly on labour force as labour play an integral part in the success of the project. Proper management of labours increases the productivity along with this the project is completed on time with optimum cost. Thisstudymainlyfocusesonthe various factors or parameters related to labours that have a great impact on the project productivity. Key Words: Labour productivity, Labour management. 1. INTRODUCTION The construction segment plays a key part in the development of nation by providinginfrastructureandother various facilities. At present the development segment is proceeding with fast growth, these developments influence the expanded needs of the components connected with the development in administration sector, a standout amongst which may be labor management. Workforce is a significant component that influences the coherence and smooth implementation of construction undertakings. Labour management in construction activity includes improving labour productivity and reducing time and cost overrun of projects, solving problems etc Construction industry is the major and demanding industry in the world. Human asset plays a vital role construction field, with the efficient and optimal use of human resource increase in productivity can be achieved. Labour productivity is one of the important variable which influences progress of any construction project. Enhancing productivity is the foremost concern for any profit oriented association. Labour productivity can be defined as the ratio of input to output. Labour is an integral part of construction organization and proper management of labours can yield higher productivity. Success of any construction project depends on the work carried out by the labours. Labour productivity directly influences construction productivity and hence it is important toknowthefactorsaffectinglabour productivity. Labour is an essential aspect of construction industry hence sound labour management cannot be disregarded. Labour management is the process of channeling mankind’s vitality and abilities under accomplishing business targets. Labour managementisthus concerned with both the efficiency and the effectiveness of the labour i.e. how fast the job is done and also how useful the task is. 1.1 LITERATURE REVIEW Labour productivity and its management play a key role in construction project. The success of any construction projects depends on the factors influencing labour productivity and its overall impact on the project. Thus a literaturereview wasconductedtounderstandtheaspectsof labour productivity management. Jisha Chakkappan et.al.,[2] conducted an accurate estimation ofworkbenefitforchosenlocales.Aquestionnaire survey wasconducted and the data was analyzed by utilizing Statistical Software Package SPSS 19.0 for deciding work profit. Based on the analyzed results Multiple Linear Regression Model was prepared to anticipateproductivityof the work. Nay Chi Soe et.al.,[8] depicts the current labour management practices in construction projects in Myanmar. The paper consists of 4 classes of labour management practices i.e. labour management practices affect on project, manpower problems by shortcoming of labour management practices, factors on increasing labour productivity by good management practices and factors on reducing labour productivity by poor labour management practices. Information to this studywasacquiredthroughanorganized questionnaire administered to respondents. The responses were then analyzed by utilizing Relative Importance Index (RII) to rank the factors. H test or Kruskal Wallis test was used to check the opinions of all respondents. Odysseus Manoliadis[11] implemented benchmarking standards in some projects in Greece, by the utilization of indices. Indices for example, such as the disruption index, performance ratio, project management index and project waste index were calculated for the undertaken projects. By the implementation of the above mentioned indices on the projects it was concluded that benchmarks of labour productivity acts as a critical delineator between good and poorly performing activities. Prachi R. Ghate et.al.,[7] said that in construction there are three basic planning elements: time, cost and quality. These concepts are in a close relationship with each other. Labour productivity is also a key concept of construction planning efforts and has a direct interrelationship with the triple constraint mentioned. Lower labourperformanceisstrongly related to the presence of change of work, disruption and
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1673 rework. The most significant types of disruption are lack of materials and information and having to perform the work out of sequence. 2. FACTORS INFLUENCING PRODUCTIVITY 2.1 Documentation Documentation is the first step that comes under construction process. When there is impediment in the documentation the further process’s also gets delayed, due to which there will be delay in the start of the project which ultimately increases the time and cost of the project. The factors affecting labour productivityunderthiscategoryare:  Delay for approval of permission drawing  Changes in permission drawing  Site inspection 2.2 Technical Technical parameters play a key role in the success of construction projects. While hiring an individual in an organization it should been seen that they are well qualified and have enough of construction knowledge to tackle with the problems that arises during the construction phase. Construction methods adopted should be such that all the labours are familiar to the method for the smooth completion of the project in the given time period. The influencing criteria are:  Drawing errors  Lack of experience  Lack of construction knowledge  Construction methods adopted 2.3 Management Project management is the basic groundwork on whicheach construction project is established. A project manager will have to acquire different types of skills and qualifications to navigate through the project and establish a utilitarian relationship with various groups. Changes in construction projects are a continuous requirement and in this sense project management is important for the stability of the whole process. The important factors affecting productivity are:  Improper planning  Improper resource allocation  Improper work schedule 2.4 Resources Resources directly and indirectly affect the project by affecting time and cost of the overall projects. Resources need to be well planned, organized and managed for completion of the project in the give time frame and budgeted cost. Disorganized resource management leads to delay in the completion as well as success of any project. Factors influencing under this category are:  Material quality  Increase in the price of materials  Tools and equipment shortages 2.5 Safety Construction work is a dangerous land based vocation. It includes works such as construction of edifices, bridges, dams, roads, repair and maintenance of infrastructures etc. construction incorporates numerous unsafe errands and situations like excavation, working with height, noise, dust, machineries etc. The most common deathsarecauseddue to falling from height, being struck with between two objects, working without safety equipments, being hit by an object. Labour productivity is influenced by the following factors:  Lack of safety trainings  Dangerous working conditions  Safety measures available at site 2.6 Wages A wage can be defined as a fiscal payment paid towards an employee by an employer in return for the work completed. Pay scales may be different for each individual depending on the work assigned to them, on their qualification, type of work carried out by the labours etc. when lower wages are paid labours show lack of interest in continuing the work given to them hence, extra bonus and compensation has to be given for their performance which in turn motivates the labours to work hard. The factors affecting labour productivity are:  Lower wages  Difference in pay scales  Payment delays 2.7 Others Construction industry also get affected due to various parameters such as age of labour,mental conditionoflabour, physical health of labours, basic facilities provided to labours. Therefore proper planning is required to carry out work effectively utilizing the potency of the labours.Some of the influencing factors are:  Age  Absenteeism  Poor health of the workers
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1674 3. CONCLUSIONS From the study it can be concluded that to accomplish the expected output from any construction project, it is vital to have a good controlling hand on the productivity factors that have a great impact on the completion of the project within the budgeted cost and given time frame. In order to increase the productivity it is necessary to makeuseofsome strategies and techniques to overcome the factors influencing labour productivity and management. REFERENCES [1] Mr.C.Thiyagu, Mr.M.Dheenadhayalan, Mr.S.Janagan, “Construction Labour Productivity and Its Improvement”, International Research Journal of Engineering and Technology (IRJET) Volume: 03, Issue: 06 (2016). [2] Jisha Chakkappan, Lakshmi G Das, “Labour Productivity Analysis Using Multi-variable Linear Regression Technique”, International Research Journal of Engineering and Technology (IRJET) Volume: 03, Issue: 09 (2016). [3] Muhammad Asadullah Tahir, Hashimhanif, Zuhaib Aslam Shahid, Abdullah Hanif, “Factors Affecting Labor Productivity In Building Projects Of Pakistan”, International Journal of Management and Applied Science, Volume:1, Issue:2 (2015). [4] Shinde V. J., Hedaoo M. N., “A Review on Productivity Improvement in Construction Industry” International Research Journal of Engineering and Technology (IRJET), Volume: 04, Issue: 11 (2017). [5] Mr.T.R.Vignesh, Mr.S.S.Janagan, “Investigating Factors Influencing Labour ProductivityinConstruction Projects”, International ResearchJournal ofEngineering and Technology (IRJET) Volume: 02, Issue: 08 (2015). [6] Mistry Soham, Bhatt Rajiv, “Critical FactorsAffecting Labour Productivity In Construction Projects: Case Study Of South Gujarat Region Of India”, International Journal of Engineering and Advanced Technology (IJEAT), Volume: 2, Issue: 4 (2013). [7] Prachi R. Ghate, Ashok. B. More, Pravin R. Minde, “Importance of Measurement of Labour Productivity in Construction”, International Journal of Research in Engineering and Technology (IJRET), Volume:05,Issue: 07 (2016). [8]Nay Chi Soe, Aye Mya Cho, “Current Practices on Labour Management in Building ConstructionProjects”, International Journal of Scientific Engineering and Technology Research, Volume: 3, Issue: 10 (2014). [9] Dharani K, “Study on Labours Productivity Management in Construction Industry”, International Journal of Latest Trends in Engineering and Technology (IJLTET), Volume: 6, Issue: 1 (2015). [10] Desai Megha, Dr Bhatt Rajiv, “A Methodology for Ranking of Causes of Delay for Residential Construction Projects in Indian Context”, International Journal of Emerging Technology and Advanced Engineering, Volume: 3, Issue: 3 (2013). [11]Odysseus Manoliadis, “Labour Productivity Benchmarking in Greek Projects”. [12] P. Dayakar, P. JothiKrishnan, “Onsite Labour Productivity in Construction Industry in and Around Chennai”, International Journal of Biotech Trends and Technology (IJBTT), Volume: 2, Issue: 4(2012). [13]Yogendra Kumar, Gadde Harish Kumar,SatishBabu Mynemi and C.V.N. Sai Charan, “Productivity Analysis of Small Construction Projects in India”, Asian Journal of Applied Sciences (2013).