Requirement Phase
Testing
Presented By:
Jailalita
ME-CSE(Regular)
NITTTR,CHD
Content
1 Perform a test Factor Analysis for the
Requirements Phase
1.1 Methodology Test Factor
1.2 Correctness Test Factor
1.3 Maintainable Test Factor
1.4 Portable Test Factor
1.5 Performance Test Factor
2 Conduct a Requirements Walkthrough
2.1 Establish Ground Rules
2.2 Select Team/Notify Participants
2.3 Project Presentation
2.4 Questions/Recommendations
02/24/15 2NITTTR, Chandigarh
Methodology Test Factor
 The requirements process is one of fact
gathering ,analysis , decision making,
and requirements in a predefined
manner for use in design.
02/24/15 3NITTTR, Chandigarh
Portable Test Factor
 The ability to operate the system on
different types of hardware and different
version of the software should be stated
as part of the requirements.
02/24/15 4NITTTR, Chandigarh
Ease-of-Use Test Factor
 Amount of effort required to use the
system and skill level is necessary
should be defined during the
requirement phase.
 Experience shows that difficult-to-use
applications are not often used.
 Ease-to-use specifications will be
created by system analyst or
programmer.
02/24/15 5NITTTR, Chandigarh
Performance Test Factor
 Expected efficiency ,economy, and
effectiveness of the application system
should be established.
 These system goals an integral part of
the system design process.
 End product of the requirements phase
should be a calculation of the
cost/benefit to be derived from the
application.
02/24/15 6NITTTR, Chandigarh
Correctness Test Factor
 User satisfaction can be assured when system
objectives are achieved.
 Qualitative objectives –such as improving
service to users are unmeasurable objectives
while processing a user order in four hours is
measurable.
02/24/15 7NITTTR, Chandigarh
Authorization Test Factor
 Authorization requirements specify the
authorization methods to ensure that
transaction are processed accordance
with the intent of management.
02/24/15 8NITTTR, Chandigarh
Maintenance Test Factor
 Degree of expected maintenance should
be defined, as well as areas where
change is most probable.
02/24/15 9NITTTR, Chandigarh
Audit Trail Test Factor
 Reconstruction involves both
maintaining the accuracy of processing
and recovery after an identified problem.
 Both of these needs involve the
retention of information to backup
processing.
02/24/15 10NITTTR, Chandigarh
Continuity-of-Processing Test
Factor
 Continuity of processing is dependent
upon the impact of failure.
 If system failure causes only minimal
problems , ensuring continuous
processing may be unnecessary.
02/24/15 11NITTTR, Chandigarh
Service Level Test Factor
 Service level implies response time
based on the requirements.
 Service level required will vary on the
requirements.
 Example: Service level to process a
specific transaction, service level to
correct a programming error, service
level to install a change and service level
to respond to a request.
02/24/15 12NITTTR, Chandigarh
Security Test Factor
 Security requirements should be
developed showing the relationship
between system resources and people.
 Requirements should state all of the
available system resources subject to
control and then indicate who can have
access to those resources and for what
purposes.
02/24/15 13NITTTR, Chandigarh
Conduct a Requirements
Walkthrough
 Requirements phase involves creativity ,
experience and judgment as well as a
methodology.
 Walkthrough becomes a review process that
complements the objectives of the requirements
phase.
 Team of skilled individuals can help the project
team in the development of the project solutions.
02/24/15 14NITTTR, Chandigarh
Establish Ground Rules
 Walkthrough concept requires the
project people to make a presentation
explaining the functioning of the system.
 Ground rules should be understood by
both the project team and the
walkthrough team:
 Size and makeup of the walkthrough
team.
02/24/15 15NITTTR, Chandigarh
Establish Ground Rules
 Responsibility of the walkthrough team
which is usually limited to
recommendations, comments and
questions.
 Approximate length, time and location of
the walkthrough.
 Confidentiality of information discussed
at the walkthrough.
02/24/15 16NITTTR, Chandigarh
Establish Ground Rules
 Who will receive the result of the
walkthrough and how are those results
to be used?
02/24/15 17NITTTR, Chandigarh
Select Team/ Notify
Participants
 Most common participants on a
walkthrough team include:
 Information services project
manager/systems analyst.
 Senior management with responsibilty
over the computerized areas.
 Operations management.
 User management
02/24/15 18NITTTR, Chandigarh
Select Team/ Notify
Participants
 Consultants possessing needed
expertise.
02/24/15 19NITTTR, Chandigarh
Project Presentation
 Good walkthrough includes presentation
of the following:
 Statements of the goals and objectives
of the projects.
 List of any exceptions made by the
project team.
 Discussion of the alternatives
considered.
02/24/15 20NITTTR, Chandigarh
Questions/Recommendations
 Project presentation should be
interrupted with questions, comments
and recommendations as they occur to
the walkthrough team.
 Appoint one individual as recorder for
the walkthrough. Recorder duty is
capture questions for which appropriate
answers are not supplied during the
walkthrough.
02/24/15 21NITTTR, Chandigarh
References
 Effective Methods for Software Testing
by William E.Perry, Third Edition
NITTTR, Chandigarh 2202/24/15
THANK YOU !!!
02/24/15 23NITTTR, Chandigarh

Contenu connexe

Tendances

Software Engineering (Software Quality Assurance)
Software Engineering (Software Quality Assurance)Software Engineering (Software Quality Assurance)
Software Engineering (Software Quality Assurance)ShudipPal
 
Chapter 8 software quality assurance and configuration audit
Chapter 8 software quality assurance and configuration auditChapter 8 software quality assurance and configuration audit
Chapter 8 software quality assurance and configuration auditCliftone Mullah
 
Ch 10 cost of software quality
Ch 10 cost of software qualityCh 10 cost of software quality
Ch 10 cost of software qualityKittitouch Suteeca
 
Components of the sqa system
Components of the sqa system Components of the sqa system
Components of the sqa system Hamza Malik
 
computer system validation
computer system validationcomputer system validation
computer system validationGopal Patel
 
Software Quality Assurance SQA
Software Quality Assurance SQASoftware Quality Assurance SQA
Software Quality Assurance SQAFizah Ali
 
Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02Dr. Pierpaolo Mangeruga
 
IT Validation Training
IT Validation TrainingIT Validation Training
IT Validation TrainingRobert Sturm
 
Building a QMS for Your SaMD
Building a QMS for Your SaMDBuilding a QMS for Your SaMD
Building a QMS for Your SaMDEMMAIntl
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assuranceEr. Nancy
 
Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentationWalter Acevedo
 
Qualification dqiqoq
Qualification dqiqoqQualification dqiqoq
Qualification dqiqoqhoanhhai12345
 
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)David Stokes
 
Term Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software DevelopmentTerm Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software DevelopmentSharad Srivastava
 
Software quality infrastructure
Software quality infrastructureSoftware quality infrastructure
Software quality infrastructureLuthfia Ulinnuha
 
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...Shay Ginsbourg
 

Tendances (20)

Cv 1
Cv 1Cv 1
Cv 1
 
Software Engineering (Software Quality Assurance)
Software Engineering (Software Quality Assurance)Software Engineering (Software Quality Assurance)
Software Engineering (Software Quality Assurance)
 
Chapter 8 software quality assurance and configuration audit
Chapter 8 software quality assurance and configuration auditChapter 8 software quality assurance and configuration audit
Chapter 8 software quality assurance and configuration audit
 
Ch 10 cost of software quality
Ch 10 cost of software qualityCh 10 cost of software quality
Ch 10 cost of software quality
 
Components of the sqa system
Components of the sqa system Components of the sqa system
Components of the sqa system
 
computer system validation
computer system validationcomputer system validation
computer system validation
 
Sqa
SqaSqa
Sqa
 
Software Quality Assurance SQA
Software Quality Assurance SQASoftware Quality Assurance SQA
Software Quality Assurance SQA
 
Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02
 
SQA Components
SQA ComponentsSQA Components
SQA Components
 
SDLC
SDLCSDLC
SDLC
 
IT Validation Training
IT Validation TrainingIT Validation Training
IT Validation Training
 
Building a QMS for Your SaMD
Building a QMS for Your SaMDBuilding a QMS for Your SaMD
Building a QMS for Your SaMD
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
 
Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentation
 
Qualification dqiqoq
Qualification dqiqoqQualification dqiqoq
Qualification dqiqoq
 
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
 
Term Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software DevelopmentTerm Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software Development
 
Software quality infrastructure
Software quality infrastructureSoftware quality infrastructure
Software quality infrastructure
 
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
 

En vedette

Writing Scalable and Maintainable CSS
Writing Scalable and Maintainable CSSWriting Scalable and Maintainable CSS
Writing Scalable and Maintainable CSSDmitry Sheiko
 
TESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPTTESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPTsuhasreddy1
 
Software quality
Software qualitySoftware quality
Software qualityjagadeesan
 
Quality Assurance and Software Testing
Quality Assurance and Software TestingQuality Assurance and Software Testing
Quality Assurance and Software Testingpingkapil
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycleGaruda Trainings
 

En vedette (7)

Writing Scalable and Maintainable CSS
Writing Scalable and Maintainable CSSWriting Scalable and Maintainable CSS
Writing Scalable and Maintainable CSS
 
Reliabilty
ReliabiltyReliabilty
Reliabilty
 
TESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPTTESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPT
 
Software quality
Software qualitySoftware quality
Software quality
 
Test Life Cycle
Test Life CycleTest Life Cycle
Test Life Cycle
 
Quality Assurance and Software Testing
Quality Assurance and Software TestingQuality Assurance and Software Testing
Quality Assurance and Software Testing
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycle
 

Similaire à Requirement phase testing

IT Services Management
IT Services ManagementIT Services Management
IT Services ManagementChetan Goenka
 
461361 1013243 chapter_2_dec__11
461361 1013243 chapter_2_dec__11461361 1013243 chapter_2_dec__11
461361 1013243 chapter_2_dec__11anup4704
 
Requirement Analysis & Specification sharbani bhattacharya
Requirement Analysis & Specification sharbani bhattacharyaRequirement Analysis & Specification sharbani bhattacharya
Requirement Analysis & Specification sharbani bhattacharyaSharbani Bhattacharya
 
Requirements management planning & Requirements change management
Requirements management planning & Requirements change managementRequirements management planning & Requirements change management
Requirements management planning & Requirements change managementRa'Fat Al-Msie'deen
 
SYNOPSIS ON BANK MANAGEMENT SYSTEM
SYNOPSIS ON BANK MANAGEMENT SYSTEMSYNOPSIS ON BANK MANAGEMENT SYSTEM
SYNOPSIS ON BANK MANAGEMENT SYSTEMNitish Xavier Tirkey
 
Performance Testing
Performance TestingPerformance Testing
Performance TestingvodQA
 
Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...
Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...
Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...Lionel Briand
 
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...madhurpatidar2
 
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...IRJET Journal
 
SW Development Methodologies
SW Development MethodologiesSW Development Methodologies
SW Development Methodologiesthiago_tadeu
 
A CASE Lab Report - Project File on "ATM - Banking System"
A CASE Lab Report - Project File on  "ATM - Banking System"A CASE Lab Report - Project File on  "ATM - Banking System"
A CASE Lab Report - Project File on "ATM - Banking System"joyousbharat
 
SE Chapter 4 - Software Requirements.pptx
SE Chapter 4 - Software  Requirements.pptxSE Chapter 4 - Software  Requirements.pptx
SE Chapter 4 - Software Requirements.pptxDibyesh1
 
A Guide to UAT and its Effective Execution
A Guide to UAT and its Effective ExecutionA Guide to UAT and its Effective Execution
A Guide to UAT and its Effective ExecutionSerena Gray
 
Sexton_Jay_MPM357_IP5
Sexton_Jay_MPM357_IP5Sexton_Jay_MPM357_IP5
Sexton_Jay_MPM357_IP5Jay T Sexton
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based projecteSAT Journals
 
Cleaned example 1
Cleaned example 1Cleaned example 1
Cleaned example 1Bruce Carr
 
5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docx5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docxevonnehoggarth79783
 
5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docx5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docxtaishao1
 

Similaire à Requirement phase testing (20)

IT Services Management
IT Services ManagementIT Services Management
IT Services Management
 
461361 1013243 chapter_2_dec__11
461361 1013243 chapter_2_dec__11461361 1013243 chapter_2_dec__11
461361 1013243 chapter_2_dec__11
 
System requirements analysis
System requirements analysisSystem requirements analysis
System requirements analysis
 
Requirement Analysis & Specification sharbani bhattacharya
Requirement Analysis & Specification sharbani bhattacharyaRequirement Analysis & Specification sharbani bhattacharya
Requirement Analysis & Specification sharbani bhattacharya
 
Requirements management planning & Requirements change management
Requirements management planning & Requirements change managementRequirements management planning & Requirements change management
Requirements management planning & Requirements change management
 
SYNOPSIS ON BANK MANAGEMENT SYSTEM
SYNOPSIS ON BANK MANAGEMENT SYSTEMSYNOPSIS ON BANK MANAGEMENT SYSTEM
SYNOPSIS ON BANK MANAGEMENT SYSTEM
 
Performance Testing
Performance TestingPerformance Testing
Performance Testing
 
Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...
Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...
Automated Analysis of Natural-Language Requirements: Industrial Needs and Opp...
 
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
 
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
 
SW Development Methodologies
SW Development MethodologiesSW Development Methodologies
SW Development Methodologies
 
A CASE Lab Report - Project File on "ATM - Banking System"
A CASE Lab Report - Project File on  "ATM - Banking System"A CASE Lab Report - Project File on  "ATM - Banking System"
A CASE Lab Report - Project File on "ATM - Banking System"
 
Block 1 ms-034 unit-3
Block 1 ms-034 unit-3Block 1 ms-034 unit-3
Block 1 ms-034 unit-3
 
SE Chapter 4 - Software Requirements.pptx
SE Chapter 4 - Software  Requirements.pptxSE Chapter 4 - Software  Requirements.pptx
SE Chapter 4 - Software Requirements.pptx
 
A Guide to UAT and its Effective Execution
A Guide to UAT and its Effective ExecutionA Guide to UAT and its Effective Execution
A Guide to UAT and its Effective Execution
 
Sexton_Jay_MPM357_IP5
Sexton_Jay_MPM357_IP5Sexton_Jay_MPM357_IP5
Sexton_Jay_MPM357_IP5
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
 
Cleaned example 1
Cleaned example 1Cleaned example 1
Cleaned example 1
 
5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docx5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docx
 
5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docx5222020 SafeAssign Originality ReportfileCUsersDl.docx
5222020 SafeAssign Originality ReportfileCUsersDl.docx
 

Dernier

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 

Dernier (20)

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Requirement phase testing

  • 2. Content 1 Perform a test Factor Analysis for the Requirements Phase 1.1 Methodology Test Factor 1.2 Correctness Test Factor 1.3 Maintainable Test Factor 1.4 Portable Test Factor 1.5 Performance Test Factor 2 Conduct a Requirements Walkthrough 2.1 Establish Ground Rules 2.2 Select Team/Notify Participants 2.3 Project Presentation 2.4 Questions/Recommendations 02/24/15 2NITTTR, Chandigarh
  • 3. Methodology Test Factor  The requirements process is one of fact gathering ,analysis , decision making, and requirements in a predefined manner for use in design. 02/24/15 3NITTTR, Chandigarh
  • 4. Portable Test Factor  The ability to operate the system on different types of hardware and different version of the software should be stated as part of the requirements. 02/24/15 4NITTTR, Chandigarh
  • 5. Ease-of-Use Test Factor  Amount of effort required to use the system and skill level is necessary should be defined during the requirement phase.  Experience shows that difficult-to-use applications are not often used.  Ease-to-use specifications will be created by system analyst or programmer. 02/24/15 5NITTTR, Chandigarh
  • 6. Performance Test Factor  Expected efficiency ,economy, and effectiveness of the application system should be established.  These system goals an integral part of the system design process.  End product of the requirements phase should be a calculation of the cost/benefit to be derived from the application. 02/24/15 6NITTTR, Chandigarh
  • 7. Correctness Test Factor  User satisfaction can be assured when system objectives are achieved.  Qualitative objectives –such as improving service to users are unmeasurable objectives while processing a user order in four hours is measurable. 02/24/15 7NITTTR, Chandigarh
  • 8. Authorization Test Factor  Authorization requirements specify the authorization methods to ensure that transaction are processed accordance with the intent of management. 02/24/15 8NITTTR, Chandigarh
  • 9. Maintenance Test Factor  Degree of expected maintenance should be defined, as well as areas where change is most probable. 02/24/15 9NITTTR, Chandigarh
  • 10. Audit Trail Test Factor  Reconstruction involves both maintaining the accuracy of processing and recovery after an identified problem.  Both of these needs involve the retention of information to backup processing. 02/24/15 10NITTTR, Chandigarh
  • 11. Continuity-of-Processing Test Factor  Continuity of processing is dependent upon the impact of failure.  If system failure causes only minimal problems , ensuring continuous processing may be unnecessary. 02/24/15 11NITTTR, Chandigarh
  • 12. Service Level Test Factor  Service level implies response time based on the requirements.  Service level required will vary on the requirements.  Example: Service level to process a specific transaction, service level to correct a programming error, service level to install a change and service level to respond to a request. 02/24/15 12NITTTR, Chandigarh
  • 13. Security Test Factor  Security requirements should be developed showing the relationship between system resources and people.  Requirements should state all of the available system resources subject to control and then indicate who can have access to those resources and for what purposes. 02/24/15 13NITTTR, Chandigarh
  • 14. Conduct a Requirements Walkthrough  Requirements phase involves creativity , experience and judgment as well as a methodology.  Walkthrough becomes a review process that complements the objectives of the requirements phase.  Team of skilled individuals can help the project team in the development of the project solutions. 02/24/15 14NITTTR, Chandigarh
  • 15. Establish Ground Rules  Walkthrough concept requires the project people to make a presentation explaining the functioning of the system.  Ground rules should be understood by both the project team and the walkthrough team:  Size and makeup of the walkthrough team. 02/24/15 15NITTTR, Chandigarh
  • 16. Establish Ground Rules  Responsibility of the walkthrough team which is usually limited to recommendations, comments and questions.  Approximate length, time and location of the walkthrough.  Confidentiality of information discussed at the walkthrough. 02/24/15 16NITTTR, Chandigarh
  • 17. Establish Ground Rules  Who will receive the result of the walkthrough and how are those results to be used? 02/24/15 17NITTTR, Chandigarh
  • 18. Select Team/ Notify Participants  Most common participants on a walkthrough team include:  Information services project manager/systems analyst.  Senior management with responsibilty over the computerized areas.  Operations management.  User management 02/24/15 18NITTTR, Chandigarh
  • 19. Select Team/ Notify Participants  Consultants possessing needed expertise. 02/24/15 19NITTTR, Chandigarh
  • 20. Project Presentation  Good walkthrough includes presentation of the following:  Statements of the goals and objectives of the projects.  List of any exceptions made by the project team.  Discussion of the alternatives considered. 02/24/15 20NITTTR, Chandigarh
  • 21. Questions/Recommendations  Project presentation should be interrupted with questions, comments and recommendations as they occur to the walkthrough team.  Appoint one individual as recorder for the walkthrough. Recorder duty is capture questions for which appropriate answers are not supplied during the walkthrough. 02/24/15 21NITTTR, Chandigarh
  • 22. References  Effective Methods for Software Testing by William E.Perry, Third Edition NITTTR, Chandigarh 2202/24/15
  • 23. THANK YOU !!! 02/24/15 23NITTTR, Chandigarh