SlideShare une entreprise Scribd logo
1  sur  29
IMPLEMENTING THE
PROCUREMENT LEGISLATION
Winston Riley FAPETT
Chairman of the Private Sector Civil Society Group on Public
Procurement (PSCSG) Past President and Member of the Board
of JCC
Preamble
• The following are the main reasons for this presentation:
• (1) The present administration successively advocated for
amendments to the existing legislation and successfully
amended the legislation through Act #5 of 2016 which was
assented to on the 6th of June 2016
• (2) The administrative structure for implementing the legislation
appears to have been disbanded
• (3) The present administration made several announcements
on Implementation and March 31 st 2017 is the targeted date
for full implementation
The Two Stages of The Implementation
Process
1) Proclamation
(2) Operationalization
These two stages are interlinked. The Act affects every
aspect of government business thus, in order to initiate
operations some sections of the Act have to be proclaimed
without giving power to the sections of the Act which affects
external entities.
The Proclamation Process
(1) What is to be proclaimed
(2) The proclamation process
What is to be Proclaimed
At present there are two Acts to be proclaimed.
These two Act are now law but are subject to the
provision laid out in section 2 of the parent Act
which states “This Act comes into operation on
such date as is fixed by the President by
Proclamation.”
The Two Acts
(1) Act #1 of 2015 assented to 14th January,
2015 is an Act to provide for Public
Procurement, and for the retention and disposal
of public property, in accordance with the
principles of good governance, namely
accountability, transparency, integrity and value
for money, the establishment of the Office of
Procurement Regulation, the repeal of the
Partial Proclamation of Act #1 of 2015
Act #1 of 2015 was partially proclaimed on the 31st of July 2015.
WHEREAS it is provided by section 2 of the Public Procurement
and Disposal of Public Property Act, 2015 (hereinafter referred to
as "the Act") that the Act shall come into operation on such date
as is fixed by the President by Proclamation:
And whereas it is expedient that sections 1,2,3,4,5(1), 8, 9, 10,
11, 12, 13(l)(a), (b), (c), (d), (k), (p) and (r), 13(2),14(3), 15, 16,
17, 18, 19,20,21,22,23,25,62 and 63 of the Act come into
operation:
Appointment of the OPR
Section 10. (1) “The Office shall be governed by a Board which
shall be appointed by the President after consultation with the
Prime Minister and the Leader of the Opposition and shall
comprise no less than eight and no more than eleven members
as follows:”
(a) “The Procurement Regulator (hereinafter referred to as “the
Regulator, who shall be the Chairman”
Appointment of the OPR Cont.
(2) “The President, after consultation with the Prime
Minister and Leader of the Opposition shall appoint a
member as Deputy Chairman of the Board who shall
exercise the powers and functions of the Regulator in the
event of the Regulator’s absence or inability to exercise
his powers or perform his functions”
Regulations Section 63 (1)
“The Minister may, on the recommendation of the Office, make
regulations to give effect to the provisions of this Act, including
regulations with respect to—
(a) the conduct of challenge proceedings under Part V; and (b)
the addition to, or removal from, an ineligibility list under section
58.”
Regulations Section 63 (1) Cont.
(2) “Regulations made under this section may provide that the
contravention of any regulation constitutes an offence and
may prescribe penalties for any offence not exceeding a
fine of one million dollars and imprisonment for five years.”
(3) “Regulations made under this section shall be subject to
affirmative resolution of Parliament.”
Other Sections Proclaimed
Sections 1,2,3,4,5(1) and 8 are part of Part one the Preliminary
Section of the Act. They state how the Act is to cited, which
sections of the constitution are waved, conditions for
operationalization. Section 8 defines terms and objectives of the
Act. Section 8 states This Act binds the state.
Sections 11, 12, 13(l)(a), (b), (c), (d), (k), (p) and (r), 13(2),14(3),
15, 16, 17, 18, 19,20,21,22,23,25 are part of the Part two of the
Act dealing with General Provisions of the OPR
Section 62 gives immunity from personal liability for members of
the OPR, staff of the Office or to any authorized officer.
The Amendment to Act #1 of 2015
(Act # 5 of 2016)
The amendments deal specifically with
(1) The addition of a sub-section12 (h) to the parent Act and
deals with removal of a member of the OPR by the President.
(2) Matters related to the lifting of suspension of procurement
proceedings under Section 50 of the parent Act.
(3) The establishment of a Public Procurement Review Board to
review decisions of the OPR by inserting under sections 51 sub-
sections a to m of the parent Act
(4)The disposal of state lands through the addition of sub-section
57 A to the parent Act
Establishing the Environment for
Effective Implementation
The following conditions are necessary for the establishment of
an environment for effective Implementation:
1) The process must be transparent This can only be achieved
by having civil-society embedded in the process.
2) The establishing of the OPR and a Review Board envisage at
organisational level a major change management process.
3) The initiation of sustainable procurement brings into play
Value for Money and Risk Management which require a
change in mind set about the procurement process
Change Management Requirements
Sustainable Public Procurement as enviseaged by the act is
a process that takes into account the economic, environmental
and social impacts of the entity’s spending. Sustainable
procurement allows organizations to define goals and measure
outcomes in a way that achieves Value for Money on a whole-life
basis.
In the present context assessment of procurement performance
is defined in terms of the Central Tenders Board Act which is
modelled on procedural compliance.
The cultural shift is required. A shift in the mind set to a modern
results oriented management approach
Internal Control Framework
The establishment of a modern risk based Internal Control
Framework (ICF) for all procuring entities is the process by
which change management can be accomplished and the
principles of Transparency, Accountability and Value for Money
implemented.
An ICF is “a process, effected by a procuring entity’s designed to
provide reasonable assurance regarding the achievement of
objectives relating to operations, reporting and compliance.”
Its purpose is to provide a framework of accountability at all
stages of the procurement process through an effective system of
internal controls.
The ICF links the Procurement Act with the Audit and Exchequer
Act
and
Handbooks
The Office of
Procurement
Regulation
The Complexity of the Problem from
an Institutional Perspective
Public Bodies Under the Act No of
Ministries 21
Division of Ministries
Statutory Boards 15
Regional Corporations 14
Regional Corporation Districts 106
State Enterprises 100% Owned 59
State Enterprises Majority Owned 6
State Enterprise less than 50% 3
Indirectly Owned Majority Subsidiary 6
Tobago House of Assembly
Departments 12
Regional Health Authorities 5
The Office of the President;
Corruption and Global Competitiveness
Ranking of TT
T&T’s corruption is perceived to be worse than Jamaica and Cuba’s,
with almost no improvement for many years according to the
Corruption Perception Index (CPI). World Bank Governance indicators
show deterioration in Control of Corruption
T&T global competitive index has deteriorated from a score of 4.0 with
a rank of 84/144 in 2012, to score of 3.9 with a rank of 89/140 in 2016.
Private Bodies Subject to the Act
Public Money is at the centre of the procurement process. All
entities that use public money come under the Act.
Thus a private entity receiving a benefit or performing the
function or providing the service and receiving public monies for
so doing is subject to the Act—
This means that all non-profit organisations receiving public
monies are subject to the provisions of the Act
The Basic Elements Required for
Implementation
1.There are four aspects to the implementation of the public
procurement reforms that must be managed in parallel:
a. Establishing the Office of Procurement Regulation
b. Establishing the Review Board envisaged under the Amendment Bill
c. Readying public procuring entities
d. Planning and overseeing the dissolution of the Central Tenders Board
e. Readying the contractor and supplier communities for implementation
f. Educating private sector entities using public money as to their
responsibilities under the Act
g. Informing contractors and supplier as ttheir responsibilities under the
Act
Implementation Activities to Date
In November of
2014 cabinet
engaged the
The PSCSG –Positions and Recommendations
as at February 10th 2015
(1 )The Act can be proclaimed in part. There is precedent for
this. In this regard, the Office should be immediately
established.
(2) A committee of stake holders chaired by the Regulator
should be established. The PSCSG should be represented
on that committee
(3) Consultants should be engaged to advise the committee
of stake holders
(4 )The UNDP should continue to play the role of advising on
the requirements of the consulting team.
(5)Since this is a change management process, there should
Positions and Recommendations (cont’d)
(6) The proclamation of Act No 1 of 2015 partial or otherwise,
(7) The identification of staffing requirements for the OPR and the
approval of its budget.
(8) The passing of regulations by Parliament should be
completed before the general elections of 2015
(9) The process of establishing the Board of the OPR will take
time. In the interim it will be necessary to have a committee
working on regulations, staffing and budget requirements. This
committee should preferably not be chaired by an individual in
the public service
Implementation Activities (cont’d)
On March 12th 2015
Cabinet approved the
establishment of an
Achievements To Date
The achievements to date :-
1) A review of the Internal
Control Framework and
Model Procurement
Achievements To Date (cont’d)
The PSCSG advocated for a transparent process for procuring the
Regulator and Deputy Regulator and an expansion of the job
requirements as specified in the Act
“It is necessary to go beyond the minimum experience and
training as identified in the Procurement Act 2015. The function of
the Regulator is primarily to manage the OPR. There is no
requirement for the Regulator to have managerial experience or
skills in the Act. The proposed Regulator should have managed
an entity similar to the Office of Procurement Regulations (OPR)
for a period in excess of 5 years. In this regard the Act should be
appended to the job description” These recommendations
Achievements To Date (cont’d)
An important aspect of the work of the Oversight Committee was
to achieve with the concurrence of the President, a transparent
procurement process for the selection of the Regulator and the
Deputy Regulator. The committee met with the President and he
concurred with the approach outlined.
The approach was :
a) To have the Cabinet approve the job specifications and salary
ranges for the Regulator and Deputy Regulator
b) With the approval of the President allow the UNDP to
advertise internationally for both post positions. The
evaluation process to take place locally and a short list
The Way Forward
1)Reinstate with
amendments the
Oversight Committee
and the administrative

Contenu connexe

Tendances

Offences and Penalties under GST
Offences and Penalties under GSTOffences and Penalties under GST
Offences and Penalties under GSTGST Law India
 
UAE Tax procedures (with Index)
UAE Tax procedures (with Index)UAE Tax procedures (with Index)
UAE Tax procedures (with Index)Pankaj S. Jain
 
AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)
AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)
AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)Pankaj S. Jain
 
Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)
Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)
Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)Pankaj S. Jain
 
the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981 the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981 SURYAKANTVERMA2
 
Input tax-credit-mechanism-onlineversion-07june2017
Input tax-credit-mechanism-onlineversion-07june2017Input tax-credit-mechanism-onlineversion-07june2017
Input tax-credit-mechanism-onlineversion-07june2017KIRANKUMARPASALA1
 
WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS ...
WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS                 ...WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS                 ...
WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS ...Solidarity Fund PL, Office in Kyiv
 
(1) wateract1974
(1) wateract1974 (1) wateract1974
(1) wateract1974 Jameel Khan
 
ELECTRONIC WAY BILL (e-WAY BILL)
ELECTRONIC WAY  BILL  (e-WAY BILL) ELECTRONIC WAY  BILL  (e-WAY BILL)
ELECTRONIC WAY BILL (e-WAY BILL) gst-trichy
 
AN OVERVIEW OF IGST ACT
AN OVERVIEW OF IGST ACTAN OVERVIEW OF IGST ACT
AN OVERVIEW OF IGST ACTgst-trichy
 
Analysis of Negative list (17 Services)
Analysis of Negative list (17 Services)Analysis of Negative list (17 Services)
Analysis of Negative list (17 Services)CA Gupta
 
A brief introduction to the parliament of bhutan.
A brief introduction to the parliament of bhutan.A brief introduction to the parliament of bhutan.
A brief introduction to the parliament of bhutan.Sangay Khandu
 
Gst compensation-to-states-act
Gst compensation-to-states-actGst compensation-to-states-act
Gst compensation-to-states-actSumit Das
 
Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974SURYAKANTVERMA2
 
Pakistan INCOME TAX ORDINANCE (2001)
Pakistan INCOME TAX ORDINANCE (2001)Pakistan INCOME TAX ORDINANCE (2001)
Pakistan INCOME TAX ORDINANCE (2001)MuhammadBasit56
 
Pathways to-devolution-the-scope-for-decentralising-state-agencies
Pathways to-devolution-the-scope-for-decentralising-state-agenciesPathways to-devolution-the-scope-for-decentralising-state-agencies
Pathways to-devolution-the-scope-for-decentralising-state-agenciesAfrica Centre For Open Governance
 

Tendances (20)

Offences and Penalties under GST
Offences and Penalties under GSTOffences and Penalties under GST
Offences and Penalties under GST
 
UAE Tax procedures (with Index)
UAE Tax procedures (with Index)UAE Tax procedures (with Index)
UAE Tax procedures (with Index)
 
AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)
AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)
AskPankaj - Value Added Tax (VAT) law of the United Arab Emirates (UAE)
 
Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)
Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)
Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT) Law (with Index)
 
the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981 the air (prevention and control of pollution) act, 1981
the air (prevention and control of pollution) act, 1981
 
Input tax-credit-mechanism-onlineversion-07june2017
Input tax-credit-mechanism-onlineversion-07june2017Input tax-credit-mechanism-onlineversion-07june2017
Input tax-credit-mechanism-onlineversion-07june2017
 
WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS ...
WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS                 ...WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS                 ...
WOJCIECH MISIĄG REVENUE AND EXPENDITURE OF LOCAL GOVERNMENTS ...
 
Negative list
Negative listNegative list
Negative list
 
(1) wateract1974
(1) wateract1974 (1) wateract1974
(1) wateract1974
 
Thailand Disaster Management Law
Thailand Disaster Management LawThailand Disaster Management Law
Thailand Disaster Management Law
 
ELECTRONIC WAY BILL (e-WAY BILL)
ELECTRONIC WAY  BILL  (e-WAY BILL) ELECTRONIC WAY  BILL  (e-WAY BILL)
ELECTRONIC WAY BILL (e-WAY BILL)
 
AN OVERVIEW OF IGST ACT
AN OVERVIEW OF IGST ACTAN OVERVIEW OF IGST ACT
AN OVERVIEW OF IGST ACT
 
Unit 2 gst supply of goods
Unit 2 gst supply of goodsUnit 2 gst supply of goods
Unit 2 gst supply of goods
 
Analysis of Negative list (17 Services)
Analysis of Negative list (17 Services)Analysis of Negative list (17 Services)
Analysis of Negative list (17 Services)
 
A brief introduction to the parliament of bhutan.
A brief introduction to the parliament of bhutan.A brief introduction to the parliament of bhutan.
A brief introduction to the parliament of bhutan.
 
Gst compensation-to-states-act
Gst compensation-to-states-actGst compensation-to-states-act
Gst compensation-to-states-act
 
Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974Water (prevention and control of pollution) act, 1974
Water (prevention and control of pollution) act, 1974
 
Levy & collection
Levy & collectionLevy & collection
Levy & collection
 
Pakistan INCOME TAX ORDINANCE (2001)
Pakistan INCOME TAX ORDINANCE (2001)Pakistan INCOME TAX ORDINANCE (2001)
Pakistan INCOME TAX ORDINANCE (2001)
 
Pathways to-devolution-the-scope-for-decentralising-state-agencies
Pathways to-devolution-the-scope-for-decentralising-state-agenciesPathways to-devolution-the-scope-for-decentralising-state-agencies
Pathways to-devolution-the-scope-for-decentralising-state-agencies
 

En vedette

National public procurement policy framework
National public procurement policy frameworkNational public procurement policy framework
National public procurement policy frameworkDr Lendy Spires
 
Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...Carina Risvig Hamer
 
Media planing & selection for Products promotion
Media planing & selection for Products promotionMedia planing & selection for Products promotion
Media planing & selection for Products promotionZahir Khan
 
New Product Development Process
New Product Development ProcessNew Product Development Process
New Product Development ProcessAnvesh Sharma
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Saket Bansal
 
MBA663 Philippine Business Environment PPT presentation
MBA663 Philippine Business Environment PPT presentationMBA663 Philippine Business Environment PPT presentation
MBA663 Philippine Business Environment PPT presentationVictoria Caballero, MBA
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)Abu Bashar
 
Production planning
Production planningProduction planning
Production planningSarkar Jayo
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
An introduction to product planning and development
An introduction to product planning and developmentAn introduction to product planning and development
An introduction to product planning and developmentMaxwell Ranasinghe
 
Product planning & development
Product planning & developmentProduct planning & development
Product planning & developmentSoma Giri
 
Product and service design
Product and service designProduct and service design
Product and service designGrace Falcis
 

En vedette (18)

Vesna Gojkovic Milin, SIGMA Public procurement review bodies conference, Ohri...
Vesna Gojkovic Milin, SIGMA Public procurement review bodies conference, Ohri...Vesna Gojkovic Milin, SIGMA Public procurement review bodies conference, Ohri...
Vesna Gojkovic Milin, SIGMA Public procurement review bodies conference, Ohri...
 
National public procurement policy framework
National public procurement policy frameworkNational public procurement policy framework
National public procurement policy framework
 
Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...
 
Media planing & selection for Products promotion
Media planing & selection for Products promotionMedia planing & selection for Products promotion
Media planing & selection for Products promotion
 
Bid evaluation shopping
Bid evaluation   shoppingBid evaluation   shopping
Bid evaluation shopping
 
New Product Development Process
New Product Development ProcessNew Product Development Process
New Product Development Process
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar
 
Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013
 
MBA663 Philippine Business Environment PPT presentation
MBA663 Philippine Business Environment PPT presentationMBA663 Philippine Business Environment PPT presentation
MBA663 Philippine Business Environment PPT presentation
 
Public procurement act 2003 act 663
Public procurement act 2003 act 663Public procurement act 2003 act 663
Public procurement act 2003 act 663
 
Product planning
Product planningProduct planning
Product planning
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
 
Production planning
Production planningProduction planning
Production planning
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
An introduction to product planning and development
An introduction to product planning and developmentAn introduction to product planning and development
An introduction to product planning and development
 
Product planning & development
Product planning & developmentProduct planning & development
Product planning & development
 
Product and service design
Product and service designProduct and service design
Product and service design
 

Similaire à Implementing the procurement legislation

Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.Government of Ekiti State, Nigeria
 
The Real Estate (Regulation & Development) Act 2016 & its Draft Rules
The Real Estate (Regulation & Development) Act 2016 & its Draft RulesThe Real Estate (Regulation & Development) Act 2016 & its Draft Rules
The Real Estate (Regulation & Development) Act 2016 & its Draft RulesJash Vaidya
 
RoP-Legislative-Impact-Assessment-.pdf
RoP-Legislative-Impact-Assessment-.pdfRoP-Legislative-Impact-Assessment-.pdf
RoP-Legislative-Impact-Assessment-.pdfindra47847
 
опис дерегуляція
опис дерегуляціяопис дерегуляція
опис дерегуляціяtmelnik
 
SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...
SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...
SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...Iaroslav GREGIRCHAK
 
Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...
Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...
Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...Cummings
 
S v Mokhesi + 12 (Ace included)
S v Mokhesi + 12 (Ace included) S v Mokhesi + 12 (Ace included)
S v Mokhesi + 12 (Ace included) SABC News
 
Risk Analysis in Audit Plannig.doc
Risk Analysis in Audit Plannig.docRisk Analysis in Audit Plannig.doc
Risk Analysis in Audit Plannig.docNeerajOjha17
 
DAP: A Digest of the Supreme Court Decision
DAP: A Digest of the Supreme Court DecisionDAP: A Digest of the Supreme Court Decision
DAP: A Digest of the Supreme Court DecisionDashfox
 
PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015
PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015
PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015Nigel Campbell
 
COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...
COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...
COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...New Corporate Laws Treatise(NCLT)
 
Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...
Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...
Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...Cummings
 
RERA FAQ Legal Advice Online
RERA FAQ Legal Advice OnlineRERA FAQ Legal Advice Online
RERA FAQ Legal Advice OnlineSatish Mishra
 
Frequently asked Questions on RERA
Frequently asked Questions on RERA Frequently asked Questions on RERA
Frequently asked Questions on RERA ApnaComplex
 

Similaire à Implementing the procurement legislation (20)

Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
Ekiti State Fiscal Responsibility (First Amendment) Law, 2020.
 
The Real Estate (Regulation & Development) Act 2016 & its Draft Rules
The Real Estate (Regulation & Development) Act 2016 & its Draft RulesThe Real Estate (Regulation & Development) Act 2016 & its Draft Rules
The Real Estate (Regulation & Development) Act 2016 & its Draft Rules
 
RoP-Legislative-Impact-Assessment-.pdf
RoP-Legislative-Impact-Assessment-.pdfRoP-Legislative-Impact-Assessment-.pdf
RoP-Legislative-Impact-Assessment-.pdf
 
Ekiti State Public Procurement Law
Ekiti State Public Procurement LawEkiti State Public Procurement Law
Ekiti State Public Procurement Law
 
опис дерегуляція
опис дерегуляціяопис дерегуляція
опис дерегуляція
 
SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...
SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...
SYSTEMIC REPORT "CHALLENGES AND PROBLEMS IN THE SPHERE OF COMPETITION PROTECT...
 
IBC_in_Covid-19_25.04.20_Adv. CA Puneet Agrawal
IBC_in_Covid-19_25.04.20_Adv. CA Puneet AgrawalIBC_in_Covid-19_25.04.20_Adv. CA Puneet Agrawal
IBC_in_Covid-19_25.04.20_Adv. CA Puneet Agrawal
 
Analysis of the fiscal management bill-2008
Analysis of the fiscal management bill-2008Analysis of the fiscal management bill-2008
Analysis of the fiscal management bill-2008
 
Agenda Public finance management and audit in Jordan, Amman 4-5 November 2014
Agenda Public finance management and audit in Jordan, Amman 4-5 November 2014Agenda Public finance management and audit in Jordan, Amman 4-5 November 2014
Agenda Public finance management and audit in Jordan, Amman 4-5 November 2014
 
Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...
Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...
Legal shorts 20.03.15 including March 2015 Budget and disguised fee income su...
 
S v Mokhesi + 12 (Ace included)
S v Mokhesi + 12 (Ace included) S v Mokhesi + 12 (Ace included)
S v Mokhesi + 12 (Ace included)
 
Risk Analysis in Audit Plannig.doc
Risk Analysis in Audit Plannig.docRisk Analysis in Audit Plannig.doc
Risk Analysis in Audit Plannig.doc
 
DAP: A Digest of the Supreme Court Decision
DAP: A Digest of the Supreme Court DecisionDAP: A Digest of the Supreme Court Decision
DAP: A Digest of the Supreme Court Decision
 
PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015
PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015
PSCSG response before the JSC on the PP & DPP (Amendment) Bill 2015
 
COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...
COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...
COMPANIES ACT, 2013 - CONSTITUTION OF NATIONAL COMPANY LAW TRIBUNAL AND NATIO...
 
Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...
Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...
Legal shorts 28.11.14 including FCA reminder of new ‘connect’ portal for firm...
 
Public announcement
Public announcementPublic announcement
Public announcement
 
Fiscal responsibility law
Fiscal responsibility lawFiscal responsibility law
Fiscal responsibility law
 
RERA FAQ Legal Advice Online
RERA FAQ Legal Advice OnlineRERA FAQ Legal Advice Online
RERA FAQ Legal Advice Online
 
Frequently asked Questions on RERA
Frequently asked Questions on RERA Frequently asked Questions on RERA
Frequently asked Questions on RERA
 

Plus de Nigel Campbell

Public procurement & Disposal - comparison between the Guyanese and T&T laws
Public procurement & Disposal - comparison between the Guyanese and T&T lawsPublic procurement & Disposal - comparison between the Guyanese and T&T laws
Public procurement & Disposal - comparison between the Guyanese and T&T lawsNigel Campbell
 
The Integrity Matrix - a comparison of Anti-Corruption approaches
The Integrity Matrix - a comparison of Anti-Corruption approachesThe Integrity Matrix - a comparison of Anti-Corruption approaches
The Integrity Matrix - a comparison of Anti-Corruption approachesNigel Campbell
 
Property Tax? OR Tax on Property?
Property Tax? OR Tax on Property?Property Tax? OR Tax on Property?
Property Tax? OR Tax on Property?Nigel Campbell
 
The 2012 visionary moment
The 2012 visionary momentThe 2012 visionary moment
The 2012 visionary momentNigel Campbell
 
The evolving East Port of Spain growth pole and heritage site plan
The evolving East Port of Spain growth pole and heritage site planThe evolving East Port of Spain growth pole and heritage site plan
The evolving East Port of Spain growth pole and heritage site planNigel Campbell
 
The politics of procurement
The politics of procurementThe politics of procurement
The politics of procurementNigel Campbell
 
The imperative of public procurement: the government to government arrangements
The imperative of public procurement: the government to government arrangementsThe imperative of public procurement: the government to government arrangements
The imperative of public procurement: the government to government arrangementsNigel Campbell
 
The CL Financial bailout
The CL Financial bailoutThe CL Financial bailout
The CL Financial bailoutNigel Campbell
 
A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)Nigel Campbell
 

Plus de Nigel Campbell (9)

Public procurement & Disposal - comparison between the Guyanese and T&T laws
Public procurement & Disposal - comparison between the Guyanese and T&T lawsPublic procurement & Disposal - comparison between the Guyanese and T&T laws
Public procurement & Disposal - comparison between the Guyanese and T&T laws
 
The Integrity Matrix - a comparison of Anti-Corruption approaches
The Integrity Matrix - a comparison of Anti-Corruption approachesThe Integrity Matrix - a comparison of Anti-Corruption approaches
The Integrity Matrix - a comparison of Anti-Corruption approaches
 
Property Tax? OR Tax on Property?
Property Tax? OR Tax on Property?Property Tax? OR Tax on Property?
Property Tax? OR Tax on Property?
 
The 2012 visionary moment
The 2012 visionary momentThe 2012 visionary moment
The 2012 visionary moment
 
The evolving East Port of Spain growth pole and heritage site plan
The evolving East Port of Spain growth pole and heritage site planThe evolving East Port of Spain growth pole and heritage site plan
The evolving East Port of Spain growth pole and heritage site plan
 
The politics of procurement
The politics of procurementThe politics of procurement
The politics of procurement
 
The imperative of public procurement: the government to government arrangements
The imperative of public procurement: the government to government arrangementsThe imperative of public procurement: the government to government arrangements
The imperative of public procurement: the government to government arrangements
 
The CL Financial bailout
The CL Financial bailoutThe CL Financial bailout
The CL Financial bailout
 
A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)A national investment infrastructure bank {nib} presentation 1 11-11(01)
A national investment infrastructure bank {nib} presentation 1 11-11(01)
 

Dernier

Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageTechSoup
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 

Dernier (20)

Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized Storage
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 

Implementing the procurement legislation

  • 1. IMPLEMENTING THE PROCUREMENT LEGISLATION Winston Riley FAPETT Chairman of the Private Sector Civil Society Group on Public Procurement (PSCSG) Past President and Member of the Board of JCC
  • 2. Preamble • The following are the main reasons for this presentation: • (1) The present administration successively advocated for amendments to the existing legislation and successfully amended the legislation through Act #5 of 2016 which was assented to on the 6th of June 2016 • (2) The administrative structure for implementing the legislation appears to have been disbanded • (3) The present administration made several announcements on Implementation and March 31 st 2017 is the targeted date for full implementation
  • 3. The Two Stages of The Implementation Process 1) Proclamation (2) Operationalization These two stages are interlinked. The Act affects every aspect of government business thus, in order to initiate operations some sections of the Act have to be proclaimed without giving power to the sections of the Act which affects external entities.
  • 4. The Proclamation Process (1) What is to be proclaimed (2) The proclamation process
  • 5. What is to be Proclaimed At present there are two Acts to be proclaimed. These two Act are now law but are subject to the provision laid out in section 2 of the parent Act which states “This Act comes into operation on such date as is fixed by the President by Proclamation.”
  • 6. The Two Acts (1) Act #1 of 2015 assented to 14th January, 2015 is an Act to provide for Public Procurement, and for the retention and disposal of public property, in accordance with the principles of good governance, namely accountability, transparency, integrity and value for money, the establishment of the Office of Procurement Regulation, the repeal of the
  • 7. Partial Proclamation of Act #1 of 2015 Act #1 of 2015 was partially proclaimed on the 31st of July 2015. WHEREAS it is provided by section 2 of the Public Procurement and Disposal of Public Property Act, 2015 (hereinafter referred to as "the Act") that the Act shall come into operation on such date as is fixed by the President by Proclamation: And whereas it is expedient that sections 1,2,3,4,5(1), 8, 9, 10, 11, 12, 13(l)(a), (b), (c), (d), (k), (p) and (r), 13(2),14(3), 15, 16, 17, 18, 19,20,21,22,23,25,62 and 63 of the Act come into operation:
  • 8. Appointment of the OPR Section 10. (1) “The Office shall be governed by a Board which shall be appointed by the President after consultation with the Prime Minister and the Leader of the Opposition and shall comprise no less than eight and no more than eleven members as follows:” (a) “The Procurement Regulator (hereinafter referred to as “the Regulator, who shall be the Chairman”
  • 9. Appointment of the OPR Cont. (2) “The President, after consultation with the Prime Minister and Leader of the Opposition shall appoint a member as Deputy Chairman of the Board who shall exercise the powers and functions of the Regulator in the event of the Regulator’s absence or inability to exercise his powers or perform his functions”
  • 10. Regulations Section 63 (1) “The Minister may, on the recommendation of the Office, make regulations to give effect to the provisions of this Act, including regulations with respect to— (a) the conduct of challenge proceedings under Part V; and (b) the addition to, or removal from, an ineligibility list under section 58.”
  • 11. Regulations Section 63 (1) Cont. (2) “Regulations made under this section may provide that the contravention of any regulation constitutes an offence and may prescribe penalties for any offence not exceeding a fine of one million dollars and imprisonment for five years.” (3) “Regulations made under this section shall be subject to affirmative resolution of Parliament.”
  • 12. Other Sections Proclaimed Sections 1,2,3,4,5(1) and 8 are part of Part one the Preliminary Section of the Act. They state how the Act is to cited, which sections of the constitution are waved, conditions for operationalization. Section 8 defines terms and objectives of the Act. Section 8 states This Act binds the state. Sections 11, 12, 13(l)(a), (b), (c), (d), (k), (p) and (r), 13(2),14(3), 15, 16, 17, 18, 19,20,21,22,23,25 are part of the Part two of the Act dealing with General Provisions of the OPR Section 62 gives immunity from personal liability for members of the OPR, staff of the Office or to any authorized officer.
  • 13. The Amendment to Act #1 of 2015 (Act # 5 of 2016) The amendments deal specifically with (1) The addition of a sub-section12 (h) to the parent Act and deals with removal of a member of the OPR by the President. (2) Matters related to the lifting of suspension of procurement proceedings under Section 50 of the parent Act. (3) The establishment of a Public Procurement Review Board to review decisions of the OPR by inserting under sections 51 sub- sections a to m of the parent Act (4)The disposal of state lands through the addition of sub-section 57 A to the parent Act
  • 14. Establishing the Environment for Effective Implementation The following conditions are necessary for the establishment of an environment for effective Implementation: 1) The process must be transparent This can only be achieved by having civil-society embedded in the process. 2) The establishing of the OPR and a Review Board envisage at organisational level a major change management process. 3) The initiation of sustainable procurement brings into play Value for Money and Risk Management which require a change in mind set about the procurement process
  • 15. Change Management Requirements Sustainable Public Procurement as enviseaged by the act is a process that takes into account the economic, environmental and social impacts of the entity’s spending. Sustainable procurement allows organizations to define goals and measure outcomes in a way that achieves Value for Money on a whole-life basis. In the present context assessment of procurement performance is defined in terms of the Central Tenders Board Act which is modelled on procedural compliance. The cultural shift is required. A shift in the mind set to a modern results oriented management approach
  • 16. Internal Control Framework The establishment of a modern risk based Internal Control Framework (ICF) for all procuring entities is the process by which change management can be accomplished and the principles of Transparency, Accountability and Value for Money implemented. An ICF is “a process, effected by a procuring entity’s designed to provide reasonable assurance regarding the achievement of objectives relating to operations, reporting and compliance.” Its purpose is to provide a framework of accountability at all stages of the procurement process through an effective system of internal controls. The ICF links the Procurement Act with the Audit and Exchequer Act
  • 18. The Complexity of the Problem from an Institutional Perspective Public Bodies Under the Act No of Ministries 21 Division of Ministries Statutory Boards 15 Regional Corporations 14 Regional Corporation Districts 106 State Enterprises 100% Owned 59 State Enterprises Majority Owned 6 State Enterprise less than 50% 3 Indirectly Owned Majority Subsidiary 6 Tobago House of Assembly Departments 12 Regional Health Authorities 5 The Office of the President;
  • 19. Corruption and Global Competitiveness Ranking of TT T&T’s corruption is perceived to be worse than Jamaica and Cuba’s, with almost no improvement for many years according to the Corruption Perception Index (CPI). World Bank Governance indicators show deterioration in Control of Corruption T&T global competitive index has deteriorated from a score of 4.0 with a rank of 84/144 in 2012, to score of 3.9 with a rank of 89/140 in 2016.
  • 20. Private Bodies Subject to the Act Public Money is at the centre of the procurement process. All entities that use public money come under the Act. Thus a private entity receiving a benefit or performing the function or providing the service and receiving public monies for so doing is subject to the Act— This means that all non-profit organisations receiving public monies are subject to the provisions of the Act
  • 21. The Basic Elements Required for Implementation 1.There are four aspects to the implementation of the public procurement reforms that must be managed in parallel: a. Establishing the Office of Procurement Regulation b. Establishing the Review Board envisaged under the Amendment Bill c. Readying public procuring entities d. Planning and overseeing the dissolution of the Central Tenders Board e. Readying the contractor and supplier communities for implementation f. Educating private sector entities using public money as to their responsibilities under the Act g. Informing contractors and supplier as ttheir responsibilities under the Act
  • 22. Implementation Activities to Date In November of 2014 cabinet engaged the
  • 23. The PSCSG –Positions and Recommendations as at February 10th 2015 (1 )The Act can be proclaimed in part. There is precedent for this. In this regard, the Office should be immediately established. (2) A committee of stake holders chaired by the Regulator should be established. The PSCSG should be represented on that committee (3) Consultants should be engaged to advise the committee of stake holders (4 )The UNDP should continue to play the role of advising on the requirements of the consulting team. (5)Since this is a change management process, there should
  • 24. Positions and Recommendations (cont’d) (6) The proclamation of Act No 1 of 2015 partial or otherwise, (7) The identification of staffing requirements for the OPR and the approval of its budget. (8) The passing of regulations by Parliament should be completed before the general elections of 2015 (9) The process of establishing the Board of the OPR will take time. In the interim it will be necessary to have a committee working on regulations, staffing and budget requirements. This committee should preferably not be chaired by an individual in the public service
  • 25. Implementation Activities (cont’d) On March 12th 2015 Cabinet approved the establishment of an
  • 26. Achievements To Date The achievements to date :- 1) A review of the Internal Control Framework and Model Procurement
  • 27. Achievements To Date (cont’d) The PSCSG advocated for a transparent process for procuring the Regulator and Deputy Regulator and an expansion of the job requirements as specified in the Act “It is necessary to go beyond the minimum experience and training as identified in the Procurement Act 2015. The function of the Regulator is primarily to manage the OPR. There is no requirement for the Regulator to have managerial experience or skills in the Act. The proposed Regulator should have managed an entity similar to the Office of Procurement Regulations (OPR) for a period in excess of 5 years. In this regard the Act should be appended to the job description” These recommendations
  • 28. Achievements To Date (cont’d) An important aspect of the work of the Oversight Committee was to achieve with the concurrence of the President, a transparent procurement process for the selection of the Regulator and the Deputy Regulator. The committee met with the President and he concurred with the approach outlined. The approach was : a) To have the Cabinet approve the job specifications and salary ranges for the Regulator and Deputy Regulator b) With the approval of the President allow the UNDP to advertise internationally for both post positions. The evaluation process to take place locally and a short list
  • 29. The Way Forward 1)Reinstate with amendments the Oversight Committee and the administrative