                               LEAN MANAGEMENT

                               Organizational Development

Lean management is a way to eliminate waste and improve efficiency in a manufacturing
environment.

Lean focuses on flow, the value stream and eliminating MUDA a Japanese word for waste.
It is basically to produce the goods with less of everything: human effort, material,
inventory, time and space.




For a lean project to be sustainable, the following four phases in a project are of utmost
importance viz-

   1. Foundation
   2. Preparation
   3. Implementation
   4. Sustainability

Any inconsistency in the above phases can lead to failure of lean methodology. Lean failure
is caused majorly if there are hurdles in individual, group and organizational objectives.



                                                                                   Page 1 of 10
Lean Management




Some of the factors that can be associated with failure in the implementation of lean
manufacturing initiatives are: leadership,    organizational culture, skills and expertise,
absence of bottom-up implementation approach team autonomy, senior management
commitment and participation and organizational communication, training, project
selection, employee engagement, desire to improve, management’s resistance to change,
absence of feedback system, accountability and ownership.



Successful Implementation of Lean Management:


                           Subway: Eat Fresh, Live Green

Though Subway does not advertise themselves as a Lean corporation but their restaurants
seem to employ some basic Lean principles.

This example is based on our understanding of the lean management concept and our
observation at the Subway Outlet.




The sandwich area is laid out in the form of an assembly line from taking the order to
paying for the order. There are signs with pictures along the assembly process to support the
customer order. Everything used to make the sandwich is displayed on the line through clear
viewing panels.

                                                                                 Page 2 of 10
Lean Management


   Reasons for successful implementation:


 Overproduction:


   Subway makes their sandwiches to customer demand. They make the exact sandwich
   the customer wants at the time the customer orders it. They process one customer at a
   time. They follow the principle of one-piece flow. Also the main commitment of
   Subway is Eat Fresh they do not make any sandwiches beforehand. This reduces
   overproduction.


 Defects:


   The sandwiches are made according to the demand of the customer & as per their will.
   Even the quantity of toppings is as per the requirement & demand of the customer thus
   the changes of defect is zero.


 Transportation:


   During heavy volume times they apply one-piece flow using a team instead of
   individuals. Team members will assemble parts of the sandwich passing it from one to
   another along the serving line. Each person performs a specified task in a specific
   sequence. Hence this reduces the transportation of the product from one hand to other
   as the arrangement is in the form of an assembly line.


 Waiting Time:


   The waiting time of the customer as well as the person making the sandwiches is
   reduced as he is busy making one sandwich after the other.


 Inventory:


   While the sandwich is made just in time the materials to make all the sandwiches have
   been prepared beforehand. Due to the need for freshness and longer cycle times the


                                                                             Page 3 of 10
Lean Management


   bread is baked, cheese is sliced, and vegetables are cut prior to the store opening. For
   example, lettuce and tomatoes will be found closest to the team member in multiple
   large size bins while the hot peppers and olives will be in smaller bins further away.
   Some of the inventory is kited for accuracy and efficiency like the meat. This allows
   Subway to produce the same size sandwich every time for a 12 inch or 6 inch sandwich
   in every restaurant. The kit also helps control inventory by knowing how much is
   consumed for each sandwich enabling a simple replenishment scheme. As the team
   member is preparing the sandwich if he consumes the last item in the bin he was using
   and turned to the refrigerator behind him to replace the bin. He slides the older bins
   closest to him and placed the newest bin in back of the others. This technique meant the
   customer was getting the freshest produce while not spoiling their inventory. This also
   reduces the motion from one place to another to get the toppings.


 Over Processing:


   Subway uses simple methods to make the sandwiches. The product undergoes
   minimum processes since the sandwiches are handmade. This reduces over processing.


 Motion:


   The raw materials are stored at the point of use in bins in the assembly line. They are
   placed in the order in which the sandwich is prepared creating a standard while mistake
   proofing the preparation sequence. The amount of the vegetables prepared and the
   location in the line is based on the popularity of the product.




                                Food is Always a Good Motivator.




                                                                               Page 4 of 10
Lean Management




Failure of Lean Management:


The derailment of a Lean initiative at Environs, a Northern New England
company


Environs, a Northern New England company is a manufacturing unit which deals in
producing pumping components for automotive and industrial concerns worldwide. Opened
in 1968, it began making machined parts from steel bar stock at the plant in Northern New
England. The company was purchased by Midwestern corporation in 1985, a leader in
motion services. This led to its listing on the Newyork Stock Exchange and expansion as
well as rapid changes.

The Company experienced many good years from 1985 through 2000. This tide, so to
speak, changed after 2000, when NNE Co. struggled to satisfy increased customer demand
for product units, for the quality thereof, and for rapid delivery. To combat the poor
shipping performance and to recoup money lost every day on premium freight costs, the
plant manager moved to implement lean manufacturing in 2000.


Factors that led to failure:

    Resistance to Change:


       Resistance to changes was a common theme at NNE during the lean implementation
       from 2000 to 2008. In 2002, the CEO at NNE decided to purchase upgraded
       automation equipment, even though the fuel product line department had plenty of
       capacity with existing older equipment. This purchase was expected to reduce both
       the time for set-ups and the level of mechanical skill needed for set-ups.
       Nonetheless, these expected improvements met strong resistance from the assigned
       employees until the older equipment had been removed from the area.


       The main reason for resistance in the organization for change was:




                                                                                 Page 5 of 10
Lean Management


   No Involvement of Employees in Decision Making:- The Company had 12 hr
   shift, it was learned that the night shift employees resisted change to the new
   procedures on 1 of the project . The main reason of these resistance was that the
   night shift employees were not involved in the project , the area experts were
   entirely left out of the decision making about the changes to be made.


   No Support/help was provided:-There was nobody during the night shifts who
   could help the employees if they had any problem with the new procedure (followed
   in lean management) or other concerns



 Lack of Timely Communication:



   The failure of top management to create, embrace, and communicate a strategic
   organizational plan, a compelling vision, and purpose and goals about lean
   manufacturing created a communication gap between leaders and followers at NNE.
   There were great opportunities here for communication improvement throughout the
   organization. Even though employees reported instances of good ideas coming from
   low in the organizational hierarchy, their managers largely ignored those ideas.


          Timely communication was missing as in some cases the off shift people
          knew about the project after they came to work and the saw the changes.


          Resentment from other shifts occurs whenever the lack of communication
          causes the work to be more difficult to accomplish. “If problems occur on the
          first shift, they may carry over to the second or third shift.          Hence,
          communication between shifts is critical.



 Training and development:



   Managers at all levels of the organization must participate in the training and must
   both understand the benefits of lean and have the necessary capacities for its


                                                                             Page 6 of 10
Lean Management


   implementation. To support the organizational transformation to lean, the company
   should invest in continued mentoring. At NNE, Lean training classes stopped after 2
   years, leaving a basic skill gap for newer employees. The employees were not given
   classroom training on topics such as Company’s Management Philosophy,
   leadership development, problem solving, safety, etc.


   The organization did not have a good reporting system so it was a problem. To
   monitor and maintain both the success of training and the project, itself, team
   members should develop a good reporting system of numerous key measurements to
   identify, track, and measure project gains.



   Lean training classes were stopped after few years leaving a basic skill gap for newer
   employees.



 Loss of Focus & Leadership Vision:


   “Under the leadership factor, management should have a clear vision, strategic
   initiatives, a good level of education, and the willingness to support productivity
   improvement initiatives like Lean manufacturing”. The vision, while clear, must be
   shared with all in the organization.


   Initially when the organization implemented lean management there was a steering
   committee which discussed the regular training that need to be given, the new
   projects that would be undertaken etc.        The group remained active until the plant
   manager who began the lean implementation was transferred in December 2005.


   The new plant manager, who was supportive of lean, attended the meetings only
   occasionally; and therefore, the weekly meetings became less important to
   committee members. Previously, this lean meeting had been just about the most
   important hour of the week for committee members, and people were fined if they
   came late. The lean manager regularly scheduled and attempted to facilitate the
   meetings, but soon group members stopped attending the meetings. Weekly


                                                                               Page 7 of 10
Lean Management


   meetings have since stopped, there have been no training classes, waste reduction
   implementations were not being submitted on time, there was no recognition of
   employees’ accomplishments, and projects were no longer planned.


 Project Selection:


   A best practice for an organization is to prioritize potential projects against clearly
   identified strategic business objectives. Selection criteria should also be well
   communicated to team members to ensure adequate time is spent on selected
   projects.

   It was reported that the project selection process of the organization was either
   completed too quickly without sufficient thought or that projects were initiated
   because they were “pet projects” and biased in their selection process.


   Managers and line employees differed in their beliefs about the criteria used for
   determining which projects should be implemented and the level of gains made in
   those projects




 Lack of Accountability / Ownership



   Lean projects require managers to take responsibility to produce lean results within a
   specific time frame as well as ownership for the results and there should be follow-
   up by management and team project members to ensure continuous improvement.

   Lack of attention to lean manufacturing over several months gave employees the
   impression that lean is good to do only if they have time; and that if they have other
   things to do, then it is okay to ignore it. So here in many case the Projects were lost
   because the managers stop watching.


   In many cases people will only follow new standard work as long as management
   watches



                                                                              Page 8 of 10
Lean Management




 Project Team Selection


   During the Implementation phase of a lean project, a first step would be to select
   appropriate team members. Since selected employees for the project help determine
   its direction, this vital step, when done correctly, will have positive effects on the
   project, ensuring the proper mix of personnel who will take ownership and
   responsibility for the sustainable implementation of the project. A standard lean team
   makeup includes a facilitator, leader, area expert, an observer, plus an occasional
   maintenance person.


   It was observed that Instability in the projects is created by not having sufficient
   personnel to follow the standard-work that has been implemented by the continuous
   improvement team. An example is that often the standard-work requires that
   changeovers be completed with a “two-man” set-up. In actual practice this rarely
   happens after the 30-day follow up has been completed.




   It was also observed that whenever the project was large, more team members were
   selected from a pool of employees interested in participating. Since projects were
   often done with only one area person as a team member, the result was that only one
   person became familiar with the focus area and able to make key decisions about
   change




 Absence of benchmarking employee satisfaction:


   The projects should have conformed to at least three criteria for benchmarking:
   process improvement and simplification, quality improvement, and safer work
   stations. There was failure to address all the above employee concerns.




                                                                             Page 9 of 10
Lean Management


    Employee Engagement:


       The scope and level of employee input in the decision making process were low.
       The employees at NNE felt disconnected and devalued primarily because the
       management often predetermined the paths of projects, thus discounting employee
       engagement in the decision making process. The employees here, did not feel
       empowered to share their voice in continuous improvement initiatives.
       Lack of flexibility: The project mainly had four types of employees, viz. facilitator,
       leader, area expert, observer and an occasional maintenance person. There was lack
       of flexibility among these employees.


    Lack of continued follow-up:


       The management system did not adequately provide needed follow-up to ensure
       accountability for sustaining project gains. This laid back attitude on the behalf of
       the management lead the employees to believe that lean is good to do only if they
       have time or else it is okay to ignore it.



The basic pitfall that happened here was that only the management was accountable to all
the changes that were happening in the organization. Had the employees been equally
involved from the beginning, the lean approach would have been a success.




                                                                                Page 10 of 10

Contenu connexe

Tendances (20)

Kaizen
KaizenKaizen
Kaizen
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Visual management
Visual managementVisual management
Visual management
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Lean management
Lean management Lean management
Lean management
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Kanban
KanbanKanban
Kanban
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kaizen
KaizenKaizen
Kaizen
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 

En vedette (6)

Lean system
Lean systemLean system
Lean system
 
lean production
lean productionlean production
lean production
 
lean production
lean productionlean production
lean production
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
Lean System
Lean SystemLean System
Lean System
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 

Similaire à Lean management

Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Corealanlund
 
IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)rujbennett
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptxSaranshGera2
 
DCSUG - Finding Lean in Agile
DCSUG - Finding Lean in AgileDCSUG - Finding Lean in Agile
DCSUG - Finding Lean in AgileExcella
 
Applying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentationApplying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentationFayssal AL-KILANI
 
Undersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signUndersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signTeh Chin Weng
 
How to do Change Management for mandatory change
How to do Change Management for mandatory changeHow to do Change Management for mandatory change
How to do Change Management for mandatory changeProsci ANZ
 
Project Management
Project ManagementProject Management
Project ManagementMayanSardana
 
Succeeding in a change saturated environment - Being Human Change Community o...
Succeeding in a change saturated environment - Being Human Change Community o...Succeeding in a change saturated environment - Being Human Change Community o...
Succeeding in a change saturated environment - Being Human Change Community o...Prosci ANZ
 
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdfHow Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdfMr. Business Magazine
 

Similaire à Lean management (20)

Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Core
 
IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptx
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Finding Lean in Agile by Adam Parker
Finding Lean in Agile by Adam ParkerFinding Lean in Agile by Adam Parker
Finding Lean in Agile by Adam Parker
 
DCSUG - Finding Lean in Agile
DCSUG - Finding Lean in AgileDCSUG - Finding Lean in Agile
DCSUG - Finding Lean in Agile
 
Lean Change Management
Lean Change ManagementLean Change Management
Lean Change Management
 
Kaizen: Elevating Continuous Improvement for Success
Kaizen: Elevating Continuous Improvement for SuccessKaizen: Elevating Continuous Improvement for Success
Kaizen: Elevating Continuous Improvement for Success
 
Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"
 
Applying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentationApplying lean thinking in the food supply chain presentation
Applying lean thinking in the food supply chain presentation
 
GEMBAKAIZEN
GEMBAKAIZENGEMBAKAIZEN
GEMBAKAIZEN
 
Undersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signUndersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content sign
 
Culture for implementing_lean
Culture for implementing_leanCulture for implementing_lean
Culture for implementing_lean
 
Culture for implementing_lean
Culture for implementing_leanCulture for implementing_lean
Culture for implementing_lean
 
Culture for implementing_lean
Culture for implementing_leanCulture for implementing_lean
Culture for implementing_lean
 
Culture for implementing lean
Culture for implementing leanCulture for implementing lean
Culture for implementing lean
 
How to do Change Management for mandatory change
How to do Change Management for mandatory changeHow to do Change Management for mandatory change
How to do Change Management for mandatory change
 
Project Management
Project ManagementProject Management
Project Management
 
Succeeding in a change saturated environment - Being Human Change Community o...
Succeeding in a change saturated environment - Being Human Change Community o...Succeeding in a change saturated environment - Being Human Change Community o...
Succeeding in a change saturated environment - Being Human Change Community o...
 
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdfHow Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
 

Dernier

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Dernier (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

Lean management

  • 1. Lean Management Assignment 1 LEAN MANAGEMENT Organizational Development Lean management is a way to eliminate waste and improve efficiency in a manufacturing environment. Lean focuses on flow, the value stream and eliminating MUDA a Japanese word for waste. It is basically to produce the goods with less of everything: human effort, material, inventory, time and space. For a lean project to be sustainable, the following four phases in a project are of utmost importance viz- 1. Foundation 2. Preparation 3. Implementation 4. Sustainability Any inconsistency in the above phases can lead to failure of lean methodology. Lean failure is caused majorly if there are hurdles in individual, group and organizational objectives. Page 1 of 10
  • 2. Lean Management Some of the factors that can be associated with failure in the implementation of lean manufacturing initiatives are: leadership, organizational culture, skills and expertise, absence of bottom-up implementation approach team autonomy, senior management commitment and participation and organizational communication, training, project selection, employee engagement, desire to improve, management’s resistance to change, absence of feedback system, accountability and ownership. Successful Implementation of Lean Management: Subway: Eat Fresh, Live Green Though Subway does not advertise themselves as a Lean corporation but their restaurants seem to employ some basic Lean principles. This example is based on our understanding of the lean management concept and our observation at the Subway Outlet. The sandwich area is laid out in the form of an assembly line from taking the order to paying for the order. There are signs with pictures along the assembly process to support the customer order. Everything used to make the sandwich is displayed on the line through clear viewing panels. Page 2 of 10
  • 3. Lean Management Reasons for successful implementation:  Overproduction: Subway makes their sandwiches to customer demand. They make the exact sandwich the customer wants at the time the customer orders it. They process one customer at a time. They follow the principle of one-piece flow. Also the main commitment of Subway is Eat Fresh they do not make any sandwiches beforehand. This reduces overproduction.  Defects: The sandwiches are made according to the demand of the customer & as per their will. Even the quantity of toppings is as per the requirement & demand of the customer thus the changes of defect is zero.  Transportation: During heavy volume times they apply one-piece flow using a team instead of individuals. Team members will assemble parts of the sandwich passing it from one to another along the serving line. Each person performs a specified task in a specific sequence. Hence this reduces the transportation of the product from one hand to other as the arrangement is in the form of an assembly line.  Waiting Time: The waiting time of the customer as well as the person making the sandwiches is reduced as he is busy making one sandwich after the other.  Inventory: While the sandwich is made just in time the materials to make all the sandwiches have been prepared beforehand. Due to the need for freshness and longer cycle times the Page 3 of 10
  • 4. Lean Management bread is baked, cheese is sliced, and vegetables are cut prior to the store opening. For example, lettuce and tomatoes will be found closest to the team member in multiple large size bins while the hot peppers and olives will be in smaller bins further away. Some of the inventory is kited for accuracy and efficiency like the meat. This allows Subway to produce the same size sandwich every time for a 12 inch or 6 inch sandwich in every restaurant. The kit also helps control inventory by knowing how much is consumed for each sandwich enabling a simple replenishment scheme. As the team member is preparing the sandwich if he consumes the last item in the bin he was using and turned to the refrigerator behind him to replace the bin. He slides the older bins closest to him and placed the newest bin in back of the others. This technique meant the customer was getting the freshest produce while not spoiling their inventory. This also reduces the motion from one place to another to get the toppings.  Over Processing: Subway uses simple methods to make the sandwiches. The product undergoes minimum processes since the sandwiches are handmade. This reduces over processing.  Motion: The raw materials are stored at the point of use in bins in the assembly line. They are placed in the order in which the sandwich is prepared creating a standard while mistake proofing the preparation sequence. The amount of the vegetables prepared and the location in the line is based on the popularity of the product. Food is Always a Good Motivator. Page 4 of 10
  • 5. Lean Management Failure of Lean Management: The derailment of a Lean initiative at Environs, a Northern New England company Environs, a Northern New England company is a manufacturing unit which deals in producing pumping components for automotive and industrial concerns worldwide. Opened in 1968, it began making machined parts from steel bar stock at the plant in Northern New England. The company was purchased by Midwestern corporation in 1985, a leader in motion services. This led to its listing on the Newyork Stock Exchange and expansion as well as rapid changes. The Company experienced many good years from 1985 through 2000. This tide, so to speak, changed after 2000, when NNE Co. struggled to satisfy increased customer demand for product units, for the quality thereof, and for rapid delivery. To combat the poor shipping performance and to recoup money lost every day on premium freight costs, the plant manager moved to implement lean manufacturing in 2000. Factors that led to failure:  Resistance to Change: Resistance to changes was a common theme at NNE during the lean implementation from 2000 to 2008. In 2002, the CEO at NNE decided to purchase upgraded automation equipment, even though the fuel product line department had plenty of capacity with existing older equipment. This purchase was expected to reduce both the time for set-ups and the level of mechanical skill needed for set-ups. Nonetheless, these expected improvements met strong resistance from the assigned employees until the older equipment had been removed from the area. The main reason for resistance in the organization for change was: Page 5 of 10
  • 6. Lean Management No Involvement of Employees in Decision Making:- The Company had 12 hr shift, it was learned that the night shift employees resisted change to the new procedures on 1 of the project . The main reason of these resistance was that the night shift employees were not involved in the project , the area experts were entirely left out of the decision making about the changes to be made. No Support/help was provided:-There was nobody during the night shifts who could help the employees if they had any problem with the new procedure (followed in lean management) or other concerns  Lack of Timely Communication: The failure of top management to create, embrace, and communicate a strategic organizational plan, a compelling vision, and purpose and goals about lean manufacturing created a communication gap between leaders and followers at NNE. There were great opportunities here for communication improvement throughout the organization. Even though employees reported instances of good ideas coming from low in the organizational hierarchy, their managers largely ignored those ideas. Timely communication was missing as in some cases the off shift people knew about the project after they came to work and the saw the changes. Resentment from other shifts occurs whenever the lack of communication causes the work to be more difficult to accomplish. “If problems occur on the first shift, they may carry over to the second or third shift. Hence, communication between shifts is critical.  Training and development: Managers at all levels of the organization must participate in the training and must both understand the benefits of lean and have the necessary capacities for its Page 6 of 10
  • 7. Lean Management implementation. To support the organizational transformation to lean, the company should invest in continued mentoring. At NNE, Lean training classes stopped after 2 years, leaving a basic skill gap for newer employees. The employees were not given classroom training on topics such as Company’s Management Philosophy, leadership development, problem solving, safety, etc. The organization did not have a good reporting system so it was a problem. To monitor and maintain both the success of training and the project, itself, team members should develop a good reporting system of numerous key measurements to identify, track, and measure project gains. Lean training classes were stopped after few years leaving a basic skill gap for newer employees.  Loss of Focus & Leadership Vision: “Under the leadership factor, management should have a clear vision, strategic initiatives, a good level of education, and the willingness to support productivity improvement initiatives like Lean manufacturing”. The vision, while clear, must be shared with all in the organization. Initially when the organization implemented lean management there was a steering committee which discussed the regular training that need to be given, the new projects that would be undertaken etc. The group remained active until the plant manager who began the lean implementation was transferred in December 2005. The new plant manager, who was supportive of lean, attended the meetings only occasionally; and therefore, the weekly meetings became less important to committee members. Previously, this lean meeting had been just about the most important hour of the week for committee members, and people were fined if they came late. The lean manager regularly scheduled and attempted to facilitate the meetings, but soon group members stopped attending the meetings. Weekly Page 7 of 10
  • 8. Lean Management meetings have since stopped, there have been no training classes, waste reduction implementations were not being submitted on time, there was no recognition of employees’ accomplishments, and projects were no longer planned.  Project Selection: A best practice for an organization is to prioritize potential projects against clearly identified strategic business objectives. Selection criteria should also be well communicated to team members to ensure adequate time is spent on selected projects. It was reported that the project selection process of the organization was either completed too quickly without sufficient thought or that projects were initiated because they were “pet projects” and biased in their selection process. Managers and line employees differed in their beliefs about the criteria used for determining which projects should be implemented and the level of gains made in those projects  Lack of Accountability / Ownership Lean projects require managers to take responsibility to produce lean results within a specific time frame as well as ownership for the results and there should be follow- up by management and team project members to ensure continuous improvement. Lack of attention to lean manufacturing over several months gave employees the impression that lean is good to do only if they have time; and that if they have other things to do, then it is okay to ignore it. So here in many case the Projects were lost because the managers stop watching. In many cases people will only follow new standard work as long as management watches Page 8 of 10
  • 9. Lean Management  Project Team Selection During the Implementation phase of a lean project, a first step would be to select appropriate team members. Since selected employees for the project help determine its direction, this vital step, when done correctly, will have positive effects on the project, ensuring the proper mix of personnel who will take ownership and responsibility for the sustainable implementation of the project. A standard lean team makeup includes a facilitator, leader, area expert, an observer, plus an occasional maintenance person. It was observed that Instability in the projects is created by not having sufficient personnel to follow the standard-work that has been implemented by the continuous improvement team. An example is that often the standard-work requires that changeovers be completed with a “two-man” set-up. In actual practice this rarely happens after the 30-day follow up has been completed. It was also observed that whenever the project was large, more team members were selected from a pool of employees interested in participating. Since projects were often done with only one area person as a team member, the result was that only one person became familiar with the focus area and able to make key decisions about change  Absence of benchmarking employee satisfaction: The projects should have conformed to at least three criteria for benchmarking: process improvement and simplification, quality improvement, and safer work stations. There was failure to address all the above employee concerns. Page 9 of 10
  • 10. Lean Management  Employee Engagement: The scope and level of employee input in the decision making process were low. The employees at NNE felt disconnected and devalued primarily because the management often predetermined the paths of projects, thus discounting employee engagement in the decision making process. The employees here, did not feel empowered to share their voice in continuous improvement initiatives. Lack of flexibility: The project mainly had four types of employees, viz. facilitator, leader, area expert, observer and an occasional maintenance person. There was lack of flexibility among these employees.  Lack of continued follow-up: The management system did not adequately provide needed follow-up to ensure accountability for sustaining project gains. This laid back attitude on the behalf of the management lead the employees to believe that lean is good to do only if they have time or else it is okay to ignore it. The basic pitfall that happened here was that only the management was accountable to all the changes that were happening in the organization. Had the employees been equally involved from the beginning, the lean approach would have been a success. Page 10 of 10